FY 2016-2021 Proposed Highway Improvement Program - "13' ,5 mumm?wean-game .. i .. - ??fm .10State of Illinois Illinois Department Illinois Department of Transportation of Transporta?hon District 1 Interchange reconstruction and bridge rehabilitation of the Central Avenue Bridge on Interstate 55 in Forest View. District 5 Widening, resurfacing and adding a bi-directional turn lane and modernizing traffic signals on US 136 from National Street to west of Lick Creek in Danville. District 6 Four-lane expressway on Concord Road in Morgan County. District 8 Construction of a pedestrian bridge in O’Fallon. District 8 Replace the Illinois 127 bridge at the Kaskaskia River southwest of Carlyle. Printed by authority of the State of Illinois, 0747-15, 04/15, 20 FY 2016-2021 Proposed Highway Improvement Program Spring 2015 Published by the Illinois Department of Transportation Springfield, Illinois 62764 Printed by authority of State of Illinois, May 2015. This document is printed on recycled paper. This document is available on-line at http://www.idot.illinois.gov/transportation-system/transportationmanagement/transportation-improvement-programs-/multi-modal-transportationimprovement-program/index CONTENTS Page Executive Summary ………………………………………. 1 Program Planning and Development Process.............. 13 Public Review and Comment Form ............................ 24 Glossary .................................................................... 25 Project Listing Index. .................................................. 26 Department of Transportation District Map ................. 27 Guide to Listings ........................................................ 28 EXECUTIVE SUMMARY The State of Illinois faces significant budgetary challenges and will struggle to provide a highquality highway and bridge network in coming years. Funding from previous capital bills is winding down, and the Illinois Department of Transportation’s FY 2016-2021 Proposed Highway Improvement Program totals $8.385 billion and includes a Fiscal Year (FY) 2016 annual program of $1.850 billion. While 83 percent of the state maintained highway system mileage and 93 percent of our bridges are in acceptable condition today, based on the latest available data, in FY 2017 and beyond, annual program levels will decline significantly. Without action, IDOT estimates a significant decline in system condition. By FY 2021, the percentage of state maintained highway system mileage in acceptable condition will drop by 21 percent, and only 86 percent of our bridges will be in acceptable condition. 7000 3.5 6000 3 5000 2.5 4000 2 3000 1.5 2000 1 1000 0.5 0 $ Billions Miles/Bridges in Backlog Condition Annual Program vs Condition of State System 0 2021 (Est) 2020 (Est) 2019 (Est) 2018 (Est) 2017 (Est) 2016 (Est) 2015 Annual 2014 2013 2012 2011 Bridges 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 Backlog Miles IDOT’s revenue projections do not provide much hope moving forward. On the federal end, the Highway Trust Fund’s health is in serious doubt, and infusions of general funds have been required to keep it functioning. IDOT anticipates declining Motor Fuel Tax revenue collections, resuming a long running trend, and Motor Vehicle Registration fees for highway use are expected to remain stagnant. 1 Revenue ($ millions) $1,600 $1,400 $1,200 $1,000 $800 $600 $400 $200 $ 2004 2005 2006 2007 2008 2009 Motor Fuel Tax 2010 2011 2012 2013 2014 Vehicle Registration As a result of several recent capital bond programs, IDOT was able to improve the deteriorating condition of state roads and bridges. In the development of this proposed highway improvement program, maintaining the system of roads and bridges under state jurisdiction is the primary priority. The majority of funds are allocated to projects that improve the condition of Illinois roads and bridges. A concerted effort is being made to address the bridge system condition goal and to keep roadways as safe and well-maintained as possible. IDOT has identified four vital elements for the state highway system with roadway safety as an over-arching goal. These vital elements are: • System Maintenance: reconstruction, resurfacing/widening and safety projects. • Bridge Maintenance: bridge replacement and rehabilitation projects and minor structure repairs. • Congestion Mitigation: major projects that reduce traffic congestion in urban areas and other improvements that improve traffic flow. • System Expansion: new roads and other projects that increase access and promote economic development. 2 The FY 2016-2021 Proposed Highway Improvement Program will: • Provide funding to maintain 1,431 miles of highways and replace or rehabilitate 357 bridges. • Provide for reinvestment in downstate Illinois for interstate highways such as Interstate 70 from the abandoned railroad bridge at Altamont to the Little Wabash River west of Effingham and Interstate 57 from the Jefferson County line to 0.5 miles north of Cross Road in Marion County. • Provide $426 million for local benefits programs to help cities, counties and townships improve local roads and support economic development. • Provide funding for railroad crossing safety improvements throughout the state. • Enhance highway safety as part of IDOT’s regular highway improvement program by targeting specific fatal and severe crash locations and addressing statewide safety concerns. The following $8.385 billion program outline for FY 2016-2021 is IDOT’s six-year plan. IDOT will publish the final annual program for FY 2016 later this summer. FY 2016-2021 Program Funding The $8.385 billion highway improvement program for FY 2016-2021 includes $5.236 billion for improvements to the state highway system with $3.149 billion available for the local highway system. This available funding for local system projects is over and above regular state motor fuel tax allotments made directly to local governments. FY 2016-2021 PROGRAM DISTRIBUTION ($Billions) Program Distribution State Highways Local Roads and Streets Total FY 2016 1.218 0.632 1.850 3 Total FY 2016-2021 5.236 3.149 8.385 Average Annual FY 2016-2021 0.873 0.525 1.398 FY 2016-2021 Program Distribution $Billions Local Roads $3.149 38% State Highways $5.236 62% Federal Funding Federal highway and highway safety programs are currently authorized under a bill commonly referred to as MAP-21 (Moving Ahead for Progress in the 21st Century). MAP-21 was signed into law in July 2012 and expired in September 2014. However, the Highway and Transportation Funding Act of 2014 extended authorizing authority and authority to expend funds from the Highway Trust Fund through an eight-month law that expires on May 31, 2015. MAP-21 did not include any earmarks and there were no built in rescissions (the reclaiming of unobligated apportionments). Furthermore, MAP-21 did not provide the Highway Trust Fund “funding guarantees” found in previous transportation authorization bills such as SAFETEA-LU and TEA-21. Although MAP-21 was “fully funded” through Federal Fiscal Year (FFY) 2014, the bill did not address the long-term disparity between federal HTF receipts and highway/transit outlays. Currently, national outlays from the HTF exceed revenues by $14 to $15 billion annually and the solvency of the HTF has only been maintained through nearly $65 billion in General Revenue fund transfers since FFY 2008. Because MAP-21 included no earmarks, MAP-21 apportioned over 92 percent of available funding to the formula programs. In contrast SAFETEA-LU only apportioned 83 percent of available funding to the apportioned programs. Overall, MAP-21 provided an emphasis on the National Highway System, restructured and consolidated many highway and transit programs, streamlined project delivery, emphasized performance-based metrics and focused on improving the nation’s freight movement system. 4 The State of Illinois highway funding fared well under MAP-21. The Illinois formula share of federal funds distributed increased to 3.67 percent of the national total from 3.3 percent under SAFETEA-LU. MAP-21 provided Illinois with its highest share of formula funding since 1997. Illinois now ranks 6th nationally in highway funding, up from 7th place previously. MAP-21 also made significant policy changes, some which require the development of performance measures that reflect more than just the condition of a facility; they include the need to examine expected socio-economic benefits related to potential major construction projects as well. IDOT will continue work on further development of such performance measures during the development of the next Long Range Transportation Plan. The current six-year estimate for federal highway funding is $7.496 billion based on anticipated apportionments and allocations at levels established in MAP-21. Federal funds available during the six-year program are estimated since they encompass a period of six-years of future federal funding and are subject to annual Congressional budget approval. For planning purposes, each fiscal year component of this MYP assumes federal formula funding at estimated apportionments. Because MAP-21 has expired and because of the solvency issues associated with the HTF, the program reasonably assumes a decreasing obligation authority ratio for program development ranging from 97 percent of estimated federal apportionments for FY 2016 to 87 percent for FY 2021. These assumptions provide a conservative projection of available funding with the recognition of significant funding issues at the federal level. Actual obligation authority has historically been slightly above 90 percent. The following table and chart summarize program funding for FY 2016-2021. FY 2016-2021 PROGRAM FUNDING ($Billions) Fund Source Federal Aid State Funds Local Funds Total FY 2016 1.344 0.405 0.101 1.850 5 Total FY 2016-2021 7.496 0.352 0.537 8.385 Average Annual FY 2016-2021 1.249 0.059 0.090 1.398 FY 2016-2021 Program Fund Sources $ Billions State Funds $0.352 4% Local Funds $0.537 7% Federal Aid $7.496 89% Funding for State Projects State funds for this highway program are primarily generated from motor fuel taxes and motor vehicle registration fees. The $352 million in state funds are utilized for a variety of purposes in program development. The $5.236 billion state highway system program continues emphasis on maintaining the existing state road and bridge system while also providing funding for needed congestion mitigation and system expansion projects. The proposed six-year program will maintain 1,431 miles of highways and replace or rehabilitate 357 bridges. Anticipated accomplishments for the FY 2016-2021 program are summarized in the following table. 6 FY 2016-2021 PROGRAM ACCOMPLISHMENTS STATE HIGHWAY SYSTEM System Maintenance Interstate (miles) Non-Interstate (miles) Safety Locations (number) Bridge Maintenance Interstate (number) Non-Interstate (number) New Bridges (number) Minor Structural Repairs (number) Congestion Mitigation Roads (miles) Traffic Improvements (number) System Expansion Roads (miles) Locations (number) 276 1,155 43 120 237 23 433 30 126 25 0 The FY 2016-2021 state program can be summarized by four major priorities: • System Maintenance: $2.292 billion is scheduled for reconstruction, resurfacing/widening and safety projects. This includes $473 million for Interstate resurfacing projects and $409 million for safety improvements. • Bridge Maintenance: $1.492 billion is scheduled to address bridge needs. • Congestion Mitigation: $1.019 billion is scheduled to address traffic congestion. This includes $421 million for construction of the new Interstate 74 bridge over the Mississippi River and connecting roadways in the Quad Cities. • System Expansion: $433 million is scheduled to build new roads to increase access and to encourage economic development. The distribution of these major priorities can be seen in the following pie chart. About 72 percent of the state program is allocated to maintaining Illinois roads and bridges. The remaining 28 percent is for needed congestion mitigation and system expansion projects. 7 FY 2016-2021 State Program Distribution $ Billions System Maintenance $2.292 44% Bridge Maintenance $1.492 29% Congestion Mitigation $1.019 19% System Expansion $0.433 8% System Performance and Needs Before the implementation of American Recovery and Reinvestment Act (ARRA) and the Jump Start Capital Plan/Accelerated Construction Program in 2009 and 2010, state roads were deteriorating quickly with little potential for system condition improvement. The backlog of roads and bridges in need of repair was increasing significantly. However, as a result of the additional funding, the department was able to temporarily improve the deteriorating condition of state roads and bridges, as noted in the bar chart on the following page. The rate of deterioration of roads and bridges was also temporarily slowed. However, one-time infusions of federal funds and bond programs are both non-sustainable revenue sources. Although the funding made available is welcome, there are also significant negative economic, performance and planning issues associated with such ‘boom and bust’ program cycles. As can be seen in the bar chart, the short-term infusion of funding made immediate improvements, but did not address the backlog growth of deterioration. A second example of the same effect is shown in the bar chart at FY 2014, when another infusion of bonds made an impact, but the next year the upward trend of needs resumed. The backlog of state miles that need improvement is rapidly growing and is expected to significantly grow during this proposed highway improvement program. Based on the latest available data, 83 percent of state-maintained highway system mileage is acceptable. In addition, 93 percent of state-maintained structures are in acceptable condition. Safely maintaining the system of roads and bridges under state jurisdiction is the primary priority in the development of this highway improvement program. The vast majority of funds are allocated to projects that improve the condition of Illinois roads and bridges. A concerted effort was made to maintain the department’s bridge system condition and to keep roadways as safe and wellmaintained as possible. However, given the current economic and budget pressures in Illinois, the considerable needs for funding for other transportation modes, and the expected uptick of 8 system condition needs, the department will not be able to maintain the current levels of acceptable condition on the state highway system. IDOT-maintained bridges are anticipated to be 86 percent acceptable at the end of FY 2021. In order to achieve this level, IDOTmaintained mileage is expected to drop to 62 percent acceptable at the end of FY 2021. Note that the predicted condition for roads and bridges is basically the same as the previous MYP. Based on these expected condition levels, it is estimated that an additional 4,650 miles and 590 bridges are needed to return to the 90/93 performance goals for roads and bridges, respectively. The estimated cost of the additional need is approximately $7 billion. Performance Metrics and System Condition The department, through the Office of Planning and Programming, conducts a Condition Rating Survey (CRS) to assess pavement condition on the approximately 16,000-mile state highway system. The CRS is an important tool to assist the department with its pavement management activities. The CRS value, a measure of the predominant distresses for a pavement section, indicates the current condition of the pavement. The CRS serves several functions. It is a factor in highway program development, it provides an opportunity to review the highway network, it provides overall condition of the state highway system, it gives input to the legislative/budgeting process and it allows calculation of pavement needs. The department began CRS in 1974. The CRS is conducted annually on alternating halves of the state, with data collected on the interstates every year. 9 The CRS value is a rating on a scale from 1.0 to 9.0 where 1.0 represents a completely failed pavement and 9.0 represents a pavement in its best/new condition. Pavements in Excellent condition fall into the range of 9.0 to 7.6. Pavements in Good condition are in the range of 7.5 to 6.1. Pavements in Fair condition range from 6.0 to 4.6 and pavements in Poor condition range from 4.5 to 1.0. The CRS value assigned to a pavement section, together with the average daily traffic the roadway carries and its functional importance, are used to prioritize roadway deficiencies or needs. The general need categories used by the department are Backlog, Accruing and Adequate. Backlog means that pavement condition has deteriorated to the level where an improvement is recommended now. If the improvement is delayed, the ultimate cost would be much higher. Accruing means that pavement condition is expected to deteriorate to Backlog condition within the highway program timeframe. Adequate means that pavement condition is not expected to deteriorate to Backlog condition within the highway program timeframe. The Acceptable percentage is the ratio of the Accruing plus Adequate mileage to the total highway mileage. The department manages the state bridge system using a wide-ranging process that incorporates inspection and inventory data, needs analysis and funding allocation methods in order to maximize efficient use of available funds and address the defined system condition goal. The national Bridge Inspection Program (NBIP) was developed by the Federal Highway Administration (FHWA) as a result of the Federal-Aid Highway Act of 1968, which requires the inventory and inspection of the nation’s bridges. Federal regulations established the requirements for inspection procedures, frequency of inspections, qualifications of personnel, inspection reports and preparation and maintenance of a state bridge inventory for bridges greater than 20.0 feet in length. Bridge needs in Illinois are identified through the use of current inspection and inventory data. Bridge program management requires the use of a reliable method for assessing bridge needs and a uniform approach to prioritization and project selection. The department evaluates bridges and groups them into four categories: Backlog, Short-term Accruing, Long-term Accruing, and Adequate condition. Initially, each bridge is examined by using the structure inspection rating and appraisal data and other criteria such as accident data, load limits, route, and traffic volume. The timely and accurate assessment of bridge condition is critical to the identification, selection and prioritization of bridge needs in the programming process. The bridge management system used by the department to analyze and monitor bridge deficiencies and improvement programs on a statewide basis provides a logical and uniform approach to prioritizing bridge needs for repair, rehabilitation and replacement. For each program development cycle, the bridge inventory is reevaluated for additional candidate bridges for inclusion in the multi-year and annual programs and to verify changes in the condition and status of the bridges that were included in the previous MYP. This information is not all-inclusive with respect to how projects are selected or prioritized, but it does provide some insight into the department’s program development process. The project lists for this program show a significant amount of information that is used to identify and select System Maintenance and Bridge Maintenance projects. For System Maintenance projects, some of the information includes Needs Category, International Roughness Index (IRI), Average Daily Traffic (ADT) and others. The Needs Category is divided into three subcategories: Backlog, Accruing and Adequate, as explained previously. The IRI information is generally indicative of how rough a roadway is and also divided into three subcategories: Not 10 Acceptable, Acceptable and Good. The ADT information indicates the number of vehicles the roadway experiences on a daily average. For Bridge Maintenance projects, additional information includes ADT, structure status and others. Structure status is similar to the Needs Category information for roads, with additional information regarding whether the need is structural or functional. For both roads and bridges, it is indicated if the road or structure is included in the National Highway System (NHS). This information becomes more and more important as federal highway authorizations place more and more emphasis on the condition and performance of the NHS as a performance metric for the States. The following bar charts compare historical backlog needs for IDOT-maintained roads and bridges beginning in 1998 with estimated backlog needs through the FY 2016-2021 program timeframe. 1,727 1,969 2,426 2,814 1,725 2,051 2,145 2,314 1,879 1,462 1,425 1,670 2,021 1,993 1,784 1,505 Estimates Based on FY 2016-2021 Proposed Highway Improvement Program 2,762 3,167 3,542 4,214 4,780 4,969 5,622 6,151 Backlog Miles on IDOT Jurisdiction Roads 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 (Est) (Est) (Est) 11 881 693 641 595 556 581 637 707 762 749 687 643 599 607 650 582 599 695 791 912 968 1,058 1,156 1,067 Backlog Bridges on IDOT Jurisdiction Roads Estimates Based on FY 2016-2021 Proposed Highway Improvement Program 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 (Est) (Est) (Est) 12 ILLINOIS DEPARTMENT OF TRANSPORTATION HIGHWAY PROGRAM PLANNING AND DEVELOPMENT PROCESS Program Objectives    Preserve and maintain the existing highway system of roads and bridges. Upgrade existing facilities for congestion mitigation and safety improvements. Expand the system to enhance economic development. Program Planning    Estimate revenues from federal and state sources. Deduct costs for administration, maintenance and operations, certain other state agency operations and bond debt service to determine available funds. Determine the annual amount as well as the multi-year period. Assess highway needs for preservation, increased capacity and expansion of the highway system. • • • Assess physical condition of the highway system, including bridges, using technical data and processes. Identify crash locations and safety needs. Identify needed additional capacity improvements on existing roads and new major arterials to relieve congestion and enhance economic development.  The pavement and structural condition ratings, the type and volume of traffic being served, the functional importance of the route, accident history, geometrics and public input are considered in developing proposed projects.  Funding targets and technical guidelines are issued to the Illinois Department of Transportation’s (IDOT) nine highway districts to develop, prioritize and submit projects for inclusion in the Multi-Year Program (MYP). This guarantees statewide consistency in the overall level of service and ensures that each district is achieving the overall objectives of IDOT.  Engineering, land acquisition, utility adjustments and construction are scheduled for each project as needed.  The anticipated fiscal year for construction is dependent on the status of preconstruction activities and availability of resources.  An annual element is identified that forms the basis of the proposed highway improvement program for the upcoming fiscal year.  The program is reviewed and announced on approval of the Governor. The published MYP is a highway improvement program developed by engineers using technical data. It is presented to the General Assembly and the public for review and discussion during the appropriation process. 13 Major Project Highlights The following major projects are tentatively scheduled during FY 2016-2021. Northeastern Illinois • Interstate 55 (Inbound) (Stevenson Expressway) from Interstate 94 (Dan Ryan Expressway) to US 41 (Lake Shore Drive) in Chicago. Bridge replacements, reconstruction of 1.8 miles, lighting, changeable message signs, retaining wall, land acquisition, engineering for contract plans, construction engineering, landscaping, and a railroad flagger are programmed during FY 2016-2021 at an estimated cost of $76.4 million. Of this total, $71.1 million is included in FY 2016 for the replacement of three structures, reconstruction of 1.8 miles, lighting, installation of changeable message signs, a retaining wall, construction engineering, engineering for contract plans, land acquisition and a railroad flagger. This project has been approved for Illinois Major Bridge Program funding. • Interstate 55 from Illinois 129 to Lorenzo Road and Interstate 55 Frontage Roads from Kavanaugh Road to Lorenzo Road in Will County. Interchange reconstruction, bridge replacement, reconstruction of 8.1 miles, widening and resurfacing on 2.5 miles, addition of auxiliary lanes, construction engineering, engineering for contract plans, land acquisition and utility adjustments are programmed during FY 2017-2021 at an estimated cost of $144.7 million. • Interstate 55 (Stevenson Expressway) from Weber Road to Willow Springs Road in Will County. Resurfacing on 14.6 miles, bridge deck repairs, bridge joint repair and construction engineering are programmed during FY 2017-2021 at an estimated cost of $57 million. • Interstate 80 from Ridge Road to US 30 (Lincoln Highway) in Joliet, New Lenox and Minooka. Bridge superstructure, bridge replacements, substructure widening, new bridge decks, bridge widening, reconstruction of 2.8 miles, bridge rehabilitation, land acquisition and engineering for contract plans, utility adjustments and railroad flaggers are programmed during FY 2016-2021 at an estimated cost of $82.6 million. Of this total, $500,000 is included in FY 2016 for engineering for contract plans. • Interstate 90/190 (Kennedy Expressway) at Cumberland Avenue (Cumberland Flyover) in Chicago. Resurfacing on 0.5 mile, drainage improvements, lighting, new signing, new construction, reconstruction, retaining walls and construction engineering are included in FY 2016 at an estimated cost of $13.3 million. Provides for efficient freight movement. • Interstate 90/94 at Interstate 290/Congress Parkway (Jane Byrne Interchange) in Chicago. Interchange reconstruction, reconstruction, retaining walls, bridge superstructure, bridge replacement, bridge rehabilitation, lighting, noise barriers, water main, landscaping, miscellaneous work, construction engineering and engineering for contract plans are programmed during FY 2016-2021 at an estimated cost of $351 million. Of this total, $9.7 million is included in FY 2016 for construction engineering, engineering for contract plans and miscellaneous work. The I-90/94 and I-290 Jane Byrne Interchange in downtown Chicago is one of the worst bottlenecks in the country for traffic congestion. The Jane Byrne Interchange links the Dan Ryan Expressway (I-90/94) to the south, the Eisenhower Expressway (I-290) to the west, Congress Parkway to the east and the Kennedy Expressway (I-90/94) to the north. The interchange is congested for many hours of the day causing substantial backups in every direction. Provides for efficient freight movement. 14 • Interstate 290 (Eisenhower Expressway) at Salt Creek in Addison. Bridge replacement, utility adjustments, engineering for contract plans and construction engineering are programmed during FY 2017-2021 at an estimated cost of $22.1 million. This project has been approved for Illinois Major Bridge Program funding. • Interstate 290/Illinois 110 (Eisenhower Expressway) at Des Plaines River in Forest Park. A pump station, engineering for contract plans and construction engineering are programmed during FY 2017-2021 at an estimated cost of $36.1 million. • US 20 at Illinois 31 in Elgin. Bridge replacement, land acquisition and engineering for contract plans are programmed during FY 2017-2021 at an estimated cost of $10.3 million. • Illinois 21 (Milwaukee Avenue) from north of Sanders Road to south of Euclid Avenue in Glenview. Intersection improvement, reconstruction, traffic signal modernization, signal timing, land acquisition, engineering for right-of-way and construction engineering are programmed during FY 2017-2021 at an estimated cost of $12.2 million. • Illinois 22 (Half Day Road) from Quentin Road to west of Illinois 83 (Mundelein Road) in Kildeer and Long Grove. Additional lanes for 3.5 miles, retaining wall, culvert replacement, engineering for contract plans, construction engineering, land acquisition and utility adjustments are programmed during FY 2017-2021 at an estimated cost of $52 million. Provides for efficient freight movement. • Illinois 43 (Harlem Avenue) over US 12/20 (95th Street) 0.6 mile north of Interstate 294 (Tri-State Tollway) in Bridgeview. Bridge rehabilitation, bridge widening, interchange reconstruction, land acquisition, a pump station, engineering for contract plans, construction engineering, lighting, a railroad flagger and utility adjustments are programmed during FY 2016-2021 at an estimated cost of $20.5 million. Of this total, $750,000 is included in FY 2016 for engineering for contract plans. Provides for efficient freight movement. • Illinois 43 (Harlem Avenue) from 63rd Street to BRC Railroad (65th Street) in Bedford Park and Chicago. A railroad grade separation, land acquisition, engineering for design, location and environmental studies, engineering for contract plans and construction engineering are programmed during FY 2016-2021 at an estimated cost of $24.7 million. Of this total, $2.5 million is included in FY 2016 for engineering for design, location and environmental studies. • Illinois 47 at Kishwaukee River in McHenry County. Bridge replacement is programmed during FY 2017-2021 at an estimated cost of $6.5 million. • Illinois 53 at Illinois 56 (Butterfield Road) in DuPage County. Intersection reconstruction, engineering for contract plans, land acquisition and utility adjustments are programmed during FY 2016-2021 at an estimated cost of $25 million. Of this total, $2.1 million is included in FY 2016 for engineering for contract plans. Provides for efficient freight movement. • Illinois 390 (Elgin O’Hare Expressway) from Interstate 290/Illinois 53 to O’Hare Western Bypass. Land Acquisition is programmed during FY 2016 at an estimated cost of $22 million. These are SAFETEA-LU Projects of National and Regional Significance. SAFETEA-LU provided a total of $140 million for these projects. 15 • Willow Road from East of Des Plaines River to Culligan Parkway in Prospect Heights and Glenview. Reconstruction of nearly 1 mile, intersection improvement, noise barriers, land acquisition, engineering for contract plans, construction engineering and lighting are programmed during FY 2016-2021 at an estimated cost of $19.6 million. Of this total, $500,000 is included in FY 2016 for engineering for contract plans. • Wood Street from north of the Little Calumet River to south of US 6 (159th Street) in Harvey, Dixmoor, Riverdale and Blue Island. Additional lanes for 3.7 miles, bridge repair, construction engineering, utility adjustments and a railroad flagger are programmed during FY 2017-2021 at an estimated cost of $53.9 million. Provides for efficient freight movement. Downstate Illinois • Interstate 74/US 6 (new bridge) over the Mississippi River in Moline. Iowa is the lead agency on the project and Illinois will be reimbursing Iowa as projects are let for construction and work is completed. The Central Section of the new bridge will be split into 11 primary construction contracts: two contracts for the river bridge, three contracts on the Illinois side and six contracts on the Iowa side. The reimbursement to Iowa for the Central Section for construction of the new bridges across the Mississippi River including lighting and construction engineering are programmed during FY 2017-2021 at a cost of $200 million. On the Illinois side, 5 miles of additional lanes, a new bridge, bridge replacements, reconstruction, retaining walls, construction engineering, building demolition and utility adjustments for connecting the Mississippi River to the existing Interstate 74 alignment are programmed during FY 2017-2021 at a cost of $221.3 million. There is an additional $800,000 programmed during FY 2017-2021 for rehabilitation of the existing bridges in order to keep them serviceable until the new bridge is open to traffic. Provides for efficient freight movement. • Interstate 80 from 0.8 mile north of Illinois 5/Illinois 92 in Rock Island County to the Iowa Interstate Railroad 1.7 miles north of US 6 in Henry County. Resurfacing on 2.5 miles and reconstruction for a new vertical alignment over the Burlington Northern Santa Fe Railroad; a bridge replacement over Barstow Road south of Illinois 5/Illinois 92; a bridge replacement over the Green River north of US 6 and bridge joint repair over Cleveland Road and the Iowa Interstate Railroad north of US 6 are programmed in FY 2016 at a cost of $30.8 million. • Interstate 88/Illinois 110 from 0.1 mile east of Sand Road to 0.6 mile west of Illinois 78 in Whiteside County. Resurfacing and patching on 8.6 miles and ramp repairs at Albany Road are programmed during FY 2017-2021 at a cost of $14.5 million. • Interstate 280 at the Mississippi River southwest of Rock Island in Rock Island County. New bridge decks, bridge rehabilitation and engineering for contract plans are programmed during FY 2017-2021 at a cost of $28.2 million. Of this total, engineering for contract plans is programmed in FY 2016 at a cost of $2.2 million. 