Calgary ?'56 Project Prioritization -1 Street Range Rd 11 I 8 Street (144 Ave NE to 40 Avenue) 4 lanes Ca algary/ Balzac/Airdrie 84. 00 40 Avenue QEII Interchange Airdrie 68.17 - Highway 1A (Highway 22 to Gleneagles Dr) 4 lanes Cochrane 64.49 QEII (Stoney Trail to Yankee Valley Blvd) 8 lanes Calgary Balzac [Airdrie 63.33 Stoney Trail 11 Street Interchange Calgary 61.33 Crowchild Trail/ 12 Mile Coulee Rd Interchange Calgary I Bearspaw 60.49 Stoney Trail /Airport Trail Interchange Calgary va 59.83 Highway 555 QEII Interchange Balzac 59.17 Highway 1 lGarden Rd Interchange g?fsgr?gm 59.00 Highway Highway 22 Interchange Cochrane 57.50 Presentation to IGA May 16, 2019 15 Study Area (this study) Study Area Study Area do ills 57?. i: (underway now) ??9131 I Hi9? fii '1 Rivej