16 • US 20 from Logemann Road to 0.2 mile west of Rush Street in Stockton. Resurfacing on 1 mile, reconstruction of 2.7 miles, a bridge replacement, horizontal and vertical realignments, shoulder repair, culvert removals and replacements, land acquisition and utility adjustments are programmed during FY 2017-2021 at a cost of $23.4 million. Of this total, land acquisition is programmed in FY 2016 at a cost of $1.0 million. • US 20 (Rockford Bypass) from Simpson Road to Rock River and Illinois 2 from south of Southrock Drive to south of US 20 Interchange in Rockford. Interchange reconstruction including a bridge replacement, reconstruction on 1.9 miles and land acquisition are programmed during FY 2017-2021 at a cost of $17.4 million. Provides for efficient freight movement. • US 52/Illinois 64 over the Mississippi River and the Burlington Northern Santa Fe Railroad in Savanna. A bridge replacement, 0.6 mile of reconstruction, construction engineering and utility adjustments are programmed during FY 2016-2021 at a cost of $79.1 million. Of this total, a bridge replacement, reconstruction, construction engineering and utility adjustments are programmed in FY 2016 at a cost of $78.6 million. Illinois is the lead agency for this project with Iowa sharing equally in the costs. This project has been approved for Illinois Major Bridge Program funding. • Interstate 55 from 1.7 miles south of Illinois 116 to 4.2 miles north of Illinois 23 in Pontiac. Resurfacing on 9.7 miles, patching, bridge deck repair, culvert repair and underdrains are programmed during FY 2017-2021 at a cost of $27.3 million. • Interstate 57 from 0.7 mile north of the Iroquois County line to south of the Illinois 50 Interchange in Bourbonnais. Resurfacing on 11.6 miles, patching, bridge repair, culvert repair and a new bridge deck under Waldron Road at Kankakee and a bridge replacement, bridge approach spans and bridge approach roadway under North Street 2 miles north of Illinois 17 in Bradley are programmed during FY 2017-2021 at a cost of $41.5 million. Also included within this section is engineering for contract plans from 0.9 mile north of the Illinois 17 to south of Waldron Road programmed during FY 2017-2021 at a cost of $3 million. • US 34 from east of Eldamain Road to Center Parkway in Yorkville. Reconstruction and additional lanes for 2.1 miles, a bridge replacement, culvert extension, land acquisition and construction engineering are programmed during FY 2016-2021 at a cost of $22 million. Of this total, land acquisition is programmed in FY 2016 at a cost of $2.5 million. SAFETEA-LU provided NCII funding for this project. Provides for efficient freight movement. • Illinois 89 over the Illinois River at Spring Valley in Putnam and Bureau Counties. A bridge replacement and construction engineering are programmed in FY 2016 at a cost of $29.5 million. This project has been approved for Illinois Major Bridge Program funding. • Illinois 178 over the Illinois River south of Utica. A bridge replacement, land acquisition, utility adjustments and construction engineering are programmed during FY 2016-2021 at a cost of $26.7 million. Of this total, land acquisition and utility adjustments are programmed in FY 2016 at a cost of $150,000. This project has been approved for Illinois Major Bridge Program funding. • Interstate 74 from Tazewell County line to McLean County line in Woodford County. Rubblization with an overlay on 9.2 miles and construction engineering are programmed during FY 2017-2021 at a cost of $38.6 million. 17 • Interstate 474/US 24 at the Illinois River in Peoria County. Bridge painting and construction engineering are programmed during FY 2017-2021 at a cost of $15.6 million. This project has been approved for Illinois Major Bridge Program funding. • US 67/Illinois 135 from Illinois 135/Alexis Road to US 34 in Monmouth. Resurfacing and new shoulders on 4.6 miles, from Alexis Road to 270th Avenue, widening and resurfacing and new shoulders on 6.9 miles from 270th Avenue to US 34, land acquisition and engineering for contract plans are programmed during FY 2016-2021 at a cost of $16.2 million. Of this total, engineering for contract plans is programmed in FY 2016 at a cost of $200,000. • US 150 (War Memorial Drive) eastbound over the Illinois River. A bridge replacement, engineering for contract plans, land acquisition, utility adjustments, construction engineering and railroad flagger are programmed during FY 2016-2021 at a cost of $196.6 million. Of this total, engineering for contract plans is programmed in FY 2016 at a cost of $8.5 million. This project has been approved for Illinois Major Bridge Program funding. • Illinois 8/Illinois 116 (Cedar Street Extension) over Peoria & Pekin Union Railway in East Peoria. A bridge replacement, interchange reconstruction, railroad flagger, land acquisition, engineering for location, environmental and design studies, engineering for contract plans, construction engineering, utility adjustments and hazardous material mitigation are programmed during FY 2016-2021 at a cost of $32.2 million. Of this total, engineering for location, environmental and design studies is programmed in FY 2016 at a cost of $1.5 million. This project has been approved for Illinois Major Bridge Program funding. • Farmington Road over Kickapoo Creek and at Kickapoo Creek Road west of Peoria. A bridge replacement, bridge approach roadway, horizontal realignment for 0.5 mile, intersection reconstruction and land acquisition are programmed during FY 2016-2021 at a cost of $13.9 million. Of this total, land acquisition is programmed in FY 2016 at a cost of $300,000. Provides for efficient freight movement. • Interstate 55 from south of Lexington to Livingston County line in McLean County. Resurfacing on 10.1 miles, ramp repairs and bridge repair are programmed during FY 2017-2021 at a cost of $17.2 million. • Interstate 57 from Sadorus Road to 1 mile south of Interstate 74 in Champaign. Resurfacing on 12.1 miles, ramp repairs and bridge deck repair are programmed in FY 2016 at a cost of $15.1 million. • Interstate 57 under Mattis Avenue, Interstate 74 under Mattis Avenue and Interstate 57 under US 150 northwest of Champaign. Bridge replacements, land acquisition, utility adjustments and construction engineering are programmed during FY 2017-2021 at a cost of $28.6 million. These projects have been approved for Illinois Major Bridge Program funding. • Interstate 74 from US 150 west of Danville to Middle Fork Vermilion River in Danville. Reconstruction on 5.8 miles is programmed during FY 2017-2021 at a cost of $23.0 million. 18 • Interstate 74 at Salt Fork Vermilion River west of Danville in Vermilion County. Bridge rehabilitation and construction engineering are programmed during FY 2017-2021 at a cost of $18 million. This project has been approved for Illinois Major Bridge Program funding. • US 150/Illinois 1 from US 36 to 0.5 mile south of Gibson Road south of Paris. Resurfacing on 16.7 miles, cold milling, pedestrian ramps/ADA, guardrails and bridge deck overlays at Brouilletts Creek and South Fork Brouilletts Creek are programmed during FY 2016-2021 at a cost of $5.1 million. Of this total, resurfacing for 10.2 miles and guardrail from US 36 to Moss Road and bridge deck overlays at Brouilletts Creek and South Fork Brouilletts Creek are programmed in FY 2016 at a cost of $2.7 million. • Interstate 55 from 0.6 miles north of Illinois 108 to 0.7 miles south of County Highway 17 at Farmersville in Montgomery County. Resurfacing on 10.2 miles, bridge repair, bridge joint repair, ditch cleaning and rip rap are programmed during FY 2017-2021 at a cost of $18.6 million. • Interstate 55 and Interstate 72 additional lanes, reconstruction and interchange reconstruction around Springfield. Engineering for contract plans for the reconstruction of the mainline pavement, interchange reconstruction and additional lanes in each direction on Interstate 55 from south of the 6th Street Interchange to the Sherman Interchange, on Interstate 72 from Illinois 4 to Interstate 55 south of Springfield and on Interstate 72 from Interstate 55 east of Springfield to Old US 36 are programmed during FY 2017-2021 at an estimated cost of $25 million. Phase I engineering for location, environmental and design studies is under way and is expected to be completed by FY 2017. The total unfunded cost for construction, construction engineering, land acquisition and utility adjustments for the project is estimated to range between $600-$650 million including $33 million for major work needed prior to the interstate work on Interstate 55 Business/6th Street from Interstate 72 to Stanford Avenue and an intersection improvement at Sangamon Avenue and Dirksen Parkway. • Interstate 55/Interstate 55 Business from 1.2 miles south of Interstate 55 Business to 0.3 miles north of Illinois 10 west of Lincoln on Interstate 55 and on Interstate 55 Business from 900th Avenue to south of 1056 Avenue in Logan County. Resurfacing on 6.6 miles and bridge joint repair are programmed during FY 2017-2021 at a cost of $14 million. • Interstate 72/US 36 from 0.7 miles east of Matson Road to 0.5 mile west of the New Berlin Interchange in Morgan and Sangamon Counties. Resurfacing on 9.7 miles, bridge repair, bridge substructure, bridge joint repair, slopewall repair and bridge approach roadway are programmed in FY 2016 at a cost of $18 million. • US 54 over the Mississippi River Bridge at Louisiana, Missouri in Pike County. A bridge replacement and engineering for contract plans are programmed during FY 2016-2021 at a cost of $30.8 million. Of this total, engineering for contract plans is programmed in FY 2016 at a cost of $750,000. Missouri is the lead agency for this project with Illinois sharing equally in the costs. This project has been approved for Illinois Major Bridge Program funding. • Interstate 57 from Marion County Line to Clay County Line in Fayette County. Resurfacing on 8.5 miles, ramp repair at Farina interchange, bridge deck repair, bridge joint repair and rip rap are programmed in FY 2016 at a cost of $17 million. 19 • Interstate 70 from abandoned railroad bridge at Altamont to Little Wabash River west of Effingham. Rubblization with an overlay on 9.1 miles, ramp repair at Altamont interchange, bridge joint repair, bridge deck repair, bridge repair, rip rap and wing wall repair are programmed during FY 2017-2021 at a cost of $34.1 million. • Interstate 70 from Township Road 258 2.1 miles east of US 45 Interchange to Cumberland County line in Effingham County. Rubblization with an overlay on 7.1 miles, a bridge new deck, bridge repair, culvert rehabilitation and repair and bridge deck repair are programmed during FY 2017-2021 at a cost of $28.1 million. • US 50 over Little Muddy Creek 0.8 mile west of the Richland County line and Big Muddy Creek at the Clay County line. Bridge replacements are programmed during FY 2017-2021 at a cost of $17.3 million. These projects have been approved for Illinois Major Bridge Program funding. • US 51 over the Sangamon River 1 mile south of Harristown (northbound and southbound). A bridge superstructure replacement is programmed during FY 2016 at a cost of $17 million. This project has been approved for Illinois Major Bridge Program funding. • Illinois 1 at Embarras River Overflow 0.5 miles north of US 50 and at Embarras River Overflow 1.0 miles north of US 50. Bridge replacements are programmed during FY 2017-2021 at a cost of $13.4 million. These projects have been approved for Illinois Major Bridge Program funding. • Interstate 55/Interstate 64/US 40 at Poplar Street Bridge and Illinois Approach in St. Clair County. Bridge widening, bridge deck overlay, bridge repair and bridge joint repair are programmed in FY 2016 at a cost of $25.1 million. This is the department’s participation in the project in which Missouri is the lead agency. Provides for efficient movement. • Interstate 55/Interstate 64/US 40 at Poplar Street Collector Distributor (westbound) 0.1 mile east and 0.8 miles east of Poplar Street Bridge in St. Clair County. Engineering for design, location and environmental studies, engineering for contract plans, engineering for bridge inspection, bridge deck overlay and pier repair are programmed during FY 2016-2021 at a cost of $31.2 million. Of this total, engineering for design, location and environmental studies, engineering for contract plans and engineering for bridge inspection is programmed in FY 2016 at a cost of $2 million. Provides for efficient movement. • Interstate 57 from Jefferson County line to 0.5 miles north of Cross Road in Marion County. Resurfacing on 9.5 miles, ramp repairs at Illinois 161 interchange, bridge deck repair, bridge joint repair, bridge approach roadway, bridge deck sealing and rip rap are programmed during FY 2017-2021 at a cost of $22 million. • Interstate 70/US 40 from 0.1 miles west of Prairie Road to Bond County line in Madison and Bond Counties. Resurfacing on 6.4 miles, ramp repairs, bridge painting, bridge joint repair, bridge deck sealing, rip rap, a bridge replacement, bridge deck overlay and bridge repair are programmed during FY 2017-2021 at a cost of $24 million. • Interstate 70 from 0.3 mile west of Sugar Loaf Road to Burlington Northern Railroad in Bond County. Resurfacing on 9.2 miles, ramp repairs, bridge repair, bridge painting, bridge joint repair, bridge new deck, bridge deck sealing and rip rap are programmed during FY 2017-2021 at a cost of $32 million. 20 • US 67 at Delhi Bypass in Jersey County. New construction of 3.2 miles of a four lane expressway for the bypass around Delhi including grading, paving, drainage, signing and lighting are programmed during FY 2017-2021 at a cost of $23 million. Provides for efficient movement. • King Bridge Ramps over Interstate 55/64/70 westbound, Missouri Avenue, Relocated Illinois 3, Terminal Railroad Association and Union Pacific Railroads in East St. Louis 0.7 mile east of the Mississippi River. Engineering for contract plans, land acquisition, utility adjustments and a bridge replacement are programmed during FY 2016-2021 at a cost of $36.5 million. Of this total, engineering for contract plans is programmed in FY 2016 at a cost of $2 million. These projects have been approved for Illinois Major Bridge Program funding. Provides for efficient freight movement. • Interstate 57/US 51 at Township Road 277 1.2 miles north of Pulaski County line in Union County. A bridge replacement is programmed during FY 2017-2021 at a cost of $5 million. • Interstate 57 at Illinois 146 Interchange in Union County. programmed during FY 2017-2021 at a cost of $6.1 million. • Interstate 57 (northbound) from 0.5 miles north of Illinois 146 to Interstate 24 in Union and Johnson Counties. Reconstruction on 12.7 miles of the northbound lanes is programmed during FY 2017-2021 at a cost of $18.1 million. • Interstate 64 from Interstate 57 to Illinois 142 east of Mt. Vernon in Jefferson County. Resurfacing on 4.4 miles is programmed during FY 2017-2021 at a cost of $6.9 million. • Interstate 64 at Wabash River in White County. A bridge replacement, engineering for contract plans and construction engineering are programmed during FY 2016-2021 at a cost of $76.5 million. Of this total, engineering for contract plans is programmed in FY 2016 at a cost of $500,000. Indiana and Illinois will share the cost equally with Illinois being the lead agency. This project has been approved for Illinois Major Bridge Program funding. A bridge replacement is Funding for Locally Implemented Projects The $3.149 billion local program includes federal, state and local funds for highway improvements identified by local units of government. Included in this program is $426 million in state funds over six years designed to address specific local needs. This includes $131 million for a County Consolidated Program, $24 million for High-Growth Cities, $60 million for Needy Townships, $90 million for the Township Bridge Program, $42 million for upgrading local truck routes, $24 million for state matching assistance and $55 million to foster economic development. Most of these funds are appropriated separately from the highway improvement program and do not appear explicitly in this program. 21 Grouped Projects Funds are set aside in the six-year program for specified projects and programs. They have been grouped into the following activity categories: • Safety Programs. $560 million for safety construction activities including roadside safety improvements and rail-highway crossings. Projects are identified on an annual basis to correct severe accident locations and protect rail grade crossings. These funds are from the new federal Highway Safety Improvement Program and may be used on state and local roads. These funds are able to be used in stand-alone projects or are used for safety features incorporated in department projects. • Enhancement Program. The Illinois Transportation Enhancement Program (ITEP) is funded using federal dollars from a new funding category in MAP-21 called “Transportation Alternatives”. Project sponsors are required to keep projects on track toward implementation or risk loss of enhancement funds. In April 2014, 71 projects were selected totaling $52.8 million (federal). The next application cycle for candidate projects is undetermined. • Congestion Mitigation/Air Quality (CMAQ) Program. $582 million is available exclusively for specific traffic congestion and mitigation and air quality projects in the northeastern Illinois and Metro-East areas in accordance with federal legislation. Eligible projects will be developed to contribute to air quality standards and can include traffic flow improvements, public transportation projects and non-motorized transportation projects. A substantial amount of these funds will be used for public transportation projects. Local metropolitan planning organizations will select projects. Major Bridge Program IDOT’s Illinois Major Bridge Program (IMBP) targets deficient highway bridge projects that exceed replacement or rehabilitation costs of $7.5 million for state bridges and $1 million for local bridges. The IMBP provides federal National Highway Performance Program funds and/or Surface Transportation Program funds for up to 80 percent of eligible project costs; a 20 percent non-federal match is required. The FY 2016-2021 IMBP identifies $804 million of federal bridge funds for 39 local projects and 25 state projects. For the Record Each year IDOT prepares For the Record; a report of accomplishments that details the status of each project in the preceding annual highway improvement program. This report will be published in fall 2015 listing the accomplishments of the FY 2015 program. Public Involvement Public involvement is an important component of all transportation system plans and programs. In Illinois, public input on transportation issues is fundamental to the success of the program. Every year IDOT solicits public comments for the MYP and considers these comments during development of the next six-year program cycle. The FY 2016-2021 Proposed Highway Improvement Program is the culmination of the programming process conducted by IDOT. 22 In 2014, IDOT held two webinars and 17 open house style public outreach meetings across the state soliciting input on the FY 2016-2021 MYP. These meetings continue to be a mainstay in the program, allowing for face-to-face interaction with IDOT staff. This is the second year the on-line outreach workshop platform was used. In addition to the 17 in-person meetings, IDOT held two on-line workshops or “webinars” covering the state’s MYP. This innovative tool allows for a large audience to hear a specific speaker or ask questions of a specific project. IDOT will continue to refine our outreach efforts and continue to seek public feedback. Please complete the department’s Public Review and Comment Transportation Issues form on the following page. The completed form can be sent to the appropriate district office at the address listed on the Illinois Department of Transportation Region and District Boundaries map found on page 26 or you may send the completed form to IDOT’s Central Office at the below address: Illinois Department of Transportation Office of Planning and Programming Bureau of Statewide Program Planning 2300 South Dirksen Parkway, Room 307 Springfield, Illinois 62764 Individuals can also contact IDOT by phone concerning planning, programming and public involvement issues at 1-800/493-3434. Hearing impaired persons can comment by phone through the Ameritech Illinois relay number 1-800/526-0844. 23 Public Review and Comment Transportation Issues Issue / Comment Questions / Comments Please Print Submitted By Telephone ( Street Address City ) State Zip Code E-mail Address For Office Use Only Detailed Location Description Return To: Illinois Department of Transportation Office of Statewide Program Planning Room 307 2300 South Dirksen Parkway Springfield, Illinois 62764 Date Received: Reviewed By: Printed 5/13/2015 OPP 2241 (Rev. 03/27/08) 24 GLOSSARY AADT ADA AVE/AV BI-DIRECT BLDG BLVD BUS/BUSN BYP CAA CC CD CDOT CH CMAQ CO CRS CT CTA DEMO DIST DR E E-W EB ECL EIS EXPWY EXT FAP FAS FAU FR FT FY HGTS HPP HS HWY I ICC IDNR IDOT IHPA ILL I&M INCL INT INTCHG IRI ITEP ISTEA ISTHA Annual Average Daily Traffic Americans with Disabilities Act Avenue Bi-Directional Building Boulevard Business Route Bypass Clean Air Act Community College Collector-Distributor Chicago Department of Transportation County Highway Congestion Mitigation Air Quality County Condition Rating Survey Court Chicago Transit Authority Demonstration District Drive East East-West Eastbound East Corporate Limit Environmental Impact Statement Expressway Extension Federal-aid Primary Federal-aid Secondary Federal-aid Urban Frontage Road Feet Fiscal Year(s) Heights High Priority Projects Program High School Highway Interstate Route Illinois Commerce Commission Illinois Department of Natural Resources Illinois Department of Transportation Illinois Historic Preservation Agency Illinois Route Illinois & Michigan Including Intersection Interchange International Roughness Index Illinois Transportation Enhancement Program Intermodal Surface Transportation Efficiency Act of 1991 Illinois State Toll Highway Authority 25 JCT LN MAP-21 METRA MI MO MRB MT MYP N NB NCL NCIIP NE NW NHS OR P.E. PE (PHASE I) PE (PHASE II) PK PKWY PL PNRS RD REHAB ROW RR S SAFETEA-LU SB SBI SCL SE ST STA STR SW TEA-21 TI TR TRAF TRIB TSL US W WB WCL Junction Lane Moving Ahead for Progress in st the 21 Century Rail Transit System Mile(s) Missouri Mississippi River Bridge Mount Multi-Year Program North Northbound North Corporate Limit National Corridor Infrastructure Improvement Program Northeast Northwest National Highway System Other Road Preliminary Engineering Location Studies Plan Preparation Park Parkway Place Projects of National and Regional Significance Road Rehabilitation Right of Way Railroad South Safe Accountable Flexible and Efficient Transportation Equity Act – Legacy for Users Southbound State Bond Issue South Corporate Limit Southeast Street Station Structure Southwest Transportation Equity Act for st the 21 Century Transportation Improvements Township Road Traffic Tributary Type, Size and Location Plans US Route West Westbound West Corporate Limit PROJECT LISTING INDEX Page District 1 Program Summary .........................................................................................1-i State Project List ............................................................................ 1-1 to 1-110 Local Project List ........................................................................ 1-111 to 1-157 District 2 Program Summary .........................................................................................2-i State Project List .............................................................................. 2-1 to 2-23 Local Project List ............................................................................ 2-24 to 2-27 District 3 Program Summary .........................................................................................3-i State Project List .............................................................................. 3-1 to 3-15 Local Project List ............................................................................ 3-16 to 3-26 District 4 Program Summary .........................................................................................4-i State Project List .............................................................................. 4-1 to 4-23 Local Project List ............................................................................ 4-24 to 4-31 District 5 Program Summary .........................................................................................5-i State Project List .............................................................................. 5-1 to 5-13 Local Project List ............................................................................ 5-14 to 5-19 District 6 Program Summary .........................................................................................6-i State Project List .............................................................................. 6-1 to 6-22 Local Project List ............................................................................ 6-23 to 6-33 District 7 Program Summary .........................................................................................7-i State Project List .............................................................................. 7-1 to 7-12 Local Project List ............................................................................ 7-13 to 7-24 District 8 Program Summary .........................................................................................8-i State Project List .............................................................................. 8-1 to 8-20 Local Project List ............................................................................ 8-21 to 8-29 District 9 Program Summary .........................................................................................9-i State Project List .............................................................................. 9-1 to 9-20 Local Project List ............................................................................ 9-21 to 9-34 Statewide Items Program Summary .........................................................................................0-i State Project List .............................................................................. 0-1 to 0-13 26 ILLINOIS DEPARTMENT OF TRANSPORTATION REGION and DISTRICT BOUNDARIES Region 1 DISTRICT 1 201 WEST CENTER COURT SCHAUM BURG. ILLINOIS 50195-1096 PHONE: 34117054000 Region 2 DISTRICT 2 819 DEPOTAVENUE DIXON. ILLINOIS 61021-3545 PHONE: 315284-231 DISTRICT 3 TDD EAST NORRIS DRIVE OTTAWA. ILLINOIS 61350-1623 PHONE: 31 541134-6131 Region 3 DISTRICT 4 401 MAIN STREET PEORIA, ILLINOIS 31502-1111 PHONE: 309571?3333 DISTRICT 5 13473 IL Hwy. 133 P. O. BOX 610 PARIS. ILLINOIS 51944-0510 PHONE: 211'1455-4181 Region 4 DISTRICT 5 126 EAST ASH STREET SPRINGFIELD. ILLINOIS 621114-4792 PHONE: DISTRICT 7' 400 WEST WABASH EF FINSHAM. ILLINOIS 52401-2699 PHONE: 21 TIE-426951 Region 5 I: DISTRICT 1102 PLAZA DRIVE COLLINSVILLE. ILLINOIS 62234-6193 PHONE: 513345-3100 DISTRICT 9 STATE TRANSPORTATION BUILDING P. O. BOX 100 CARBON DALE. ILLINOIS 62903-0100 PHONE: 513549-2173] ?rhl'lapping E- IrI-TOrrna-lim'l Systems at Office at 3. Programman HANCOCK JDDAHESS STEPHENSON mnneamo CARROLL DGLE WHITESIDE HENRY BLIRERU mil-Ii . MERCER am? KNOX WARREN 3mm HI 5 PEOHIA momma Ill I Mara. FULTON ucmnouau SCHUYLEII DEKALE 03 D5 Emu PIKE mm mucus Ema Paris. 5 cows 0 i mcaurm CLARK a CUMBERLAND .l I: D7 JERSEY JASPER Elfinng cw, RIGHLNID ch-ron ST.CI.NR D8 WAYNE JEFFERSON 3 MONROE u: - RANDOLPH WHITE FRAMLII i i SALINE WILLIAMSON t:an a a mum: JGHNEDN POPE Puusm April 2014 27 GUIDE TO HIGHWAY PROJECT LISTINGS Projects on the state highway system identified for the FY 2016-2021 Proposed Highway Improvement Program are listed on the following pages. The lists are identified within IDOT’s nine geographic highway districts. The map on previous page shows individual highway district boundaries. The following sequence is used within the district project listing: Interstate marked routes in ascending numerical order US marked routes in ascending numerical order Illinois marked routes in ascending numerical order Unmarked routes in alphabetical order by street name starting with numbered streets The estimated cost of each project is shown. The actual cost of a project listed for FY 2015-2020 can vary depending on when it is implemented in the multi-year period. The listing of projects is arranged in eight columns: MYP Years Route/Street Location Improvements Objectives Est. Cost Route/Street – Identifies the marked route(s) and street name Location – Identifies project limits, length, and vital element Improvements – identifies type of improvement Objectives – Identifies the department’s Long Term State Transportation Plan objective that this project addresses. Est. Cost – identifies the estimated project cost County – identifies county MYP Years Past – identifies the number of years a project has appeared in the multi-year program. FY 1999-2003 is year one. MYP Years Current – identifies projects scheduled for FY 2016 and those scheduled for FY 2017-2021. Project Footnotes denote special fund sources, participation requirements, and other important, project-specific information. 28 County Past Current Needs Category BACKLOG Miles 1.75 Roughness(IRI) NOT ACCEPTABLE Rutting 0.09 AADT 97,529 Truck Pct 12.1 NHS Y Needs Category – Provides an overall condition of a route. This condition is based on multiple factors including the Condition Rating Survey (CRS), the traffic a highway carries (ADT), the highways functional classification, pavement width, and the highways geographic location (northern or southern and urban or rural). This categorization is divided into three subcategories allowing the department to describe the condition in terms of acceptable, accruing, or backlog. ADEQUATE – The condition of the highway ranges from good to excellent; no improvements are needed at this time. ACCURING – The condition of the highway is expected to deteriorate to backlog condition within the next 6 years. BACKLOG – The condition of the highway has deteriorated to the point where an improvement is needed now. Miles – Identifies project length. International Roughness Index (IRI) – A measured value that is used to determine the roughness or ride quality of a section of highway. It is the accumulation of the inches of vertical movement of a vehicle over a highway surface adjusted to reflect the rate per mile. The lower the value the smoother the ride, higher values indicate a rougher ride. This category is divided into three subcategories allowing the department to describe the condition in terms of GOOD (rating range is below 95), ACCEPTABLE (equal to fair, rating range is 95-170), and NOT ACCEPTABLE (equal to poor, rating range is above 170). Rutting – A measured value of the longitudinal surface depressions in the highway wheel path. It is measured in inches and averaged over the highway section. Rutting is caused by compaction or lateral movement of materials due to traffic load. AADT – Identifies the average volume of traffic for one day (24 hour period). Truck Pct – Identifies the percentage of the average volume of total trucks compared to the average volume of total vehicles for an average day. NHS – Shows if this route is designated as part of the National Highway System. Structure Status STRUCTURAL BACKLOG AADT 61,700 Truck Pct 8.1 Str Number 0060036 NHS N Structure Status – Designation of the overall condition of the structure. This is divided into six subcategories – • ADEQUATE – Structures that do not meet the criteria for a BAMS table, are not structurally deficient (SD) or functionally obsolete (FO) and not in any needs category for backlog or accruing. • FUNCTIONAL LONG TERM - BAMS tables 15 & 16 are functionally obsolete and needs category of long term accruing. • FUNCTIONAL ACCRUING - BAMS table 14 is functionally obsolete and needs category of short-term accruing. • STRUCTURAL ACCRUING - BAMS tables 10-13 are structurally deficient and needs category of short-term accruing. • FUNCTIONAL BACKLOG - BAMS tables 7-9 are functionally obsolete and needs category of other backlog. • STRUCTURAL BACKLOG - BAMS tables 1-6 are all structurally deficient and have a needs category of critical backlog for BAMS 1-4 and other backlog for BAMS 5 & 6. AADT – Annual Average Daily Traffic Truck Pct – Identifies the percentage of the average volume of total trucks compared to the average volume of total vehicles for an average day. Str Number – Unique identification number assigned to each structure. NHS – Shows if this route is designated as part of the National Highway System. 29 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE KANE DEKALB D2 COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK PEORIA D4 Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT ADAMS D5 MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 1 District 1 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 1, DISTRICT 1, SCHAUMBURG Overview Highway District 1 encompasses six counties in northeastern Illinois and includes the city of Chicago, suburban Cook County, and the five collar counties of DuPage, Kane, Lake, McHenry and Will. The state highway system in District 1 consists of 2,774 miles of highways and 1,446 bridges, supporting more than 75.1 million miles of travel daily. State Program The program for state and local highways will average $1.398 billion annually for the FY 2016-2021 period. Approximately $2.065 billion will be provided during FY 2016-2021 for improvements to state highways in District 1. The following table summarizes anticipated accomplishments on the state highway system in District 1 during this time frame. FY 2016-2021 Accomplishments System Maintenance Interstate (miles) Non-Interstate (miles) Safety Locations (number) Bridge Maintenance Interstate (number) Non-Interstate (number) New Bridges (number) Minor Structure Repair (number) Congestion Mitigation Roads (miles) Traffic Improvements (number) System Expansion Roads (miles) Locations (number) 35 304 24 36 59 1 5 15 110 18 0 Major Highway projects of interest that are tentatively scheduled during the FY 2016-2021 time frame include:  Interstate 55 (Inbound) (Stevenson Expressway) from Interstate 94 (Dan Ryan Expressway) to US 41 (Lake Shore Drive) in Chicago. Bridge replacements, reconstruction of 1.8 miles, lighting, changeable message signs, retaining wall, land acquisition, engineering for contract plans, construction engineering, landscaping, and a railroad flagger are programmed during FY 2016-2021 at an estimated cost of $76.4 million. Of this total, $71.1 million is included in FY 2016 for the replacement of three structures, reconstruction of 1.8 miles, lighting, installation of changeable message signs, a retaining wall, construction engineering, engineering for contract plans, land acquisition and a railroad flagger. This project has been approved for Illinois Major Bridge Program funding. 1-i  Interstate 55 from Illinois 129 to Lorenzo Road and Interstate 55 Frontage Roads from Kavanaugh Road to Lorenzo Road in Will County. Interchange reconstruction, bridge replacement, reconstruction of 8.1 miles, widening and resurfacing on 2.5 miles, addition of auxiliary lanes, construction engineering, engineering for contract plans, land acquisition, and utility adjustments are programmed during FY 2017-2021 at an estimated cost of $144.7 million.  Interstate 55 (Stevenson Expressway) from Weber Road to Willow Springs Road in Will County. Resurfacing on 14.6 miles, bridge deck repairs, bridge joint repair, and construction engineering are programmed during FY 2017-2021 at an estimated cost of $57 million.  Interstate 80 from Ridge Road to US 30 (Lincoln Highway) in Joliet, New Lenox and Minooka. Bridge superstructure, bridge replacements, substructure widening, new bridge decks, bridge widening, reconstruction of 2.8 miles, bridge rehabilitation, land acquisition and engineering for contract plans, utility adjustments, and railroad flaggers are programmed during FY 2016-2021 at an estimated cost of $82.6 million. Of this total, $500,000 is included in FY 2016 for engineering for contract plans.  Interstate 90/190 (Kennedy Expressway) at Cumberland Avenue (Cumberland Flyover) in Chicago. Resurfacing on 0.5 mile, drainage improvements, lighting, new signing, new construction, reconstruction, retaining walls and construction engineering are included in FY 2016 at an estimated cost of $13.3 million. Provides for efficient freight movement.  Interstate 90/94 at Interstate 290/Congress Parkway (Jane Byrne Interchange) in Chicago. Interchange reconstruction, reconstruction, retaining walls, bridge superstructure, bridge replacement, bridge rehabilitation, lighting, noise barriers, water main, landscaping, miscellaneous work, construction engineering, and engineering for contract plans are programmed during FY 2016-2021 at an estimated cost of $351 million. Of this total, $9.7 million is included in FY 2016 for construction engineering, engineering for contract plans, and miscellaneous work. The I-90/94 and I-290 Jane Byrne Interchange in downtown Chicago is one of the worst bottlenecks in the country for traffic congestion. The Jane Byrne Interchange links the Dan Ryan Expressway (I-90/94) to the south, the Eisenhower Expressway (I-290) to the west, Congress Parkway to the east and the Kennedy Expressway (I-90/94) to the north. The interchange is congested for many hours of the day causing substantial backups in every direction. Provides for efficient freight movement.  Interstate 290 (Eisenhower Expressway) at Salt Creek in Addison. Bridge replacement, utility adjustments, engineering for contract plans and construction engineering are programmed during FY 2017-2021 at an estimated cost of $22.1 million. This project has been approved for Illinois Major Bridge Program funding.  Interstate 290/Illinois 110 (Eisenhower Expressway) at Des Plaines River in Forest Park. A pump station, engineering for contract plans, and construction engineering are programmed during FY 2017-2021 at an estimated cost of $36.1 million.  US 20 at Illinois 31 in Elgin. Bridge replacement, land acquisition, and engineering for contract plans are programmed during FY 2017-2021 at an estimated cost of $10.3 million.  Illinois 21 (Milwaukee Avenue) from north of Sanders Road to south of Euclid Avenue in Glenview. Intersection improvement, reconstruction, traffic signal modernization, signal timing, land acquisition, engineering for right-of-way and construction engineering are programmed during FY 2017-2021 at an estimated cost of $12.2 million. 1-ii  Illinois 22 (Half Day Road) from Quentin Road to west of Illinois 83 (Mundelein Road) in Kildeer and Long Grove. Additional lanes for 3.5 miles, retaining wall, culvert replacement, engineering for contract plans, construction engineering, land acquisition, and utility adjustments are programmed during FY 2017-2021 at an estimated cost of $52 million. Provides for efficient freight movement.  Illinois 43 (Harlem Avenue) over US 12/20 (95th Street) 0.6 mile north of Interstate 294 (Tri-State Tollway) in Bridgeview. Bridge rehabilitation, bridge widening, interchange reconstruction, land acquisition, a pump station, engineering for contract plans, construction engineering, lighting, a railroad flagger and utility adjustments are programmed during FY 2016-2021 at an estimated cost of $20.5 million. Of this total, $750,000 is included in FY 2016 for engineering for contract plans. Provides for efficient freight movement.  Illinois 43 (Harlem Avenue) from 63rd Street to BRC Railroad (65th Street) in Bedford Park and Chicago. A railroad grade separation, land acquisition, engineering for design, location and environmental studies, engineering for contract plans, and construction engineering are programmed during FY 2016-2021 at an estimated cost of $24.7 million. Of this total, $2.5 million is included in FY 2016 for engineering for design, location and environmental studies.  Illinois 47 at Kishwaukee River in McHenry County. Bridge replacement is programmed during FY 2017-2021 at an estimated cost of $6.5 million.  Illinois 53 at Illinois 56 (Butterfield Road) in DuPage County. Intersection reconstruction, engineering for contract plans, land acquisition and utility adjustments are programmed during FY 2016-2021 at an estimated cost of $25 million. Of this total, $2.1 million is included in FY 2016 for engineering for contract plans. Provides for efficient freight movement.  Illinois 390 (Elgin O’Hare Expressway) from Interstate 290/Illinois 53 to O’Hare Western Bypass. Land Acquisition is programmed during FY 2016 at an estimated cost of $22 million. These are SAFETEA-LU Projects of National and Regional Significance. SAFETEA-LU provided a total of $140 million for these projects.  rd th Central Avenue from 63 Street to 87 Street in Chicago, Bedford Park and Burbank. Corridor improvement, engineering for contract plans, land acquisition and a railroad flagger are programmed during FY 2017-2021 at an estimated cost of $146.4 million. Provides for efficient freight movement.  Torrence Avenue at Grand Calumet River in Chicago. A bridge replacement and construction engineering are programmed during FY 2017-2021 at an estimated cost of $14.9 million.  Willow Road from East of Des Plaines River to Culligan Parkway in Prospect Heights and Glenview. Reconstruction of nearly 1 mile, intersection improvement, noise barriers, land acquisition, engineering for contract plans, construction engineering, and lighting are programmed during FY 2016-2021 at an estimated cost of $19.6 million. Of this total, $500,000 is included in FY 2016 for engineering for contract plans.  th Wood Street from north of the Little Calumet River to south of US 6 (159 Street) in Harvey, Dixmoor, Riverdale and Blue Island. Additional lanes for 3.7 miles, bridge repair, construction engineering, utility adjustments and a railroad flagger are programmed during FY 2017-2021 at an estimated cost of $53.9 million. Provides for efficient freight movement. 1-iii COOK COUNTY FY 2016-2021 PROPOSED HIGHWAY IMPROVEMENT PROGRAM FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street I 55 STEVENSON EXPWY I 55 STEVENSON EXPWY I 55 STEVENSON EXPWY Location Improvements Objectives Est. Cost City Past Current I-355 (VETERANS MEMORIAL TOLLWAY) TO I-90/94 (DAN RYAN EXPWY) Congestion Mitigation P.E. (PHASE I) $1,500,000 DARIEN WILLOWBROOK BURR RIDGE INDIAN HEAD PARK COUNTRYSIDE HODGKINS SUMMIT FOREST VIEW STICKNEY CHICAGO WOODRIDGE 2 2016 I-355 (VETERANS MEMORIAL TOLLWAY) TO I-90/94 (DAN RYAN EXPWY) Congestion Mitigation P.E. (PHASE I) $750,000 DARIEN WILLOWBROOK BURR RIDGE INDIAN HEAD PARK COUNTRYSIDE HODGKINS SUMMIT FOREST VIEW STICKNEY CHICAGO WOODRIDGE 1 2017-2021 I-355 (VETERANS MEMORIAL TOLLWAY) TO I-90/94 (DAN RYAN EXPY) SWEEPING (BUS ON SHOULDER) System Maintenance MISCELLANEOUS $590,000 BURR RIDGE DARIEN WILLOWBROOK INDIAN HEAD PARK COUNTRYSIDE HODGKINS SUMMIT FOREST VIEW STICKNEY CHICAGO WOODRIDGE 1 2016 1-1 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street I 55 (INBOUND) STEVENSON EXPWY Location Improvements I-94 (DAN RYAN EXPWY) TO US 41 (LAKE SHORE DR) Miles = 1.75 Bridge Maintenance BRIDGE REPLACEMENT RECONSTRUCTION LIGHTING SURVEILLANCE CHANGEABLE MESSAGE SIGNS Objectives Est. Cost SAFETY PRESERVE SYSTEM INFRASTR SECURITY TRANSPORTATION OPS $56,869,000 City Past Current CHICAGO 2 2016 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Needs Category ADEQUATE I 55 (INBOUND) STEVENSON EXPWY Miles 1.75 Roughness(IRI) ACCEPTABLE Rutting 0.10 AADT 83,459 I-94 (DAN RYAN EXPWY) TO US 41 (LAKE SHORE DR) System Maintenance Truck Pct 10.8 NHS Y Structure Status STRUCTURAL BACKLOG AADT 59,600 Truck Pct 9 Str Number 0160036 NHS Y STRUCTURAL BACKLOG 23,600 N/A 0161045 Y FUNCTIONAL BACKLOG 38,250 1 0161075 Y PRESERVE SYSTEM SUSTAINABILITY RETAINING WALL $2,631,000 CHICAGO 1 2016 $500,000 CHICAGO 1 2017-2021 $2,500,000 CHICAGO 4 2016 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 55 (INBOUND) STEVENSON EXPWY I-94 (DAN RYAN EXPWY) TO US 41 (LAKE SHORE DR) Bridge Maintenance SUSTAINABILITY LANDSCAPING ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 55 (INBOUND) STEVENSON EXPWY I-94 (DAN RYAN EXPWY) TO US 41 (LAKE SHORE DR) Bridge Maintenance CONSTRUCTION ENGINEERING ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. 1-2 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street I 55 (INBOUND) STEVENSON EXPWY Location I-94 (DAN RYAN EXPWY) TO US 41 (LAKE SHORE DR) Bridge Maintenance Improvements Objectives CONSTRUCTION ENGINEERING Est. Cost City Past Current $4,750,000 CHICAGO 1 2017-2021 $5,575,000 CHICAGO 2 2016 $1,500,000 CHICAGO 1 2016 $1,000,000 CHICAGO 1 2016 $25,000 CHICAGO 1 2016 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 55 (INBOUND) STEVENSON EXPWY I-94 (DAN RYAN EXPWY) TO US 41 (LAKE SHORE DR) Bridge Maintenance CONSTRUCTION ENGINEERING ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 55 (INBOUND) STEVENSON EXPWY I-94 (DAN RYAN EXPWY) TO US 41 (LAKE SHORE DR) Bridge Maintenance P.E. (PHASE II) ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 55 (INBOUND) STEVENSON EXPWY I-94 (DAN RYAN EXPWY) TO US 41 (LAKE SHORE DR) Bridge Maintenance LAND ACQUISITION ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 55 (INBOUND) STEVENSON EXPWY I-94 (DAN RYAN EXPWY) TO US 41 (LAKE SHORE DR) Bridge Maintenance SAFETY RR FLAGGER ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. 1-3 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street I 55 (INBOUND) STEVENSON EXPWY Location Improvements I-94 (DAN RYAN EXPWY) TO US 41 (LAKE SHORE DR) Bridge Maintenance Objectives Est. Cost SAFETY $1,000,000 MILLED RUMBLE STRIP MISCELLANEOUS PAVEMENT MARKING SAFETY BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM RR FLAGGER City Past Current CHICAGO 1 2016 $420,000 MATTESON COUNTRY CLUB HILLS 1 2016 $2,270,000 COUNTRY CLUB HILLS OAK FOREST 13 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 57 I-80 TO US 30 System Maintenance I 57 UNDER ILL 50 (CICERO AVE) Bridge Maintenance Structure Status STRUCTURAL ACCRUING I 57 AT 167TH ST SAFETY PRESERVE SYSTEM BRIDGE REHABILITATION Bridge Maintenance Structure Status STRUCTURAL ACCRUING AADT 16,600 $4,500,000 AADT 24,800 I 57 OVER I-294 (TRI-STATE TOLLWAY) Congestion Mitigation P.E. (PHASE II) P.E. (CONSULTANT TSL) P.E. (CONSULTANT PLANS) $700,000 I 80 183RD ST EXIT & ENTRANCE FROM RIDGELAND AVE (NEW RAMPS) Congestion Mitigation P.E. (PHASE I) $800,000 Truck Pct 7 Str Number 0161014 OAK FOREST Truck Pct 8 MARKHAM NHS Y 9 Str Number 0162125 2017-2021 NHS Y 2 2016 10 2017-2021 1 2017-2021 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. I 90 I 94 CANAL ST TO MARTIN LUTHER KING DR System Maintenance SAFETY MISCELLANEOUS GUARDRAIL DAN RYAN EXPWY 1-4 $300,000 CHICAGO FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street I 90 KENNEDY EXPWY I 90 KENNEDY EXPWY I 90 KENNEDY EXPWY I 90 I 190 KENNEDY EXPWY Needs Category BACKLOG I 90 I 190 KENNEDY EXPWY I 90 I 94 KENNEDY EXPWY Location Improvements Objectives Est. Cost City Past Current I-190 TO ILL 43 (HARLEM AVE) Congestion Mitigation P.E. (PHASE II) $1,000,000 CHICAGO 4 2016 I-190 TO ILL 43 (HARLEM AVE) Congestion Mitigation P.E. (PHASE II) $2,160,000 CHICAGO 4 2017-2021 I-190 TO ILL 43 (HARLEM AVE) Congestion Mitigation P.E. (PHASE II) $1,215,000 CHICAGO 2 2017-2021 AT CUMBERLAND AVE (CUMBERLAND FLYOVER) Miles = 0.46 Congestion Mitigation RESURFACING DRAINAGE LIGHTING SIGNING (NEW) NEW CONSTRUCTION RECONSTRUCTION RETAINING WALL $11,160,000 CHICAGO 1 2016 $2,095,000 CHICAGO 1 2016 $4,000,000 CHICAGO 4 2016 $1,000,000 CHICAGO 3 2016 Miles 0.46 Roughness(IRI) ACCEPTABLE Rutting 0.23 AADT 177,578 Truck Pct 4.4 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT SUSTAINABILITY NHS Y AT CUMBERLAND AVE (CUMBERLAND FLYOVER) Congestion Mitigation CONSTRUCTION ENGINEERING I-94 (EDENS EXPWY) TO OHIO ST (REVERSIBLE LANE CHANGEABLE MESSAGE SYSTEM) System Maintenance SIGN BOARD SYSTEM SAFETY SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. I 90 I 94 KENNEDY EXPWY REVERSIBLE LANE ACCESS CONTROL STUDY / DESIGN System Maintenance P.E. (PHASE II) 1-5 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street I 90 I 94 KENNEDY EXPWY I 90 I 94 I 90 I 94 I 90 I 94 I 90 I 94 I 90 I 94 I 90 I 94 Location REVERSIBLE LANE ACCESS CONTROL STUDY / DESIGN System Maintenance Improvements Objectives P.E. (PHASE I) AT I-290 / CONGRESS PKWY (JAYNE MISCELLANEOUS BYRNE INTCHG) - FLYOVER N TO W I-290 (CITY OF CHICAGO POLICE TRAFFIC CONTROL SERVICES) System Maintenance AT I-290 / CONGRESS PKWY (JANE CONSTRUCTION ENGINEERING BYRNE INTCHG) - TAYLOR ST BRIDGES & MAINLINE BRIDGES (PEORIA ST TO MORGAN ST) System Maintenance Est. Cost City Past Current $500,000 CHICAGO 1 2016 $200,000 CHICAGO 1 2016 $1,140,000 CHICAGO 1 2016 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) System Maintenance INTERCHANGE RECONSTRUCTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY FREIGHT MOVEMENT TRANSPORTATION OPS $80,000,000 CHICAGO 3 2017-2021 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) - MONROE ST OVER I-90/94 & I-90/94(NB) C-D COMPLETION Miles = 2.28 System Maintenance RECONSTRUCTION RETAINING WALL BRIDGE SUPERSTRUCTURE SAFETY PRESERVE SYSTEM SUSTAINABILITY TRANSPORTATION OPS $14,400,000 CHICAGO 1 2017-2021 AT I-290 / CONGRESS PKWY (JANE BRIDGE REPLACEMENT BYRNE INTCHG) - UNDER VAN BUREN ST LIGHTING System Maintenance LANDSCAPING RETAINING WALL SAFETY PRESERVE SYSTEM SUSTAINABILITY $20,000,000 CHICAGO 1 2017-2021 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) System Maintenance SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY FREIGHT MOVEMENT TRANSPORTATION OPS $112,000,000 CHICAGO 2 2017-2021 INTERCHANGE RECONSTRUCTN 1-6 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street I 90 I 94 I 90 I 94 I 90 I 94 I 90 I 94 I 90 I 94 Location Improvements Objectives 90 I 94 City Past Current AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) - AT VARIOUS LOCATIONS System Maintenance LANDSCAPING SUSTAINABILITY $225,000 CHICAGO 2 2017-2021 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) - AT VARIOUS LOCATIONS System Maintenance LANDSCAPING SUSTAINABILITY $200,000 CHICAGO 2 2017-2021 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) - AT VARIOUS LOCATIONS System Maintenance LANDSCAPING SUSTAINABILITY $200,000 CHICAGO 2 2017-2021 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) WB MAINLINE CONGRESS PKWY TO RACINE Miles = 2.28 System Maintenance RECONSTRUCTION LIGHTING SURVEILLANCE NOISE BARRIERS SAFETY PRESERVE SYSTEM INFRASTR SECURITY TRANSPORTATION OPS SUSTAINABILITY $13,250,000 CHICAGO 1 2017-2021 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) BRIDGE EB (E OF DES PLAINES) & I-290 EB BRIDGE OVER I-90/94 Miles = 2.28 System Maintenance BRIDGE REHABILITATION RECONSTRUCTION RETAINING WALL LIGHTING SURVEILLANCE SAFETY PRESERVE SYSTEM SUSTAINABILITY INFRASTR SECURITY TRANSPORTATION OPS $27,150,000 CHICAGO 1 2017-2021 Structure Status FUNCTIONAL BACKLOG I Est. Cost AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) WATERMAIN RELOC/REHAB AND RETAINING WALL UIC System Maintenance WATER MAIN RETAINING WALL PRESERVE SYSTEM SUSTAINABILITY 1-7 AADT 97,900 $15,000,000 Truck Pct 1 CHICAGO Str Number 0160461 NHS Y 1 2017-2021 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street I 90 I 94 I 90 I 94 I 90 I 94 I 90 I 94 I 90 I 94 I 90 I 94 I 90 I 94 I 90 I 94 I 90 I 94 Location Improvements Objectives Est. Cost City Past Current AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) JACKSON BLVD UT RELOC System Maintenance MISCELLANEOUS $4,500,000 CHICAGO 1 2017-2021 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) System Maintenance CONSTRUCTION ENGINEERING $1,250,000 CHICAGO 1 2016 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) System Maintenance CONSTRUCTION ENGINEERING $4,150,000 CHICAGO 3 2016 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) System Maintenance CONSTRUCTION ENGINEERING $6,500,000 CHICAGO 2 2017-2021 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) System Maintenance CONSTRUCTION ENGINEERING $9,450,000 CHICAGO 3 2017-2021 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) System Maintenance CONSTRUCTION ENGINEERING $15,450,000 CHICAGO 2 2017-2021 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) System Maintenance P.E. (PHASE II) P.E. (CONSULTANT PLANS) $3,000,000 CHICAGO 1 2016 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) System Maintenance P.E. (PHASE II) P.E. (CONSULTANT PLANS) $12,000,000 CHICAGO 1 2017-2021 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) - (WORKZONE SAFETY) System Maintenance MISCELLANEOUS $3,168,000 CHICAGO 1 2017-2021 1-8 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street I 90 I 94 I 90 I 94 I 90 I 94 Location Improvements Objectives Est. Cost City Past Current AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) - (WORKZONE SAFETY) System Maintenance MISCELLANEOUS $4,320,000 CHICAGO 1 2017-2021 AT I-290 / CONGRESS PKWY (JANE BYRNE INTCHG) - (WORKZONE SAFETY) System Maintenance MISCELLANEOUS $3,456,000 CHICAGO 1 2017-2021 13TH ST TO CERMAK RD & AT CANAL ST System Maintenance BRIDGE PAINTING PRESERVE SYSTEM $3,390,000 CHICAGO 7 2017-2021 NB - LAWRENCE AVE TO S OF IL 68 (DUNDEE RD) System Maintenance CRACK & JOINT SEALING PRESERVE SYSTEM $690,000 NORTHBROOK NORTHFIELD WILMETTE SKOKIE MORTON GROVE LINCOLNWOOD CHICAGO 1 2016 AT OLD ORCHARD RD Bridge Maintenance BRIDGE SUPERSTRUCTURE DRAINAGE BRIDGE DECK OVERLAY BRIDGE REPAIR BRIDGE DECK REPAIRS SAFETY PRESERVE SYSTEM TRANSPORTATION OPS SKOKIE 6 2017-2021 DAN RYAN EXPWY I 94 US 41 EDENS EXPWY I 94 EDENS EXPWY I 94 EDENS EXPWY I 94 EDENS EXPWY Structure Status STRUCTURAL ACCRUING AADT 10,900 Truck Pct 6 Str Number 0160823 NHS N FUNCTIONAL BACKLOG 10,200 N/A 0163212 Y AT OLD ORCHARD RD System Maintenance BRIDGE REMOVAL/DEMOLITION RETAINING WALL AT OLD ORCHARD RD Bridge Maintenance P.E. (PHASE II) 1-9 $7,040,000 SUSTAINABILITY $820,000 SKOKIE 1 2017-2021 $800,000 SKOKIE 1 2016 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street I 94 EDENS EXPWY I 94 KENNEDY EXPWY Location Improvements Objectives AT OLD ORCHARD RD Bridge Maintenance CONSTRUCTION ENGINEERING AT MONTROSE AVE Bridge Maintenance BRIDGE SUPERSTRUCTURE $600,000 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Structure Status STRUCTURAL BACKLOG I 94 KENNEDY EXPWY SKOKIE 2 2017-2021 CHICAGO 8 2017-2021 Truck Pct 6 Str Number 0160852 NHS N $100,000 CHICAGO 4 2017-2021 $231,000 CHICAGO CALUMET CITY DOLTON SOUTH HOLLAND LANSING COUNTRY CLUB HILLS HAZEL CREST EAST HAZEL CREST THORNTON 1 2016 CHICAGO 1 2017-2021 94 I-57 TO INDIANA STATE LINE (GREAT LAKES RESTORATION INITIATIVE (GLRI) MISCELLANEOUS 80 I 94 AT 111TH ST BRIDGE DECK OVERLAY BRIDGE JOINT REPAIR Bridge Maintenance BISHOP FORD EXPWY SAFETY PRESERVE SYSTEM Structure Status FUNCTIONAL BACKLOG 94 AADT 17,200 Past Current UTILITY ADJUSTMENT I BISHOP FORD EXPWY $11,380,000 City AT MONTROSE AVE Bridge Maintenance I I Est. Cost AT 115TH ST System Maintenance SAFETY PRESERVE SYSTEM BRIDGE DECK OVERLAY BRIDGE JOINT REPAIR Structure Status FUNCTIONAL BACKLOG FUNCTIONAL BACKLOG 1 - 10 $1,105,000 AADT 15,300 $730,000 AADT 3,675 3,675 Truck Pct 10 Str Number 0160992 CHICAGO NHS N 1 2017-2021 Truck Pct 7 Str Number 0162042 NHS N 7 0162043 N FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street I 94 BISHOP FORD EXPWY Location AT US 6 (159TH ST) Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE DECK OVERLAY BRIDGE JOINT REPAIR Structure Status STRUCTURAL ACCRUING I 290 ILL 110 AT DES PLAINES RIVER System Maintenance PUMP STATION AT DES PLAINES RIVER System Maintenance SAFETY PRESERVE SYSTEM Est. Cost $1,400,000 AADT 28,500 City SOUTH HOLLAND Truck Pct 1 Past Current 1 Str Number 0160388 2017-2021 NHS Y $30,000,000 FOREST PARK 18 2017-2021 CONSTRUCTION ENGINEERING $4,000,000 FOREST PARK 4 2017-2021 DES PLAINES RIVER System Maintenance P.E. (PHASE II) $2,146,000 FOREST PARK 1 2017-2021 AT 179TH ST / BROOK HILL DR Congestion Mitigation UTILITY ADJUSTMENT $3,200,000 ORLAND PARK 1 2016 AT KEDZIE AVE, PULASKI RD / CRAWFORD AVE, CENTRAL AVE & CENTRAL PARK AVE Congestion Mitigation TRAF SIGNAL MODERNIZATION CHANNELIZATION INTERSECTION RECONSTN $4,250,000 MARKHAM OAK FOREST 3 2017-2021 AT KEDZIE AVE, PULASKI RD / CRAWFORD AVE, CENTRAL AVE & CENTRAL PARK AVE Congestion Mitigation LAND ACQUISITION $1,300,000 MARKHAM OAK FOREST 3 2017-2021 EISENHOWER EXPWY I 290 ILL 110 EISENHOWER EXPWY I 290 ILL 110 EISENHOWER EXPWY US 6 SOUTHWEST HWY US 6 159TH ST US 6 159TH ST 1 - 11 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP FREIGHT MOVEMENT FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street US 6 159TH ST Location AT MIDLOTHIAN CREEK 0.1 MI W OF ILL 50 (CICERO AVE) Bridge Maintenance Improvements Objectives BRIDGE REPLACEMENT CHANNELIZATION DRAINAGE SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP Structure Status STRUCTURAL BACKLOG ADEQUATE US 6 ILL 83 AT LITTLE CALUMET RIVER Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Est. Cost $4,780,000 City Past Current OAK FOREST 9 2017-2021 AADT 31,300 Truck Pct 2 Str Number 0162843 NHS Y 31,800 3 0160423 Y $7,260,000 LANSING 11 2017-2021 TORRENCE AVE Structure Status STRUCTURAL BACKLOG US 6 ILL 83 AT LITTLE CALUMET RIVER Bridge Maintenance CONSTRUCTION ENGINEERING S OF HARDING AVE TO S OF I-294 Miles = 5.73 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA AADT 26,500 Truck Pct 1 Str Number 0160936 NHS Y $1,090,000 LANSING 4 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $6,820,000 LA GRANGE COUNTRYSIDE LA GRANGE PARK HODGKINS WILLOW SPRINGS 3 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP $1,000,000 LA GRANGE 3 2017-2021 TORRENCE AVE US 12 US 20 US 45 LA GRANGE RD Needs Category ADEQUATE US 12 US 20 Miles 5.73 Roughness(IRI) NOT ACCEPTABLE Rutting 0.22 AADT 39,477 AT US 34 (OGDEN AVE) Congestion Mitigation Truck Pct 7.7 NHS Y TRAF SIGNAL MODERNIZATION CHANNELIZATION US 45 LA GRANGE RD 1 - 12 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street US 12 US 20 Location Improvements AT US 34 (OGDEN AVE) Congestion Mitigation LAND ACQUISITION WESTERN AVE TO HALSTED ST & LAFAYETTE AVE TO STONY ISLAND AVE Miles = 4.07 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA Objectives Est. Cost $200,000 City Past Current LA GRANGE 2 2016 US 45 LA GRANGE RD US 12 US 20 95TH ST Needs Category BACKLOG Miles 2.01 Roughness(IRI) NOT ACCEPTABLE Rutting 0.27 AADT 24,047 Truck Pct 9.8 NHS Y ACCRUING 2.06 NOT ACCEPTABLE 0.14 17,569 16.7 Y US 14 NORTHWEST HWY Needs Category BACKLOG US 14 NORTHWEST HWY US 14 NORTHWEST HWY US 14 NORTHWEST HWY MINER ST TO US 45 (DES PLAINES RIVER RESURFACING RD) PEDESTRIAN RAMPS/ADA Miles = 6.04 System Maintenance Miles 6.04 Roughness(IRI) NOT ACCEPTABLE Rutting 0.22 AADT 13,647 Truck Pct 6.2 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $4,280,000 CHICAGO 7 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $7,530,000 ARLINGTON HEIGHTS MOUNT PROSPECT DES PLAINES 5 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY $1,500,000 DES PLAINES 2 2017-2021 $200,000 DES PLAINES 2 2017-2021 $300,000 DES PLAINES 1 2017-2021 NHS N AT MT. PROSPECT RD Congestion Mitigation TRAF SIGNAL MODERNIZATION PEDESTRIAN SIGNALS LEFT TURN LANES AT MT. PROSPECT RD Congestion Mitigation LAND ACQUISITION AT MT. PROSPECT RD Congestion Mitigation RR FLAGGER SAFETY 1 - 13 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street US 14 NORTHWEST HWY US 14 NORTHWEST HWY Location Improvements Objectives Est. Cost City Past Current AT BROADWAY ST System Maintenance TRAF SIGNAL INSTALLATION CHANNELIZATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP $1,530,000 DES PLAINES 8 2017-2021 AT WISCONSIN CENTRAL & UP RR 0.7 MI NW OF US 12/45 (DES PLAINES RIVER RD) System Maintenance PUMP STATION STORM SEWER (NEW) SAFETY PRESERVE SYSTEM $6,900,000 DES PLAINES 15 2017-2021 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS SUSTAINABILITY $9,000,000 BARTLETT 7 2017-2021 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. US 20 LAKE ST US 20 LAKE ST US 30 LINCOLN HWY AT ILL 59 (SUTTON RD) Congestion Mitigation RAMP MODIFICATIONS RETAINING WALL NOISE BARRIERS AT ILL 59 (SUTTON RD) Congestion Mitigation CONSTRUCTION ENGINEERING $550,000 BARTLETT 1 2017-2021 AT CN RR N OF SAUK TRAIL Congestion Mitigation CONSTRUCTION ENGINEERING $3,400,000 LYNWOOD 4 2016 $6,890,000 CHICAGO 3 2017-2021 CN RR RESPONSIBLE FOR 78.5% OF PROJECT COST. US 41 LAKE SHORE DR Needs Category ACCRUING FULLERTON PKWY TO MONROE DR Miles = 3.47 System Maintenance Miles 3.47 Roughness(IRI) ACCEPTABLE Rutting 0.13 AADT 135,177 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 0.0 NHS Y 1 - 14 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street ILL 1 HALSTED ST ILL 1 HALSTED ST ILL 19 IRVING PARK RD ILL 19 IRVING PARK RD ILL 21 MILWAUKEE AVE ILL 21 MILWAUKEE AVE ILL 21 MILWAUKEE AVE Location OVER IHB RR & OVER CSX RR Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM TRANSPORTATION OPS BRIDGE DECK OVERLAY BRIDGE JOINT REPAIR BRIDGE SUBSTRUCTURE Est. Cost $4,135,000 City Past Current RIVERDALE 1 2017-2021 Structure Status STRUCTURAL BACKLOG AADT 19,100 Truck Pct 6 Str Number 0160194 NHS N STRUCTURAL BACKLOG 19,100 6 0160195 N AT VINCENNES RD Congestion Mitigation CHANNELIZATION TRAF SIGNAL MODERNIZATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP PRESERVE SYSTEM $2,500,000 HARVEY 5 2017-2021 AT SCOTT ST & AT JUDD AVE Congestion Mitigation INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $2,225,000 SCHILLER PARK 3 2017-2021 AT SCOTT ST & AT JUDD AVE Congestion Mitigation LAND ACQUISITION $525,000 SCHILLER PARK 4 2017-2021 N OF SANDERS RD TO S OF EUCLID AVE Miles = 0.28 Congestion Mitigation INTERSECTION IMPROVEMENT RECONSTRUCTION TRAF SIGNAL MODERNIZATION SIGNAL TIMING/PROGRESSION $7,250,000 GLENVIEW 18 2017-2021 N OF SANDERS RD TO S OF EUCLID AVE Congestion Mitigation CONSTRUCTION ENGINEERING $750,000 GLENVIEW 5 2017-2021 N OF SANDERS RD TO S OF EUCLID AVE Congestion Mitigation P.E. (ROW) $225,000 GLENVIEW 13 2017-2021 1 - 15 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street ILL 21 MILWAUKEE AVE ILL 21 MILWAUKEE AVE ILL 38 ROOSEVELT RD Needs Category ADEQUATE Location Improvements Objectives N OF SANDERS RD TO S OF EUCLID AVE Congestion Mitigation LAND ACQUISITION AT ILL 58 (GOLF RD) & AT GREENWOOD AVE Congestion Mitigation TRAF SIGNAL MODERNIZATION SIDEWALKS PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS I-294 (TRI-STATE TOLLWAY) TO HARRISON ST Miles = 0.19 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA Miles 0.19 Roughness(IRI) NOT ACCEPTABLE Rutting 0.19 AADT 27,000 Truck Pct 7.3 $4,000,000 2017-2021 $915,000 NILES 5 2016 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $165,000 HILLSIDE 1 2016 $435,000 CHICAGO 1 2017-2021 $1,350,000 CHICAGO 2 2017-2021 $200,000 CHICAGO 2 2017-2021 $2,350,000 BERWYN 2 2017-2021 $200,000 BERWYN 2 2017-2021 NHS Y SAFETY MODAL CONNECTIVITY HARLEM AVE AT ARCHER AVE Miles = 0.01 Congestion Mitigation TRAF SIGNAL MODERNIZATION LEFT TURN LANES RESURFACING MISCELLANEOUS SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS ILL 43 AT ARCHER AVE LAND ACQUISITION ILL 43 HARLEM AVE ILL 43 HARLEM AVE ILL 43 HARLEM AVE Past Current 13 RR INTERCONNECT HARLEM AVE City GLENVIEW HARLEM AVE, NORTHWEST HWY & DEVON AVE System Maintenance ILL 43 Est. Cost Congestion Mitigation AT CERMAK RD / 22ND ST Congestion Mitigation TRAF SIGNAL MODERNIZATION LEFT TURN LANES AT CERMAK RD / 22ND ST Congestion Mitigation LAND ACQUISITION 1 - 16 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street ILL 43 HARLEM AVE Needs Category ACCRUING ILL 43 HARLEM AVE ILL 43 HARLEM AVE (NB) Location Improvements 26TH ST TO I-55 (STEVENSON EXPWY) Miles = 3.00 System Maintenance Miles 3.00 Roughness(IRI) NOT ACCEPTABLE Rutting 0.25 AADT 32,431 Objectives RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 10.2 HARLEM AVE (NB) ILL 43 HARLEM AVE ILL 43 HARLEM AVE ILL 43 HARLEM AVE City Past Current SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $2,500,000 NORTH RIVERSIDE RIVERSIDE LYONS STICKNEY FOREST VIEW 5 2017-2021 NHS Y AT 46TH / 47TH ST Congestion Mitigation INTERSECTION IMPROVEMENT TRAF SIGNAL MODERNIZATION SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $1,450,000 LYONS 6 2017-2021 OVER MWRDGC RR 0.2 MI N OF I-55 (STEVENSON EXPWY) Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $4,650,000 FOREST VIEW 8 2017-2021 Structure Status STRUCTURAL BACKLOG ILL 43 Est. Cost OVER MWRDGC RR 0.2 MI N OF I-55 (STEVENSON EXPWY) Bridge Maintenance UTILITY ADJUSTMENT 63RD ST TO 65TH ST System Expansion P.E. (PHASE I) 63RD ST TO 65TH ST System Expansion 63RD ST TO 65TH ST System Expansion AADT 18,900 $110,000 Truck Pct 15 Str Number 0160314 NHS Y FOREST VIEW 3 2017-2021 $2,500,000 BEDFORD PARK CHICAGO 1 2016 P.E. (PHASE I) $2,500,000 BEDFORD PARK CHICAGO 1 2017-2021 P.E. (PHASE I) $250,000 BEDFORD PARK CHICAGO 1 2017-2021 1 - 17 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street ILL 43 HARLEM AVE ILL 43 HARLEM AVE ILL 43 HARLEM AVE ILL 43 HARLEM AVE ILL 43 HARLEM AVE Location Improvements Objectives Est. Cost HARLEM AVE ILL 43 HARLEM AVE Past Current SAFETY MODAL CONNECTIVITY FREIGHT MOVEMENT $15,000,000 BEDFORD PARK 2 2017-2021 AT BRC RR (65TH ST) System Expansion RR GRADE SEPARATION AT BRC RR (65TH ST) System Expansion CONSTRUCTION ENGINEERING $1,950,000 BEDFORD PARK 1 2017-2021 AT BRC RR (65TH ST) System Expansion P.E. (PHASE II) $1,500,000 BEDFORD PARK 1 2017-2021 AT BRC RR (65TH ST) System Expansion LAND ACQUISITION $1,000,000 BEDFORD PARK 1 2017-2021 OVER US 12/20 (95TH ST) 0.6 MI N OF I-294 (TRI-STATE TOLLWAY) Bridge Maintenance BRIDGE REHABILITATION BRIDGE WIDENING INTERCHANGE RECONSTRUCTN PUMP STATION LIGHTING BRIDGEVIEW 17 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT Structure Status STRUCTURAL BACKLOG ILL 43 City OVER US 12/20 (95TH ST) 0.6 MI N OF I-294 (TRI-STATE TOLLWAY) Bridge Maintenance CONSTRUCTION ENGINEERING OVER US 12/20 (95TH ST) 0.6 MI N OF I-294 (TRI-STATE TOLLWAY) Bridge Maintenance P.E. (PHASE II) 1 - 18 $17,000,000 AADT 40,300 Truck Pct 8 Str Number 0160320 NHS Y FUNCTIONAL LONG TERM 40,300 8 0160321 Y FUNCTIONAL LONG TERM 20,150 8 0161010 Y $1,700,000 BRIDGEVIEW 3 2017-2021 $750,000 BRIDGEVIEW 2 2016 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street ILL 43 Location Improvements Objectives OVER US 12/20 (95TH ST) 0.6 MI N OF I-294 (TRI-STATE TOLLWAY) Bridge Maintenance UTILITY ADJUSTMENT OVER US 12/20 (95TH ST) 0.6 MI N OF I-294 (TRI-STATE TOLLWAY) Bridge Maintenance RR FLAGGER OVER US 12/20 (95TH ST) 0.6 MI N OF I-294 Bridge Maintenance LAND ACQUISITION HARLEM AVE ILL 43 AT 151ST ST INTERSECTION RECONSTN TRAF SIGNAL MODERNIZATION HARLEM AVE ILL 43 HARLEM AVE ILL 43 Congestion Mitigation HARLEM AVE ILL 50 SAFETY Needs Category ACCRUING BYRON ST TO DIVISION ST & I-290 RESURFACING (EISENHOWER EXPWY) TO ROOSEVELT PEDESTRIAN RAMPS/ADA RD Miles = 3.78 System Maintenance Miles Roughness(IRI) Rutting AADT Truck Pct NHS NOT ACCEPTABLE 0.25 3.37 29,460 8.2 Y ACCRUING 0.41 CICERO AVE ILL 50 CICERO AVE Needs Category BACKLOG NOT ACCEPTABLE 0.19 28,700 79TH ST TO 95TH ST Miles = 2.04 System Maintenance Miles 2.04 Roughness(IRI) NOT ACCEPTABLE Rutting 0.44 AADT 44,585 19.2 City Past Current $500,000 BRIDGEVIEW 4 2017-2021 $500,000 BRIDGEVIEW 4 2017-2021 $10,000 BRIDGEVIEW 1 2017-2021 ORLAND PARK 4 2016 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $800,000 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $3,475,000 CHICAGO 3 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $3,040,000 OAK LAWN HOMETOWN CHICAGO 3 2017-2021 Y RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 6.9 Est. Cost NHS Y 1 - 19 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street ILL 50 ILL 83 Location Improvements N OF CAL SAG RD TO 147TH ST Miles = 2.05 System Maintenance Objectives ILL 50 ILL 83 CICERO AVE ILL 50 ILL 83 CICERO AVE ILL 50 Miles 2.05 Roughness(IRI) ACCEPTABLE CICERO AVE AADT 38,279 CRESTWOOD MIDLOTHIAN 3 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY $2,500,000 CRESTWOOD 3 2017-2021 $400,000 CRESTWOOD 1 2017-2021 $675,000 RICHTON PARK 2 2017-2021 LAND ACQUISITION $100,000 RICHTON PARK 1 2017-2021 Truck Pct 5.5 NHS Y TRAF SIGNAL MODERNIZATION RIGHT TURN LANE INTERSECTION IMPROVEMENT AT MIDLOTHIAN TURNPIKE, AT 135TH ST & AT CAL SAG RD Congestion Mitigation LAND ACQUISITION AT STEGER RD TRAF SIGNAL INSTALLATION TURNING LANES LIGHTING Congestion Mitigation AT STEGER RD Past Current $1,745,000 AT MIDLOTHIAN TURNPIKE, AT 135TH ST & AT CAL SAG RD Congestion Mitigation CICERO AVE ILL 50 Rutting 0.16 City SAFETY PRESERVE SYSTEM TRANSPORTATION OPS RESURFACING PEDESTRIAN RAMPS/ADA CICERO AVE Needs Category ACCRUING Est. Cost SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY PRESERVE SYSTEM Congestion Mitigation ILL 53 OVER US 12 (RAND RD) Bridge Maintenance P.E. (PHASE I) $335,000 ARLINGTON HEIGHTS 1 2017-2021 ILL 53 OVER US 14 (NORTHWEST HWY) & UP RR Bridge Maintenance P.E. (PHASE I) $200,000 PALATINE ROLLING MEADOWS 1 2017-2021 ILL 53 RAMP (NB) TO ILL 62 (ALGONQUIN RD) System Maintenance DRAINAGE $300,000 ROLLING MEADOWS 7 2017-2021 SAFETY PRESERVE SYSTEM 1 - 20 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives ILL 53 OVER ILL 62 (ALGONQUIN RD) Bridge Maintenance P.E. (PHASE I) ILL 53 US 12 (RAND RD) TO KENNEDY DR Congestion Mitigation INTERSECTION IMPROVEMENT NEW MEDIAN SIDEWALKS US 12 (RAND RD) TO KENNEDY DR Congestion Mitigation ILL 68 ILL 53 $200,000 City Past Current ROLLING MEADOWS 1 2017-2021 $3,300,000 PALATINE 7 2017-2021 P.E. (PHASE II) $200,000 PALATINE 1 2016 US 12 (RAND RD) TO KENNEDY DR Congestion Mitigation LAND ACQUISITION $325,000 PALATINE ARLINGTON HEIGHTS 3 2017-2021 MICHAEL MANOR TO WASHINGTON RD System Maintenance TRAF SIGNAL MODERNIZATION SAFETY PRESERVE SYSTEM $700,000 NILES 1 2017-2021 E OF ROHRSSEN RD TO W OF BARRINGTON RD System Maintenance TRAF SIGNAL MODERNIZATION CHANNELIZATION MILLED RUMBLE STRIP SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP $2,260,000 HOFFMAN ESTATES 2 2017-2021 ILL 62 (ALGONQUIN RD) TO BROADWAY ST Miles = 4.52 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $4,030,000 MOUNT PROSPECT DES PLAINES ARLINGTON HEIGHTS 3 2017-2021 DUNDEE RD ILL 68 Est. Cost SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS DUNDEE RD ILL 53 ILL 68 DUNDEE RD ILL 58 GOLF RD ILL 58 GOLF RD ILL 58 GOLF RD Needs Category BACKLOG Miles 4.52 Roughness(IRI) ACCEPTABLE Rutting 0.14 AADT 30,062 Truck Pct 5.1 NHS Y 1 - 21 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street ILL 58 GOLF RD ILL 58 GOLF RD ILL 58 GOLF RD ILL 58 DEMPSTER ST ILL 58 DEMPSTER ST ILL 59 SUTTON RD ILL 62 ALGONQUIN RD Location Improvements Objectives AT WOLF RD N JCT (CUMBERLAND CIRCLE) Miles = 0.02 Congestion Mitigation RECONSTRUCTION SIGNING (NEW) PAVEMENT MARKING RESURFACING SAFETY PRESERVE SYSTEM AT WOLF RD N JCT (CUMBERLAND CIRCLE) Congestion Mitigation LAND ACQUISITION COLLEGE DR TO E RIVER RD System Maintenance DRAINAGE AT NILES CENTER RD & US 41 (SKOKIE BLVD) Congestion Mitigation INTERSECTION IMPROVEMENT CURB AND GUTTER DRAINAGE LIGHTING RIGHT TURN LANE LEFT TURN LANES TRAF SIGNAL MODERNIZATION AT NILES CENTER RD & US 41 (SKOKIE BLVD) Congestion Mitigation LAND ACQUISITION AT WEST BARTLETT RD Congestion Mitigation TURNING LANES SAFETY MODAL CONNECTIVITY PENNY RD TO ROSELLE RD (WESTBOUND) System Maintenance PATCHING SAFETY PRESERVE SYSTEM 1 - 22 Est. Cost City Past Current $3,500,000 DES PLAINES 2 2017-2021 $115,000 DES PLAINES 1 2016 SAFETY PRESERVE SYSTEM $1,050,000 DES PLAINES 7 2017-2021 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $3,000,000 SKOKIE 16 2017-2021 $1,025,000 SKOKIE 2 2017-2021 BARTLETT 4 2016 SOUTH BARRINGTON HOFFMAN ESTATES PALATINE 1 2016 $665,000 $1,255,000 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street ILL 62 ALGONQUIN RD Needs Category BACKLOG Location Improvements E OF ROSELLE RD TO ILL 58 (GOLF RD) Miles = 4.78 System Maintenance Miles 4.78 Roughness(IRI) NOT ACCEPTABLE Rutting 0.17 AADT 32,319 Objectives SAFETY PRESERVE SYSTEM TRANSPORTATION OPS RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 8.6 Est. Cost $4,165,000 City Past Current PALATINE SCHAUMBURG ROLLING MEADOWS ARLINGTON HEIGHTS 5 2017-2021 $950,000 MELROSE PARK 4 2017-2021 NHS Y AT IHB RR W OF 25TH AVE System Maintenance PUMP STATION STORM SEWER (NEW) STORM SEWER REPAIR AT IHB RR W OF 25TH AVE System Maintenance LAND ACQUISITION $50,000 MELROSE PARK 4 2017-2021 AT IHB RR W OF 25TH AVE System Maintenance UTILITY ADJUSTMENT $20,000 MELROSE PARK 4 2017-2021 NORTH AVE ILL 64 AT CLARK ST INTERSECTION IMPROVEMENT TRAF SIGNAL MODERNIZATION SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $280,000 CHICAGO 7 2017-2021 INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $2,860,000 BARRINGTON 15 2017-2021 AT NORTH WILKE RD Congestion Mitigation TURNING LANES SAFETY MODAL CONNECTIVITY $400,000 ARLINGTON HEIGHTS 4 2016 AT KENNICOTT AVE Congestion Mitigation TURNING LANES SAFETY MODAL CONNECTIVITY $350,000 ARLINGTON HEIGHTS 4 2016 ILL 64 NORTH AVE ILL 64 NORTH AVE ILL 64 Congestion Mitigation EUGENIE ST ILL 68 DUNDEE RD ILL 68 DUNDEE RD ILL 68 DUNDEE RD AT S GROVE AVE SAFETY PRESERVE SYSTEM Congestion Mitigation 1 - 23 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street ILL 68 DUNDEE RD ILL 68 DUNDEE RD Needs Category ADEQUATE ILL 68 DUNDEE RD ILL 68 DUNDEE RD ILL 68 DUNDEE RD ILL 68 DUNDEE RD Location AT BUFFALO GROVE RD Congestion Mitigation Improvements Objectives INTERSECTION RECONSTN POTOWATOMI WOODS FOREST RESURFACING PRESERVE ENTRANCE TO I-94 / US 41 PEDESTRIAN RAMPS/ADA (EDENS EXPWY) Miles = 5.91 System Maintenance Miles Roughness(IRI) Rutting AADT Truck Pct NHS NOT ACCEPTABLE 0.24 5.91 34,844 7.7 Y Est. Cost City Past Current SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $2,500,000 BUFFALO GROVE 4 2016 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $5,135,000 NORTHBROOK 1 2016 AT ILL 83 (ELMHURST RD) Congestion Mitigation INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $850,000 WHEELING 4 2016 AT MCHENRY RD / WHEELING RD Congestion Mitigation INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $1,000,000 WHEELING 4 2016 AT LANDWEHR RD Congestion Mitigation TURNING LANES SAFETY MODAL CONNECTIVITY $600,000 NORTHBROOK 4 2016 AT PFINGSTEN RD Congestion Mitigation TURNING LANES SAFETY MODAL CONNECTIVITY $800,000 NORTHBROOK 4 2016 1 - 24 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street ILL 68 DUNDEE RD Location Improvements AT MIDDLE FORK NORTH BRANCH CHICAGO RIVER 0.8 MI E OF ILL 43 (WAUKEGAN RD) Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM CULVERT REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 68 DUNDEE RD ILL 68 DUNDEE RD ILL 72 HIGGINS RD Needs Category ACCRUING ILL 72 HIGGINS RD ILL 72 ILL 83 AT MIDDLE FORK NORTH BRANCH CHICAGO RIVER 0.8 MI E OF ILL 43 (WAUKEGAN RD) Bridge Maintenance LAND ACQUISITION Est. Cost $4,500,000 AADT 36,000 City NORTHBROOK Truck Pct 3 Past Current 15 Str Number 0160813 2017-2021 NHS Y $100,000 NORTHBROOK 2 2017-2021 MIDDLE FORK NORTH BRANCH CHICAGO LANDSCAPING RIVER 0.8 MI E OF ILL 43 (WAUKEGAN RD) Bridge Maintenance SUSTAINABILITY $180,000 NORTHBROOK 2 2017-2021 MEACHAM RD TO I-290 E FR RD Miles = 0.85 System Maintenance SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $750,000 SCHAUMBURG 5 2017-2021 Miles 0.85 Roughness(IRI) ACCEPTABLE Rutting 0.10 AADT 50,535 RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 8.2 NHS Y LEXINGTON DR TO I-290 RAMP(NB) & I-290 (E & W FR RDS) AT WOODFIELD RD Congestion Mitigation INTERSECTION IMPROVEMENT TRAF SIGNAL MODERNIZATION SIGNING (NEW) LIGHTING SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $3,000,000 SCHAUMBURG 5 2016 ILL 72 (N) TO ILL 72 (S) INCL ILL 83 (S) Congestion Mitigation INTERSECTION IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $3,700,000 ELK GROVE VILLAGE 4 2017-2021 OAKTON ST 1 - 25 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street ILL 83 ILL 171 Location Improvements Objectives AT ILL 171 (MAIN ST) (S JCT) Congestion Mitigation INTERSECTION RECONSTN TRAF SIGNAL MODERNIZATION AT ILL 171 (MAIN ST) (S JCT) Congestion Mitigation ILL 171 City Past Current $5,200,000 6 2017-2021 P.E. (PHASE II) $375,000 1 2016 AT ILL 171 (MAIN ST) (S JCT) Congestion Mitigation LAND ACQUISITION $400,000 6 2016 ILL 43 (HARLEM AVE) TO I-294 (SB) RAMP TO ILL 83 Miles = 3.39 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA ARCHER AVE ILL 83 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT Est. Cost ARCHER AVE ILL 83 ILL 171 ARCHER AVE ILL 83 CAL SAG RD Needs Category ACCRUING ILL 171 CUMBERLAND AVE Needs Category ACCRUING ILL 171 FIRST AVE Needs Category ADEQUATE Miles 3.39 Roughness(IRI) NOT ACCEPTABLE Rutting 0.20 AADT 25,258 I-90 (KENNEDY EXPWY) TO FOREST PRESERVE DR Miles = 3.05 System Maintenance Miles 3.05 Roughness(IRI) NOT ACCEPTABLE Rutting 0.17 AADT 32,145 Truck Pct 8.0 Roughness(IRI) NOT ACCEPTABLE Rutting 0.20 AADT 29,138 Truck Pct 11.2 PALOS HEIGHTS ALSIP 7 2017-2021 SAFETY PRESERVE SYSTEM $1,750,000 CHICAGO NORRIDGE 8 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $5,960,000 RIVER GROVE MELROSE PARK MAYWOOD NORTH RIVERSIDE BROOKFIELD 5 2017-2021 NHS Y DES PLAINES RIVER RD TO BROOKFIELD RESURFACING ZOO 0.3 MI S OF 31ST ST PEDESTRIAN RAMPS/ADA Miles = 5.84 System Maintenance Miles 5.84 $2,330,000 NHS Y RESURFACING Truck Pct 5.0 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS NHS Y 1 - 26 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives AT ROOSEVELT RD Congestion Mitigation TRAF SIGNAL MODERNIZATION CHANNELIZATION LAND ACQUISITION FIRST AVE AT ROOSEVELT RD Congestion Mitigation ILL 171 47TH ST TO I-55 BRIDGE PAINTING PRESERVE SYSTEM BRIDGE PAINTING RR FLAGGER BRIDGE REPLACEMENT ILL 171 FIRST AVE ILL 171 ARCHER AVE ILL 171 (NORTHBOUND) I-55 TO 55TH ST Bridge Maintenance AT I-55 (STEVENSON EXPWY) Bridge Maintenance ARCHER AVE (NORTHBOUND) ILL 171 ARCHER AVE (NORTHBOUND) 47TH ST TO 55TH ST BRIDGE COMPLEX AT I-55 Bridge Maintenance UTILITY ADJUSTMENT 47TH ST TO 55TH ST BRIDGE COMPLEX AT I-55 Bridge Maintenance RR FLAGGER 4 2017-2021 $200,000 MAYWOOD 4 2017-2021 $5,246,000 SUMMIT LYONS MC COOK 2 2017-2021 PRESERVE SYSTEM SAFETY $4,944,000 SUMMIT LYONS MC COOK 2 2017-2021 SAFETY PRESERVE SYSTEM $4,907,000 SUMMIT 2 2016 SAFETY 1 - 27 Past Current MAYWOOD Structure Status STRUCTURAL BACKLOG ILL 171 City $1,400,000 Bridge Maintenance ARCHER AVE ILL 171 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP Est. Cost AADT 21,100 Truck Pct 14 Str Number 0160485 NHS Y $550,000 SUMMIT LYONS MC COOK 2 2017-2021 $400,000 SUMMIT LYONS MC COOK 1 2017-2021 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street ILL 171 ARCHER AVE Needs Category ACCRUING ILL 171 Location N OF 55TH PL TO 63RD ST Miles = 0.98 System Maintenance Miles 0.98 Roughness(IRI) NOT ACCEPTABLE AT 95TH ST ARCHER AVE Needs Category ACCRUING 25TH AVE Needs Category BACKLOG 39TH ST PERSHING RD Objectives RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 16.7 Est. Cost SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $835,000 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT City SUMMIT Past Current 3 2017-2021 $4,500,000 12 2017-2021 $40,000 7 2017-2021 $800,000 4 2017-2021 WILLOW SPRINGS 3 2017-2021 NHS N INTERSECTION RECONSTN CULVERT REHABILITATION LAND ACQUISITION Congestion Mitigation AT 95TH ST LANDSCAPING SUSTAINABILITY RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $3,415,000 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $870,000 FRANKLIN PARK 3 2017-2021 $370,000 CHICAGO 7 2017-2021 Congestion Mitigation ARCHER AVE ILL 171 AADT 26,400 Congestion Mitigation ARCHER AVE ILL 171 Rutting 0.25 AT 95TH ST ARCHER AVE ILL 171 Improvements ILL 83 (KINGERY HWY) TO N OF POSTON RD Miles = 5.02 System Maintenance Miles 5.02 Roughness(IRI) NOT ACCEPTABLE Rutting 0.21 AADT 12,608 GRAND AVE TO ARMITAGE AVE Miles = 1.02 System Maintenance Miles 1.02 Roughness(IRI) NOT ACCEPTABLE Rutting 0.22 AADT 18,400 RACINE AVE & CN RR 1.3 MI W OF I-94 Bridge Maintenance Truck Pct 8.3 NHS N RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 6.6 NHS N P.E. (PHASE II) 1 - 28 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street 39TH ST PERSHING RD Location Improvements RACINE AVE & CN RR 1.3 MI W OF I-94 Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM TRANSPORTATION OPS BRIDGE REHABILITATION BRIDGE DECK OVERLAY BRIDGE SUPERSTRUCTURE BRIDGE SUBSTRUCTURE BRIDGE REPAIR Structure Status STRUCTURAL BACKLOG 47TH ST AT EAST AVE / EBERLY AVE Congestion Mitigation P.E. (PHASE I) 111TH ST VINCENNES AVE TO RACINE AVE Miles = 0.58 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA Needs Category ACCRUING 115TH ST Miles 0.58 Roughness(IRI) NOT ACCEPTABLE Rutting 0.26 AADT 10,883 AT PULASKI RD MCCARTHY RD Needs Category ACCRUING 138TH ST US 45 (96TH AVE) TO ILL 43 (HARLEM AVE) Miles = 3.28 System Maintenance Miles 3.28 Roughness(IRI) NOT ACCEPTABLE Rutting 0.27 AADT 7,029 AT ASHLAND AVE System Maintenance $3,700,000 AADT 9,450 City CHICAGO Truck Pct 26 Past Current 7 Str Number 0160396 2017-2021 NHS Y $400,000 BROOKFIELD 2 2016 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $550,000 CHICAGO 7 2017-2021 INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $850,000 ALSIP CHICAGO 4 2016 RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $1,680,000 PALOS PARK PALOS HEIGHTS 6 2017-2021 SAFETY PRESERVE SYSTEM $3,850,000 RIVERDALE 18 2017-2021 Truck Pct 3.7 NHS N Congestion Mitigation 123RD ST Est. Cost Truck Pct 6.9 NHS N PUMP STATION DRAINAGE 1 - 29 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current 143RD ST AT CREEK CROSSING DR Congestion Mitigation SIGNAL TIMING/PROGRESSION TRAF SIGNAL INSTALLATION INTERSECTION IMPROVEMENT SAFETY TRANSPORTATION OPS PRESERVE SYSTEM MODAL CONNECTIVITY $1,050,000 ORLAND PARK 8 2017-2021 154TH ST I-94 (BISHOP FORD EXPWY) TO MICHIGAN CITY RD Miles = 0.59 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $305,000 DOLTON CALUMET CITY 7 2017-2021 TRAF SIGNAL INSTALLATION SAFETY TRANSPORTATION OPS $1,000,000 8 2017-2021 RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $755,000 LANSING 7 2017-2021 BLUE ISLAND 11 2017-2021 Needs Category BACKLOG 183RD ST Miles 0.59 Roughness(IRI) NOT ACCEPTABLE Rutting 0.20 AADT 7,200 AT CENTRAL AVE Truck Pct 2.2 NHS N System Maintenance 186TH ST Needs Category ACCRUING ILL 83 (TORRENCE AVE) TO WENTWORTH AVE Miles = 1.50 System Maintenance Miles 1.50 Roughness(IRI) NOT ACCEPTABLE Rutting 0.13 AADT 4,975 Truck Pct 2.1 NHS N ASHLAND AVE AT ABANDONED 135TH ST BRIDGE Bridge Maintenance BRIDGE REMOVAL/DEMOLITION SIDEWALKS RETAINING WALL SAFETY MODAL CONNECTIVITY TRANSPORTATION OPS SUSTAINABILITY $2,400,000 BELMONT AVE AT ORIOLE AVE TRAF SIGNAL INSTALLATION SAFETY TRANSPORTATION OPS $345,000 ELMWOOD PARK CHICAGO 8 2017-2021 RR INTERCONNECT SAFETY MODAL CONNECTIVITY $500,000 BURNHAM 2 2017-2021 Congestion Mitigation BRAINARD AVE AT BURNHAM AVE System Maintenance 1 - 30 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street BUSSE HWY Location Improvements AT PRAIRIE CREEK 0.4 MI SE OF US 14 Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE DECK OVERLAY Structure Status ADEQUATE CENTRAL AVE 63RD ST TO 87TH ST Miles = 3.81 System Expansion CORRIDOR IMPROVEMENT CENTRAL AVE 63RD ST TO 87TH ST System Expansion P.E. (PHASE II) CENTRAL AVE 63RD ST TO 87TH ST System Expansion LAND ACQUISITION CENTRAL AVE 63RD ST TO 87TH ST System Expansion RR FLAGGER CHICAGO HEIGHTS RD AT THORN CREEK Bridge Maintenance BRIDGE BEAM REPLACEMENT BRIDGE NEW DECK GLENWOOD RD TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT COMPREHENSIVE PLAN AT ROBINSON RD INTERSECTION RECONSTN Congestion Mitigation 1 - 31 $100,000 AADT 3,200 City DES PLAINES Truck Pct 5 Past Current 1 Str Number 0160239 2017-2021 NHS N $105,000,000 CHICAGO BEDFORD PARK BURBANK 19 2017-2021 $30,000,000 CHICAGO BEDFORD PARK BURBANK 2 2017-2021 $5,400,000 CHICAGO BEDFORD PARK BURBANK 15 2017-2021 SAFETY $6,000,000 CHICAGO BEDFORD PARK BURBANK 3 2017-2021 SAFETY PRESERVE SYSTEM $1,400,000 GLENWOOD 11 2017-2021 Structure Status STRUCTURAL BACKLOG DES PLAINES RIVER Est. Cost SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT AADT 5,900 $2,000,000 Truck Pct 13 Str Number 0162417 FRANKLIN PARK NHS N 8 2017-2021 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street DES PLAINES RIVER Location Improvements AT ROBINSON RD Objectives LAND ACQUISITION Est. Cost City Past Current $197,000 FRANKLIN PARK 1 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $510,000 CHICAGO 8 2016 SAFETY TRANSPORTATION OPS $293,000 CHICAGO 1 2016 $32,000 CHICAGO 1 2016 $2,900,000 LYNWOOD 2 2017-2021 $200,000 LYNWOOD 3 2017-2021 Congestion Mitigation ERIE ST NOBLE ST TO 0.1 MI E OF OGDEN AVE & MORGAN ST TO UNION AVE Miles = 0.60 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA Needs Category ACCRUING Miles 0.28 Roughness(IRI) NOT ACCEPTABLE Rutting 0.13 AADT 13,000 Truck Pct 0.0 NHS N ACCRUING 0.32 NOT ACCEPTABLE 0.10 13,000 0.0 N FOSTER AVE AT AVERS AVE TRAF SIGNAL INSTALLATION System Maintenance FOSTER AVE AT AVERS AVE CONSTRUCTION ENGINEERING System Maintenance GLENWOOD DYER RD Needs Category ACCRUING GLENWOOD DYER RD STONY ISLAND AVE TO ILL 83 (TORRENCE AVE) Miles = 1.25 System Maintenance Miles 1.25 Roughness(IRI) NOT ACCEPTABLE Rutting 0.23 AADT 10,300 STONY ISLAND AVE TO ILL 83 (TORRENCE AVE) System Maintenance WIDENING & RESURFACING BI-DIRECT LEFT TURN LANE PEDESTRIAN RAMPS/ADA Truck Pct 8.5 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS NHS N LAND ACQUISITION 1 - 32 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street GOVERNORS HWY Needs Category ADEQUATE HALSTED ST Needs Category BACKLOG HARTS RD Needs Category ACCRUING HARTS RD Location Improvements 175TH ST TO PUALSKI RD / CRAWFORD AVE Miles = 4.87 System Maintenance Miles 4.87 Roughness(IRI) ACCEPTABLE Rutting 0.15 AADT 10,250 Objectives RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 3.9 Roughness(IRI) NOT ACCEPTABLE Rutting 0.23 AADT 1,150 CRONAME RD TO MILWAUKEE AVE Miles = 0.74 System Maintenance Miles 0.74 Roughness(IRI) NOT ACCEPTABLE Rutting 0.20 AADT 4,750 AT NORTH BRANCH CHICAGO RIVER Bridge Maintenance Truck Pct 0.0 $4,140,000 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS SAFETY PRESERVE SYSTEM TRANSPORTATION OPS AT ILLINOIS RD System Maintenance HIBBARD RD AT ILLINOIS RD EAST HAZEL CREST HOMEWOOD HAZEL CREST FLOSSMOOR OLYMPIA FIELDS 3 2017-2021 $430,000 CHICAGO HEIGHTS 1 2017-2021 $585,000 NILES 1 2017-2021 $1,315,000 NILES 11 2017-2021 NHS N SAFETY PRESERVE SYSTEM BRIDGE BEAM REPLACEMENT BRIDGE NEW DECK Structure Status STRUCTURAL ACCRUING HIBBARD RD Past Current NHS N RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 9.9 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS City NHS N US 30 (LINCOLN HWY / 14TH ST) TO MAIN RESURFACING ST PEDESTRIAN RAMPS/ADA Miles = 0.63 System Maintenance Miles 0.63 Est. Cost TRAF SIGNAL INSTALLATION CHANNELIZATION LAND ACQUISITION System Maintenance 1 - 33 SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP AADT 4,750 Truck Pct 9 Str Number 0160726 NHS N $750,000 WILMETTE 8 2017-2021 $85,000 WILMETTE 2 2017-2021 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives IL-53NB TO I-90EB EXIT RAMP TO I-90 (JANE ADDAMS MEMORIAL TOLLWAY) System Maintenance SAFETY IMPROVEMENTS SAFETY JOLIET RD AT FLAG CREEK BRIDGE SUPERSTRUCTURE SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Bridge Maintenance Structure Status STRUCTURAL ACCRUING Est. Cost $200,000 $2,770,000 AADT 11,750 City Past Current SCHAUMBURG 1 2016 INDIAN HEAD PARK 8 2017-2021 Truck Pct 12 Str Number 0160393 NHS N JOLIET RD AT WILLOW SPRINGS RD System Maintenance TRAF SIGNAL MODERNIZATION SAFETY PRESERVE SYSTEM $385,000 COUNTRYSIDE 1 2016 KEDZIE AVE AT 119TH ST INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $850,000 MERRIONETTE PARK 2 2017-2021 $194,000 MERRIONETTE PARK 1 2017-2021 LEMONT 3 2017-2021 Congestion Mitigation KEDZIE AVE AT 119TH ST LAND ACQUISITION Congestion Mitigation LEMONT RD BLUFF RD TO S OF ILLINOIS ST Miles = 1.03 System Maintenance Needs Category BACKLOG Miles 0.93 Roughness(IRI) ACCEPTABLE BACKLOG 0.10 NOT ACCEPTABLE SAFETY PRESERVE SYSTEM TRANSPORTATION OPS RESURFACING PEDESTRIAN RAMPS/ADA Rutting 0.13 AADT 21,876 Truck Pct 9.6 NHS N 0.23 5,600 14.1 N 1 - 34 $1,610,000 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street LINCOLN AVE Needs Category BACKLOG MADISON ST Needs Category BACKLOG Location Improvements FOSTER AVE TO WESTERN AVE Miles = 0.47 System Maintenance Miles 0.47 Roughness(IRI) NOT ACCEPTABLE Rutting 0.28 AADT 14,100 THATCHER AVE TO DES PLAINES AVE Miles = 0.62 System Maintenance Miles 0.62 Roughness(IRI) NOT ACCEPTABLE Rutting 0.30 AADT 11,700 Objectives RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 10.8 $580,000 CHICAGO 3 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $605,000 RIVER FOREST 3 2017-2021 DOLTON 3 2017-2021 $1,500,000 THORNTON 8 2017-2021 $100,000 THORNTON 2 2017-2021 $1,300,000 THORNTON 3 2017-2021 NHS N INDIANA AVE TO DOLTON AVE System Maintenance RR FLAGGER SAFETY MARGARET ST AT RIDGE RD INTERSECTION RECONSTN TRAF SIGNAL INSTALLATION CHANNELIZATION RR INTERCONNECT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT ECONOMIC DEVELOP MARGARET ST AT RIDGE RD LAND ACQUISITION $10,000 Congestion Mitigation BROWN DERBY RD MARGARET ST Past Current SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MAIN ST / 142ND ST Congestion Mitigation City NHS N RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 9.0 Est. Cost AT RIDGE RD SAFETY RR FLAGGER Congestion Mitigation 1 - 35 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street MILWAUKEE AVE Needs Category BACKLOG PULASKI RD Location Improvements ALBION AVE TO ELSTON AVE Miles = 0.69 System Maintenance Miles 0.69 Roughness(IRI) NOT ACCEPTABLE Rutting 0.24 AADT 24,264 AT FORD CITY DR Congestion Mitigation PULASKI RD / AT 203RD ST AT DES PLAINES RIVER Bridge Maintenance 3 2017-2021 INTERSECTION CONSTRUCTION BRIDGE REMOVAL/DEMOLITION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY $2,675,000 CHICAGO 6 2017-2021 INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $1,500,000 OLYMPIA FIELDS 11 2017-2021 BRIDGE REPLACEMENT RETAINING WALL SAFETY PRESERVE SYSTEM SUSTAINABILITY DES PLAINES 9 2017-2021 Truck Pct 6.0 NHS Y AT DES PLAINES RIVER Bridge Maintenance LAND ACQUISITION RIDGE BLVD HOWARD ST TO DEVON AVE Miles = 1.54 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA Roughness(IRI) NOT ACCEPTABLE Rutting 0.22 AADT 17,851 Past Current CHICAGO RAND RD Miles 1.54 City $695,000 Structure Status STRUCTURAL BACKLOG Needs Category ACCRUING Est. Cost SAFETY PRESERVE SYSTEM TRANSPORTATION OPS RESURFACING PEDESTRIAN RAMPS/ADA Congestion Mitigation CRAWFORD AVE RAND RD Objectives Truck Pct 2.3 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS NHS N 1 - 36 $10,500,000 AADT 29,900 Truck Pct 2 Str Number 0160362 NHS N $1,750,000 DES PLAINES 2 2017-2021 $1,765,000 CHICAGO 1 2017-2021 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street ROOSEVELT RD Location Improvements PULASKI RD TO WESTERN AVE & RESURFACING HALSTED ST TO US 41 (LAKE SHORE DR) PEDESTRIAN RAMPS/ADA Miles = 3.49 System Maintenance Needs Category BACKLOG Miles 2.04 Roughness(IRI) NOT ACCEPTABLE Rutting 0.20 AADT 25,725 Truck Pct 4.6 NHS Y BACKLOG 1.45 NOT ACCEPTABLE 0.21 24,060 6.0 Y SAUK TRAIL Needs Category ADEQUATE Objectives TORRENCE AVE TO US 30 (LINCOLN HWY) Miles = 1.63 System Maintenance Miles 1.63 Roughness(IRI) NOT ACCEPTABLE Rutting 0.15 AADT 10,501 RESURFACING GUARDRAIL END-SECT REPL PEDESTRIAN RAMPS/ADA Truck Pct 4.3 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $2,000,000 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $750,000 $550,000 AT BURNHAM AVE Congestion Mitigation LEFT TURN LANES SAFETY MODAL CONNECTIVITY TRANSPORTATION OPS SHERIDAN RD SCOTT AVE TO TOWER RD System Maintenance DRAINAGE SAFETY PRESERVE SYSTEM SHERIDAN RD LAKE COOK RD TO WINNETKA AVE Miles = 5.04 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA SHERMER RD Needs Category BACKLOG Miles 5.04 Roughness(IRI) NOT ACCEPTABLE Rutting 0.14 AADT 5,371 ILL 68 (DUNDEE RD) TO ILL 43 (WAUKEGAN RD) Miles = 0.83 System Maintenance Miles 0.83 Roughness(IRI) NOT ACCEPTABLE Rutting 0.34 AADT 11,100 Truck Pct 6.5 Past Current CHICAGO 1 2016 SAUK VILLAGE 4 2017-2021 3 2017-2021 $75,000 GLENCOE WINNETKA 8 2016 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $2,915,000 GLENCOE WINNETKA 8 2016 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $945,000 NORTHBROOK 8 2016 NHS N RESURFACING NEW SHOULDERS PEDESTRIAN RAMPS/ADA Truck Pct 6.5 City NHS N SAUK TRAIL Needs Category BACKLOG Est. Cost NHS N 1 - 37 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street STATE ST Needs Category BACKLOG TALCOTT AVE Location Improvements US 14 (NORTHWEST HWY) TO ILL 58 (DES PLAINES CIRCLE) Miles = 0.20 System Maintenance Miles 0.20 Roughness(IRI) NOT ACCEPTABLE Rutting 0.19 AADT 5,300 CANFIELD AVE TO BRYN MAWR AVE & GREGORY ST TO HIGGINS RD Miles = 1.61 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 0.0 RESURFACING PEDESTRIAN RAMPS/ADA Miles 0.94 Roughness(IRI) NOT ACCEPTABLE Rutting 0.15 AADT 8,350 Truck Pct 5.5 NHS N BACKLOG 0.38 NOT ACCEPTABLE 0.21 6,713 0.0 N BACKLOG 0.29 NOT ACCEPTABLE 0.26 3,200 0.0 N Needs Category BACKLOG THATCHER AVE Needs Category BACKLOG THORNTONLANSING RD Needs Category ACCRUING DEE RD TO FAIRVIEW AVE Miles = 2.19 System Maintenance Miles 2.19 Roughness(IRI) NOT ACCEPTABLE Rutting 0.24 AADT 11,100 ILL 171 (FIRST AVE) TO CHICAGO AVE Miles = 2.52 System Maintenance Miles 2.52 Roughness(IRI) NOT ACCEPTABLE Rutting 0.24 AADT 5,658 SCHWAB ST TO ILL 83 (TORRENCE AVE) Miles = 2.67 System Maintenance Miles 2.67 Roughness(IRI) NOT ACCEPTABLE Rutting 0.34 AADT 7,882 RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 1.4 $235,000 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Past Current DES PLAINES 3 2017-2021 $2,075,000 CHICAGO 3 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $1,000,000 PARK RIDGE 3 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $2,095,000 RIVER GROVE RIVER FOREST ELMWOOD PARK 3 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $1,365,000 THORNTON LANSING 8 2017-2021 NHS N RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 7.9 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS City NHS N RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 5.3 Est. Cost NHS N Needs Category ACCRUING TALCOTT RD Objectives NHS N 1 - 38 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street THORNTONLANSING RD TORRENCE AVE Location Improvements AT STONY ISLAND AVE Congestion Mitigation LAND ACQUISITION AT GRAND CALUMET RIVER Bridge Maintenance BRIDGE REPLACEMENT Objectives SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG TORRENCE AVE AT GRAND CALUMET RIVER Bridge Maintenance CONSTRUCTION ENGINEERING TOUHY AVE AT DES PLAINES RIVER Bridge Maintenance BRIDGE REPAIR BRIDGE DECK OVERLAY SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG TOUHY AVE AT NORTH BRANCH CHICAGO RIVER 0.6 MI E OF ILL 43 Bridge Maintenance BRIDGE REPLACEMENT TRAF SIGNAL MODERNIZATION SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG TOUHY AVE AT NORTH BRANCH CHICAGO RIVER 0.6 MI E OF ILL 43 Bridge Maintenance LAND ACQUISITION TOUHY AVE AT HAMLIN AVE TRAF SIGNAL INSTALLATION CHANNELIZATION Congestion Mitigation 1 - 39 SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP Est. Cost City Past Current $330,000 LANSING 1 2016 $13,000,000 CHICAGO 9 2017-2021 AADT 11,900 Truck Pct 12 Str Number 0160934 NHS Y $1,900,000 CHICAGO 2 2017-2021 $1,800,000 DES PLAINES 7 2017-2021 AADT 32,600 $2,577,000 AADT 25,800 Truck Pct 3 Str Number 0160829 NILES Truck Pct 11 NHS Y 7 Str Number 0160363 2017-2021 NHS Y $250,000 NILES 2 2017-2021 $750,000 LINCOLNWOOD 8 2017-2021 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street TOUHY AVE Location Improvements AT HAMLIN AVE Objectives LAND ACQUISITION Est. Cost $85,000 City Past Current LINCOLNWOOD 2 2017-2021 NORTHFIELD 1 2017-2021 BARTLETT 1 2017-2021 DES PLAINES ROSEMONT PARK RIDGE ARLINGTON HEIGHTS MOUNT PROSPECT SCHAUMBURG ROLLING MEADOWS ELK GROVE VILLAGE PROSPECT HEIGHTS BUFFALO GROVE WHEELING BARRINGTON HILLS SOUTH BARRINGTON WILMETTE EVANSTON NORTHBROOK GLENVIEW SKOKIE LINCOLNWOOD NILES CHICAGO STREAMWOOD HANOVER PARK 1 2016 Congestion Mitigation TOWER RD Needs Category ACCRUING US 20 SERVICE RD Needs Category ADEQUATE VARIOUS I-94 W FR RD TO W OF FORESTWAY DR (WEST CORP LIMITS) Miles = 0.53 System Maintenance Miles 0.53 Roughness(IRI) NOT ACCEPTABLE Rutting 0.23 AADT 8,000 US 20 TO DEAD END Miles = 0.21 System Maintenance Miles 0.21 Roughness(IRI) N/A Rutting N/A AADT VARIOUS LOCATIONS IN NORTHERN COOK COUNTY Miles = 7.46 System Maintenance RESURFACING Truck Pct 5.8 $1,500,000 SAFETY PRESERVE SYSTEM $85,000 SAFETY PRESERVE SYSTEM $2,935,000 NHS N RESURFACING Truck Pct 0.0 SAFETY PRESERVE SYSTEM NHS N RESURFACING INTERMITTENT 1 - 40 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street VARIOUS Location Improvements Objectives VARIOUS LOCATIONS IN CENTRAL COOK RESURFACING INTERMITTENT COUNTY Miles = 4.35 System Maintenance 1 - 41 SAFETY PRESERVE SYSTEM Est. Cost $1,540,000 City HOMETOWN OAK LAWN STICKNEY LYONS FOREST VIEW SUMMIT CHICAGO CICERO BEDFORD PARK JUSTICE WILLOW SPRINGS WESTCHESTER LA GRANGE PARK LA GRANGE COUNTRYSIDE HODGKINS BELLWOOD BROADVIEW MAYWOOD NORTH RIVERSIDE MC COOK HILLSIDE BROOKFIELD MELROSE PARK Past Current 1 2016 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current VARIOUS VARIOUS LOCATIONS IN SOUTHERN COOK COUNTY Miles = 8.22 System Maintenance RESURFACING INTERMITTENT SAFETY PRESERVE SYSTEM $1,630,000 OAK FOREST TINLEY PARK PALOS PARK MERRIONETTE PARK ALSIP WORTH PALOS HEIGHTS OAK LAWN MIDLOTHIAN CRESTWOOD PALOS HILLS ORLAND PARK WILLOW SPRINGS MATTESON COUNTRY CLUB HILLS CHICAGO HEIGHTS FORD HEIGHTS GLENWOOD LYNWOOD PARK FOREST SOUTH CHICAGO HTS STEGER RICHTON PARK 1 2016 VARIOUS VARIOUS SOUTH EXPRESSWAY ROUTES RESURFACING INTERMITTENT Miles = 1.40 System Maintenance SAFETY PRESERVE SYSTEM $1,225,000 COUNTRY CLUB HILLS OAK FOREST MARKHAM CHICAGO CALUMET PARK POSEN DIXMOOR RIVERDALE BLUE ISLAND MATTESON HAZEL CREST LANSING SOUTH HOLLAND DOLTON JOLIET ROMEOVILLE CHANNAHON 1 2016 1 - 42 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost VARIOUS VARIOUS LOCATIONS (ADA RAMPS) System Maintenance PEDESTRIAN RAMPS/ADA SAFETY TRANSPORTATION OPS VARIOUS VARIOUS LOCATIONS NEAR MIDWAY AIRPORT System Maintenance CURB AND GUTTER PRESERVE SYSTEM SAFETY $250,000 WARREN BLVD HOMAN AVE TO KEDZIE AVE Miles = 0.25 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Needs Category BACKLOG WASHINGTON BLVD Miles 0.25 Roughness(IRI) NOT ACCEPTABLE Rutting 0.17 AADT 3,700 OGDEN AVE TO DAMEN AVE & HOMAN AVE TO ALBANY AVE Miles = 1.09 System Maintenance Truck Pct 2.1 RESURFACING PEDESTRIAN RAMPS/ADA Miles 0.72 Roughness(IRI) NOT ACCEPTABLE Rutting 0.20 AADT 3,389 Truck Pct 3.6 NHS N ACCRUING 0.37 NOT ACCEPTABLE 0.21 3,410 4.3 N AT CAL-SAG CHANNEL Bridge Maintenance BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG WESTERN AVE AT CAL-SAG CHANNEL Bridge Maintenance $1,000,000 Past Current 4 2017-2021 CHICAGO 1 2016 $360,000 CHICAGO 9 2017-2021 $505,000 CHICAGO 8 2016 BLUE ISLAND 9 2017-2021 NHS N Needs Category BACKLOG WESTERN AVE City CONSTRUCTION ENGINEERING 1 - 43 $12,000,000 AADT 8,300 $1,600,000 Truck Pct 7 BLUE ISLAND Str Number 0160777 NHS Y 4 2017-2021 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost WESTERN AVE 135TH PL TO 147TH ST System Maintenance BIKEWAY TRAF SIGNAL MODERNIZATION CHANNELIZATION PEDESTRIAN SIGNALS TRANSPORTATION OPS MODAL CONNECTIVITY SAFETY PRESERVE SYSTEM ECONOMIC DEVELOP $1,350,000 WILLIAMS ST MARGARET ST TO MAIN ST Miles = 1.55 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $965,000 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS SUSTAINABILITY Needs Category ADEQUATE WILLOW RD Needs Category ACCRUING Miles 1.55 Roughness(IRI) NOT ACCEPTABLE Rutting 0.23 AADT 5,050 E OF DES PLAINES RIVER TO CULLIGAN PKWY (ALLSTATE ENTRANCE) Miles = 0.91 System Maintenance Miles 0.91 Roughness(IRI) NOT ACCEPTABLE Rutting 0.16 AADT 40,765 Truck Pct 15.5 Past Current BLUE ISLAND DIXMOOR 1 2017-2021 THORNTON GLENWOOD 1 2017-2021 $17,000,000 PROSPECT HEIGHTS GLENVIEW 17 2017-2021 $2,000,000 PROSPECT HEIGHTS GLENVIEW 12 2017-2021 $500,000 PROSPECT HEIGHTS GLENVIEW 3 2016 8 2017-2021 NHS N RECONSTRUCTION INTERSECTION IMPROVEMENT LIGHTING NOISE BARRIERS Truck Pct 10.3 City NHS Y WILLOW RD E OF DES PLAINES RIVER TO CULLIGAN PKWY (ALLSTATE ENTRANCE) System Maintenance CONSTRUCTION ENGINEERING WILLOW RD E OF DES PLAINES RIVER TO CULLIGAN PKWY (ALLSTATE ENTRANCE) System Maintenance P.E. (PHASE II) WILLOW RD AT DES PLAINES RIVER (EB & WB FR RDS) Bridge Maintenance BRIDGE NEW DECK SAFETY PRESERVE SYSTEM Structure Status FUNCTIONAL BACKLOG FUNCTIONAL BACKLOG 1 - 44 $2,250,000 AADT 7,500 5,100 Truck Pct 7 Str Number 0160272 NHS Y 11 0160273 Y FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street Location Improvements WILLOW RD PALATINE RD / CULLIGAN PKWY System Maintenance LAND ACQUISITION WILLOW RD OVER LEHIGH AVE & SOO RR Bridge Maintenance BRIDGE NEW DECK BRIDGE WIDENING RETAINING WALL Objectives SAFETY PRESERVE SYSTEM TRANSPORTATION OPS SUSTAINABILITY Structure Status STRUCTURAL ACCRUING WILLOW RD OVER LEHIGH AVE & SOO RR Bridge Maintenance LAND ACQUISITION WILLOW RD OVER LEHIGH AVE & SOO RR Bridge Maintenance RR FLAGGER WILLOW RD AT FOREST WAY DR Congestion Mitigation WILLOW SPRINGS RD AT DES PLAINES RIVER 1.9 MI S OF I-55 Bridge Maintenance OVER I-94 (EDENS EXPWY) & I-94 TO SKOKIE RIVER Miles = 0.29 Bridge Maintenance City Past Current $50,000 GLENVIEW 1 2017-2021 $5,500,000 GLENVIEW 11 2017-2021 AADT 32,200 Truck Pct 9 Str Number 0160533 NHS Y $155,000 GLENVIEW 1 2017-2021 SAFETY $130,000 GLENVIEW 4 2017-2021 CHANNELIZATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP $150,000 WINNETKA 8 2017-2021 BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM WILLOW SPRINGS 18 2017-2021 Structure Status STRUCTURAL BACKLOG WINNETKA RD Est. Cost BRIDGE REHABILITATION RETAINING WALL RESURFACING SAFETY PRESERVE SYSTEM SUSTAINABILITY Structure Status FUNCTIONAL LONG TERM 1 - 45 $2,200,000 AADT 10 $2,740,000 AADT 9,650 Truck Pct N/A Str Number 0160539 NORTHFIELD Truck Pct 2 NHS N 18 Str Number 0160923 2017-2021 NHS N FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street WINNETKA RD Location Improvements AT SKOKIE RIVER E OF I-94 (EDENS EXPWY) Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REHABILITATION Structure Status STRUCTURAL BACKLOG WINNETKA RD SKOKIE RIVER TO HIBBARD RD Miles = 0.28 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS WOLF RD ILL 21 (MILWAUKEE AVE) TO N OF HINTZ RD Miles = 2.04 System Maintenance RECONSTRUCTION TRAF SIGNAL MODERNIZATION LIGHTING BI-DIRECT LEFT TURN LANE SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY Needs Category BACKLOG Miles 0.50 Roughness(IRI) NOT ACCEPTABLE Rutting 0.23 AADT 9,850 Truck Pct 2.4 NHS N BACKLOG 1.54 NOT ACCEPTABLE 0.23 12,606 4.4 N WOLF RD ILL 21 (MILWAUKEE AVE) TO N OF HINTZ RD System Maintenance CONSTRUCTION ENGINEERING WOLF RD ILL 21 (MILWAUKEE AVE) TO N OF HINTZ RD System Maintenance UTILITY ADJUSTMENT WOLF RD CAMP MCDONALD RD TO EUCLID AVE Miles = 0.52 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA Needs Category ACCRUING Miles 0.52 Roughness(IRI) NOT ACCEPTABLE Rutting 0.24 AADT 11,700 Truck Pct 7.7 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS NHS N 1 - 46 Est. Cost $2,150,000 AADT 8,950 $115,000 City NORTHFIELD Truck Pct 2 Past Current 18 Str Number 0161162 2017-2021 NHS N NORTHFIELD 7 2017-2021 $10,080,000 WHEELING 17 2017-2021 $1,300,000 WHEELING 4 2017-2021 $100,000 WHEELING 3 2017-2021 $605,000 PROSPECT HEIGHTS MOUNT PROSPECT 7 2017-2021 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street WOLF RD Needs Category BACKLOG WOLF RD Location Improvements S OF RAND RD TO ILL 58 (GOLF RD) / CUMBERLAND CIRCLE Miles = 0.37 System Maintenance Miles 0.37 Roughness(IRI) NOT ACCEPTABLE Rutting 0.19 AADT 11,950 AT WELLERS DITCH Bridge Maintenance Objectives RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 9.8 N OF LITTLE CALUMET RIVER TO S OF US 6 (159TH ST) Miles = 3.70 Congestion Mitigation City Past Current SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $435,000 DES PLAINES 3 2017-2021 SAFETY PRESERVE SYSTEM $440,000 DES PLAINES 11 2017-2021 NHS N BRIDGE DECK OVERLAY Structure Status FUNCTIONAL LONG TERM WOOD ST Est. Cost ADDITIONAL LANES BRIDGE REPAIR SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT PRESERVE SYSTEM AADT 13,000 Truck Pct 5 Str Number 0162009 NHS N $45,155,000 BLUE ISLAND RIVERDALE DIXMOOR HARVEY 7 2017-2021 CONSTRUCTION ENGINEERING $2,720,000 BLUE ISLAND RIVERDALE DIXMOOR HARVEY 6 2017-2021 CONSTRUCTION ENGINEERING $3,780,000 BLUE ISLAND RIVERDALE DIXMOOR HARVEY 6 2017-2021 ILLINOIS JOBS NOW! PROJECT WOOD ST N OF LITTLE CALUMET RIVER TO S OF US 6 (159TH ST) Congestion Mitigation ILLINOIS JOBS NOW! PROJECT WOOD ST N OF LITTLE CALUMET RIVER TO S OF US 6 (159TH ST) Congestion Mitigation ILLINOIS JOBS NOW! PROJECT 1 - 47 FY 2016-2021 Highway Improvement Program District 1 State Highways COOK COUNTY MYP Years Route/Street WOOD ST Location N OF LITTLE CALUMET RIVER TO S OF US 6 (159TH ST) Congestion Mitigation Improvements Objectives UTILITY ADJUSTMENT Est. Cost City Past Current $200,000 BLUE ISLAND RIVERDALE DIXMOOR HARVEY 4 2017-2021 $2,000,000 BLUE ISLAND RIVERDALE DIXMOOR HARVEY 3 2017-2021 ILLINOIS JOBS NOW! PROJECT WOOD ST N OF LITTLE CALUMET RIVER TO S OF US 6 (159TH ST) Congestion Mitigation SAFETY RR FLAGGER ILLINOIS JOBS NOW! PROJECT 1 - 48 DUPAGE COUNTY FY 2016-2021 PROPOSED HIGHWAY IMPROVEMENT PROGRAM FY 2016-2021 Highway Improvement Program District 1 State Highways DUPAGE COUNTY MYP Years Route/Street I 55 Location OVER MADISON ST Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM TRANSPORTATION OPS BRIDGE SUBSTRUCTURE BRIDGE DECK OVERLAY BRIDGE JOINT REPAIR Structure Status ADEQUATE I 55 STEVENSON EXPWY I 55 I-355 (VETERANS MEMORIAL TOLLWAY) TO WILLOW SPRINGS RD System Maintenance SURVEILLANCE CHANGEABLE MESSAGE SIGNS SAFETY INFRASTR SECURITY TRANSPORTATION OPS OVER LEMONT RD Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Est. Cost $1,250,000 AADT 158,400 $1,500,000 $10,000,000 City WILLOWBROOK Truck Pct 11 Past Current 1 Str Number 0220003 2017-2021 NHS Y INDIAN HEAD PARK COUNTRYSIDE BURR RIDGE DARIEN WILLOWBROOK WOODRIDGE 6 2017-2021 WOODRIDGE 9 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG I 55 OVER LEMONT RD Bridge Maintenance CONSTRUCTION ENGINEERING AADT 145,900 Truck Pct 12 Str Number 0220001 NHS Y $1,620,000 WOODRIDGE 1 2017-2021 $1,100,000 WOODRIDGE 1 2017-2021 $100,000 WOODRIDGE 1 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 55 OVER LEMONT RD Bridge Maintenance P.E. (PHASE II) ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 55 OVER LEMONT RD Bridge Maintenance UTILITY ADJUSTMENT ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. 1 - 49 FY 2016-2021 Highway Improvement Program District 1 State Highways DUPAGE COUNTY MYP Years Route/Street I 290 Location Improvements I-355 TO I-294 System Maintenance US 20 Objectives GUARDRAIL MISCELLANEOUS SAFETY BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Est. Cost $380,000 EISENHOWER EXPWY I 290 AT SALT CREEK Bridge Maintenance EISENHOWER EXPWY $17,700,000 City Past Current ADDISON WOOD DALE ELMHURST ELK GROVE VILLAGE BERKELEY ITASCA 1 2016 ADDISON 8 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG I 290 AT SALT CREEK CONSTRUCTION ENGINEERING AADT 134,800 Truck Pct 8 Str Number 0220103 NHS Y $1,000,000 ADDISON 6 2017-2021 $1,300,000 ADDISON 2 2017-2021 $750,000 ADDISON 6 2017-2021 $1,000,000 ADDISON 2 2017-2021 $300,000 ADDISON 1 2017-2021 Bridge Maintenance EISENHOWER EXPWY ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 290 AT SALT CREEK CONSTRUCTION ENGINEERING Bridge Maintenance EISENHOWER EXPWY ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 290 AT SALT CREEK P.E. (PHASE II) Bridge Maintenance EISENHOWER EXPWY ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 290 AT SALT CREEK P.E. (PHASE II) Bridge Maintenance EISENHOWER EXPWY ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 290 EISENHOWER EXPWY AT SALT CREEK UTILITY ADJUSTMENT Bridge Maintenance ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. 1 - 50 FY 2016-2021 Highway Improvement Program District 1 State Highways DUPAGE COUNTY MYP Years Route/Street US 20 Location AT GARY AVE LAKE ST US 20 LAKE ST US 20 LAKE ST Needs Category BACKLOG US 34 Objectives LAND ACQUISITION Est. Cost City Past Current $200,000 HANOVER PARK 1 2017-2021 $900,000 HANOVER PARK 5 2016 $2,400,000 ROSELLE HANOVER PARK BLOOMINGDALE 13 2017-2021 $3,695,000 ROSELLE HANOVER PARK 6 2017-2021 $3,150,000 AURORA 4 2016 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $6,120,000 NAPERVILLE LISLE 7 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP $1,100,000 NAPERVILLE 3 2017-2021 Congestion Mitigation LAKE ST US 20 Improvements AT BEAR FLAG DR / ONTARIOVILLE RD, ELGIN-O'HARE EXPWY & GREENBROOK BLVD Congestion Mitigation TRAF SIGNAL MODERNIZATION TURNING LANES ELGIN-O'HARE EXPWY TO ROSEDALE AVE Congestion Mitigation P.E. (PHASE I) 0.2 MI E OF GREENBROOK BLVD TO 0.1 MI W OF SUMMERFIELD DR Miles = 2.12 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA Miles 2.12 Roughness(IRI) ACCEPTABLE Rutting 0.19 AADT 29,571 AT CN RR Truck Pct 10.1 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY SAFETY PRESERVE SYSTEM TRANSPORTATION OPS NHS Y CONSTRUCTION ENGINEERING Congestion Mitigation OGDEN AVE CN RR RESPONSIBLE FOR 67% OF PROJECT COST. US 34 OGDEN AVE Needs Category ACCRUING US 34 OGDEN AVE NORTH AURORA RD / RAYMOND DR TO I-355 (VETERANS MEMORIAL TOLLWAY) Miles = 6.84 System Maintenance Miles 6.84 Roughness(IRI) NOT ACCEPTABLE Rutting 0.24 AADT 30,877 AT COLUMBIA DR Congestion Mitigation RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 6.4 NHS Y TRAF SIGNAL MODERNIZATION CHANNELIZATION 1 - 51 FY 2016-2021 Highway Improvement Program District 1 State Highways DUPAGE COUNTY MYP Years Route/Street US 34 Location AT COLUMBIA DR IRVING PARK RD Needs Category ACCRUING ILL 19 IRVING PARK RD Needs Category BACKLOG ILL 38 Miles 1.95 Roughness(IRI) NOT ACCEPTABLE ROOSEVELT RD Needs Category ADEQUATE ILL 38 ROOSEVELT RD Rutting 0.17 AADT 14,509 EMERSON AVE TO ILL 83 Miles = 2.24 System Maintenance Miles 2.24 Roughness(IRI) NOT ACCEPTABLE Rutting 0.20 AADT 22,617 AT WINFIELD RD Est. Cost $145,000 RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 7.2 City Past Current NAPERVILLE 3 2016 RESURFACING PEDESTRIAN RAMPS/ADA RR FLAGGER Truck Pct 8.6 $1,850,000 ITASCA 6 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $2,215,000 ITASCA WOOD DALE BENSENVILLE 6 2017-2021 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $6,000,000 WINFIELD 15 2017-2021 $1,340,000 WINFIELD 6 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $1,470,000 GLEN ELLYN LOMBARD 8 2017-2021 SAFETY TRANSPORTATION OPS $945,000 VILLA PARK 4 2016 NHS N INTERSECTION RECONSTN AT WINFIELD RD SAFETY PRESERVE SYSTEM TRANSPORTATION OPS NHS N Congestion Mitigation LAND ACQUISITION Congestion Mitigation ROOSEVELT RD ILL 38 LAND ACQUISITION BAKER DR TO EMERSON ST Miles = 1.95 System Maintenance ROOSEVELT RD ILL 38 Objectives Congestion Mitigation OGDEN AVE ILL 19 Improvements BRYANT AVE TO FINLEY RD Miles = 1.33 System Maintenance Miles 1.33 Roughness(IRI) NOT ACCEPTABLE Rutting 0.12 AADT 42,732 AT ARDMORE AVE Congestion Mitigation RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 9.0 NHS Y RIGHT TURN LANE 1 - 52 FY 2016-2021 Highway Improvement Program District 1 State Highways DUPAGE COUNTY MYP Years Route/Street Location Improvements Objectives AT ARDMORE AVE Congestion Mitigation LAND ACQUISITION SUMMIT AVE TO ILL 83 (KINGERY HWY) Congestion Mitigation TRAF SIGNAL INSTALLATION CHANNELIZATION SUMMIT AVE TO ILL 83 (KINGERY HWY) Congestion Mitigation Est. Cost City Past Current VILLA PARK 1 2016 $940,000 VILLA PARK OAKBROOK TERRACE 5 2017-2021 LAND ACQUISITION $400,000 VILLA PARK OAKBROOK TERRACE 5 2016 ILL 64 (NORTH AVE) TO ST CHARLES RD Congestion Mitigation P.E. (PHASE II) $270,000 LOMBARD GLEN ELLYN 5 2017-2021 AT PARKVIEW BLVD / SURREY LN Congestion Mitigation INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $1,500,000 GLEN ELLYN 8 2017-2021 AT TRIB #4 N OF BEMIS RD (GLEN CREST CULVERT REPLACEMENT CREEK) Bridge Maintenance SAFETY PRESERVE SYSTEM $2,005,000 7 2017-2021 ILL 53 AT ILL 56 (BUTTERFIELD RD) Congestion Mitigation INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $21,000,000 14 2017-2021 ILL 53 AT ILL 56 (BUTTERFIELD RD) Congestion Mitigation P.E. (PHASE II) 2 2016 ILL 38 ROOSEVELT RD ILL 38 ROOSEVELT RD ILL 38 ROOSEVELT RD ILL 53 COLUMBINE AVE ILL 53 COLUMBINE AVE ILL 53 BRYANT AVE $1,650,000 SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP $2,100,000 1 - 53 DOWNERS GROVE FY 2016-2021 Highway Improvement Program District 1 State Highways DUPAGE COUNTY MYP Years Route/Street Location Improvements ILL 53 AT ILL 56 (BUTTERFIELD RD) Congestion Mitigation UTILITY ADJUSTMENT ILL 53 AT ILL 56 (BUTTERFIELD RD) Congestion Mitigation LAND ACQUISITION ILL 56 NAPERVILLE RD TO ILL 53 Miles = 2.63 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA BUTTERFIELD RD Needs Category ACCRUING ILL 56 BUTTERFIELD RD Needs Category ADEQUATE ILL 59 Miles 2.63 Roughness(IRI) ACCEPTABLE SUTTON RD ILL 59 SUTTON RD AADT 29,300 FINLEY RD TO HIGHLAND AVE Miles = 0.76 System Maintenance Miles 0.76 Roughness(IRI) NOT ACCEPTABLE Rutting 0.13 AADT 54,900 AT STEARNS RD City Past Current $100,000 3 2017-2021 $1,800,000 2 2017-2021 WHEATON 6 2017-2021 DOWNERS GROVE 6 2017-2021 $3,240,000 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $920,000 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $3,025,000 BARTLETT 4 2016 LAND ACQUISITION $1,740,000 BARTLETT 1 2016 LAND ACQUISITION $400,000 BARTLETT 1 2017-2021 Truck Pct 1.6 NHS Y RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 8.0 NHS Y INTERSECTION RECONSTN AT STEARNS RD Est. Cost SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Congestion Mitigation SUTTON RD ILL 59 Rutting 0.16 Objectives Congestion Mitigation AT ARMY TRAIL RD Congestion Mitigation 1 - 54 FY 2016-2021 Highway Improvement Program District 1 State Highways DUPAGE COUNTY MYP Years Route/Street ILL 59 NELTNOR BLVD ILL 59 NELTNOR BLVD ILL 59 Needs Category ACCRUING ILL 59 Needs Category BACKLOG ILL 64 NORTH AVE ILL 64 NORTH AVE ILL 64 NORTH AVE Needs Category ADEQUATE Location Improvements Objectives Est. Cost City Past Current AT ILL 38 (N RAMPS) Congestion Mitigation TURNING LANES SAFETY MODAL CONNECTIVITY $700,000 WEST CHICAGO 4 2016 AT ILL 38 (S RAMPS) Congestion Mitigation TURNING LANES SAFETY MODAL CONNECTIVITY $400,000 WEST CHICAGO 4 2016 BATAVIA RD TO FERRY RD Miles = 1.53 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $1,365,000 WARRENVILLE 6 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $595,000 NAPERVILLE 6 2017-2021 $1,000,000 ST. CHARLES WEST CHICAGO 1 2016 Miles 1.53 Roughness(IRI) ACCEPTABLE Rutting 0.32 AADT 26,147 AURORA AVE TO MCCOY DR Miles = 0.45 System Maintenance Miles 0.45 Roughness(IRI) NOT ACCEPTABLE Rutting 0.18 AADT 44,500 Truck Pct 14.0 NHS Y RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 4.1 NHS Y KAUTZ RD TO ILL 59 (NELTNOR BLVD) Congestion Mitigation LAND ACQUISITION AT POWIS RD Miles = 0.01 ADDITIONAL LANES SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT $2,100,000 WEST CHICAGO 2 2017-2021 RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $5,115,000 CAROL STREAM GLENDALE HEIGHTS LOMBARD 6 2017-2021 Congestion Mitigation GARY AVE TO ILL 53 (ROHLWING RD) Miles = 4.57 System Maintenance Miles 4.57 Roughness(IRI) ACCEPTABLE Rutting 0.10 AADT 54,648 Truck Pct 14.9 NHS Y 1 - 55 FY 2016-2021 Highway Improvement Program District 1 State Highways DUPAGE COUNTY MYP Years Route/Street ILL 390 ELGIN O'HARE EXPWY Location Improvements I-290 / ILL 53 TO O'HARE WEST BYP System Expansion Objectives LAND ACQUISITION Est. Cost $22,019,000 City Past Current ELK GROVE VILLAGE BENSENVILLE ITASCA WOOD DALE SCHAUMBURG ROSELLE DES PLAINES FRANKLIN PARK HANOVER PARK 6 2016 SAFETEA-LU PROJECT OF NATIONAL AND REGIONAL SIGNIFICANCE. STATE MATCH REQUIRED. I 55 N FR RD Needs Category BACKLOG I 55 N FR RD Needs Category ACCRUING I 55 S FR RD Needs Category ACCRUING I 55 W FR RD CASS AVE TO OLDFIELD RD Miles = 1.45 System Maintenance Miles 1.45 Roughness(IRI) ACCEPTABLE Rutting 0.18 AADT 5,700 OLDFIELD RD TO LEMONT RD Miles = 1.15 System Maintenance Miles 1.15 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 1,600 WOODWARD AVE TO 97TH ST W OF LEMONT Miles = 1.38 System Maintenance Miles 1.38 Roughness(IRI) NOT ACCEPTABLE Rutting 0.15 AADT ILL 83 (KINGERY HWY) TO S ELM ST Miles = 1.66 System Maintenance Needs Category ACCRUING Miles 0.78 Roughness(IRI) NOT ACCEPTABLE ACCRUING 0.88 ACCEPTABLE Rutting 0.11 0.14 AADT 3,800 RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 0.0 DARIEN 6 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $580,000 DARIEN 6 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $675,000 WOODRIDGE DARIEN 6 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $775,000 WILLOWBROOK BURR RIDGE 6 2017-2021 NHS N RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 0.0 $715,000 NHS N RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 5.9 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS NHS N RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 5.5 NHS N 0.0 N 1 - 56 FY 2016-2021 Highway Improvement Program District 1 State Highways DUPAGE COUNTY MYP Years Route/Street VARIOUS Location VARIOUS LOCATIONS IN DUPAGE COUNTY Miles = 0.96 System Maintenance Improvements Objectives RESURFACING INTERMITTENT 1 - 57 SAFETY PRESERVE SYSTEM Est. Cost $1,850,000 City AURORA DOWNERS GROVE ELMHURST VILLA PARK OAKBROOK TERRACE WESTMONT CLARENDON HILLS HINSDALE ADDISON LOMBARD OAK BROOK HANOVER PARK ROSELLE ITASCA WOOD DALE BENSENVILLE SCHAUMBURG Past Current 1 2016 KANE COUNTY FY 2016-2021 PROPOSED HIGHWAY IMPROVEMENT PROGRAM FY 2016-2021 Highway Improvement Program District 1 State Highways KANE COUNTY MYP Years Route/Street US 20 Location Improvements Objectives Est. Cost City Past Current W OF RANDALL RD TO E OF SHALES PKWY System Maintenance P.E. (PHASE I) $1,000,000 ELGIN 3 2016 W OF RANDALL RD TO E OF SHALES PKWY System Maintenance P.E. (PHASE I) $500,000 ELGIN 1 2017-2021 LAKE ST US 20 AT ILL 31 BRIDGE REPLACEMENT $9,200,000 ELGIN 7 2017-2021 LAKE ST US 20 SAFETY PRESERVE SYSTEM Bridge Maintenance Structure Status FUNCTIONAL BACKLOG US 20 AT ILL 31 AADT 16,600 Truck Pct 9 Str Number 0450017 NHS N LAND ACQUISITION $200,000 ELGIN 1 2017-2021 P.E. (PHASE II) $370,000 ELGIN 1 2017-2021 P.E. (PHASE II) $550,000 ELGIN 1 2017-2021 $6,100,000 SUGAR GROVE BIG ROCK 6 2017-2021 $450,000 SUGAR GROVE BIG ROCK 2 2016 Bridge Maintenance US 20 AT ILL 31 Bridge Maintenance US 20 AT ILL 31 Bridge Maintenance US 30 ILL 56 GALENA ST Needs Category ACCRUING US 30 DEKALB CO LINE TO I-88 (RONALD REAGAN MEMORIAL TOLLWAY) Miles = 11.95 System Maintenance Miles 11.95 Roughness(IRI) ACCEPTABLE Rutting 0.16 AADT 10,805 W OF DUGAN RD TO W OF ILL 47 Congestion Mitigation SAFETY PRESERVE SYSTEM RESURFACING Truck Pct 12.4 NHS Y P.E. (PHASE I) P.E. (PHASE II) 1 - 58 FY 2016-2021 Highway Improvement Program District 1 State Highways KANE COUNTY MYP Years Route/Street Location Improvements Objectives US 30 W OF DUGAN RD TO W OF ILL 47 Congestion Mitigation P.E. (PHASE I) P.E. (PHASE II) US 30 AT HARVEY RD INTERSECTION IMPROVEMENT TRAF SIGNAL INSTALLATION Congestion Mitigation US 30 AT HARVEY RD Est. Cost $550,000 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS LAND ACQUISITION City Past Current SUGAR GROVE BIG ROCK 1 2017-2021 $1,750,000 OSWEGO 6 2017-2021 $200,000 OSWEGO 6 2017-2021 $950,000 CARPENTERSVILLE 3 2017-2021 $55,000 CARPENTERSVILLE 2 2016 ELGIN 6 2017-2021 Congestion Mitigation ILL 25 AT GOLFVIEW LN System Maintenance JOHN F KENNEDY DR ILL 25 AT GOLFVIEW LN ILL 25 A ST CHARLES ST Needs Category ACCRUING SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP PRESERVE SYSTEM LAND ACQUISITION System Maintenance JOHN F KENNEDY DR ILL 25 CHANNELIZATION TRAF SIGNAL MODERNIZATION I-90 (JANE ADDAMS MEMORIAL TOLLWAY) TO DUNHAM RD Miles = 5.98 System Maintenance Miles 5.98 Roughness(IRI) NOT ACCEPTABLE Rutting 0.17 AADT 15,178 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 8.4 NHS Y 1 - 59 $2,035,000 FY 2016-2021 Highway Improvement Program District 1 State Highways KANE COUNTY MYP Years Route/Street ILL 25 Needs Category ACCRUING Location Improvements DUNHAM RD TO SPRING ST Miles = 17.00 System Maintenance Miles 17.00 Roughness(IRI) ACCEPTABLE Rutting 0.14 AADT 10,957 Truck Pct 7.4 LAND ACQUISITION ILL 31 AT MILLER RD CHANNELIZATION LEFT TURN LANES CULVERT REPLACEMENT ILL 31 MAIN ST AT MILLER RD Est. Cost $5,780,000 City WAYNE ST. CHARLES GENEVA BATAVIA NORTH AURORA AURORA Past Current 6 2017-2021 $300,000 1 2017-2021 $1,475,000 8 2017-2021 $270,000 8 2016 $1,500,000 8 2016 $195,000 1 2016 10 2016 NHS N AT MAY LN, CURRIER AVE & SEMINARY RD System Maintenance MAIN ST SAFETY PRESERVE SYSTEM TRANSPORTATION OPS RESURFACING PEDESTRIAN RAMPS/ADA ILL 25 Congestion Mitigation Objectives SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP PRESERVE SYSTEM LAND ACQUISITION Congestion Mitigation ILL 31 AT SILVER GLEN RD Congestion Mitigation CHANNELIZATION TRAF SIGNAL INSTALLATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP ILL 31 AT SILVER GLEN RD Congestion Mitigation CONSTRUCTION ENGINEERING ILL 31 AT FERSON CREEK Miles = 0.01 Bridge Maintenance BRIDGE REPLACEMENT WIDENING & RESURFACING SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG 1 - 60 $3,835,000 AADT 12,800 ST. CHARLES Truck Pct 7 Str Number 0450019 NHS N FY 2016-2021 Highway Improvement Program District 1 State Highways KANE COUNTY MYP Years Route/Street Location Improvements Objectives ILL 31 AT FERSON CREEK Bridge Maintenance CONSTRUCTION ENGINEERING ILL 47 I-90 (JANE ADDAMS MEMORIAL TOLLWAY) TO ILLINOIS PRAIRIE PATH Miles = 13.50 System Maintenance RESURFACING ILL 72 US 20 Needs Category ACCRUING ILL 47 Miles 13.50 Roughness(IRI) ACCEPTABLE Rutting 0.16 AADT 7,040 AT EAKIN CREEK Truck Pct 15.7 $520,000 SAFETY PRESERVE SYSTEM $4,300,000 SAFETY PRESERVE SYSTEM $1,000,000 CULVERT REPLACEMENT Structure Status STRUCTURAL BACKLOG AT PLATO RD Congestion Mitigation ILL 47 AT PLATO RD City Past Current ST. CHARLES 1 2016 PINGREE GROVE LILY LAKE 6 2017-2021 4 2017-2021 NHS Y Bridge Maintenance ILL 47 Est. Cost CHANNELIZATION TRAF SIGNAL INSTALLATION INTERSECTION RECONSTN SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP PRESERVE SYSTEM FREIGHT MOVEMENT AADT 9,850 Truck Pct 13 Str Number 0450231 NHS Y $3,000,000 8 2017-2021 LAND ACQUISITION $150,000 2 2016 LAND ACQUISITION $50,000 1 2017-2021 Congestion Mitigation ILL 47 AT BURLINGTON RD Congestion Mitigation 1 - 61 FY 2016-2021 Highway Improvement Program District 1 State Highways KANE COUNTY MYP Years Route/Street ILL 47 Location Improvements AT I-88 (RONALD REAGAN MEMORIAL TOLLWAY) System Maintenance Objectives INTERCHANGE RECONSTRUCTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY FREIGHT MOVEMENT TRANSPORTATION OPS Est. Cost City Past Current $3,795,000 SUGAR GROVE 3 2017-2021 $180,000 SUGAR GROVE 1 2016 8 2017-2021 SAFETEA-LU NATIONAL CORRIDOR INFRASTRUCTURE IMPROVEMENT PROJECT. STATE MATCH REQUIRED. ILL 47 AT I-88 (RONALD REAGAN MEMORIAL TOLLWAY) System Maintenance P.E. (PHASE I) SAFETEA-LU NATIONAL CORRIDOR INFRASTRUCTURE IMPROVEMENT PROJECT. STATE MATCH REQUIRED. ILL 47 AT MAIN ST S OF ELBURN Congestion Mitigation INTERSECTION IMPROVEMENT TRAF SIGNAL INSTALLATION BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS Structure Status ADEQUATE ILL 47 AT MAIN ST S OF ELBURN Congestion Mitigation P.E. (PHASE II) ILL 47 AT MAIN ST S OF ELBURN Congestion Mitigation LAND ACQUISITION ILL 56 AT HANKES RD BRIDGE REPLACEMENT REPROFILING Bridge Maintenance SAFETY PRESERVE SYSTEM $8,100,000 AADT 7,900 Truck Pct 18 Str Number 0452000 NHS Y $400,000 2 2017-2021 $1,423,000 2 2017-2021 $8,200,000 5 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status FUNCTIONAL BACKLOG FUNCTIONAL LONG TERM 1 - 62 AADT 3,200 4,000 Truck Pct 4 Str Number 0450081 NHS N 3 0453073 N FY 2016-2021 Highway Improvement Program District 1 State Highways KANE COUNTY MYP Years Route/Street ILL 56 Location Improvements AT HANKES RD Objectives CONSTRUCTION ENGINEERING Est. Cost City Past Current $900,000 5 2017-2021 $900,000 5 2017-2021 $500,000 5 2017-2021 $150,000 5 2017-2021 Bridge Maintenance ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 56 AT HANKES RD P.E. (PHASE II) Bridge Maintenance ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 56 AT HANKES RD LAND ACQUISITION Bridge Maintenance ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 56 AT HANKES RD & BLACKBERRY CREEK Bridge Maintenance UTILITY ADJUSTMENT ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 56 BUTTERFIELD RD ILL 72 OAK KNOLL DR ILL 72 AT RADDANT RD INTERSECTION IMPROVEMENT TRAF SIGNAL INSTALLATION SIGNAL TIMING/PROGRESSION SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $1,860,000 AURORA 8 2017-2021 AT STATE ST / GETZELMAN RD Congestion Mitigation INTERSECTION RECONSTN DRAINAGE SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $3,105,000 HAMPSHIRE 4 2017-2021 AT STATE ST / GETZELMAN RD Congestion Mitigation LAND ACQUISITION $300,000 HAMPSHIRE 3 2016 Congestion Mitigation 1 - 63 FY 2016-2021 Highway Improvement Program District 1 State Highways KANE COUNTY MYP Years Route/Street ILL 72 Location Improvements AT TYLER CREEK 2.3 MI E OF ILL 47 Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM CULVERT REPLACEMENT Structure Status STRUCTURAL ACCRUING ILL 72 AT DITCH CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT Bridge Maintenance ILL 72 AT BIG TIMBER RD Congestion Mitigation INTERSECTION RECONSTN ILL 72 AT BIG TIMBER RD Congestion Mitigation CONSTRUCTION ENGINEERING ILL 72 W OF VILLAGE QUARTER RD TO E OF 3RD ST Miles = 0.68 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA Needs Category BACKLOG VARIOUS Miles 0.68 Roughness(IRI) NOT ACCEPTABLE Rutting 0.34 AADT 29,512 VARIOUS LOCATIONS IN KANE COUNTY Miles = 3.13 System Maintenance Truck Pct 3.0 Est. Cost City $500,000 AADT 9,650 Past Current 1 Truck Pct 7 Str Number 0450080 2017-2021 NHS Y $400,000 1 2017-2021 $4,555,000 11 2016 $650,000 1 2016 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $325,000 WEST DUNDEE 6 2017-2021 SAFETY PRESERVE SYSTEM $525,000 HAMPSHIRE PINGREE GROVE ALGONQUIN CARPENTERSVILLE BARRINGTON HILLS SUGAR GROVE NORTH AURORA BATAVIA 1 2016 NHS Y RESURFACING INTERMITTENT 1 - 64 FY 2016-2021 Highway Improvement Program District 1 State Highways KANE COUNTY MYP Years Route/Street VARIOUS Location VARIOUS LOCATIONS (ADA RAMPS) System Maintenance Improvements Objectives SAFETY TRANSPORTATION OPS PEDESTRIAN RAMPS/ADA 1 - 65 Est. Cost $1,000,000 City Past Current 4 2017-2021 LAKE COUNTY FY 2016-2021 PROPOSED HIGHWAY IMPROVEMENT PROGRAM FY 2016-2021 Highway Improvement Program District 1 State Highways LAKE COUNTY MYP Years Route/Street I 94 US 41 EDENS EXPWY I 94 US 41 EDENS EXPWY I 94 US 41 Location Improvements Objectives City Past Current WISCONSIN STATE LINE TO I-90 (KENNEDY EXPWY) System Maintenance P.E. (PHASE I) P.E. (PHASE II) $1,000,000 WADSWORTH OLD MILL CREEK GURNEE WAUKEGAN METTAWA LAKE FOREST BANNOCKBURN NORTHBROOK DEERFIELD NORTHFIELD WILMETTE SKOKIE MORTON GROVE LINCOLNWOOD CHICAGO 1 2016 WISCONSIN STATE LINE TO I-90 (KENNEDY EXPWY) System Maintenance P.E. (PHASE I) P.E. (PHASE II) $500,000 WADSWORTH OLD MILL CREEK GURNEE WAUKEGAN METTAWA LAKE FOREST BANNOCKBURN NORTHBROOK DEERFIELD NORTHFIELD WILMETTE SKOKIE MORTON GROVE LINCOLNWOOD CHICAGO 1 2017-2021 WISCONSIN STATE LINE TO US 41 Miles = 0.96 System Maintenance RESURFACING WADSWORTH 10 2017-2021 SAFETY PRESERVE SYSTEM IDOT PARTICIPATION IN PROJECT. Needs Category ADEQUATE Est. Cost Miles 0.96 Roughness(IRI) ACCEPTABLE Rutting 0.15 AADT 71,550 Truck Pct 21.6 NHS Y 1 - 66 $2,711,000 FY 2016-2021 Highway Improvement Program District 1 State Highways LAKE COUNTY MYP Years Route/Street US 12 RAND RD Location Improvements NIPPERSINK LAKE CHANNEL Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE DECK OVERLAY BRIDGE JOINT REPAIR Structure Status ADEQUATE US 12 AT ILL 59 (SB) BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Bridge Maintenance RAND RD Structure Status STRUCTURAL BACKLOG US 41 SKOKIE HWY US 41 SKOKIE HWY US 41 SKOKIE HWY US 41 SKOKIE HWY US 41 SKOKIE HWY Needs Category ACCRUING Est. Cost $1,705,000 AADT 26,800 $3,500,000 AADT 9,650 City FOX LAKE Truck Pct 10 1 Str Number 0490167 FOX LAKE Truck Pct 5 Past Current 2017-2021 NHS Y 6 Str Number 0490020 2017-2021 NHS Y I-94 (TRI-STATE TOLLWAY) TO ILL 21 System Maintenance CONSTRUCTION ENGINEERING $253,000 WADSWORTH GURNEE 1 2016 AT ILL 132 (UNDER UP RR) Congestion Mitigation CONSTRUCTION ENGINEERING $974,000 GURNEE 2 2016 AT ILL 132 (UNDER UP RR) Congestion Mitigation RR FLAGGER SAFETY $7,200,000 GURNEE 1 2016 AT ILL 132 (UNDER UP RR) Congestion Mitigation WATER MAIN PRESERVE SYSTEM SUSTAINABILITY $100,000 GURNEE 1 2016 DORCHESTER AVE TO ILL 120 (BELVIDERE RD) Miles = 1.08 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $850,000 GURNEE PARK CITY 6 2017-2021 Miles 1.08 Roughness(IRI) ACCEPTABLE Rutting 0.14 AADT 35,883 Truck Pct 12.0 NHS Y 1 - 67 FY 2016-2021 Highway Improvement Program District 1 State Highways LAKE COUNTY MYP Years Route/Street Location Improvements Objectives AT ILL 176 (ROCKLAND RD) System Maintenance PUMP STATION DRAINAGE AT ILL 176 (ROCKLAND RD) System Maintenance LAND ACQUISITION SKOKIE HWY US 41 AT DEERPATH RD PUMP STATION SAFETY PRESERVE SYSTEM $4,250,000 AT ILL 173 (ROSECRANS RD) Congestion Mitigation CHANNELIZATION INTERSECTION RECONSTN SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP PRESERVE SYSTEM FREIGHT MOVEMENT AT ILL 173 (ROSECRANS RD) Congestion Mitigation LAND ACQUISITION N OF GRASS LAKE RD TO COUNTRY PL Miles = 1.32 System Expansion NEW CONSTRUCTION US 41 SKOKIE HWY US 41 SKOKIE HWY US 45 LAKE ST US 45 LAKE ST US 45 MILBURN BYP SAFETY PRESERVE SYSTEM Est. Cost System Maintenance TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT City Past Current $3,700,000 LAKE BLUFF 7 2017-2021 $100,000 LAKE BLUFF 5 2017-2021 LAKE FOREST 18 2017-2021 $2,095,000 4 2017-2021 $100,000 3 2017-2021 $15,103,000 OLD MILL CREEK 3 2016 $1,600,000 OLD MILL CREEK 3 2016 $110,000 OLD MILL CREEK 1 2016 PROJECT WILL BE FUNDED WITH LAKE COUNTY CHALLENGE BONDS. US 45 MILBURN BYP N OF MILBURN RD TO N OF GRASS LAKE RD System Expansion CONSTRUCTION ENGINEERING PROJECT WILL BE FUNDED WITH LAKE COUNTY CHALLENGE BONDS. US 45 MILBURN BYP N OF MILBURN RD TO S OF MILBURN RD System Expansion UTILITY ADJUSTMENT 1 - 68 FY 2016-2021 Highway Improvement Program District 1 State Highways LAKE COUNTY MYP Years Route/Street US 45 LAKE ST US 45 LAKE ST US 45 LAKE ST Needs Category BACKLOG US 45 ILL 83 OLDE HALF DAY RD US 45 ILL 83 OLDE HALF DAY RD US 45 ILL 83 OLDE HALF DAY RD US 45 ILL 83 OLDE HALF DAY RD ILL 22 Location Improvements Objectives Est. Cost S OF MILBURN BYP TO N OF ILL 132 Congestion Mitigation P.E. (PHASE II) $1,354,000 N OF GRANT AVE TO WASHINGTON ST Congestion Mitigation P.E. (PHASE II) $780,000 ILL 176 (MAPLE ST) TO WOODLAWN DR Miles = 1.06 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA Miles 1.06 Roughness(IRI) GOOD Rutting 0.24 AADT 22,835 Truck Pct 5.5 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS City OLD MILL CREEK LINDENHURST Past Current 1 2017-2021 1 2016 $1,595,000 MUNDELEIN 3 2017-2021 NHS Y ILL 60 (TOWNLINE RD) TO ILL 22 (HALF DAY RD) Congestion Mitigation P.E. (PHASE II) $2,000,000 MUNDELEIN INDIAN CREEK VERNON HILLS LINCOLNSHIRE 2 2016 ILL 60 (TOWNLINE RD) TO ILL 22 (HALF DAY RD) Congestion Mitigation P.E. (PHASE II) $600,000 MUNDELEIN INDIAN CREEK VERNON HILLS LINCOLNSHIRE 1 2017-2021 ILL 60 (TOWNLINE RD) TO N OF ILL 22 (HALF DAY RD) Congestion Mitigation P.E. (ROW) $750,000 MUNDELEIN VERNON HILLS INDIAN CREEK LINCOLNSHIRE 1 2016 ILL 60 (TOWNLINE RD) TO ILL 22 (HALF DAY RD) Congestion Mitigation LAND ACQUISITION $3,500,000 MUNDELEIN INDIAN CREEK VERNON HILLS LINCOLNSHIRE 7 2017-2021 $1,770,000 NORTH BARRINGTON 8 2016 AT OLD BARRINGTON RD 0.8 MI W OF ILL TRAF SIGNAL INSTALLATION 59 CHANNELIZATION Congestion Mitigation 1 - 69 SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP FY 2016-2021 Highway Improvement Program District 1 State Highways LAKE COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT PRESERVE SYSTEM SUSTAINABILITY $41,000,000 KILDEER LONG GROVE 15 2017-2021 $5,200,000 KILDEER LONG GROVE 11 2017-2021 QUENTIN RD TO W OF ILL 83 (MUNDELEIN RD) Miles = 3.51 Congestion Mitigation ADDITIONAL LANES RETAINING WALL CULVERT REPLACEMENT QUENTIN RD TO W OF ILL 83 (MUNDELEIN RD) Congestion Mitigation CONSTRUCTION ENGINEERING QUENTIN RD TO W OF ILL 83 (MUNDELEIN RD) Congestion Mitigation P.E. (PHASE II) P.E. (CONSULTANT PLANS) $500,000 KILDEER LONG GROVE 2 2017-2021 QUENTIN RD TO W OF ILL 83 (MUNDELEIN RD) Congestion Mitigation UTILITY ADJUSTMENT $275,000 KILDEER LONG GROVE 4 2017-2021 LAND ACQUISITION $5,000,000 KILDEER LONG GROVE 1 2017-2021 HALF DAY RD QUENTIN RD TO W OF ILL 83 (MUNDELEIN RD) Congestion Mitigation ILL 53 AT OLD HICKS RD CHANNELIZATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP $910,000 LONG GROVE 8 2017-2021 TRAF SIGNAL INSTALLATION INTERSECTION RECONSTN RESURFACING SAFETY TRANSPORTATION OPS PRESERVE SYSTEM MODAL CONNECTIVITY FREIGHT MOVEMENT $3,200,000 8 2017-2021 ILL 22 HALF DAY RD ILL 22 HALF DAY RD ILL 22 HALF DAY RD ILL 22 HALF DAY RD ILL 22 Congestion Mitigation ILL 59 Needs Category BACKLOG AT PETITE LAKE RD & HIGHWOODS DR TO ILL 132 (GRAND AVE) Miles = 1.56 Congestion Mitigation Miles 1.56 Roughness(IRI) NOT ACCEPTABLE Rutting 0.25 AADT 9,617 Truck Pct 3.6 NHS Y 1 - 70 FY 2016-2021 Highway Improvement Program District 1 State Highways LAKE COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current ILL 59 AT PETITE LAKE RD (DITCH) Bridge Maintenance CULVERT REPAIR SAFETY PRESERVE SYSTEM $100,000 1 2017-2021 ILL 60 AT WILSON RD INTERSECTION IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $950,000 6 2017-2021 $500,000 6 2017-2021 Congestion Mitigation ILL 60 AT WILSON RD LAND ACQUISITION Congestion Mitigation ILL 60 ILL 83 Needs Category ACCRUING ILL 83 Needs Category ACCRUING ILL 83 BARRON BLVD ILL 83 BARRON BLVD ILL 83 BARRON BLVD 0.1 MI E OF CN RR TO 0.1 MI E OF DES PLAINES RIVER Miles = 3.47 System Maintenance Miles 3.47 Roughness(IRI) ACCEPTABLE Rutting 0.16 AADT 31,197 N OF PETITE LAKE RD TO N OF ILL 132 (GRAND AVE) Miles = 1.26 System Maintenance Miles 1.26 Roughness(IRI) ACCEPTABLE Rutting 0.22 AADT 13,000 RESURFACING PEDESTRIAN RAMPS/ADA RR FLAGGER Truck Pct 4.8 $3,335,000 MUNDELEIN VERNON HILLS METTAWA 6 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $2,115,000 LAKE VILLA 4 2017-2021 NHS Y RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 3.7 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS NHS Y PETITE LAKE RD TO ILL 120 (BELVIDERE RD) Congestion Mitigation P.E. (PHASE II) $1,750,000 LAKE VILLA ROUND LAKE BEACH GRAYSLAKE 3 2016 PETITE LAKE RD TO ILL 120 (BELVIDERE RD) Congestion Mitigation P.E. (PHASE II) $1,750,000 LAKE VILLA ROUND LAKE BEACH GRAYSLAKE 3 2017-2021 PETITE LAKE RD TO ILL 120 (BELVIDERE RD) Congestion Mitigation P.E. (PHASE II) $1,750,000 LAKE VILLA ROUND LAKE BEACH GRAYSLAKE 2 2017-2021 1 - 71 FY 2016-2021 Highway Improvement Program District 1 State Highways LAKE COUNTY MYP Years Route/Street ILL 83 BARRON BLVD Location Improvements ILL 120 (BELVIDERE RD) TO ILL 137 & AT ATKINSON RD Congestion Mitigation Objectives INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT Est. Cost City Past Current $6,400,000 GRAYSLAKE 15 2017-2021 $690,000 GRAYSLAKE 2 2016 LONG GROVE BUFFALO GROVE MUNDELEIN 6 2017-2021 ADDITIONAL FUNDING REQUIRED TO IMPLEMENT (PROJECT HAS A SHORTFALL FOR CONSTRUCTION). ILL 83 BARRON BLVD ILL 83 MCHENRY RD Needs Category ACCRUING ILL 120 (BELVIDERE RD) TO ILL 137 & AT ATKINSON RD Congestion Mitigation P.E. (PHASE II) US 45 TO BUFFALO GROVE RD Miles = 5.82 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA Miles 5.82 Roughness(IRI) ACCEPTABLE Rutting 0.11 AADT 34,276 Truck Pct 5.9 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $4,525,000 NHS Y AT HAINESVILLE RD Congestion Mitigation TURNING LANES SAFETY MODAL CONNECTIVITY $660,000 HAINESVILLE 2 2017-2021 RR FLAGGER SAFETY $100,000 HAINESVILLE 1 2017-2021 BELVIDERE RD AT HAINESVILLE RD Congestion Mitigation ILL 120 AT O'PLAINE RD TRAF SIGNAL MODERNIZATION CHANNELIZATION SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP $1,000,000 GURNEE 1 2017-2021 $500,000 GURNEE 1 2017-2021 ILL 120 BELVIDERE RD ILL 120 Congestion Mitigation BELVIDERE RD ILL 120 BELVIDERE RD AT O'PLAINE RD LAND ACQUISITION Congestion Mitigation 1 - 72 FY 2016-2021 Highway Improvement Program District 1 State Highways LAKE COUNTY MYP Years Route/Street ILL 120 BELVIDERE RD ILL 120 BELVIDERE RD ILL 120 BELVIDERE RD ILL 120 BELVIDERE RD ILL 120 BELVIDERE RD ILL 120 BELVIDERE RD Location OVER CMSTP&P RR Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE NEW DECK Est. Cost $1,100,000 City Past Current WAUKEGAN 7 2017-2021 Structure Status FUNCTIONAL BACKLOG AADT 16,350 Truck Pct 9 Str Number 0490048 NHS Y FUNCTIONAL BACKLOG 16,350 9 0490049 Y OVER CMSTP&P RR (WB) Bridge Maintenance RR FLAGGER SAFETY AT US 41; UP RR & OLD SKOKIE RD Bridge Maintenance BRIDGE NEW DECK SAFETY PRESERVE SYSTEM $300,000 WAUKEGAN 3 2017-2021 $6,915,000 PARK CITY WAUKEGAN 4 2017-2021 Structure Status STRUCTURAL ACCRUING AADT 19,600 Truck Pct 6 Str Number 0490050 NHS Y STRUCTURAL ACCRUING 29,800 6 0490051 N AT US 41; UP RR & OLD SKOKIE RD Bridge Maintenance LAND ACQUISITION AT US 41; UP RR & OLD SKOKIE RD Bridge Maintenance RR FLAGGER SAFETY OVER GREENLEAF AVE Bridge Maintenance BRIDGE NEW DECK SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL ACCRUING STRUCTURAL ACCRUING 1 - 73 $100,000 PARK CITY WAUKEGAN 3 2017-2021 $300,000 PARK CITY WAUKEGAN 3 2017-2021 $2,500,000 WAUKEGAN 6 2017-2021 AADT 9,800 9,800 Truck Pct 6 Str Number 0490125 NHS Y 6 0490126 Y FY 2016-2021 Highway Improvement Program District 1 State Highways LAKE COUNTY MYP Years Route/Street ILL 120 BELVIDERE ST Needs Category BACKLOG ILL 131 GREEN BAY RD ILL 131 Location Improvements US 41 (SKOKIE HWY) TO KNIGHT AVE Miles = 0.50 System Maintenance Miles 0.50 Roughness(IRI) NOT ACCEPTABLE Rutting 0.22 AADT 29,800 Objectives SAFETY PRESERVE SYSTEM TRANSPORTATION OPS RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 6.4 Est. Cost $1,585,000 City Past Current PARK CITY WAUKEGAN 8 2017-2021 ZION WADSWORTH BEACH PARK WAUKEGAN 1 2016 NHS N RUSSELL RD TO SUNSET AVE Congestion Mitigation P.E. (PHASE I) $420,000 29TH ST TO PROPOSED KENOSHA RD Miles = 0.18 Congestion Mitigation CHANNELIZATION RELOCATION PAVEMENT WIDENING TRAF SIGNAL INSTALLATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP $3,700,000 BEACH PARK 1 2017-2021 SAFETY PRESERVE SYSTEM $6,093,000 LAKE VILLA 6 2017-2021 DRY LAND BRIDGE E OF CEDAR LAKE RD P.E. (PHASE II) Bridge Maintenance $700,000 LAKE VILLA 1 2016 DRY LAND BRIDGE E OF CEDAR LAKE RD LAND ACQUISITION Bridge Maintenance $410,000 LAKE VILLA 3 2017-2021 GRAND AVE ILL 132 AT FAIRFIELD RD $9,830,000 LAKE VILLA 11 2016 $100,000 LAKE VILLA 1 2016 GREEN BAY RD ILL 132 GRAND AVE ILL 132 GRAND AVE ILL 132 DRY LAND BRIDGE E OF CEDAR LAKE RD BRIDGE REPLACEMENT Bridge Maintenance Congestion Mitigation GRAND AVE ILL 132 GRAND AVE AT FAIRFIELD RD INTERSECTION RECONSTN CULVERT REPLACEMENT PEDESTRIAN RAMPS/ADA UTILITY ADJUSTMENT Congestion Mitigation 1 - 74 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT FY 2016-2021 Highway Improvement Program District 1 State Highways LAKE COUNTY MYP Years Route/Street ILL 132 GRAND AVE Needs Category ACCRUING ILL 132 GRAND AVE ILL 132 GRAND AVE ILL 132 GRAND AVE ILL 132 GRAND AVE Needs Category BACKLOG ILL 137 AMSTUTZ EXPWY ILL 137 BUCKLEY RD Location Improvements SHEEHAN DR TO MUNN RD Miles = 0.80 System Maintenance Miles 0.80 Roughness(IRI) ACCEPTABLE Rutting 0.26 AADT 18,600 Objectives RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 3.6 LAKE VILLA LINDENHURST 4 2017-2021 $250,000 LINDENHURST 2 2017-2021 $7,660,000 LINDENHURST 6 2016 $1,950,000 LINDENHURST 1 2016 $4,355,000 GURNEE WAUKEGAN 3 2017-2021 WAUKEGAN 2 2017-2021 LIBERTYVILLE GRAYSLAKE 3 2017-2021 NHS Y SAFETY PRESERVE SYSTEM MUNN RD TO DEERPATH DR Congestion Mitigation CHANNELIZATION TRAF SIGNAL MODERNIZATION SIDEWALKS SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP PRESERVE SYSTEM MUNN RD TO DEERPATH RD Congestion Mitigation LAND ACQUISITION E OF TRI STATE PKWY TO ILL 131 (GREEN BAY RD) Miles = 3.90 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA Rutting 0.17 AADT 25,306 Truck Pct 4.2 Past Current $775,000 CULVERT REPLACEMENT Roughness(IRI) ACCEPTABLE City SAFETY PRESERVE SYSTEM TRANSPORTATION OPS AT CREEK 0.3 MI E OF DEEP LAKE RD Bridge Maintenance Miles 3.90 Est. Cost SAFETY PRESERVE SYSTEM TRANSPORTATION OPS NHS Y OVER ILL 137 (AMSTUTZ EXPWY) Bridge Maintenance P.E. (PHASE II) $26,000 ILL 83 (IVANHOE RD) TO PETERSEN RD Congestion Mitigation P.E. (PHASE II) $1,070,000 1 - 75 FY 2016-2021 Highway Improvement Program District 1 State Highways LAKE COUNTY MYP Years Route/Street ILL 137 BUCKLEY RD Location Improvements ILL 83 (IVANHOE RD) TO PETERSEN RD Congestion Mitigation Objectives P.E. (PHASE II) Est. Cost $540,000 City LIBERTYVILLE GRAYSLAKE Past Current 3 2017-2021 $1,520,000 8 2017-2021 $79,000 1 2017-2021 ILLINOIS JOBS NOW! PROJECT ILL 173 AT LAKE AVE Congestion Mitigation ILL 173 AT LAKE AVE SIGNAL TIMING/PROGRESSION CHANNELIZATION TRAF SIGNAL INSTALLATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP LAND ACQUISITION Congestion Mitigation ILL 173 ROSECRANS RD ILL 176 Needs Category BACKLOG ILL 176 PARK AVE Needs Category ACCRUING W OF ILL 59 TO E OF US 41 Congestion Mitigation P.E. (PHASE II) ROBERTS RD TO US 12 (RAND RD) Miles = 2.54 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA Miles 2.54 Roughness(IRI) ACCEPTABLE Rutting 0.24 AADT 18,024 I-94 (SB) RAMPS TO UP RR Miles = 2.43 System Maintenance Miles 2.43 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 15,694 Truck Pct 13.1 ANTIOCH OLD MILL CREEK 1 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $2,730,000 ISLAND LAKE WAUCONDA 7 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $1,940,000 LAKE BLUFF GREEN OAKS LAKE FOREST 8 2017-2021 NHS Y RESURFACING PEDESTRIAN RAMPS/ADA RR FLAGGER Truck Pct 4.8 $2,639,000 NHS N 1 - 76 FY 2016-2021 Highway Improvement Program District 1 State Highways LAKE COUNTY MYP Years Route/Street BARRINGTON RD Needs Category ACCRUING DEERFIELD RD Location Improvements ILL 176 (LIBERTY ST) TO RAND RD Miles = 0.55 System Maintenance Miles 0.55 Roughness(IRI) NOT ACCEPTABLE Rutting 0.19 AADT 5,850 OVER UP RR & OLD SKOKIE RD Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM TRANSPORTATION OPS RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 4.2 AT CP RR Past Current WAUCONDA 6 2017-2021 BRIDGE NEW DECK SAFETY PRESERVE SYSTEM RR FLAGGER SAFETY BRIDGE NEW DECK SAFETY PRESERVE SYSTEM $4,800,000 HIGHLAND PARK 1 2017-2021 AADT 24,800 Truck Pct 2 Str Number 0490073 NHS N $250,000 PARK CITY 4 2017-2021 $1,500,000 PARK CITY 6 2017-2021 Bridge Maintenance ILL 120 WB ILL 120 EB TO $250,000 City NHS N Structure Status STRUCTURAL BACKLOG GREENLEAF AVE TO Est. Cost AT CP RR Bridge Maintenance GREENLEAF AVE GREENLEAF AVE TO ILL 120 WB (RAMPS) Structure Status STRUCTURAL ACCRUING STRUCTURAL ACCRUING MIDLOTHIAN RD CHURCH ST Needs Category BACKLOG OLD MCHENRY RD TO MAIN ST Miles = 1.98 System Maintenance Miles 1.98 Roughness(IRI) ACCEPTABLE Rutting 0.22 AADT 10,651 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 3.8 NHS N 1 - 77 AADT 5,000 4,500 $905,000 Truck Pct 3 Str Number 0490129 NHS Y 4 0490130 Y HAWTHORN WOODS LAKE ZURICH 6 2016 FY 2016-2021 Highway Improvement Program District 1 State Highways LAKE COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost SAFETY PRESERVE SYSTEM $450,000 VARIOUS LOCATIONS IN WESTERN LAKE RESURFACING INTERMITTENT COUNTY Miles = 0.97 System Maintenance SAFETY PRESERVE SYSTEM VARIOUS VARIOUS LOCATIONS IN EASTERN LAKE COUNTY Miles = 0.96 System Maintenance RESURFACING INTERMITTENT VARIOUS VARIOUS LOCATIONS (ADA RAMPS) System Maintenance PEDESTRIAN RAMPS/ADA MILWAUKEE AVE DITCH S OF ILL 132 & E OF ILL 21 Bridge Maintenance VARIOUS CULVERT REPLACEMENT 1 - 78 City Past Current GURNEE 1 2017-2021 $1,475,000 LAKE VILLA LINDENHURST GRAYSLAKE OLD MILL CREEK LIBERTYVILLE MUNDELEIN LONG GROVE BUFFALO GROVE LAKE ZURICH KILDEER VERNON HILLS INDIAN CREEK HAWTHORN WOODS BARRINGTON FOX LAKE 1 2016 SAFETY PRESERVE SYSTEM $1,305,000 ZION BEACH PARK WAUKEGAN NORTH CHICAGO GURNEE WADSWORTH PARK CITY LAKE FOREST HIGHLAND PARK VERNON HILLS METTAWA 1 2016 SAFETY TRANSPORTATION OPS $1,610,000 4 2016 MCHENRY COUNTY FY 2016-2021 PROPOSED HIGHWAY IMPROVEMENT PROGRAM FY 2016-2021 Highway Improvement Program District 1 State Highways MCHENRY COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost US 12 DITCHES 0.7 & 2.1 MI E OF ILL 31 & 8.3 MI S OF STATE LINE Bridge Maintenance CULVERT REPLACEMENT CULVERT REPAIR SAFETY PRESERVE SYSTEM $600,000 US 14 AT KISHWAUKEE RIVER 4 MI SE OF ILL 23 Bridge Maintenance BRIDGE DECK OVERLAY BRIDGE JOINT REPAIR SAFETY PRESERVE SYSTEM $710,000 Structure Status ADEQUATE US 20 GRANT HWY Needs Category BACKLOG COUNTY LINE RD TO WEST ST Miles = 4.53 System Maintenance Miles 4.53 Roughness(IRI) ACCEPTABLE Rutting 0.27 AADT 13,600 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 8.6 AT BOONE CO LINE System Maintenance DRAINAGE SAFETY PRESERVE SYSTEM US 20 AT WEST UNION RD & AT CORAL RD System Maintenance CHANNELIZATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP AT CREEK 0.4 MI W OF BECK RD Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM AT MARENGO-BECK RD / SOUTH UNION RD Miles = 0.01 System Maintenance CHANNELIZATION HORIZONTAL REALIGNMENT TRAF SIGNAL INSTALLATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP US 20 GRANT HWY US 20 GRANT HWY $2,510,000 RICHMOND Truck Pct 8 MARENGO Past Current 1 2017-2021 1 2017-2021 Str Number 0560051 NHS Y 8 2017-2021 $50,000 1 2017-2021 $1,500,000 3 2017-2021 $250,000 6 2017-2021 $2,000,000 6 2017-2021 NHS Y US 20 GRANT HWY AADT 8,050 City 1 - 79 FY 2016-2021 Highway Improvement Program District 1 State Highways MCHENRY COUNTY MYP Years Route/Street Location Improvements Objectives AT MARENGO-BECK RD / SOUTH UNION RD System Maintenance LAND ACQUISITION GRANT HWY US 20 AT HARMONY RD CHANNELIZATION TRAF SIGNAL INSTALLATION US 20 System Maintenance GRANT HWY US 20 AT HARMONY RD Needs Category BACKLOG LAND ACQUISITION US 14 TO 8TH AVE Miles = 9.61 System Maintenance Miles 9.61 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 4,637 RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 17.4 Past Current $500,000 6 2017-2021 $2,350,000 6 2017-2021 $760,000 2 2017-2021 1 2017-2021 6 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $3,375,000 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $445,000 MARENGO NHS Y ILL 23 AT CORAL RD / PLEASANT GROVE RD Congestion Mitigation INTERSECTION IMPROVEMENT ILL 31 ILL 120 (BELVIDERE RD) TO ILL 176 (TERRA COTTA RD) Congestion Mitigation P.E. (PHASE II) FRONT ST City System Maintenance GRANT HWY ILL 23 SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP Est. Cost $1,600,000 MC HENRY PRAIRIE GROVE CRYSTAL LAKE 15 2017-2021 $4,200,000 MC HENRY PRAIRIE GROVE CRYSTAL LAKE 7 2017-2021 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. ILL 31 FRONT ST ILL 120 (BELVIDERE RD) TO ILL 176 (TERRA COTTA RD) Congestion Mitigation P.E. (PHASE II) SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. 1 - 80 FY 2016-2021 Highway Improvement Program District 1 State Highways MCHENRY COUNTY MYP Years Route/Street ILL 31 Needs Category ACCRUING Location Improvements STRONG RD TO CENTRAL PARK DR Miles = 2.41 System Maintenance Miles 2.41 Roughness(IRI) ACCEPTABLE Rutting 0.18 AADT 24,514 Objectives RESURFACING RR FLAGGER PEDESTRIAN RAMPS/ADA Truck Pct 8.0 Est. Cost SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $1,690,000 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT ECONOMIC DEVELOP City CRYSTAL LAKE Past Current 8 2017-2021 $5,370,000 3 2017-2021 $700,000 3 2017-2021 NHS Y ILL 47 AT O'BRIEN RD / VAN DERKARR RD Congestion Mitigation INTERSECTION RECONSTN CHANNELIZATION SHOULDER REPAIR GUARDRAIL ILL 47 AT O'BRIEN RD / VAN DERKARR RD Congestion Mitigation LAND ACQUISITION ILL 47 CHARLES RD TO N OF ILL 120 (MCHENRY P.E. (PHASE II) AVE) Congestion Mitigation $2,325,000 WOODSTOCK 3 2016 CHARLES RD TO N OF ILL 120 (MCHENRY P.E. (PHASE II) AVE) Congestion Mitigation $1,025,000 WOODSTOCK 2 2017-2021 $785,000 WOODSTOCK 3 2017-2021 $2,325,000 WOODSTOCK 2 2016 SEMINARY ST ILL 47 SEMINARY ST ILL 47 SEMINARY ST Needs Category ACCRUING ILL 47 EASTWOOD AVE N OF WARE RD TO ILL 120 (MCHENRY AVE) Miles = 1.77 System Maintenance Miles 1.77 Roughness(IRI) ACCEPTABLE Rutting 0.19 AADT 10,400 N OF ILL 120 (MCHENRY AVE) TO US 14 Congestion Mitigation RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 4.2 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS NHS Y P.E. (PHASE II) 1 - 81 FY 2016-2021 Highway Improvement Program District 1 State Highways MCHENRY COUNTY MYP Years Route/Street ILL 47 EASTWOOD AVE ILL 47 ILL 176 ILL 47 ILL 176 ILL 47 ILL 176 ILL 47 ILL 176 ILL 47 ILL 176 ILL 47 ILL 176 ILL 47 Location Improvements Objectives Est. Cost City Past Current N OF ILL 120 (MCHENRY AVE) TO US 14 Congestion Mitigation P.E. (PHASE II) $1,025,000 WOODSTOCK 2 2017-2021 US 14 TO S OF ILL 176 Congestion Mitigation P.E. (PHASE II) $167,000 WOODSTOCK 1 2016 US 14 TO S OF ILL 176 Congestion Mitigation P.E. (PHASE II) $2,026,000 WOODSTOCK 3 2017-2021 US 14 TO S OF ILL 176 Congestion Mitigation P.E. (PHASE II) $1,230,000 WOODSTOCK 2 2017-2021 S OF ILL 176 TO REED RD Congestion Mitigation P.E. (PHASE II) $667,000 LAKEWOOD 1 2016 S OF ILL 176 TO REED RD Congestion Mitigation P.E. (PHASE II) $2,036,000 LAKEWOOD 2 2017-2021 S OF ILL 176 TO REED RD Congestion Mitigation P.E. (PHASE II) $1,500,000 LAKEWOOD 2 2017-2021 AT KISHWAUKEE RIVER Bridge Maintenance BRIDGE REPLACEMENT 3 2017-2021 SAFETY PRESERVE SYSTEM $6,500,000 Structure Status STRUCTURAL BACKLOG AADT 18,400 Truck Pct 6 Str Number 0560025 NHS Y STRUCTURAL BACKLOG 18,400 6 0560025 Y 1 - 82 FY 2016-2021 Highway Improvement Program District 1 State Highways MCHENRY COUNTY MYP Years Route/Street ILL 173 Location Improvements AT WILMOT RD Objectives LAND ACQUISITION Est. Cost City Past Current $250,000 1 2017-2021 System Maintenance ILL 173 AT WILMOT RD System Maintenance TRAF SIGNAL INSTALLATION CHANNELIZATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP $1,450,000 8 2017-2021 SAFETY MODAL CONNECTIVITY TRANSPORTATION OPS $6,800,000 3 2017-2021 $800,000 2 2017-2021 $400,000 1 2017-2021 ILL 176 DEERPASS RD TO DEAN ST Congestion Mitigation LEFT TURN LANES MILLED RUMBLE STRIP GUARDRAIL PAVEMENT WIDENING ILL 176 DEERPASS RD TO DEAN ST Congestion Mitigation LAND ACQUISITION ILL 176 DITCH 1.1 MI W OF ILL 47 & DRAINAGE DITCH 8.6 MI E OF ILL 23 Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM ILL 176 AT HALIGUS RD / MT TABOR RD Congestion Mitigation INTERSECTION IMPROVEMENT TRAF SIGNAL INSTALLATION SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS ILL 176 AT HALIGUS RD / MT TABOR RD Congestion Mitigation LAND ACQUISITION ILL 176 US 14 TO ILL 31 (TERRA COTTA AVE) Congestion Mitigation P.E. (PHASE I) 1 - 83 $2,100,000 CRYSTAL LAKE 4 2017-2021 $500,000 CRYSTAL LAKE 4 2017-2021 $2,680,000 CRYSTAL LAKE 10 2017-2021 FY 2016-2021 Highway Improvement Program District 1 State Highways MCHENRY COUNTY MYP Years Route/Street ILL 176 Location Improvements AT NISH RD Congestion Mitigation ILL 176 AT NISH RD Objectives TRAF SIGNAL INSTALLATION CHANNELIZATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP LAND ACQUISITION Est. Cost City Past Current $750,000 8 2017-2021 $80,000 2 2017-2021 1 2016 Congestion Mitigation VARIOUS VARIOUS LOCATIONS IN MCHENRY COUNTY Miles = 9.28 System Maintenance RESURFACING INTERMITTENT 1 - 84 SAFETY PRESERVE SYSTEM $1,600,000 RICHMOND HEBRON WOODSTOCK LAKEWOOD HUNTLEY MC HENRY CRYSTAL LAKE PRAIRIE GROVE MARENGO WILL COUNTY FY 2016-2021 PROPOSED HIGHWAY IMPROVEMENT PROGRAM FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street I 55 Location Improvements AT ILL 129 System Maintenance I 55 I 55 FR RDS I Needs Category ADEQUATE Miles 2.32 Roughness(IRI) ACCEPTABLE Rutting 0.13 ADEQUATE 3.37 ACCEPTABLE 0.10 ADEQUATE 2.45 GOOD 0.10 55 I 55 FR RDS I I-55: ILL 129 TO LORENZO RD & I-55 FR RDS: KAVANAUGH RD TO LORENZO RD Miles = 8.14 System Maintenance 55 Needs Category ADEQUATE Objectives Est. Cost INTERCHANGE RECONSTRUCTN BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY FREIGHT MOVEMENT TRANSPORTATION OPS $46,000,000 9 2017-2021 RECONSTRUCTION SAFETY PRESERVE SYSTEM $15,000,000 9 2017-2021 $2,200,000 4 2017-2021 $28,750,000 9 2017-2021 $10,000,000 9 2017-2021 $3,500,000 9 2017-2021 AADT Truck Pct 0.0 NHS N 0.0 N 26,437 21.7 Y I-55: ILL 129 TO LORENZO RD & I-55 FR RDS: KAVANAUGH RD TO LORENZO RD System Maintenance UTILITY ADJUSTMENT ILL 129 TO LORENZO RD Miles = 2.45 Congestion Mitigation WIDENING & RESURFACING ADD AUXILIARY LANES Miles 2.45 Roughness(IRI) GOOD Rutting 0.10 AADT 26,437 Truck Pct 21.7 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT City Past Current NHS Y I 55 ILL 129 TO LORENZO RD Congestion Mitigation CONSTRUCTION ENGINEERING I 55 ILL 129 TO LORENZO RD Congestion Mitigation P.E. (PHASE II) 1 - 85 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current I 55 ILL 129 TO LORENZO RD Congestion Mitigation P.E. (PHASE II) $2,500,000 7 2017-2021 I 55 ILL 129 TO LORENZO RD Congestion Mitigation P.E. (PHASE II) $4,000,000 9 2017-2021 I 55 ILL 129 TO LORENZO RD Congestion Mitigation LAND ACQUISITION $3,500,000 9 2017-2021 I 55 ILL 129 TO LORENZO RD Congestion Mitigation LAND ACQUISITION $3,500,000 7 2017-2021 I 55 AT ILL 129 UTILITY ADJUSTMENT $550,000 1 2017-2021 $1,100,000 3 2017-2021 $23,000,000 9 2017-2021 UTILITY ADJUSTMENT $1,100,000 1 2017-2021 LAND ACQUISITION $1,000,000 1 2016 System Maintenance I 55 ILL 129 TO LORENZO RD Congestion Mitigation UTILITY ADJUSTMENT I 55 AT LORENZO RD INTERCHANGE RECONSTRUCTN System Maintenance I 55 AT LORENZO RD SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY FREIGHT MOVEMENT TRANSPORTATION OPS System Maintenance I 55 AT ARSENAL RD Congestion Mitigation 1 - 86 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current I 55 AT US 6 (EAMES ST) System Maintenance INTERCHANGE RECONSTRUCTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY FREIGHT MOVEMENT TRANSPORTATION OPS $4,069,000 CHANNAHON 3 2016 I 55 I-55: RAMP AT US 6 (EAMES ST); I-55 W FR RD: US 6 TO DEAD END & SW FR RD TO DEAD END Miles = 1.46 System Maintenance RAMP MODIFICATIONS RECONSTRUCTION PAVEMENT WIDENING SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $5,000,000 CHANNAHON 1 2016 I 55 W FR RD Needs Category ADEQUATE Miles 0.01 Roughness(IRI) GOOD Rutting 0.14 AADT 47,800 Truck Pct 6.9 NHS Y ADEQUATE 1.34 ACCEPTABLE 0.16 1,850 0.0 N I 55 AT US 6 (EAMES ST) System Maintenance CONSTRUCTION ENGINEERING $750,000 CHANNAHON 2 2017-2021 I 55 AT US 6 (EAMES ST) System Maintenance CONSTRUCTION ENGINEERING $1,500,000 CHANNAHON 3 2016 I 55 AT US 6 (EAMES ST) System Maintenance UTILITY ADJUSTMENT $220,000 CHANNAHON 1 2016 I 55 US 52 (JEFFERSON ST) TO BLACK RD Congestion Mitigation NOISE BARRIERS JOLIET 2 2017-2021 SUSTAINABILITY IDOT PARTICIPATION IN PROJECT. 1 - 87 $1,800,000 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street I 55 STEVENSON EXPWY Needs Category ADEQUATE I RESURFACING BRIDGE DECK REPAIRS BRIDGE JOINT REPAIR SURVEILLANCE SAFETY PRESERVE SYSTEM INFRASTR SECURITY TRANSPORTATION OPS $50,000,000 JOLIET BOLINGBROOK DARIEN WILLOWBROOK BURR RIDGE WOODRIDGE ROMEOVILLE INDIAN HEAD PARK COUNTRYSIDE 3 2017-2021 $7,000,000 JOLIET BOLINGBROOK DARIEN WILLOWBROOK BURR RIDGE WOODRIDGE ROMEOVILLE INDIAN HEAD PARK COUNTRYSIDE 1 2017-2021 $13,500,000 ROMEOVILLE BOLINGBROOK 1 2016 $200,000 BOLINGBROOK 2 2016 6.94 GOOD 0.21 144,918 12.6 Y ACCRUING 6.05 GOOD 0.17 124,284 12.1 Y 55 55 WEBER RD AADT 153,992 Est. Cost ACCRUING 55 Rutting 0.15 Objectives Roughness(IRI) GOOD WEBER RD I WEBER RD TO WILLOW SPRINGS RD Miles = 14.55 System Maintenance Improvements Miles 1.56 STEVENSON EXPWY I Location Truck Pct 8.9 City Past Current NHS Y WEBER RD TO WILLOW SPRINGS RD System Maintenance CONSTRUCTION ENGINEERING I-55: AT WEBER RD & WEBER RD: RODEO DR TO NORMANTOWN RD (LOCAL SECTION) Miles = 1.87 Congestion Mitigation ADDITIONAL LANES RODEO DR TO 135TH ST / ROMEO RD System Maintenance P.E. (PHASE II) SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT 1 - 88 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street I 55 Location Improvements AT WEBER RD Objectives Est. Cost City Past Current CONSTRUCTION ENGINEERING $2,600,000 ROMEOVILLE 1 2016 P.E. (PHASE II) $1,800,000 ROMEOVILLE 2 2016 $1,000 ROMEOVILLE 1 2016 BOLINGBROOK 1 2017-2021 System Maintenance I 55 AT WEBER RD System Maintenance I 55 AT WEBER RD (LOCAL SECTION) System Maintenance LAND ACQUISITION I 55 AT JOLIET RD EXIT & AT ILL 53 Bridge Maintenance BRIDGE NEW DECK SAFETY PRESERVE SYSTEM Structure Status FUNCTIONAL BACKLOG STRUCTURAL ACCRUING I 57 AT STUENKEL RD (WORKZONE SAFETY) Congestion Mitigation MISCELLANEOUS $1,660,000 AADT 103,100 Truck Pct 16 Str Number 0990028 NHS Y 111,900 12 0990260 Y $250,000 1 - 89 UNIVERSITY PARK 1 2016 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street I 80 (EASTBOUND) I Miles 1.01 Roughness(IRI) GOOD ADEQUATE 14.99 GOOD 80 Miles 1.01 Roughness(IRI) GOOD ADEQUATE 14.99 GOOD 80 I 80 BRIDGE SUPERSTRUCTURE BRIDGE REPLACEMENT SUBSTRUCTURE WIDENING BRIDGE NEW DECK BRIDGE WIDENING RECONSTRUCTION Objectives Est. Cost SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $35,000,000 City Past Current JOLIET NEW LENOX MINOOKA 3 2017-2021 Rutting 0.10 AADT 55,600 Truck Pct 26.9 NHS Y Structure Status FUNCTIONAL LONG TERM AADT 41,000 Truck Pct 17 Str Number 0990059 NHS Y 0.12 69,488 22.6 Y STRUCTURAL ACCRUING 39,800 22 0990060 Y STRUCTURAL ACCRUING 39,800 22 0990060 Y STRUCTURAL ACCRUING 39,800 22 0990062 Y FUNCTIONAL BACKLOG 39,800 22 0990064 Y RIDGE RD TO US 30 (LINCOLN HWY) (GROUP A STRUCTURES - CHICAGO ST TO ROWELL AVE) WB Miles = 1.41 Congestion Mitigation Needs Category ADEQUATE (WESTBOUND) Improvements RIDGE RD TO US 30 (LINCOLN HWY) (GROUP A STRUCTURES - CHICAGO ST TO ROWELL AVE) EB Miles = 1.41 Congestion Mitigation Needs Category ADEQUATE (WESTBOUND) I Location SAFETY PRESERVE SYSTEM TRANSPORTATION OPS BRIDGE REPLACEMENT BRIDGE SUPERSTRUCTURE BRIDGE WIDENING BRIDGE NEW DECK BRIDGE REHABILITATION RECONSTRUCTION $32,630,000 JOLIET NEW LENOX MINOOKA 3 2017-2021 Rutting 0.10 AADT 55,600 Truck Pct 26.9 NHS Y Structure Status FUNCTIONAL LONG TERM AADT 41,000 Truck Pct 17 Str Number 0990058 NHS Y 0.09 69,488 22.6 Y STRUCTURAL BACKLOG 39,800 22 0990061 Y STRUCTURAL ACCRUING 39,800 22 0990063 Y FUNCTIONAL BACKLOG 39,800 22 0990065 Y FUNCTIONAL BACKLOG 41,750 21 0990067 Y RIDGE RD TO US 30 (LINCOLN HWY) Congestion Mitigation LAND ACQUISITION RIDGE RD TO US 30 (LINCOLN HWY) Congestion Mitigation P.E. (PHASE II) 1 - 90 $95,000 JOLIET NEW LENOX MINOOKA 2 2017-2021 $7,000,000 JOLIET NEW LENOX MINOOKA 8 2017-2021 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current I 80 RIDGE RD TO US 30 (LINCOLN HWY) Congestion Mitigation P.E. (PHASE II) $3,750,000 JOLIET NEW LENOX MINOOKA 7 2017-2021 I 80 RIDGE RD TO US 30 (LINCOLN HWY) Congestion Mitigation P.E. (PHASE II) $500,000 JOLIET NEW LENOX MINOOKA 1 2016 I 80 RIDGE RD TO US 30 (LINCOLN HWY) (GROUP A STRUCTURES EB) Congestion Mitigation UTILITY ADJUSTMENT $1,100,000 JOLIET NEW LENOX MINOOKA 1 2017-2021 RIDGE RD TO US 30 (LINCOLN HWY) (GROUP A STRUCTURES WB) Congestion Mitigation UTILITY ADJUSTMENT $1,100,000 JOLIET NEW LENOX MINOOKA 1 2017-2021 RIDGE RD TO US 30 (LINCOLN HWY) (GROUP A STRUCTURES EB) Congestion Mitigation RR FLAGGER SAFETY $350,000 JOLIET NEW LENOX MINOOKA 1 2017-2021 RIDGE RD TO US 30 (LINCOLN HWY) (GROUP A STRUCTURES EB) Congestion Mitigation RR FLAGGER SAFETY $350,000 JOLIET NEW LENOX MINOOKA 1 2017-2021 RIDGE RD TO US 30 (LINCOLN HWY) (GROUP A STRUCTURES WB) Congestion Mitigation RR FLAGGER SAFETY $350,000 JOLIET NEW LENOX MINOOKA 1 2017-2021 RIDGE RD TO US 30 (LINCOLN HWY) (GROUP A STRUCTURES WB) Congestion Mitigation RR FLAGGER SAFETY $350,000 JOLIET NEW LENOX MINOOKA 1 2017-2021 (EASTBOUND) I 80 (WESTBOUND) I 80 (EASTBOUND) I 80 (EASTBOUND) I 80 (WESTBOUND) I 80 (WESTBOUND) 1 - 91 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street I 80 Location Improvements AT CENTER ST (NB) Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM TRANSPORTATION OPS BRIDGE SUPERSTRUCTURE BRIDGE NEW DECK Structure Status STRUCTURAL ACCRUING AADT 2,200 Past Current JOLIET 11 2017-2021 Truck Pct N/A Str Number 0990074 NHS Y Y 1,300 N/A 0990075 FUNCTIONAL BACKLOG 3,800 8 0990187 N STRUCTURAL ACCRUING 3,800 8 0990188 N 80 OVER US 6 (RAILROAD ST) & DES PLAINES RIVER System Maintenance BRIDGE PAINTING I 80 OVER US 6 (RAILROAD ST) & DES PLAINES RIVER Bridge Maintenance P.E. (PHASE II) I 80 OVER US 6 (RAILROAD ST) & DES PLAINES RIVER Bridge Maintenance RR FLAGGER SAFETY I 80 AT BRIGGS ST TRAF SIGNAL INSTALLATION CHANNELIZATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP WB RAMP $3,150,000 City STRUCTURAL ACCRUING I System Maintenance Est. Cost PRESERVE SYSTEM $4,000,000 JOLIET 9 2017-2021 $450,000 JOLIET 7 2017-2021 $70,000 JOLIET 6 2017-2021 7 2017-2021 $900,000 ILLINOIS JOBS NOW! PROJECT I 80 AT US 30 (LINCOLN HWY) Congestion Mitigation PEDESTRIAN OVERPASS SAFETY MODAL CONNECTIVITY $1,600,000 NEW LENOX 1 2017-2021 I 80 AT US 30 (LINCOLN HWY) Congestion Mitigation RR FLAGGER SAFETY $1,300,000 NEW LENOX 1 2017-2021 1 - 92 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street I 355 VETERANS' MEMORIAL Location I-80 TO I-55 Miles = 12.71 Improvements Objectives NEW CONSTRUCTION TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT $4,560,000 RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $730,000 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS INTERSECTION RECONSTN RESURFACING System Expansion VETERANS MEMORIAL Est. Cost City Past Current LEMONT LOCKPORT NEW LENOX 7 2017-2021 JOLIET 1 2017-2021 $1,555,000 JOLIET NEW LENOX 1 2016 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $1,500,000 NEW LENOX 4 2016 SAFETY PRESERVE SYSTEM $2,000,000 NEW LENOX HOMER GLEN 6 2017-2021 TOLLWAY IDOT PARTICIPATION IN PROJECT. US 6 US 52 JACKSON ST TO CHICAGO ST Miles = 1.40 System Maintenance ILL 53 CHICAGO / OTTAWA CONNECTOR Needs Category ADEQUATE US 6 MAPLE RD Needs Category BACKLOG US 6 Miles 1.40 6 SOUTHWEST HWY Needs Category ACCRUING Rutting 0.20 AADT 10,004 PORTER AVE TO SPRING CREEK ST Miles = 3.28 System Maintenance Miles 3.28 Roughness(IRI) NOT ACCEPTABLE Rutting 0.22 AADT 8,746 AT GOUGAR RD Truck Pct 7.0 NHS Y RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 9.0 NHS N Congestion Mitigation MAPLE RD US Roughness(IRI) NOT ACCEPTABLE E OF CEDAR RD TO COOK CO LINE Miles = 3.06 System Maintenance Miles 3.06 Roughness(IRI) NOT ACCEPTABLE Rutting 0.24 AADT 10,293 Truck Pct 8.2 NHS N 1 - 93 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street US 6 Location AT PARKER RD 6 SOUTHWEST HWY Objectives INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT BRIDGE REPLACEMENT RECONSTRUCTION SAFETY PRESERVE SYSTEM Congestion Mitigation SOUTHWEST HWY US Improvements AT MARLEY CREEK 0.3 & 1.1 MI W OF COOK CO LINE Miles = 0.01 Bridge Maintenance Structure Status ADEQUATE STRUCTURAL ACCRUING US 6 SOUTHWEST HWY US 6 SOUTHWEST HWY US 6 US 52 US 30 Needs Category ACCRUING $3,500,000 $10,200,000 AADT 8,500 8,500 City Past Current NEW LENOX 8 2016 HOMER GLEN 11 2017-2021 Truck Pct 9 Str Number 0990148 NHS N 9 0990149 N AT MARLEY CREEK 0.3 & 1.1 MI W OF COOK CO LINE Bridge Maintenance P.E. (PHASE II) $200,000 HOMER GLEN 2 2017-2021 MARLEY CREEK 0.3 & 1.1 MI W OF COOK CO LINE Bridge Maintenance LAND ACQUISITION $210,000 HOMER GLEN 2 2017-2021 BROADWAY ST TO I-80 Miles = 1.95 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $850,000 JOLIET 1 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $2,550,000 OSWEGO PLAINFIELD 1 2017-2021 ILL 53 Needs Category ADEQUATE Est. Cost Miles 1.95 Roughness(IRI) NOT ACCEPTABLE Rutting 0.20 AADT 10,776 NW OF LINCOLN STATION DR TO 143RD ST Miles = 7.29 System Maintenance Miles 7.29 Roughness(IRI) ACCEPTABLE Rutting 0.16 AADT 13,861 Truck Pct 6.3 NHS Y RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 12.6 NHS Y 1 - 94 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street US 30 Location Improvements AT WIKADUKE TRAIL RD Congestion Mitigation Objectives Est. Cost City Past Current INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $1,440,000 8 2017-2021 TRAF SIGNAL INSTALLATION CHANNELIZATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP $1,550,000 3 2016 LAND ACQUISITION $200,000 3 2016 ILL 59 (DIVISION ST) TO I-55 Congestion Mitigation CONSTRUCTION ENGINEERING $660,000 PLAINFIELD JOLIET 1 2016 COLLINS ST TO KRAKER AVE Miles = 1.35 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA RR FLAGGER JOLIET 8 2017-2021 3 2017-2021 IDOT PARTICIPATION IN PROJECT. US 30 AT 119TH ST Congestion Mitigation US 30 AT 119TH ST Congestion Mitigation US 30 LINCOLN HWY US 30 E CASS ST Needs Category ACCRUING US 45 W FR RD Needs Category BACKLOG Miles 1.35 Roughness(IRI) NOT ACCEPTABLE Rutting 0.29 AADT 13,438 JOLIET RD TO US 45/52 (96TH AVE) Miles = 0.39 System Maintenance Miles 0.39 Roughness(IRI) NOT ACCEPTABLE Rutting 0.20 AADT Truck Pct 7.1 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS NHS Y RESURFACING Truck Pct 0.0 $1,080,000 SAFETY PRESERVE SYSTEM NHS N 1 - 95 $140,000 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street US 45 US 52 Location Improvements Objectives Est. Cost DITCH 1.4 MI S OF US 52 Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM W OF WYNSTONE DR TO EDEN LN Miles = 3.46 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $1,860,000 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $255,000 City $250,000 Past Current 1 2017-2021 SHOREWOOD JOLIET 8 2017-2021 JOLIET 6 2017-2021 1 2017-2021 96TH AVE US 52 JEFFERSON ST Needs Category ACCRUING US 52 MCDONOUGH ST Needs Category ACCRUING US 52 Miles 3.46 Roughness(IRI) NOT ACCEPTABLE Rutting 0.21 AADT 19,800 WEST PARK AVE TO RAILROAD ST Miles = 0.50 System Maintenance Miles 0.50 Roughness(IRI) NOT ACCEPTABLE Rutting 0.24 AADT 6,275 N BRANCH JACKSON CREEK 4 MI SE OF ILL 53 Bridge Maintenance Truck Pct 6.9 NHS Y RESURFACING PEDESTRIAN RAMPS/ADA RR FLAGGER Truck Pct 3.9 NHS N SAFETY PRESERVE SYSTEM BRIDGE DECK OVERLAY Structure Status STRUCTURAL ACCRUING ILL 1 MAIN ST DEER CREEK S OF CHICAGO RD Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 7 9TH ST AT ILL 171 Congestion Mitigation TRAF SIGNAL MODERNIZATION LEFT TURN LANES 1 - 96 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $2,000,000 AADT 8,950 $2,450,000 AADT 12,900 $2,250,000 Truck Pct 8 Str Number 0990129 CRETE Truck Pct 6 LOCKPORT NHS Y 1 Str Number 0990076 2017-2021 NHS Y 3 2017-2021 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street ILL 7 Location AT ILL 171 159TH ST ILL 7 159TH ST ILL 7 159TH ST ILL 50 GOVERNORS HWY Needs Category ACCRUING ILL 53 BOLINGBROOK DR ILL 53 INDEPENDENCE BLVD SAFETY RR FLAGGER I-355 (VETERANS MEMORIAL TOLLWAY) TO WILL COOK RD Congestion Mitigation CONSTRUCTION ENGINEERING I-355 (VETERANS MEMORIAL TOLLWAY) TO WILL-COOK RD Congestion Mitigation P.E. (PHASE II) I-355 (VETERANS MEMORIAL TOLLWAY) TO WILL-COOK RD Congestion Mitigation LAND ACQUISITION PEOTONE RD TO KENNEDY RD Miles = 3.31 System Maintenance RESURFACING Miles 3.31 Roughness(IRI) NOT ACCEPTABLE Rutting 0.28 AADT 7,786 AT ROYCE RD System Maintenance BOLINGBROOK DR ILL 53 Objectives Est. Cost $300,000 City Past Current LOCKPORT 1 2017-2021 $4,180,000 LOCKPORT HOMER GLEN 6 2016 $600,000 HOMER GLEN LOCKPORT 1 2016 $10,000,000 LOCKPORT HOMER GLEN 1 2016 PEOTONE 6 2017-2021 $750,000 BOLINGBROOK 3 2017-2021 $70,000 BOLINGBROOK 3 2016 ROMEOVILLE LOCKPORT 2 2017-2021 Congestion Mitigation 9TH ST ILL 7 Improvements AT ROYCE RD Truck Pct 11.2 SAFETY PRESERVE SYSTEM $2,320,000 NHS Y CHANNELIZATION TRAF SIGNAL INSTALLATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP LAND ACQUISITION System Maintenance S OF MURPHY DR TO TO ILL 7 (RENWICK RD) System Maintenance SAFETY NEW SHOULDERS 1 - 97 $1,500,000 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street ILL 53 INDEPENDENCE BLVD ILL 102 KANKAKEE ST/IL-102 ILL 102 KANKAKEE ST Location Improvements Objectives S OF MURPHY DR TO TO ILL 7 (RENWICK RD) System Maintenance LAND ACQUISITION JOHN ST TO KANKAKEE CO LINE System Maintenance SHOULDER REPAIR MILLED RUMBLE STRIP GUARDRAIL SAFETY PRESERVE SYSTEM AT RAYN'S CREEK 6 MI S OF ILL 53 Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Est. Cost $200,000 Structure Status STRUCTURAL BACKLOG 2017-2021 $3,470,000 1 2017-2021 $500,000 6 2017-2021 AADT 2,100 COMET DR TO KANKAKEE CO LINE System Maintenance SHOULDER REPAIR MILLED RUMBLE STRIP GUARDRAIL END-SECT REPL SAFETY PRESERVE SYSTEM ILL 126 AT MEADOW LN TURNING LANES TRAF SIGNAL INSTALLATION PEDESTRIAN RAMPS/ADA SAFETY MODAL CONNECTIVITY TRANSPORTATION OPS $670,000 INTERSECTION RECONSTN BRIDGE WIDENING SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $2,000,000 ILL 126 PLAINFIELD RD Congestion Mitigation AT ESSINGTON AVE 0.1 MI W OF I-55 Congestion Mitigation Structure Status ADEQUATE ILL 126 AT COUNTY LINE RD Congestion Mitigation SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP CHANNELIZATION 1 - 98 ROMEOVILLE LOCKPORT Past Current 1 ILL 113 LOCKPORT ST City $4,265,000 AADT 16,900 $1,700,000 Truck Pct 25 Str Number 0990170 NHS N BRAIDWOOD 1 2017-2021 PLAINFIELD 8 2016 8 2017-2021 Truck Pct 15 Str Number 0990262 NHS N 2 2017-2021 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street Location Improvements Objectives ILL 126 AT COUNTY LINE RD System Maintenance TRAF SIGNAL INSTALLATION ILL 126 AT ESSINGTON AVE 0.1 MI W OF I-55 Congestion Mitigation ILL 126 ILL 129 SAFETY TRANSPORTATION OPS Est. Cost City Past Current $275,000 1 2017-2021 LAND ACQUISITION $250,000 1 2017-2021 AT COUNTY LINE RD Congestion Mitigation LAND ACQUISITION $200,000 2 2017-2021 AT STRIP MINE RD Congestion Mitigation INTERSECTION RECONSTN $750,000 8 2017-2021 AT STRIP MINE RD Congestion Mitigation LAND ACQUISITION $80,000 2 2017-2021 WASHINGTON ST ILL 129 AT COAL CITY RD INTERSECTION RECONSTN PLAINFIELD RD WASHINGTON ST ILL 129 WASHINGTON ST ILL 171 ARCHER AVE SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT Congestion Mitigation WASHINGTON ST ILL 129 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT AT COAL CITY RD LAND ACQUISITION $750,000 WILMINGTON 8 2017-2021 $80,000 WILMINGTON 2 2017-2021 11 2017-2021 Congestion Mitigation AT LONG RUN CREEK Miles = 0.01 Bridge Maintenance BRIDGE REPLACEMENT VERTICAL REALIGNMENT SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Structure Status STRUCTURAL BACKLOG 1 - 99 $6,255,000 AADT 11,000 Truck Pct 10 Str Number 0990080 NHS Y FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street I 55 E FR RD Needs Category BACKLOG I 55 E FR RD Needs Category BACKLOG I 55 E FR RD Location Improvements RIVER RD TO DEAD END Miles = 1.31 System Maintenance Miles 1.31 Roughness(IRI) N/A Rutting 0.00 AADT BLUFF RD TO US 6 (EAMES ST) Miles = 1.62 System Maintenance Miles 1.62 Roughness(IRI) NOT ACCEPTABLE Rutting 0.36 AADT AT I & M CANAL 1.1 MI S OF I-80 Bridge Maintenance Objectives RESURFACING Truck Pct 0.0 SAFETY PRESERVE SYSTEM $460,000 SAFETY PRESERVE SYSTEM $570,000 SAFETY PRESERVE SYSTEM $400,000 City Past Current 3 2017-2021 CHANNAHON 3 2017-2021 CHANNAHON 1 2017-2021 NHS N RESURFACING Truck Pct 0.0 Est. Cost NHS N BRIDGE DECK OVERLAY BRIDGE JOINT REPAIR Structure Status ADEQUATE ILLIANA EXPWY I-55 (WILL CO) TO I-65 (INDIANA) System Expansion WETLAND MITIGATION ILLIANA EXPWY I-55 (WILL CO) TO I-65 (INDIANA) PE III OVERSIGHT System Expansion ILLIANA EXPWY ILLIANA EXPWY SUSTAINABILITY AADT 1,350 Truck Pct 8 Str Number 0990035 NHS N $6,800,000 WILMINGTON PEOTONE 1 2016 CONSTRUCTION ENGINEERING $3,000,000 WILMINGTON PEOTONE 1 2016 I-55 (WILL CO) TO I-65 (INDIANA) PE III OVERSIGHT System Expansion CONSTRUCTION ENGINEERING $3,000,000 WILMINGTON PEOTONE 1 2017-2021 I-55 (WILL CO) TO I-65 (INDIANA) GEOTECHNICAL System Expansion P.E. (PHASE I) $2,500,000 WILMINGTON PEOTONE 3 2017-2021 IDOT PARTICIPATION IN PROJECT. 1 - 100 FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current ILLIANA EXPWY I-55 (WILL CO) TO I-65 (INDIANA) - NEPA System Expansion P.E. (PHASE I) $4,600,000 WILMINGTON PEOTONE 1 2016 ILLIANA EXPWY I-55 (WILL CO) TO I-65 (INDIANA) PE II OVERSIGHT System Expansion P.E. (PHASE II) $2,500,000 WILMINGTON PEOTONE 1 2016 ILLIANA EXPWY I-55 (WILL CO) TO I-65 (INDIANA) PE II OVERSIGHT System Expansion P.E. (PHASE II) $2,500,000 WILMINGTON PEOTONE 1 2017-2021 ILLIANA EXPWY I-55 (WILL CO) TO I-65 (INDIANA) System Expansion LAND ACQUISITION $20,000,000 WILMINGTON PEOTONE 1 2016 ILLIANA EXPWY I-55 (WILL CO) TO I-65 (INDIANA) System Expansion UTILITY ADJUSTMENT $46,600,000 WILMINGTON PEOTONE 1 2016 ILLIANA EXPWY I-55 (WILL CO) TO I-65 (INDIANA) System Expansion UTILITY ADJUSTMENT $26,500,000 WILMINGTON PEOTONE 1 2016 1 2017-2021 11 2017-2021 MONEE-MANHATTAN RD DITCHES 0.3 MI W OF US 45 & 3 MI W OF US 45 Bridge Maintenance RICHARDS ST AT HICKORY CREEK N OF I-80 Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM BRIDGE SUPERSTRUCTURE SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Structure Status STRUCTURAL ACCRUING 1 - 101 $500,000 $3,190,000 AADT 6,850 JOLIET Truck Pct 5 Str Number 0990123 NHS N FY 2016-2021 Highway Improvement Program District 1 State Highways WILL COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost VARIOUS VARIOUS LOCATIONS IN WILL COUNTY Miles = 4.45 System Maintenance RESURFACING INTERMITTENT SAFETY PRESERVE SYSTEM VARIOUS MOVABLE BRIDGES IN JOLIET AREA Bridge Maintenance BRIDGE ELECTRICAL WORK INFRASTR SECURITY MODAL CONNECTIVITY $10,300,000 VARIOUS VARIOUS LOCATIONS (ADA RAMPS) System Maintenance PEDESTRIAN RAMPS/ADA SAFETY TRANSPORTATION OPS $1,000,000 1 - 102 $1,140,000 City Past Current BOLINGBROOK SHOREWOOD JOLIET PLAINFIELD NEW LENOX BRAIDWOOD MANHATTAN UNIVERSITY PARK MONEE 1 2016 JOLIET 6 2017-2021 4 2017-2021 DISTRICT-WIDE FY 2016-2021 PROPOSED HIGHWAY IMPROVEMENT PROGRAM FY 2016-2021 Highway Improvement Program District 1 State Highways DISTRICT-WIDE MYP Years Route/Street Location Improvements VARIOUS CHANGE ORDER RESERVE System Maintenance CHANGE ORDERS VARIOUS VARIOUS LOCATIONS ALONG EXPWY CURVES System Maintenance SAFETY IMPROVEMENTS VARIOUS BITUMINOUS MATERIALS PROCUREMENT System Maintenance VARIOUS Objectives Est. Cost City Past Current $3,001,000 1 2016 $535,000 1 2016 MISCELLANEOUS $300,000 1 2016 BUREAU OF CONSTRUCTION - BRIDGE PAINTING CONSTRUCTION ENGINEERING System Maintenance CONSTRUCTION ENGINEERING $500,000 1 2016 VARIOUS BUREAU OF CONSTRUCTION - VARIOUS CONSTRUCTION ENGINEERING CONSTRUCTION ENGINEERING $2,000,000 2 2016 VARIOUS BUREAU OF CONSTRUCTION - VARIOUS CONSTRUCTION ENGINEERING CONSTRUCTION ENGINEERING $6,000,000 2 2017-2021 VARIOUS BUREAU OF TRAFFIC - SCAT MONITORING P.E. (PHASE II) $1,200,000 1 2016 VARIOUS BUREAU OF TRAFFIC - SCAT MONITORING System Maintenance P.E. (PHASE II) $400,000 1 2017-2021 VARIOUS BUREAU OF TRAFFIC - SIGNAL DESIGN System Maintenance P.E. (PHASE II) $300,000 1 2017-2021 SAFETY 1 - 103 FY 2016-2021 Highway Improvement Program District 1 State Highways DISTRICT-WIDE MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current VARIOUS BUREAU OF TRAFFIC OPERATIONS INSPECTION System Maintenance CONSTRUCTION ENGINEERING $650,000 1 2016 VARIOUS BUREAU OF ELECTRICAL - VARIOUS ELECTRICAL ENGINEERING System Maintenance P.E. (PHASE II) $250,000 1 2016 VARIOUS BUREAU OF ELECTRICAL - VARIOUS ITS System Maintenance P.E. (PHASE II) $250,000 1 2016 VARIOUS BUREAU OF ELECTRICAL - VARIOUS PUMP STATIONS System Maintenance P.E. (PHASE II) $750,000 1 2017-2021 VARIOUS BUREAU OF TRAFFIC - SCAT STUDIES P.E. (PHASE II) $1,200,000 2 2016 VARIOUS BUREAU OF TRAFFIC - SCAT STUDIES System Maintenance P.E. (PHASE II) $400,000 1 2017-2021 VARIOUS BUREAU OF TRAFFIC - SIGNAL DESIGN P.E. (PHASE II) $1,200,000 2 2016 VARIOUS PHOTO ENFORCEMENT ACTIVITIES MISC TRAFFIC CONTROL $500,000 4 2017-2021 VARIOUS BUREAU OF DESIGN - VARIOUS PLAN PREPARATION System Maintenance P.E. (PHASE II) $500,000 2 2016 SAFETY 1 - 104 FY 2016-2021 Highway Improvement Program District 1 State Highways DISTRICT-WIDE MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current VARIOUS BUREAU OF DESIGN - VARIOUS PLAN PREPARATION - STRUCTURES P.E. (PHASE II) $2,000,000 1 2016 VARIOUS BUREAU OF DESIGN - VARIOUS PLAN PREPARATION - STRUCTURES P.E. (PHASE II) $2,500,000 1 2017-2021 VARIOUS BUREAU OF PROGRAMMING - PROJECT STUDIES (ADA RAMP INVENTORY) System Maintenance P.E. (PHASE I) $900,000 3 2016 VARIOUS BUREAU OF PROGRAMMING - VARIOUS SURVEY NPDEA COMPLAINT System Maintenance P.E. (PHASE I) $300,000 1 2016 VARIOUS BUREAU OF PROGRAMMING - VARIOUS DRAINAGE STUDIES & HYDRAULIC REPORTS System Maintenance P.E. (PHASE I) $300,000 1 2016 VARIOUS BUREAU OF MATERIALS - VARIOUS GEOTECHNICAL System Maintenance P.E. (PHASE II) $500,000 1 2017-2021 VARIOUS BUREAU OF PROGRAMMING - VARIOUS ENVIRONMENTAL STUDIES PROJECT MANAGEMENT System Maintenance P.E. (PHASE I) $600,000 1 2016 VARIOUS BUREAU OF PROGRAMMING - VARIOUS ENVIRONMENTAL STUDIES PROJECT MANAGEMENT System Maintenance P.E. (PHASE I) $600,000 1 2017-2021 VARIOUS BUREAU OF MAINTENANCE - VARIOUS BRIDGE INSPECTIONS System Maintenance P.E. (PHASE II) $300,000 1 2016 1 - 105 FY 2016-2021 Highway Improvement Program District 1 State Highways DISTRICT-WIDE MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current VARIOUS BUREAU OF MAINTENANCE - VARIOUS BRIDGE INSPECTIONS System Maintenance P.E. (PHASE II) $300,000 1 2017-2021 VARIOUS BUREAU OF DESIGN - VARIOUS SUE P.E. (PHASE II) $4,000,000 1 2016 VARIOUS BUREAU OF DESIGN - VARIOUS SUE System Maintenance P.E. (PHASE II) $2,000,000 1 2017-2021 VARIOUS BUREAU OF PROGRAMMING - PROJECT STUDIES P.E. (PHASE I) $14,850,000 2 2016 VARIOUS BUREAU OF PROGRAMMING - PROJECT STUDIES P.E. (PHASE I) $12,000,000 1 2017-2021 VARIOUS VARIOUS LAND ACQUISITION CONSULTANT System Maintenance P.E. (ROW) $750,000 1 2016 VARIOUS VARIOUS LAND ACQUISITION CONSULTANT System Maintenance P.E. (ROW) $500,000 1 2017-2021 VARIOUS BUREAU OF LAND ACQUISITION VARIOUS PE ROW P.E. (ROW) $1,000,000 1 2016 VARIOUS BUREAU OF MATERIALS - VARIOUS QUALITY ASSURANCE TESTING CE QA/MATERIALS TESTING $4,500,000 1 2016 1 - 106 FY 2016-2021 Highway Improvement Program District 1 State Highways DISTRICT-WIDE MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current VARIOUS BUREAU OF PROGRAMMING - VARIOUS GEOMETRIC PROGRAM MGR System Maintenance P.E. (PHASE I) $800,000 1 2016 VARIOUS BUREAU OF PROGRAMMING - VARIOUS GEOMETRIC PROGRAM MGR P.E. (PHASE I) $1,600,000 1 2017-2021 VARIOUS BUREAU OF PROGRAMMING - DRAINAGE P.E. PROJECT MANAGERS STUDIES & HYDRAULIC REPORTS System Maintenance $300,000 2 2016 VARIOUS BUREAU OF MAINTENANCE - VARIOUS CONTRACT MAINTENANCE CE System Maintenance CONSTRUCTION ENGINEERING $1,400,000 2 2016 VARIOUS BUREAU OF MAINTENANCE - VARIOUS CONTRACT MAINTENANCE CE CONSTRUCTION ENGINEERING $2,800,000 2 2017-2021 VARIOUS BUREAU OF MAINTENANCE - VARIOUS LANDSCAPE ARCHITECT CONSTRUCTION ENGINEERING $2,250,000 2 2016 VARIOUS BUREAU OF MAINTENANCE - VARIOUS LANDSCAPE ARCHITECTUAL SERVICES CONSTRUCTION ENGINEERING $3,000,000 1 2017-2021 VARIOUS BUREAU OF PROGRAMMING - VARIOUS TRAFFIC COUNTS System Maintenance P.E. (PHASE I) $1,000,000 1 2016 VARIOUS VARIOUS PHASE I SURVEYS P.E. SURVEYS (PHASE I) $750,000 1 2016 1 - 107 FY 2016-2021 Highway Improvement Program District 1 State Highways DISTRICT-WIDE MYP Years Route/Street Location Improvements VARIOUS VARIOUS PH I SURVEYS P.E. SURVEYS (PHASE I) VARIOUS BUREAU OF PROGRAMMING - VARIOUS ENVIRONMENTAL STUDIES PROJECT MNGT System Maintenance VARIOUS Objectives Est. Cost City Past Current $1,000,000 1 2017-2021 P.E. (PHASE I) $300,000 1 2016 BUREAU OF PROGRAMMING - VARIOUS ENVIRONMENTAL STUDIES PROJECT MNGT P.E. (PHASE I) $600,000 1 2017-2021 VARIOUS BUREAU OF DESIGN - VARIOUS PLAN PREPARATION P.E. (PHASE II) $1,750,000 1 2016 VARIOUS BUREAU OF DESIGN - VARIOUS PLAN PREPARATION - STRUCTURES System Maintenance P.E. (PHASE II) $250,000 2 2016 VARIOUS BUREAU OF DESIGN - VARIOUS PLAN PREPARATION - STRUCTURES System Maintenance P.E. (PHASE II) $1,250,000 1 2017-2021 VARIOUS BUREAU OF OPERATIONS - SIGN STRUCTURE AND HIGH MAST TOWER STRUCTURAL INSPECTIONS System Maintenance P.E. (PHASE II) $500,000 1 2016 VARIOUS BUREAU OF OPERATIONS - SIGN STRUCTURE AND HIGH MAST TOWER STRUCTURAL INSPECTIONS System Maintenance P.E. (PHASE II) $500,000 1 2017-2021 VARIOUS BUREAU OF MAINTENANCE - VARIOUS BRIDGE INSPECTIONS System Maintenance P.E. (PHASE II) $400,000 1 2016 1 - 108 FY 2016-2021 Highway Improvement Program District 1 State Highways DISTRICT-WIDE MYP Years Route/Street Location Improvements VARIOUS BUREAU OF MAINTENANCE - VARIOUS BRIDGE INSPECTIONS System Maintenance P.E. (PHASE II) VARIOUS BUREAU OF PROGRAMMING - VARIOUS PE ROW System Maintenance P.E. (ROW) VARIOUS BUREAU OF PROGRAMMING TRAFFIC COUNTS System Maintenance P.E. (PHASE I) VARIOUS BUREAU OF DESIGN - PROJECT SUPPORT/MANAGEMENT System Maintenance VARIOUS Objectives Est. Cost City Past Current $400,000 1 2017-2021 $1,000,000 1 2016 $500,000 2 2016 P.E. PROJECT MANAGERS $2,875,000 1 2016 BUREAU OF DESIGN - PROJECT SUPPORT/MANAGEMENT System Maintenance P.E. PROJECT MANAGERS $1,437,000 1 2017-2021 VARIOUS DISTRICT MISCELLANEOUS System Maintenance MISCELLANEOUS PROJECTS $2,000,000 1 2016 VARIOUS DISTRICT MISCELLANEOUS MISCELLANEOUS PROJECTS $10,000,000 1 2017-2021 VARIOUS BUREAU OF MAINTENANCE CONSTRUCTION ENGINEERING System Maintenance CONSTRUCTION ENGINEERING $500,000 1 2016 VARIOUS MISCELLANEOUS LAND ACQUISITION System Maintenance LAND ACQUISITION $3,000,000 1 2016 1 - 109 FY 2016-2021 Highway Improvement Program District 1 State Highways DISTRICT-WIDE MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION $5,000,000 1 2017-2021 VARIOUS PRE-LAND ACQUISITION ACTIVITY System Maintenance PRE-ACQUISITION ACTIVITY $2,326,000 1 2016 VARIOUS PRE-LAND ACQUISITION ACTIVITY PRE-ACQUISITION ACTIVITY $5,000,000 1 2017-2021 VARIOUS POST-LAND ACQUISITION ACTIVITY System Maintenance POST-ACQUISITION ACTIVITY $15,000,000 1 2016 VARIOUS POST-LAND ACQUISITION ACTIVITY POST-ACQUISITION ACTIVITY $5,000,000 1 2017-2021 1 - 110 DISTRICT 1 FY 2016-2019 PROPOSED LOCAL PROJECTS FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street I 294 Location Improvements Objectives Est. Cost City Past Current ILL 64 INTCHG P.E. (PHASE II) $531,000 NORTHLAKE 1 2016 TRI-STATE TOLLWAY US 6 AT VAN DAM RD P.E. (PHASE II) $116,000 SOUTH HOLLAND CALUMET CITY 1 2016 US 6 AT VAN DAM RD LAND ACQUISITION $112,000 SOUTH HOLLAND CALUMET CITY 1 2016 US 6 AT VAN DAM RD INTERSECTION IMPROVEMENT CALUMET CITY 1 2017-2021 US 6 AT VAN DAM RD CONSTRUCTION ENGINEERING $154,000 SOUTH HOLLAND CALUMET CITY 1 2017-2021 AT 51ST ST LIGHTING $450,000 OAK LAWN 1 2017-2021 AT MUSEUM DR P.E. (PHASE II) $53,000 OAK LAWN 1 2016 AT MUSEUM DR TRAF SIGNAL INSTALLATION $1,276,000 OAK LAWN 2 2017-2021 US 12 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS SAFETY PRESERVE SYSTEM US 20 $2,260,000 95TH ST US 12 US 20 95TH ST US 12 US 20 95TH ST 1 - 111 SAFETY TRANSPORTATION OPS FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street US 12 Location Improvements Objectives AT MUSEUM DR CONSTRUCTION ENGINEERING RIDGELAND AVE TO CENTRAL AVE LIGHTING SAFETY PRESERVE SYSTEM AT KOSTNER AVE INTERSECTION IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS AT KOSTNER AVE CONSTRUCTION ENGINEERING AT HIBBARD RD P.E. (PHASE II) AT HIBBARD RD LAND ACQUISITION AT HIBBARD RD CHANNELIZATION AT HIBBARD RD CONSTRUCTION ENGINEERING Est. Cost City Past Current $88,000 OAK LAWN 2 2017-2021 $906,000 MATTESON 3 2017-2021 $1,200,000 MATTESON 2 2016 $94,000 MATTESON 2 2016 $202,000 WILMETTE 3 2016 $71,000 WILMETTE 3 2016 $2,549,000 WILMETTE 3 2016 $279,000 WILMETTE 3 2016 US 20 95TH ST US 30 LINCOLN HWY US 30 LINCOLN HWY US 30 LINCOLN HWY US 41 SKOKIE BLVD US 41 SKOKIE BLVD US 41 SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP SKOKIE BLVD US 41 SKOKIE BLVD 1 - 112 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street ILL 1 Location Improvements Objectives SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP 183RD ST TO 187TH ST CHANNELIZATION 183RD ST TO 187TH ST CONSTRUCTION ENGINEERING WOLF RD TO US 45 (LAGRANGE RD) P.E. (PHASE II) WOLF RD TO US 45 (LAGRANGE RD) Miles = 1.99 WIDENING & RESURFACING 143RD ST ILL 7 WOLF RD TO US 45 (LAGRANGE RD) Est. Cost City Past Current $566,000 GLENWOOD HOMEWOOD 3 2017-2021 $42,000 GLENWOOD HOMEWOOD 3 2017-2021 $1,000,000 ORLAND PARK 1 2016 $14,000,000 ORLAND PARK 13 2017-2021 CONSTRUCTION ENGINEERING $980,000 ORLAND PARK 9 2017-2021 SCHAUMBURG RD TO BARTLETT RD P.E. (PHASE I) P.E. (PHASE II) $352,000 STREAMWOOD 4 2016 SCHAUMBURG RD TO BARTLETT RD Miles = 2.34 WIDENING & RESURFACING $4,400,000 STREAMWOOD 5 2017-2021 IRVING PARK RD ILL 19 SCHAUMBURG RD TO BARTLETT RD CONSTRUCTION ENGINEERING $440,000 STREAMWOOD 5 2017-2021 AT 91ST ST INTERSECTION IMPROVEMENT BRIDGEVIEW 10 2017-2021 HALSTED ST ILL 1 HALSTED ST ILL 7 143RD ST ILL 7 SAFETY PRESERVE SYSTEM 143RD ST ILL 19 IRVING PARK RD ILL 19 SAFETY PRESERVE SYSTEM IRVING PARK RD ILL 43 HARLEM AVE 1 - 113 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $1,429,000 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives AT 91ST ST CONSTRUCTION ENGINEERING LINCOLN HWY TO 205TH ST LIGHTING SAFETY PRESERVE SYSTEM 128TH ST TO 143RD ST SAFETY IMPROVEMENTS SAFETY AT MATTESON AVE TRAF SIGNAL INSTALLATION SAFETY TRANSPORTATION OPS ILL 56 WOLF RD TO MANNHEIM RD P.E. (PHASE II) ILL 68 CAMBRIDGE DR TO NORTHGATE AVE LIGHTING CAMBRIDGE DR TO NORTHGATE AVE CONSTRUCTION ENGINEERING BURNHAM RD TO US 30 Miles = 0.57 NEW CONSTRUCTION GLENWOOD DYER RD ILL 171 AT HEATHER TRAIL P.E. (PHASE I) P.E. (PHASE II) ILL 43 Est. Cost City Past Current $169,000 BRIDGEVIEW 1 2017-2021 $310,000 MATTESON 1 2016 CRESTWOOD ALSIP 1 2016 $364,000 MATTESON 4 2016 $645,000 HILLSIDE BELLWOOD 1 2016 $1,005,000 WHEELING BUFFALO GROVE 1 2016 $132,000 WHEELING BUFFALO GROVE 1 2016 LYNWOOD 14 2017-2021 JUSTICE 1 2016 HARLEM AVE ILL 50 CICERO AVE ILL 50 $1,168,000 ILL 83 CICERO AVE ILL 50 CICERO AVE SAFETY PRESERVE SYSTEM DUNDEE RD ILL 68 DUNDEE RD ILL 83 ARCHER AVE TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT $8,432,000 $12,000 1 - 114 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives 15TH AVE SILVER CREEK S OF ILL 64 (NORTH AVE) P.E. (PHASE II) 15TH AVE SILVER CREEK S OF ILL 64 (NORTH AVE) BRIDGE REPLACEMENT 15TH AVE SILVER CREEK S OF ILL 64 (NORTH AVE) CONSTRUCTION ENGINEERING 59TH ST CNRR TO ARCHER RD Miles = 0.52 RESURFACING 59TH ST CNRR TO ARCHER RD CONSTRUCTION ENGINEERING 79TH ST CORK AVE / 88TH AVE TO ROBERTS RD P.E. (PHASE I) 84TH AVE 159TH ST TO 171ST ST Miles = 1.52 RESURFACING 84TH AVE 159TH ST TO 171ST ST CONSTRUCTION ENGINEERING 88TH AVE 87TH ST TO 95TH ST LIGHTING SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 115 Est. Cost City Past Current $103,000 MELROSE PARK 5 2016 $1,331,000 MELROSE PARK 5 2016 $94,000 MELROSE PARK 5 2016 $250,000 SUMMIT 6 2016 $18,000 SUMMIT 6 2016 $4,000 JUSTICE 1 2016 $980,000 TINLEY PARK 4 2017-2021 $67,000 TINLEY PARK 1 2017-2021 HICKORY HILLS 12 2017-2021 $316,000 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives 91ST ST CALIFORNIA AVE TO WESTERN AVE P.E. (PHASE II) 91ST ST CALIFORNIA AVE TO WESTERN AVE SIDEWALKS 91ST ST CALIFORNIA AVE TO WESTERN AVE CONSTRUCTION ENGINEERING 107TH ST RIDGELAND AVE TO HARLEM AVE Miles = 0.98 RESURFACING 107TH ST RIDGELAND AVE TO HARLEM AVE CONSTRUCTION ENGINEERING 122ND ST CENTRAL AVE TO CICERO AVE Miles = 1.06 RESURFACING 122ND ST CENTRAL AVE TO CICERO AVE 123RD ST 86TH AVE 123RD ST 86TH AVE Est. Cost City Past Current $30,000 EVERGREEN PARK 1 2016 $250,000 EVERGREEN PARK 1 2016 $30,000 EVERGREEN PARK 1 2016 $517,000 WORTH CHICAGO RIDGE 1 2017-2021 $34,000 WORTH CHICAGO RIDGE 1 2017-2021 $475,000 ALSIP 1 2016 CONSTRUCTION ENGINEERING $38,000 ALSIP 1 2016 123RD ST: S 87TH AVE TO SW HWY; 86TH AVE: 122ND PL TO SW HWY P.E. (PHASE I) $53,000 PALOS PARK 2 2016 123RD ST: S 87TH AVE TO SW HWY; 86TH AVE: 122ND PL TO SW HWY CHANNELIZATION $766,000 PALOS PARK 3 2017-2021 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP 1 - 116 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street 123RD ST Location Improvements Objectives 123RD ST: S 87TH AVE TO SW HWY; 86TH AVE: 122ND PL TO SW HWY CONSTRUCTION ENGINEERING 127TH ST STATE ST TO ARCHER AVE Miles = 1.41 WIDENING & RESURFACING 134TH ST HALSTED ST TO 0.9 MI E AT TERMINUS OF 134TH ST P.E. (PHASE I) HALSTED ST TO 0.9 MI E AT TERMINUS OF 134TH ST P.E. (PHASE II) HALSTED ST TO 0.9 MI E AT TERMINUS OF 134TH ST Miles = 0.85 RECONSTRUCTION HALSTED ST TO 0.9 MI E AT TERMINUS OF 134TH ST CONSTRUCTION ENGINEERING 143RD ST WILL-COOK RD TO WOLF RD Miles = 1.00 WIDENING & RESURFACING 143RD ST WILL-COOK RD TO WOLF RD CONSTRUCTION ENGINEERING 151ST ST WEST AVE INTERSECTION RECONSTN 86TH AVE FORESTVIEW AVE 134TH ST FORESTVIEW AVE 134TH ST FORESTVIEW AVE 134TH ST FORESTVIEW AVE $53,000 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 117 Est. Cost SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT City Past Current PALOS PARK 3 2017-2021 LEMONT 1 2016 $98,000 RIVERDALE 1 2016 $88,000 RIVERDALE 4 2017-2021 $1,430,000 RIVERDALE 5 2017-2021 $97,000 RIVERDALE 5 2017-2021 $4,265,000 ORLAND PARK 5 2016 $462,000 ORLAND PARK 5 2016 $750,000 ORLAND PARK 1 2017-2021 $1,429,000 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives 151ST ST WEST AVE CONSTRUCTION ENGINEERING 151ST ST WEST AVE TO LAGRANGE RD (US 45) P.E. (PHASE II) 151ST ST WEST AVE TO LAGRANGE RD (US 45) Miles = 0.50 WIDENING & RESURFACING 163RD ST HAVEN AVE TO 88TH AVE P.E. (PHASE II) HAVEN AVE TO 88TH AVE Miles = 0.46 RESURFACING MEADOWVIEW DR 163RD ST HAVEN AVE TO 88TH AVE CONSTRUCTION ENGINEERING 94TH AVE TO HAVEN AVE Miles = 0.34 RESURFACING MEADOWVIEW DR 163RD ST 94TH AVE TO HAVEN AVE CONSTRUCTION ENGINEERING AT CHICAGO HEIGHTS-GLENWOOD RD P.E. (PHASE II) SAFETY PRESERVE SYSTEM Est. Cost City Past Current $80,000 ORLAND PARK 1 2017-2021 $105,000 ORLAND PARK 2 2016 $6,869,000 ORLAND PARK 2 2017-2021 $24,000 ORLAND HILLS 1 2016 $293,000 ORLAND HILLS 1 2017-2021 $30,000 ORLAND HILLS 1 2017-2021 $227,000 ORLAND HILLS 1 2016 $26,000 ORLAND HILLS 1 2016 GLENWOOD 1 2016 MEADOWVIEW DR 163RD ST SAFETY PRESERVE SYSTEM MEADOWVIEW DR 163RD ST SAFETY PRESERVE SYSTEM MEADOWVIEW DR 187TH ST $280,000 1 - 118 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives 187TH ST AT CHICAGO HEIGHTS-GLENWOOD RD INTERSECTION IMPROVEMENT 187TH ST AT CHICAGO HEIGHTS-GLENWOOD RD CONSTRUCTION ENGINEERING 191ST ST ILL 43 (HARLEM AVE) TO RIDGELAND AVE LAND ACQUISITION 191ST ST ILL 43 (HARLEM AVE) TO RIDGELAND AVE Miles = 1.15 RESURFACING 191ST ST ILL 43 (HARLEM AVE) TO RIDGELAND AVE AUSTIN AVE SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS Est. Cost City Past Current $4,000,000 GLENWOOD 4 2016 $210,000 GLENWOOD 4 2016 $14,000 TINLEY PARK 1 2016 $5,300,000 TINLEY PARK 9 2017-2021 CONSTRUCTION ENGINEERING $231,000 TINLEY PARK 7 2017-2021 LINCOLN AVE TO OAKTON ST P.E. (PHASE II) $114,000 MORTON GROVE 3 2016 AUSTIN AVE LINCOLN AVE TO OAKTON ST Miles = 0.61 RECONSTRUCTION $2,171,000 MORTON GROVE 3 2017-2021 AUSTIN AVE LINCOLN AVE TO OAKTON ST CONSTRUCTION ENGINEERING $276,000 MORTON GROVE 3 2017-2021 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 119 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current BROOKWOOD AVE AT BUTTERFIELD RD INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $810,000 FLOSSMOOR 1 2016 BURNHAM AVE SIBLEY BLVD TO PULASKI RD LIGHTING SAFETY PRESERVE SYSTEM $546,000 CALUMET CITY 3 2017-2021 BURNHAM AVE SIBLEY BLVD TO PULASKI RD CONSTRUCTION ENGINEERING $38,000 CALUMET CITY 3 2017-2021 BUTLER ST EAST END RD TO 21ST ST P.E. (PHASE II) $91,000 CHICAGO HEIGHTS 4 2016 EAST END RD TO 21ST ST Miles = 0.43 RECONSTRUCTION $1,620,000 CHICAGO HEIGHTS 4 2016 MAIN ST BUTLER ST EAST END RD TO 21ST ST CONSTRUCTION ENGINEERING $170,000 CHICAGO HEIGHTS 4 2016 CANAL ST HARRISON ST TO TAYLOR ST P.E. (PHASE II) $2,000,000 CHICAGO 3 2017-2021 CANAL ST VIADUCT MADISON ST TO HARRISON ST P.E. (PHASE II) $2,000,000 CHICAGO 3 2016 CENTRAL AVE US 30 (LINCOLN HWY) TO EJ&E RR P.E. (PHASE I) $91,000 MATTESON 1 2016 MAIN ST BUTLER ST SAFETY PRESERVE SYSTEM MAIN ST 1 - 120 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements CENTRAL AVE GREEN BAY RD TO SHERIDAN RD P.E. (PHASE II) CENTRAL AVE GREEN BAY RD TO SHERIDAN RD Miles = 1.10 RECONSTRUCTION CENTRAL AVE GREEN BAY RD TO SHERIDAN RD CENTRAL AVE Objectives Est. Cost City Past Current $322,000 WILMETTE 2 2017-2021 $6,089,000 WILMETTE 1 2017-2021 CONSTRUCTION ENGINEERING $469,000 WILMETTE 1 2017-2021 VOLLMER RD TO LINCOLN HWY P.E. (PHASE II) $113,000 MATTESON 7 2016 CENTRAL AVE VOLLMER RD TO LINCOLN HWY LAND ACQUISITION $105,000 MATTESON 1 2016 CENTRAL AVE EJ&E RR TO US 30 P.E. (PHASE II) $189,000 MATTESON 4 2016 CENTRAL AVE EJ&E RR TO US 30 Miles = 1.00 RECONSTRUCTION $2,300,000 MATTESON 4 2017-2021 CHESTNUT AVE W FORK N BRANCH CHICAGO RIVER P.E. (PHASE II) $64,000 GLENVIEW 2 2016 CHESTNUT AVE W FORK N BRANCH CHICAGO RIVER BRIDGE REHABILITATION $800,000 GLENVIEW 2 2016 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 121 SAFETY PRESERVE SYSTEM FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives CHESTNUT AVE W FORK N BRANCH CHICAGO RIVER CONSTRUCTION ENGINEERING CHICAGO AVE CHICAGO RIVER AT HALSTED ST BRIDGE REHABILITATION Est. Cost $64,000 SAFETY PRESERVE SYSTEM City Past Current GLENVIEW 2 2016 CHICAGO 10 2016 CHICAGO 8 2016 $96,000 LEMONT 1 2016 $1,100,000 LEMONT 1 2017-2021 $120,000 LEMONT 1 2017-2021 CHICAGO 3 2016 $140,000 SOUTH HOLLAND 1 2016 $16,000 SOUTH HOLLAND 1 2016 $14,196,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. CHICAGO AVE CHICAGO RIVER AT HALSTED ST CONSTRUCTION ENGINEERING $1,577,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. COMED TRAIL DERBY RD TO BELL RD P.E. (PHASE II) COMED TRAIL DERBY RD TO BELL RD BIKEWAY COMED TRAIL DERBY RD TO BELL RD CONSTRUCTION ENGINEERING CORTLAND AVE N BRANCH CHICAGO RIVER P.E. (PHASE II) COTTAGE GROVE AVE AT US 6 CHANNELIZATION COTTAGE GROVE AVE AT US 6 CONSTRUCTION ENGINEERING TRANSPORTATION OPS MODAL CONNECTIVITY $1,200,000 SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP 1 - 122 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives COUNTY LINE RD 60TH ST TO LONGWOOD DR BIKEWAY TRANSPORTATION OPS MODAL CONNECTIVITY DIVISION ST CAL-SAG CHANNEL BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM Est. Cost City Past Current $379,000 BURR RIDGE 1 2016 $4,580,000 BLUE ISLAND 2 2017-2021 $528,000 MELROSE PARK 1 2016 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. SAFETY PRESERVE SYSTEM DIVISION ST 31ST AVE TO 37TH AVE Miles = 0.36 RESURFACING DIVISION ST 31ST AVE TO 37TH AVE CONSTRUCTION ENGINEERING $51,000 MELROSE PARK 1 2016 EMERSON ST EMERSON ST: RIDGE AVE TO GREEN BAY RD; GREEN BAY RD: RIDGE AVE TO EMERSON ST; RIDGE AVE: GREEN BAY RD TO EMERSON ST P.E. (PHASE II) $54,000 EVANSTON 2 2016 CHANNELIZATION $1,473,000 EVANSTON 2 2016 RIDGE AVE EMERSON ST: RIDGE AVE TO GREEN BAY RD; GREEN BAY RD: RIDGE AVE TO EMERSON ST; RIDGE AVE: GREEN BAY RD TO EMERSON ST GRAND AVE N BRANCH CHICAGO RIVER P.E. (PHASE I) $1,200,000 CHICAGO 3 2016 GRAND AVE HOMAN AVE TO CALIFORNIA AVE & PULASKI RD TO HOMAN AVE Miles = 1.74 RECONSTRUCTION $9,360,000 CHICAGO 9 2016 GREEN BAY RD RIDGE AVE EMERSON ST GREEN BAY RD SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP SAFETY PRESERVE SYSTEM 1 - 123 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives GRAND AVE HOMAN AVE TO CALIFORNIA AVE & PULASKI RD TO HOMAN AVE CONSTRUCTION ENGINEERING GROSS POINT RD OLD ORCHARD RD TO GOLF RD P.E. (PHASE II) GROSS POINT RD OLD ORCHARD RD TO GOLF RD LAND ACQUISITION GROSS POINT RD OLD ORCHARD RD TO GOLF RD Miles = 0.69 RELOCATION HALSTED ST I-80 (EB) RAMP TO 175TH ST P.E. (PHASE II) HALSTED ST I-80 (EB) RAMP TO 175TH ST Miles = 0.38 WIDENING & RESURFACING HARRISON ST W OF CHICAGO RIVER BRIDGE REHABILITATION Est. Cost $1,040,000 City Past Current CHICAGO 9 2016 $124,000 SKOKIE 5 2016 $77,000 SKOKIE 5 2016 $3,252,000 SKOKIE 6 2016 $175,000 EAST HAZEL CREST HOMEWOOD 2 2016 SAFETY PRESERVE SYSTEM $3,326,000 EAST HAZEL CREST HOMEWOOD 3 2016 SAFETY PRESERVE SYSTEM $8,432,000 CHICAGO 8 2017-2021 8 2017-2021 1 2016 SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY. HARRISON ST W OF CHICAGO RIVER CONSTRUCTION ENGINEERING $937,000 CHICAGO ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY. HAVEN AVE 163RD ST TO 167TH ST P.E. (PHASE II) $24,000 1 - 124 ORLAND HILLS FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM HAVEN AVE 163RD ST TO 167TH ST Miles = 0.59 RESURFACING HAVEN AVE 163RD ST TO 167TH ST CONSTRUCTION ENGINEERING HOWARD ST MILWAUKEE AVE TO LEHIGH AVE LIGHTING HOWARD ST MILWAUKEE AVE TO LEHIGH AVE CONSTRUCTION ENGINEERING ILL 171 ILL 171(ARCHER RD): S OF 66TH PL TO 71ST ST EXT; STATE RD: E OF LAVERGNE AVE TO CICERO AVE SIDEWALKS SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS INDIANWOOD BLVD SAUK TRAIL TO MONEE RD Miles = 1.00 RESURFACING SAFETY PRESERVE SYSTEM INDIANWOOD BLVD SAUK TRAIL TO MONEE RD JOE ORR RD (PROP) JOE ORR RD (PROP) ARCHER RD STATE RD Est. Cost City Past Current $305,000 ORLAND HILLS 1 2017-2021 $36,000 ORLAND HILLS 1 2017-2021 $4,321,000 NILES 2 2016 $343,000 NILES 2 2016 $150,000 BEDFORD PARK SUMMIT 1 2016 $1,725,000 PARK FOREST 1 2016 CONSTRUCTION ENGINEERING $138,000 PARK FOREST 1 2016 BURNHAM AVE TO INDIANA STATE LINE P.E. (PHASE I) $162,000 LYNWOOD 4 2016 BURNHAM TO INDIANA STATE LINE P.E. (PHASE II) $114,000 LYNWOOD 1 2016 SAFETY PRESERVE SYSTEM 1 - 125 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives JOE ORR RD (PROP) BURNHAM TO INDIANA STATE LINE LAND ACQUISITION JOE ORR RD (PROP) BURNHAM AVE TO INDIANA STATE LINE Miles = 0.26 NEW CONSTRUCTION TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT KENILWORTH AVE RIDGE RD TO GREEN BAY RD Miles = 0.37 RESURFACING SAFETY PRESERVE SYSTEM KENILWORTH AVE RIDGE RD TO GREEN BAY RD CONSTRUCTION ENGINEERING KOSTNER AVE 119TH ST TO 127TH ST Miles = 1.00 RESURFACING KOSTNER AVE 119TH ST TO 127TH ST CONSTRUCTION ENGINEERING LAKE ST AT BROADWAY AVE / N 19TH AVE TRAF SIGNAL REPLACEMENT LAKE ST AT BROADWAY AVE / N 19TH AVE CONSTRUCTION ENGINEERING LINCOLN AVE LINCOLN AVE: 0.7 MI N OF BELMONT AVE LANDSCAPING TO DIVERSEY AVE; BELMONT AVE: ASHLAND AVE TO SOUTHPORT AVE BELMONT AVE SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SUSTAINABILITY 1 - 126 Est. Cost City Past Current $256,000 LYNWOOD 1 2017-2021 $2,042,000 LYNWOOD 14 2017-2021 $550,000 KENILWORTH 2 2016 $39,000 KENILWORTH 2 2016 $350,000 ALSIP 1 2016 $32,000 ALSIP 1 2016 $140,000 MELROSE PARK 1 2016 $13,000 MELROSE PARK 1 2016 CHICAGO 3 2016 $6,480,000 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current LINCOLN AVE: 0.7 MI N OF BELMONT AVE CONSTRUCTION ENGINEERING TO DIVERSEY AVE; BELMONT AVE: ASHLAND AVE TO SOUTHPORT AVE $720,000 CHICAGO 3 2016 BELMONT AVE LOCUST RD LAKE AVE TO WILMETTE AVE P.E. (PHASE II) $133,000 WILMETTE 3 2016 LOCUST RD LAKE AVE TO WILMETTE AVE Miles = 0.50 RECONSTRUCTION $2,263,000 WILMETTE 3 2016 LOCUST RD LAKE AVE TO WILMETTE AVE CONSTRUCTION ENGINEERING $174,000 WILMETTE 3 2016 MAIN ST ILLINOIS ST TO ROBERT KINGERY HWY P.E. (PHASE II) $128,000 LEMONT 1 2017-2021 ILLINOIS ST TO ROBERT KINGERY HWY BIKEWAY $1,600,000 LEMONT 1 2017-2021 ILLINOIS ST TO ROBERT KINGERY HWY CONSTRUCTION ENGINEERING $192,000 LEMONT 1 2017-2021 MCCARTHY RD ILLINOIS ST TO ARCHER AVE P.E. (PHASE I) $105,000 LEMONT 1 2016 MCCARTHY RD ILLINOIS ST TO ARCHER AVE P.E. (PHASE II) $280,000 LEMONT 8 2016 LINCOLN AVE SAFETY PRESERVE SYSTEM BICYCLE SIDE PATH MAIN ST TRANSPORTATION OPS MODAL CONNECTIVITY BICYCLE SIDE PATH MAIN ST BICYCLE SIDE PATH 1 - 127 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives MCCARTHY RD ILLINOIS ST TO WALKER RD P.E. (PHASE II) MCCARTHY RD ILLINOIS ST TO WALKER RD BIKEWAY MCCARTHY RD ILLINOIS ST TO WALKER RD CONSTRUCTION ENGINEERING MCDERMOTT DR TAFT AVE TO WOLF RD Miles = 0.51 RECONSTRUCTION SAFETY PRESERVE SYSTEM MILWAUKEE AVE ADDISON ST TO BELMONT AVE Miles = 0.78 RESURFACING SAFETY PRESERVE SYSTEM MILWAUKEE AVE ADDISON ST TO BELMONT AVE MILWAUKEE AVE Est. Cost City Past Current $96,000 LEMONT 1 2016 $1,000,000 LEMONT 1 2017-2021 $120,000 LEMONT 1 2017-2021 $1,924,000 BERKELEY 4 2016 $5,040,000 CHICAGO 4 2017-2021 CONSTRUCTION ENGINEERING $560,000 CHICAGO 4 2017-2021 LAWRENCE AVE TO ERIE ST P.E. (PHASE II) $960,000 CHICAGO 3 2016 MILWAUKEE AVE NORTH AVE TO ARMITAGE AVE P.E. (PHASE II) $800,000 CHICAGO 3 2017-2021 OAK PARK AVE 159TH ST TO 167TH ST P.E. (PHASE II) $60,000 TINLEY PARK 1 2016 TRANSPORTATION OPS MODAL CONNECTIVITY 1 - 128 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM OAK PARK AVE 159TH ST TO 167TH ST Miles = 1.00 RECONSTRUCTION OAK PARK AVE 159TH ST TO 167TH ST CONSTRUCTION ENGINEERING OAKWOOD DR 175TH ST TO STONEBRIDGE DR Miles = 0.59 RESURFACING OGDEN AVE PULASKI RD TO WESTERN AVE OGDEN AVE Est. Cost City Past Current $2,000,000 TINLEY PARK 1 2017-2021 $140,000 TINLEY PARK 1 2017-2021 $374,000 HAZEL CREST 4 2017-2021 P.E. (PHASE I) P.E. (PHASE II) $100,000 CHICAGO 5 2016 PULASKI RD TO WESTERN AVE P.E. (PHASE II) $100,000 CHICAGO 3 2017-2021 PERSHING RD ASHLAND AVE TO I-90/94 (DAN RYAN EXPWY) Miles = 1.73 PAVING $90,000 CHICAGO 3 2017-2021 PERSHING RD ASHLAND AVE TO I-90/94 (DAN RYAN EXPWY) CONSTRUCTION ENGINEERING $10,000 CHICAGO 3 2017-2021 PULASKI RD AT 183RD ST Miles = 0.01 WIDENING & RESURFACING $3,630,000 COUNTRY CLUB HILLS 5 2017-2021 PULASKI RD AT 183RD ST CONSTRUCTION ENGINEERING $261,000 COUNTRY CLUB HILLS 5 2017-2021 SAFETY PRESERVE SYSTEM PRESERVE SYSTEM TRANSPORTATION OPS 1 - 129 SAFETY PRESERVE SYSTEM FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM QUENTIN RD BRANCH SALT CREEK 0.2 MI N OF DUNDEE RD BRIDGE REPLACEMENT RAVINIA AVE AT 147TH ST P.E. (PHASE II) RAVINIA AVE AT 147TH ST CHANNELIZATION RAVINIA AVE AT 147TH ST CONSTRUCTION ENGINEERING ROBERTS RD 79TH ST TO 87TH ST SHERMER RD Est. Cost City $4,600,000 Past Current 1 2017-2021 $23,000 ORLAND PARK 3 2016 $660,000 ORLAND PARK 3 2016 $49,000 ORLAND PARK 3 2016 P.E. (PHASE I) P.E. (PHASE II) $5,000 BRIDGEVIEW JUSTICE HICKORY HILLS 11 2017-2021 W FORK N BRANCH CHICAGO RIVER P.E. (PHASE II) $68,000 NORTHBROOK 1 2016 SHERMER RD W FORK N BRANCH CHICAGO RIVER BRIDGE REHABILITATION $750,000 NORTHBROOK 1 2017-2021 SHERMER RD W FORK N BRANCH CHICAGO RIVER CONSTRUCTION ENGINEERING $88,000 NORTHBROOK 1 2017-2021 SOUTH WATER ST STETSON AVE TO BEAUBIEN CT P.E. (PHASE I) CHICAGO 3 2017-2021 SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP SAFETY PRESERVE SYSTEM $800,000 VIADUCT 1 - 130 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives STONEBRIDGE DR OAKWOOD DR TO KEDZIE AVE Miles = 0.23 RESURFACING SAFETY PRESERVE SYSTEM VARIOUS INDUSTRIAL PK RD / COTTAGE GROVE RD TO MARK COLLINS DR IN INTERNATIONAL CROSSING PARK Miles = 1.00 NEW CONSTRUCTION TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT Est. Cost City Past Current $173,000 HAZEL CREST 4 2017-2021 $1,300,000 SAUK VILLAGE 3 2016 $2,112,000 CHICAGO 4 2016 $15,300,000 CHICAGO 3 2017-2021 $1,700,000 CHICAGO 3 2017-2021 $4,246,000 CHICAGO 4 2016 $472,000 CHICAGO 4 2016 $4,246,000 CHICAGO 4 2016 $472,000 CHICAGO 4 2016 SURFACE TRANSPORTATION PROJECTS - SECTION 115. THIS EARMARK WILL BE FUNDED SEPARATELY. VARIOUS VARIOUS LOCATIONS (CREATE PROJECT) LAND ACQUISITION VARIOUS 43RD ST OVER LAKE SHORE DR RECONSTRUCTION VARIOUS 43RD ST OVER LAKE SHORE DR CONSTRUCTION ENGINEERING VARIOUS ARTERIAL ST RESURFACING (#71 NORTH) RESURFACING VARIOUS ARTERIAL ST RESURFACING (#71 NORTH) CONSTRUCTION ENGINEERING VARIOUS ARTERIAL ST RESURFACING (#72 CENTRAL) RESURFACING VARIOUS ARTERIAL ST RESURFACING (#72 CENTRAL) CONSTRUCTION ENGINEERING SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 131 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives VARIOUS ARTERIAL ST RESURFACING (#73 SOUTH) RESURFACING SAFETY PRESERVE SYSTEM VARIOUS ARTERIAL ST RESURFACING (#73 SOUTH) CONSTRUCTION ENGINEERING VARIOUS ARTERIAL ST RESURFACING (#74 FAR SOUTH) RESURFACING VARIOUS ARTERIAL ST RESURFACING (#74 FAR SOUTH) CONSTRUCTION ENGINEERING VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #5 BRIDGE PAINTING VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #5 CONSTRUCTION ENGINEERING VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #6 BRIDGE PAINTING VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #6 CONSTRUCTION ENGINEERING VARIOUS ARTERIAL ST RESURFACING (#75 NORTH) SAFETY PRESERVE SYSTEM PRESERVE SYSTEM PRESERVE SYSTEM SAFETY PRESERVE SYSTEM RESURFACING 1 - 132 Est. Cost City Past Current $4,246,000 CHICAGO 4 2016 $472,000 CHICAGO 4 2016 $4,246,000 CHICAGO 4 2016 $472,000 CHICAGO 4 2016 $1,080,000 CHICAGO 4 2016 $120,000 CHICAGO 4 2016 $1,080,000 CHICAGO 4 2016 $120,000 CHICAGO 4 2016 $4,140,000 CHICAGO 3 2017-2021 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives VARIOUS ARTERIAL ST RESURFACING (#75 NORTH) CONSTRUCTION ENGINEERING VARIOUS ARTERIAL ST RESURFACING (#76 CENTRAL) RESURFACING VARIOUS ARTERIAL ST RESURFACING (#76 CENTRAL) CONSTRUCTION ENGINEERING VARIOUS ARTERIAL ST RESURFACING (#77 SOUTH) RESURFACING VARIOUS ARTERIAL ST RESURFACING (#77 SOUTH) CONSTRUCTION ENGINEERING VARIOUS ARTERIAL ST RESURFACING (#78 FAR SOUTH) RESURFACING VARIOUS ARTERIAL ST RESURFACING (#78 FAR SOUTH) CONSTRUCTION ENGINEERING VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #7 BRIDGE PAINTING VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #7 CONSTRUCTION ENGINEERING SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM PRESERVE SYSTEM 1 - 133 Est. Cost City Past Current $460,000 CHICAGO 3 2017-2021 $4,140,000 CHICAGO 3 2017-2021 $460,000 CHICAGO 3 2017-2021 $4,140,000 CHICAGO 3 2017-2021 $460,000 CHICAGO 3 2017-2021 $4,140,000 CHICAGO 3 2017-2021 $460,000 CHICAGO 3 2017-2021 $1,080,000 CHICAGO 3 2017-2021 $120,000 CHICAGO 3 2017-2021 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives PRESERVE SYSTEM VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #8 BRIDGE PAINTING VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #8 CONSTRUCTION ENGINEERING VARIOUS BRIDGE ANNUAL INSPECTIONS P.E. (PHASE I) VARIOUS ARTERIAL ST RESURFACING (#79 NORTH) RESURFACING VARIOUS ARTERIAL ST RESURFACING (#79 NORTH) CONSTRUCTION ENGINEERING VARIOUS ARTERIAL ST RESURFACING (#80 CENTRAL) RESURFACING VARIOUS ARTERIAL ST RESURFACING (#80 CENTRAL) CONSTRUCTION ENGINEERING VARIOUS ARTERIAL ST RESURFACING (#81 SOUTH) RESURFACING VARIOUS ARTERIAL ST RESURFACING (#81 SOUTH) CONSTRUCTION ENGINEERING SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 134 Est. Cost City Past Current $1,080,000 CHICAGO 3 2017-2021 $120,000 CHICAGO 3 2017-2021 $3,200,000 CHICAGO 3 2017-2021 $3,600,000 CHICAGO 2 2017-2021 $400,000 CHICAGO 2 2017-2021 $3,600,000 CHICAGO 2 2017-2021 $400,000 CHICAGO 2 2017-2021 $3,600,000 CHICAGO 2 2017-2021 $400,000 CHICAGO 2 2017-2021 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives VARIOUS ARTERIAL ST RESURFACING (#82 FAR SOUTH) RESURFACING SAFETY PRESERVE SYSTEM VARIOUS ARTERIAL ST RESURFACING (#82 FAR SOUTH) CONSTRUCTION ENGINEERING VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #9 BRIDGE PAINTING VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #9 CONSTRUCTION ENGINEERING VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #10 BRIDGE PAINTING VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #10 CONSTRUCTION ENGINEERING VARIOUS SYSTEM WIDE-BRIDGE ANNUAL INSPECTIONS PROGRAM VARIOUS VARIOUS Est. Cost City Past Current $3,600,000 CHICAGO 2 2017-2021 $400,000 CHICAGO 2 2017-2021 $1,080,000 CHICAGO 2 2017-2021 $120,000 CHICAGO 2 2017-2021 $1,080,000 CHICAGO 2 2017-2021 $120,000 CHICAGO 2 2017-2021 P.E. (PHASE I) $3,200,000 CHICAGO 2 2017-2021 BALMORAL AVE PEDESTRIAN BRIDGE P.E. (PHASE I) $400,000 ROSEMONT 1 2016 ARTERIAL ST RESURFACING #83 NORTH RESURFACING CHICAGO 1 2017-2021 PRESERVE SYSTEM PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 135 $3,600,000 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives VARIOUS ARTERIAL ST RESURFACING #83 NORTH CONSTRUCTION ENGINEERING VARIOUS ARTERIAL ST RESURFACING #84 CENTRAL RESURFACING VARIOUS ARTERIAL ST RESURFACING #84 CENTRAL CONSTRUCTION ENGINEERING VARIOUS ARTERIAL ST RESURFACING #85 SOUTH RESURFACING VARIOUS ARTERIAL ST RESURFACING #85 SOUTH CONSTRUCTION ENGINEERING VARIOUS ARTERIAL ST RESURFACING #86 FAR SOUTH RESURFACING VARIOUS ARTERIAL ST RESURFACING #86 FAR SOUTH CONSTRUCTION ENGINEERING VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #11 BRIDGE PAINTING VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #11 CONSTRUCTION ENGINEERING SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM PRESERVE SYSTEM 1 - 136 Est. Cost City Past Current $400,000 CHICAGO 1 2017-2021 $3,600,000 CHICAGO 1 2017-2021 $400,000 CHICAGO 1 2017-2021 $3,600,000 CHICAGO 1 2017-2021 $400,000 CHICAGO 1 2017-2021 $3,600,000 CHICAGO 1 2017-2021 $400,000 CHICAGO 1 2017-2021 $1,080,000 CHICAGO 1 2017-2021 $120,000 CHICAGO 1 2017-2021 FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives PRESERVE SYSTEM VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #12 BRIDGE PAINTING VARIOUS BRIDGE/VIADUCT PAINTING-PROJECT #12 CONSTRUCTION ENGINEERING VARIOUS VARIOUS LOCATIONS IN CHICAGO MISCELLANEOUS VARIOUS VARIOUS LOCATIONS IN CRESTWOOD LIGHTING VARIOUS BRIDGE INSPECTIONS IN CHICAGO P.E. (BRIDGE INSPECTION) W 79TH ST / GARDEN LN TO OAK GROVE RD Miles = 0.33 RECONSTRUCTION N FR RD W 79TH ST / GARDEN LN TO OAK GROVE RD CONSTRUCTION ENGINEERING WEBSTER AVE N BRANCH CHICAGO RIVER BRIDGE REHABILITATION WEBSTER AVE N BRANCH CHICAGO RIVER CONSTRUCTION ENGINEERING SAFETY PRESERVE SYSTEM Est. Cost Past Current $1,080,000 CHICAGO 1 2017-2021 $120,000 CHICAGO 1 2017-2021 $40,000,000 CHICAGO 1 2016 CRESTWOOD 1 2016 CHICAGO 8 2016 $800,000 JUSTICE 1 2016 $28,000 JUSTICE 1 2016 $1,080,000 CHICAGO 3 2017-2021 $120,000 CHICAGO 3 2017-2021 $185,000 $3,200,000 SAFETY PRESERVE SYSTEM City N FR RD 1 - 137 SAFETY PRESERVE SYSTEM FY 2016-2019 Highway Improvement Program District 1 Local Highways COOK COUNTY MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM WILLOW RD WINNETKA CL TO PROVIDENT AVE Miles = 1.10 RECONSTRUCTION WILLOW RD WINNETKA CL TO PROVIDENT AVE CONSTRUCTION ENGINEERING WOLF RD AT 183RD ST P.E. (PHASE II) WOLF RD AT 183RD ST TRAF SIGNAL MODERNIZATION WOLF RD AT 183RD ST CONSTRUCTION ENGINEERING WOLF RD CAMP MCDONALD RD TO EUCLID AVE Miles = 0.52 RECONSTRUCTION WOODFIELD RD MEACHAM RD TO ILL 53 E FR RD P.E. (PHASE II) WOODFIELD RD MEACHAM RD TO ILL 53 E FR RD Miles = 0.82 RECONSTRUCTION SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 138 Est. Cost City Past Current $3,134,000 WINNETKA 6 2016 $219,000 WINNETKA 6 2016 $9,000 ORLAND PARK 1 2017-2021 $200,000 ORLAND PARK 1 2017-2021 $6,000 ORLAND PARK 1 2017-2021 PROSPECT HEIGHTS MOUNT PROSPECT 14 2017-2021 $240,000 SCHAUMBURG 1 2016 $8,000,000 SCHAUMBURG 1 2017-2021 $6,442,000 FY 2016-2019 Highway Improvement Program District 1 Local Highways DUPAGE COUNTY MYP Years Route/Street US 34 Location Improvements Objectives SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS I-355 (VETERANS MEMORIAL TOLLWAY) TO WILLIAMS ST SIDEWALKS OGDEN AVE ILL 19 I-290 BRIDGE TO RUSH ST P.E. (PHASE II) I-290 BRIDGE TO RUSH ST SAFETY IMPROVEMENTS I-290 BRIDGE TO RUSH ST CONSTRUCTION ENGINEERING ILL 53 / COLUMBINE AVE: CHARLES LN TO HARDING RD; MADISON ST: COLUMBINE AVE TO FINLEY RD Miles = 0.47 RECONSTRUCTION ILL 53 / COLUMBINE AVE: CHARLES LN TO HARDING RD; MADISON ST: COLUMBINE AVE TO FINLEY RD CONSTRUCTION ENGINEERING 31ST TRAIL HIGHLAND AVE TO MEYERS RD BIKEWAY TRANSPORTATION OPS MODAL CONNECTIVITY AURORA AVE AURORA AVE / WEST ST: WASHINGTON ST TO MARTIN ST; CHICAGO AVE: WASHINGTON ST TO ELLSWORTH ST; WASHINGTON ST: WARRENVILLE RD TO ROYCE RD TRAF SIGNAL MODERNIZATION SAFETY PRESERVE SYSTEM Est. Cost $1,094,000 City Past Current DOWNERS GROVE LISLE 1 2016 $28,000 ITASCA 1 2016 $611,000 ITASCA 1 2016 $19,000 ITASCA 1 2016 $2,253,000 LOMBARD 2 2017-2021 $140,000 LOMBARD 2 2017-2021 $699,000 HINSDALE 3 2016 NAPERVILLE BOLINGBROOK 2 2016 IRVING PARK RD ILL 19 SAFETY IRVING PARK RD ILL 19 IRVING PARK RD ILL 53 COLUMBINE AVE MADISON ST ILL 53 COLUMBINE AVE MADISON ST WEST ST CHICAGO AVE WASHINGTON ST SAFETY PRESERVE SYSTEM 1 - 139 $2,350,000 FY 2016-2019 Highway Improvement Program District 1 Local Highways DUPAGE COUNTY MYP Years Route/Street Location Improvements Objectives BATAVIA RD: WARRENVILLE RD TO 0.1 MI N; RIVER RD: WARRENVILLE RD TO 0.1 MI S; WARRENVILLE RD: BEHRS CIRCLE DRIVE E TO WINFIELD RD CHANNELIZATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP EOLA RD MONTGOMERY RD TO 87TH ST Miles = 0.48 WIDENING & RESURFACING SAFETY PRESERVE SYSTEM EOLA RD MONTOMERY RD TO 87TH ST CONSTRUCTION ENGINEERING FIRST ST WEST AVE TO WILLOW RD Miles = 1.33 RESURFACING SAFETY PRESERVE SYSTEM GARFIELD AVE 59TH ST TO 63RD ST Miles = 0.46 RESURFACING GLEN ELLYN RD LAKE ST TO ARMY TRAIL RD Miles = 1.54 GREENBROOK BLVD BATAVIA RD Est. Cost Past Current WARRENVILLE 2 2016 $3,037,000 AURORA 1 2016 $90,000 AURORA 1 2016 $900,000 ELMHURST 1 2016 SAFETY PRESERVE SYSTEM $240,000 BURR RIDGE 3 2017-2021 RESURFACING SAFETY PRESERVE SYSTEM $903,000 BLOOMINGDALE 1 2016 LAKE ST TO ARLINGTON DR Miles = 0.61 RECONSTRUCTION SAFETY PRESERVE SYSTEM $1,990,000 HANOVER PARK 16 2016 HILL AVE E BRANCH DUPAGE RIVER BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $2,500,000 LOMBARD 5 2016 HILL AVE E BRANCH DUPAGE RIVER CONSTRUCTION ENGINEERING $200,000 LOMBARD 5 2016 RIVER RD WARRENVILLE RD 1 - 140 $786,000 City FY 2016-2019 Highway Improvement Program District 1 Local Highways DUPAGE COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost MAIN ST CHURCH RD TO YORK RD Miles = 0.47 RECONSTRUCTION SAFETY PRESERVE SYSTEM $1,197,000 MILL RD E GEORGE ST TO I-290 Miles = 0.99 RESURFACING SAFETY PRESERVE SYSTEM VARIOUS TRAFFIC MANAGEMENT CENTER P.E. (PHASE I) 1 - 141 City Past Current BENSENVILLE 13 2016 $586,000 WOOD DALE 1 2016 $200,000 WOOD DALE 3 2017-2021 FY 2016-2019 Highway Improvement Program District 1 Local Highways KANE COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current AT WING ST INTERSECTION IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $287,000 ELGIN 3 2017-2021 AT ILL 47 INTERSECTION IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $825,000 SUGAR GROVE ROYALTON 1 2016 AT ILL 47 CONSTRUCTION ENGINEERING $74,000 SUGAR GROVE ROYALTON 1 2016 BONCOSKY RD COVERED BRIDGE RD TO RIVER RIDGE DR Miles = 0.52 RESURFACING $275,000 SLEEPY HOLLOW 1 2016 BONCOSKY RD COVERED BRIDGE RD TO RIVER RIDGE DR CONSTRUCTION ENGINEERING $21,000 SLEEPY HOLLOW 1 2016 CHICAGO ST CENTER ST TO ILL 25 Miles = 0.68 RECONSTRUCTION $2,331,000 ELGIN 2 2017-2021 CHICAGO ST CENTER ST TO ILL 25 CONSTRUCTION ENGINEERING $210,000 ELGIN 2 2017-2021 DEERPATH RD MILL CREEK S OF MAIN ST BRIDGE REHABILITATION $1,200,000 BATAVIA 5 2016 DEERPATH RD MILL CREEK S OF MAIN ST CONSTRUCTION ENGINEERING $144,000 BATAVIA 5 2016 ILL 31 STATE ST BLISS RD WHEELER RD BLISS RD WHEELER RD SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 142 SAFETY PRESERVE SYSTEM FY 2016-2019 Highway Improvement Program District 1 Local Highways KANE COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost E NEW YORK ST FARNSWORTH AVE TO WELSH DRIVE Miles = 0.88 RECONSTRUCTION SAFETY PRESERVE SYSTEM $8,800,000 HUNTLEY RD SLEEPY HOLLOW RD TO ELM AVE Miles = 1.09 RECONSTRUCTION SAFETY PRESERVE SYSTEM HUNTLEY RD SLEEPY HOLLOW RD TO ELM AVE CONSTRUCTION ENGINEERING LARKIN AVE AIRLITE ST TO MCLEAN BLVD Miles = 0.89 RESURFACING SAFETY PRESERVE SYSTEM LONGMEADOW PKWY / HUNTLEY RD TO E OF RANDALL RD Miles = 1.00 NEW CONSTRUCTION TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT BOLZ RD E OF RANDALL RD TO E OF ILL 31 Miles = 2.00 ADDITIONAL LANES INTERSECTION IMPROVEMENT SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT PRESERVE SYSTEM LONGMEADOW PKWY / E OF RANDALL RD TO E OF ILL 31 CONSTRUCTION ENGINEERING E OF ILL 31 TO E OF ILL 25 Miles = 0.63 INTERSECTION IMPROVEMENT NEW CONSTRUCTION BRIDGE (NEW) BOLZ RD LONGMEADOW PKWY / City Past Current AURORA 1 2017-2021 $10,335,000 WEST DUNDEE CARPENTERSVILLE 1 2017-2021 $496,000 WEST DUNDEE CARPENTERSVILLE 1 2017-2021 ELGIN 1 2016 $10,040,000 ALGONQUIN 1 2016 $29,000,000 ALGONQUIN 1 2017-2021 $1,625,000 ALGONQUIN 1 2017-2021 CARPENTERSVILLE BARRINGTON HILLS 1 2017-2021 $1,031,000 BOLZ RD LONGMEADOW PKWY / BOLZ RD 1 - 143 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $14,055,000 FY 2016-2019 Highway Improvement Program District 1 Local Highways KANE COUNTY MYP Years Route/Street LONGMEADOW PKWY / Location Improvements Objectives E OF ILL 31 TO E OF ILL 25 CONSTRUCTION ENGINEERING BOLZ RD E OF ILL 25 TO ILL 62 Miles = 0.50 INTERSECTION IMPROVEMENT NEW CONSTRUCTION LONGMEADOW PKWY / E OF ILL 25 TO ILL 62 CONSTRUCTION ENGINEERING MAIN ST AT VAN NORTWICK AVE INTERSECTION RECONSTN MAIN ST AT VAN NORTWICK AVE CONSTRUCTION ENGINEERING MAIN ST AT DEERPATH RD INTERSECTION IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS OLD LA FOX RD BURLINGTON RD TO ILL 64 Miles = 1.07 RESURFACING SAFETY PRESERVE SYSTEM OLD LA FOX RD BURLINGTON RD TO ILL 64 CONSTRUCTION ENGINEERING Est. Cost SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT Past Current $1,827,000 CARPENTERSVILLE BARRINGTON HILLS 1 2017-2021 $5,500,000 CARPENTERSVILLE 1 2016 $715,000 BARRINGTON HILLS 1 2016 $4,293,000 BATAVIA 4 2017-2021 $50,000 BATAVIA 4 2017-2021 $2,803,000 BATAVIA 1 2016 $583,000 CAMPTON HILLS 1 2016 $44,000 CAMPTON HILLS 1 2016 BOLZ RD LONGMEADOW PKWY / City BOLZ RD 1 - 144 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT FY 2016-2019 Highway Improvement Program District 1 Local Highways KANE COUNTY MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM RECKINGER RD INDIAN CREEK 0.1 MI W OF FARNSWORTH AVE BRIDGE REPLACEMENT RECKINGER RD INDIAN CREEK 0.1 MI W OF FARNSWORTH AVE CONSTRUCTION ENGINEERING SLEEPY HOLLOW RD SLEEPY HOLLOW RD: COUNTY LINE RD TO GRANDVIEW DR & MILLER RD: SHENANDOAH DR TO CARPENTERSVILLE CL Miles = 2.11 RESURFACING SLEEPY HOLLOW RD: COUNTY LINE RD TO GRANDVIEW DR & MILLER RD: SHENANDOAH DR TO CARPENTERSVILLE CL CONSTRUCTION ENGINEERING MILLER RD SLEEPY HOLLOW RD MILLER RD SAFETY PRESERVE SYSTEM 1 - 145 Est. Cost City Past Current $750,000 AURORA 4 2017-2021 $200,000 AURORA 5 2017-2021 $372,000 CARPENTERSVILLE ALGONQUIN 1 2016 $47,000 CARPENTERSVILLE ALGONQUIN 1 2016 FY 2016-2019 Highway Improvement Program District 1 Local Highways LAKE COUNTY MYP Years Route/Street Location Improvements Objectives ATKINSON RD MIDDLE FORK N BRANCH CHICAGO RIVER 0.2 MI E OF I-94 BRIDGE REHABILITATION ATKINSON RD MIDDLE FORK N BRANCH CHICAGO RIVER 0.2 MI E OF I-94 CONSTRUCTION ENGINEERING BELVIDERE ST C & NW RR BRIDGE REHABILITATION BELVIDERE ST C & NW RR CONSTRUCTION ENGINEERING BRADLEY RD I-94 TO ILL 60 Miles = 1.76 RECONSTRUCTION RIVERWOODS BLVD BRADLEY RD I-94 TO ILL 60 CONSTRUCTION ENGINEERING DEERFIELD RD WAUKEGAN RD TO RIDGE RD Miles = 1.11 RESURFACING DEERFIELD RD WAUKEGAN RD TO RIDGE RD CONSTRUCTION ENGINEERING FOREST AVE RAVINE DITCH BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM Est. Cost City Past Current $450,000 NORTH CHICAGO GREEN OAKS 5 2016 $40,000 GREEN OAKS NORTH CHICAGO 1 2016 $3,810,000 WAUKEGAN 7 2017-2021 $240,000 WAUKEGAN 7 2017-2021 $1,951,000 METTAWA 3 2017-2021 $137,000 METTAWA 3 2017-2021 $13,032,000 DEERFIELD HIGHLAND PARK 1 2016 $903,000 DEERFIELD HIGHLAND PARK 1 2016 $2,200,000 HIGHLAND PARK 1 2017-2021 RIVERWOODS BLVD SAFETY PRESERVE SYSTEM 1 - 146 SAFETY PRESERVE SYSTEM FY 2016-2019 Highway Improvement Program District 1 Local Highways LAKE COUNTY MYP Years Route/Street Location Improvements Objectives FOREST AVE RAVINE DITCH CONSTRUCTION ENGINEERING KATES RD CPRR 0.2 MI W OF WAUKEGAN RD P.E. (PHASE II) KATES RD CPRR 0.2 MI W OF WAUKEGAN RD BRIDGE REHABILITATION KATES RD CPRR 0.2 MI W OF WAUKEGAN RD CONSTRUCTION ENGINEERING LAKE RD AT WOODBINE LN BRIDGE REHABILITATION LAKE RD AT WOODBINE LN CONSTRUCTION ENGINEERING LAKE ST ST PETER ST TO ILL 83 (MAIN ST) Miles = 0.38 RESURFACING LAKE ST ST PETER ST TO ILL 83 (MAIN ST) CONSTRUCTION ENGINEERING LAKEVIEW PKWY HAWTHORN PKWY TO FAIRWAY DR Miles = 0.55 WIDENING & RESURFACING $176,000 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 147 Est. Cost SAFETY PRESERVE SYSTEM City Past Current HIGHLAND PARK 1 2017-2021 $93,000 DEERFIELD 1 2016 $1,938,000 DEERFIELD 1 2017-2021 $155,000 DEERFIELD 1 2017-2021 $1,400,000 LAKE FOREST 4 2017-2021 $148,000 LAKE FOREST 4 2017-2021 $300,000 ANTIOCH 13 2016 $22,000 ANTIOCH 13 2016 VERNON HILLS 4 2017-2021 $5,910,000 FY 2016-2019 Highway Improvement Program District 1 Local Highways LAKE COUNTY MYP Years Route/Street Location Improvements Objectives LAKEVIEW PKWY HAWTHORN PKWY TO FAIRWAY DR CONSTRUCTION ENGINEERING PARK AVE WEST SKOKIE DITCH BRIDGE REPLACEMENT Est. Cost $413,000 SAFETY PRESERVE SYSTEM City Past Current VERNON HILLS 4 2017-2021 HIGHLAND PARK 2 2017-2021 HIGHLAND PARK 1 2017-2021 $3,210,000 WAUKEGAN 7 2016 $206,000 WAUKEGAN 7 2016 $32,554,000 BUFFALO GROVE 6 2017-2021 $2,279,000 BUFFALO GROVE 6 2017-2021 $2,152,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. PARK AVE WEST SKOKIE DITCH CONSTRUCTION ENGINEERING S GENESEE ST WAUKEGAN RIVER S OF W WATER ST BRIDGE REHABILITATION S GENESEE ST WAUKEGAN RIVER S OF W WATER ST CONSTRUCTION ENGINEERING WEILAND RD ILL 22 TO LAKE-COOK RD Miles = 2.03 NEW CONSTRUCTION WEILAND RD ILL 22 TO LAKE-COOK RD CONSTRUCTION ENGINEERING $176,000 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT 1 - 148 FY 2016-2019 Highway Improvement Program District 1 Local Highways MCHENRY COUNTY MYP Years Route/Street ILL 47 Location Improvements Objectives COUNTRY CLUB RD TO MCCONNELL RD Miles = 0.59 WIDENING & RESURFACING EASTWOOD AVE ILL 47 COUNTRY CLUB RD TO MCCONNELL RD CONSTRUCTION ENGINEERING HIGHLAND AVE TANGLEWOOD DR TO HAEGERS BEND RD Miles = 0.66 WIDENING & RESURFACING JUSTEN RD TRIB OF FOX RIVER P.E. (PHASE II) JUSTEN RD TRIB OF FOX RIVER BRIDGE REPLACEMENT JUSTEN RD TRIB OF FOX RIVER CONSTRUCTION ENGINEERING LAKEVIEW DR ISLAND LAKE BRIDGE REPLACEMENT LAKEVIEW DR ISLAND LAKE CONSTRUCTION ENGINEERING LAWRENCE RD TRIB OF LAWRENCE CREEK BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Est. Cost City Past Current $1,106,000 WOODSTOCK 6 2016 $115,000 WOODSTOCK 6 2016 ALGONQUIN 1 2017-2021 $120,000 PRAIRIE GROVE 2 2016 $1,500,000 PRAIRIE GROVE 2 2017-2021 $120,000 PRAIRIE GROVE 2 2017-2021 $1,000,000 ISLAND LAKE 4 2016 $80,000 ISLAND LAKE 4 2016 3 2016 EASTWOOD AVE SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 149 $2,418,000 $1,078,000 FY 2016-2019 Highway Improvement Program District 1 Local Highways MCHENRY COUNTY MYP Years Route/Street Location Improvements Objectives MAIN ST AT CRYSTAL LAKE AVE INTERSECTION RECONSTN MAIN ST AT CRYSTAL LAKE AVE CONSTRUCTION ENGINEERING 1 - 150 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT Est. Cost City Past Current $1,694,000 CRYSTAL LAKE 3 2016 $145,000 CRYSTAL LAKE 3 2016 FY 2016-2019 Highway Improvement Program District 1 Local Highways WILL COUNTY MYP Years Route/Street US 30 Location Improvements Objectives LINCOLN HWY TO ILL 59 P.E. (PHASE II) LINCOLN HWY TO ILL 59 Miles = 1.00 RECONSTRUCTION 143RD ST SAFETY PRESERVE SYSTEM US 52 AT RIVER RD INTERSECTION IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS AT RIVER RD CONSTRUCTION ENGINEERING UNIVERSITY PKWY TO MONEE NCL LIGHTING UNIVERSITY PKWY TO MONEE NCL CONSTRUCTION ENGINEERING 2ND ST I & M CANAL BRIDGE REPLACEMENT 2ND ST I & M CANAL CONSTRUCTION ENGINEERING ABE ST SPRING CREEK P.E. (PHASE II) Est. Cost City Past Current $500,000 PLAINFIELD 6 2017-2021 $17,800,000 PLAINFIELD 6 2017-2021 $5,218,000 SHOREWOOD 7 2017-2021 $307,000 SHOREWOOD 7 2017-2021 $1,000,000 UNIVERSITY PARK 1 2016 $50,000 UNIVERSITY PARK 1 2016 $1,500,000 LOCKPORT 1 2016 $120,000 LOCKPORT 1 2016 JOLIET 1 2016 143RD ST US 30 W JEFFERSON ST US 52 W JEFFERSON ST ILL 50 SAFETY PRESERVE SYSTEM CICERO AVE ILL 50 CICERO AVE SAFETY PRESERVE SYSTEM $80,000 1 - 151 FY 2016-2019 Highway Improvement Program District 1 Local Highways WILL COUNTY MYP Years Route/Street Location Improvements Objectives ABE ST SPRING CREEK LAND ACQUISITION ABE ST SPRING CREEK BRIDGE REHABILITATION ABE ST SPRING CREEK CONSTRUCTION ENGINEERING BELL RD 151ST ST TO 159TH ST Miles = 1.00 RECONSTRUCTION SAFETY PRESERVE SYSTEM BLACK RD RIVER RD TO I-55 Miles = 1.99 RESURFACING SAFETY PRESERVE SYSTEM BLACK RD RIVER RD TO I-55 CONSTRUCTION ENGINEERING CATON FARM RD DUPAGE RIVER BRIDGE REPLACEMENT CATON FARM RD DUPAGE RIVER EGYPTIAN TRAIL MONEE-MANHATTAN RD TO GOVERNORS HWY Est. Cost City Past Current $16,000 JOLIET 1 2016 $2,500,000 JOLIET 1 2017-2021 $200,000 JOLIET 1 2017-2021 $7,200,000 HOMER GLEN 1 2017-2021 $1,525,000 SHOREWOOD 1 2016 $120,000 SHOREWOOD 1 2016 $3,751,000 JOLIET 5 2016 CONSTRUCTION ENGINEERING $240,000 JOLIET 5 2016 P.E. (PHASE II) $224,000 MONEE UNIVERSITY PARK 4 2016 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 152 FY 2016-2019 Highway Improvement Program District 1 Local Highways WILL COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current EGYPTIAN TRAIL MONEE-MANHATTAN RD TO GOVERNORS HWY Miles = 0.68 RECONSTRUCTION SAFETY PRESERVE SYSTEM $2,345,000 MONEE UNIVERSITY PARK 4 2017-2021 ESSINGTON RD ESSINGTON RD: BILTMORE ST TO CATON FARM RD; CATON FARM RD: COSMIC DR TO JUNE ST CHANNELIZATION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP $1,791,000 JOLIET 2 2016 ESSINGTON RD: BILTMORE ST TO CATON FARM RD; CATON FARM RD: COSMIC DR TO JUNE ST CONSTRUCTION ENGINEERING $144,000 JOLIET 2 2016 CATON FARM RD EXCHANGE ST CRETE RD TO ILL 394 P.E. (PHASE I) $35,000 1 2016 EXCHANGE ST CRETE RD TO ILL 394 P.E. (PHASE II) $25,000 CRETE 4 2016 EXCHANGE ST CRETE RD TO ILL 394 Miles = 1.77 RECONSTRUCTION $883,000 CRETE 4 2016 EXCHANGE ST CRETE RD TO ILL 394 CONSTRUCTION ENGINEERING $37,000 CRETE 4 2016 FARRELL RD SPRING CREEK BRIDGE REPLACEMENT $575,000 2 2016 FARRELL RD SPRING CREEK CONSTRUCTION ENGINEERING $68,000 2 2016 CATON FARM RD ESSINGTON RD SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 153 FY 2016-2019 Highway Improvement Program District 1 Local Highways WILL COUNTY MYP Years Route/Street GARNSEY AVE Location SPRING CREEK Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Est. Cost $2,100,000 City Past Current JOLIET 6 2016 JOLIET 6 2016 $750,000 CREST HILL 3 2016 $60,000 CREST HILL 3 2016 $1,800,000 CREST HILL JOLIET 3 2016 $160,000 CREST HILL JOLIET 3 2016 $994,000 WILMINGTON 4 2016 $48,000 WILMINGTON 3 2016 PEOTONE 1 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. GARNSEY AVE SPRING CREEK CONSTRUCTION ENGINEERING $148,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. GAYLORD RD ROCK RUN CREEK BRIDGE REHABILITATION GAYLORD RD ROCK RUN CREEK CONSTRUCTION ENGINEERING GAYLORD RD AT DIVISION ST CHANNELIZATION TRAF SIGNAL INSTALLATION GAYLORD RD AT DIVISION ST CONSTRUCTION ENGINEERING KANKAKEE ST FORKED CREEK 0.3 MI N OF ILL 53 BRIDGE REHABILITATION KANKAKEE ST FORKED CREEK 0.3 MI N OF ILL 53 CONSTRUCTION ENGINEERING RATHJE RD JOLIET RD TO CORNING AVE Miles = 0.63 RECONSTRUCTION SAFETY PRESERVE SYSTEM SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY ECONOMIC DEVELOP SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 154 $2,000,000 FY 2016-2019 Highway Improvement Program District 1 Local Highways WILL COUNTY MYP Years Route/Street Location Improvements Objectives Est. Cost RATHJE RD JOLIET RD TO CORNING AVE CONSTRUCTION ENGINEERING $240,000 READ ST DIVISION ST TO 7TH ST Miles = 0.51 PAVING PRESERVE SYSTEM TRANSPORTATION OPS $1,150,000 SMITH RD KISHWAUKEE RIVER BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM ST FRANCIS RD UNION DITCH BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM ST FRANCIS RD UNION DITCH CONSTRUCTION ENGINEERING ST FRANCIS RD 88TH AVE TO 80TH AVE Miles = 0.99 WIDENING & RESURFACING ST FRANCIS RD 88TH AVE TO 80TH AVE CONSTRUCTION ENGINEERING STEGER RD SCHEER RD TO US 45 (S LA GRANGE RD) P.E. (PHASE II) STEGER RD SCHEER RD TO US 45 (S LA GRANGE RD) RECONSTRUCTION Miles = 1.22 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 1 - 155 City Past Current PEOTONE 1 2017-2021 LOCKPORT 2 2016 $2,106,000 1 2017-2021 $800,000 4 2016 $116,000 4 2016 $2,132,000 FRANKFORT 1 2017-2021 $280,000 FRANKFORT 1 2017-2021 $128,000 FRANKFORT 1 2016 $2,200,000 FRANKFORT 4 2016 FY 2016-2019 Highway Improvement Program District 1 Local Highways WILL COUNTY MYP Years Route/Street Location Improvements UNIVERSITY PKWY GOVERNORS STATE UNIVERSITY ENTRANCE TO GOVERNORS HIGHWAY LAND ACQUISITION WASHINGTON ST RING RD TO NAPER BLVD Miles = 0.25 RECONSTRUCTION Objectives Est. Cost $168,000 SAFETY PRESERVE SYSTEM 1 - 156 $1,236,000 City Past Current UNIVERSITY PARK 1 2016 NAPERVILLE 1 2016 FY 2016-2019 Highway Improvement Program District 1 Local Highways DISTRICT-WIDE MYP Years Route/Street Location Improvements Objectives Est. Cost City Past Current VARIOUS DISTRICTWIDE CMAQ PROJECTS MISCELLANEOUS $118,071,000 4 2016 VARIOUS DISTRICTWIDE CMAQ PROJECTS MISCELLANEOUS $118,431,000 3 2017-2021 VARIOUS DISTRICTWIDE CMAQ PROJECTS MISCELLANEOUS $112,798,000 2 2017-2021 1 - 157 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE KANE DEKALB D2 COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK PEORIA D4 Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT ADAMS D5 MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 2 District 2 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 2, DISTRICT 2, DIXON Overview Highway District 2 encompasses 10 counties in northwestern Illinois and includes the cities of Rockford, Rock Island-Moline, Geneseo, Rochelle, Dixon, Freeport, Belvidere, Kewanee and Sterling-Rock Falls, plus many smaller communities which serve as satellites for the larger employment centers or as focal points of this farming area. The state highway system in District 2 consists of 1,606 miles of highways and 832 bridges, supporting 10.2 million vehicle miles of travel daily. State Program The program for state and local highways will average $1.398 billion annually for the FY 2016-2021 period. Approximately $710 million will be provided during FY 2016-2021 for improvements to state highways in District 2. The following table summarizes anticipated accomplishments on the state highway system in District 2 during this time frame. FY 2016-2021 Accomplishments System Maintenance Interstate (miles) Non-Interstate (miles) Safety Locations (number) Bridge Maintenance Interstate (number) Non-Interstate (number) New Bridges (number) Minor Structure Repair (number) Congestion Mitigation Roads (miles) Traffic Improvements (number) System Expansion Roads (miles) Locations (number) 2-i 15 67 2 20 16 6 11 7 1 0 0 Major Highway projects of interest that are tentatively scheduled during the FY 2016-2021 time frame include:  Interstate 74/US 6 (new bridge) over the Mississippi River in Moline. Iowa is the lead agency on the project and Illinois will be reimbursing Iowa as projects are let for construction and work is completed. The Central Section of the new bridge will be split into 11 primary construction contracts: two contracts for the river bridge, three contracts on the Illinois side and six contracts on the Iowa side. The reimbursement to Iowa for the Central Section for construction of the new bridges across the Mississippi River including lighting and construction engineering are programmed during FY 2017-2021 at a cost of $200 million. On the Illinois side, 5 miles of additional lanes, a new bridge, bridge replacements, reconstruction, retaining walls, construction engineering, building demolition and utility adjustments for connecting the Mississippi River to the existing Interstate 74 alignment are programmed during FY 2017-2021 at a cost of $221.3 million. There is an additional $800,000 programmed during FY 2017-2021 for rehabilitation of the existing bridges in order to keep them serviceable until the new bridge is open to traffic. Provides for efficient freight movement.  Interstate 80 from 0.8 mile north of Illinois 5/Illinois 92 in Rock Island County to the Iowa Interstate Railroad 1.7 miles north of US 6 in Henry County. Resurfacing on 2.5 miles and reconstruction for a new vertical alignment over the Burlington Northern Santa Fe Railroad; a bridge replacement over Barstow Road south of Illinois 5/Illinois 92; a bridge replacement over the Green River north of US 6 and bridge joint repair over Cleveland Road and the Iowa Interstate Railroad north of US 6 are programmed in FY 2016 at a cost of $30.8 million.  Interstate 88/Illinois 110 from 0.1 mile east of Sand Road to 0.6 mile west of Illinois 78 in Whiteside County. Resurfacing and patching on 8.6 miles and ramp repairs at Albany Road are programmed during FY 2017-2021 at a cost of $14.5 million.  Interstate 280 at the Mississippi River southwest of Rock Island in Rock Island County. New bridge decks, bridge rehabilitation and engineering for contract plans are programmed during FY 2017-2021 at a cost of $28.2 million. Of this total, engineering for contract plans is programmed in FY 2016 at a cost of $2.2 million.  US 20/Illinois 84 from Gear Street to Main Street in Galena. Reconstruction on 1.1 miles, a new storm sewer, drainage improvements, culvert removal, retaining wall, utility adjustments and land acquisition are programmed during FY 2016-2021 at a cost of $12.1 million. Of this total, land acquisition is programmed in FY 2016 at a cost of $900,000.  US 20 from Logemann Road to 0.2 mile west of Rush Street in Stockton. Resurfacing on 1 mile, reconstruction of 2.7 miles, a bridge replacement, horizontal and vertical realignments, shoulder repair, culvert removals and replacements, land acquisition and utility adjustments are programmed during FY 2017-2021 at a cost of $23.4 million. Of this total, land acquisition is programmed in FY 2016 at a cost of $1.0 million.  US 20 (Rockford Bypass) from Simpson Road to Rock River and Illinois 2 from south of Southrock Drive to south of US 20 Interchange in Rockford. Interchange reconstruction including a bridge replacement, reconstruction on 1.9 miles and land acquisition are programmed during FY 2017-2021 at a cost of $17.4 million. Provides for efficient freight movement.  US 20 Business (West State Street) from Day Avenue to Independence Avenue in Rockford. Reconstruction on 0.6 mile, intersection improvements, traffic signal modernization, curb and gutter, landscaping, utility adjustments and land acquisition are programmed during FY 2017-2021 at a cost of $10.3 million. 2-ii  US 52/Illinois 64 over the Mississippi River and the Burlington Northern Santa Fe Railroad in Savanna. A bridge replacement, 0.6 mile of reconstruction, construction engineering and utility adjustments are programmed during FY 2016-2021 at a cost of $79.1 million. Of this total, a bridge replacement, reconstruction, construction engineering and utility adjustments are programmed in FY 2016 at a cost of $78.6 million. Illinois is the lead agency for this project with Iowa sharing equally in the costs. This project has been approved for Illinois Major Bridge Program funding.  Illinois 2 over the Rock River in Rockton. A bridge replacement, median crossover, preliminary engineering, engineering for contract plans and construction engineering are programmed during FY 2016-2021 at a cost of $17.1 million. Of this total, preliminary engineering and engineering for contract plans are programmed in FY 2016 at a cost of $700,000. This project has been approved for Illinois Major Bridge Program funding.  Illinois 75 (Blackhawk Boulevard) from the Rock River to Illinois 2 in Rockton. 1.4 miles of reconstruction, resurfacing, curb and gutter, a new storm sewer, drainage work, utility adjustments, railroad insurance and flagger, railroad crossing improvements and land acquisition are programmed during FY 2016-2021 at a cost of $10.7 million. Of this total, land acquisition is programmed in FY 2016 at a cost of $400,000.  Illinois 251 from the Winnebago County line to 0.2 mile south of Illinois 38 (east) in Rochelle including portions of Illinois 38. Resurfacing and new shoulders with milled rumble strip on 14.4 miles from the Winnebago County line to 0.3 mile north of Flagg Road and reconstruction on 1.1 mile, a bi-directional left turn lane, curb and gutter, a new storm sewer, a median barrier, a bikeway, pavement marking, utility adjustments and land acquisition from 0.3 mile north of Flagg Road to 0.2 mile south of Illinois 38 (east) in Rochelle are programmed during FY 2017-2021 at a cost of $15.1 million. 2-iii FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street I 39 US 20 US 51 Location UNDER PERRYVILLE RD SE OF ROCKFORD Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Est. Cost $4,350,000 County WINNEBAGO Past Current 3 2017-2021 ROCKFORD BYP Structure Status FUNCTIONAL BACKLOG I 39 US 20 US 51 UNDER PERRYVILLE RD SE OF ROCKFORD Bridge Maintenance LAND ACQUISITION UNDER PERRYVILLE RD SE OF ROCKFORD Bridge Maintenance UTILITY ADJUSTMENT MISSISSIPPI RIVER IN MOLINE Bridge Maintenance BRIDGE REHABILITATION AADT 8,150 Truck Pct 7 Str Number 1010098 NHS N $100,000 WINNEBAGO 3 2017-2021 $20,000 WINNEBAGO 3 2017-2021 $800,000 ROCK ISLAND 3 2017-2021 ROCKFORD BYP I 39 US 20 US 51 ROCKFORD BYP I US 74 6 SAFETY PRESERVE SYSTEM IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. I US 74 6 MISSISSIPPI RIVER Congestion Mitigation Structure Status FUNCTIONAL BACKLOG AADT 38,350 Truck Pct 4 Str Number 0819901 NHS Y FUNCTIONAL BACKLOG 38,350 4 0819902 Y BRIDGE (NEW) LIGHTING MISCELLANEOUS CONSTRUCTION ENGINEERING TRANSPORTATION OPS FREIGHT MOVEMENT SAFETY PRESERVE SYSTEM $50,000,000 ROCK ISLAND 3 2017-2021 IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. 2-1 Structure Status FUNCTIONAL BACKLOG AADT 38,350 Truck Pct 4 Str Number 0819901 NHS Y FUNCTIONAL BACKLOG 38,350 4 0819902 Y FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street I US 74 6 Location MISSISSIPPI RIVER Congestion Mitigation Improvements BRIDGE (NEW) LIGHTING MISCELLANEOUS CONSTRUCTION ENGINEERING Objectives Est. Cost TRANSPORTATION OPS FREIGHT MOVEMENT SAFETY PRESERVE SYSTEM $50,000,000 County ROCK ISLAND Past Current 3 2017-2021 IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. I US 74 6 MISSISSIPPI RIVER Congestion Mitigation Structure Status FUNCTIONAL BACKLOG AADT 38,350 Truck Pct 4 Str Number 0819901 NHS Y FUNCTIONAL BACKLOG 38,350 4 0819902 Y BRIDGE (NEW) BRIDGE REMOVAL/DEMOLITION LIGHTING MISCELLANEOUS CONSTRUCTION ENGINEERING TRANSPORTATION OPS FREIGHT MOVEMENT SAFETY $50,000,000 ROCK ISLAND 2 2017-2021 IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. I US 74 6 MISSISSIPPI RIVER Congestion Mitigation Structure Status FUNCTIONAL BACKLOG AADT 38,350 Truck Pct 4 Str Number 0819901 NHS Y FUNCTIONAL BACKLOG 38,350 4 0819902 Y BRIDGE (NEW) BRIDGE REMOVAL/DEMOLITION LIGHTING MISCELLANEOUS CONSTRUCTION ENGINEERING TRANSPORTATION OPS FREIGHT MOVEMENT SAFETY $50,000,000 ROCK ISLAND 1 2017-2021 IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. I US I US 74 6 74 6 Structure Status FUNCTIONAL BACKLOG AADT 38,350 Truck Pct 4 Str Number 0819901 NHS Y FUNCTIONAL BACKLOG 38,350 4 0819902 Y MISSISSIPPI RIVER CORRIDOR Congestion Mitigation DEMOLITION SUSTAINABILITY $790,000 ROCK ISLAND 1 2017-2021 MISSISSIPPI RIVER CORRIDOR Congestion Mitigation DEMOLITION SUSTAINABILITY $533,000 ROCK ISLAND 1 2016 2-2 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street I 74 US 6 ILL 92 B Location Improvements MISSISSIPPI RIVER TO 7TH AVE IN MOLINE Miles = 0.81 Congestion Mitigation ILL 92 Needs Category ADEQUATE Miles 0.36 Roughness(IRI) GOOD ADEQUATE 0.14 ADEQUATE 0.14 I 74 US I 6 74 US I 6 74 US 6 Needs Category ADEQUATE ADDITIONAL LANES BRIDGE (NEW) BRIDGE REPLACEMENT RECONSTRUCTION RETAINING WALL BRIDGE REMOVAL/DEMOLITION Objectives Est. Cost SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT PRESERVE SYSTEM SUSTAINABILITY $100,000,000 County ROCK ISLAND Past Current 3 2017-2021 Rutting 0.10 AADT 68,725 Truck Pct 4.5 NHS Y Structure Status STRUCTURAL BACKLOG AADT 38,350 Truck Pct 4 Str Number 0810142 NHS Y ACCEPTABLE 0.12 5,600 7.1 Y STRUCTURAL BACKLOG 38,350 4 0810143 Y ACCEPTABLE 0.10 5,900 6.8 Y MISSISSIPPI RIVER TO 7TH AVE IN MOLINE Congestion Mitigation CONSTRUCTION ENGINEERING $300,000 ROCK ISLAND 3 2017-2021 MISSISSIPPI RIVER TO 7TH AVE IN MOLINE Congestion Mitigation UTILITY ADJUSTMENT $250,000 ROCK ISLAND 3 2017-2021 7TH AVE TO 0.9 MI S OF AVENUE OF THE CITIES IN MOLINE Miles = 3.67 Congestion Mitigation ADDITIONAL LANES BRIDGE REPLACEMENT RECONSTRUCTION BRIDGE REMOVAL/DEMOLITION RETAINING WALL $100,000,000 ROCK ISLAND 2 2017-2021 Miles 2.04 Roughness(IRI) GOOD Rutting 0.10 AADT 46,325 Truck Pct 3.8 NHS Y SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT PRESERVE SYSTEM SUSTAINABILITY Structure Status ADEQUATE AADT 25,300 Truck Pct 3 Str Number 0810099 NHS Y BACKLOG 1.20 ACCEPTABLE 0.13 6,756 2.7 N STRUCTURAL ACCRUING 25,300 3 0810100 Y BACKLOG 0.43 NOT ACCEPTABLE 0.13 3,810 3.5 N ADEQUATE 25,300 3 0810101 Y ADEQUATE 25,300 3 0810102 Y ADEQUATE 25,300 3 0810103 Y I US 74 6 7TH AVE TO 0.9 MI S OF AVENUE OF THE CITIES IN MOLINE Congestion Mitigation UTILITY ADJUSTMENT $250,000 2-3 ROCK ISLAND 2 2017-2021 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street I 74 US I 6 74 US I 6 74 US I 6 74 US I 6 74 US 6 Location Improvements MISSISSIPPI RIVER TO 0.9 MI S OF AVENUE OF THE CITIES IN MOLINE Congestion Mitigation LANDSCAPING MISSISSIPPI RIVER TO 0.9 MI S OF AVENUE OF THE CITIES IN MOLINE Congestion Mitigation Objectives SUSTAINABILITY Est. Cost County Past Current $4,200,000 ROCK ISLAND 1 2017-2021 CONSTRUCTION ENGINEERING $2,000,000 ROCK ISLAND 3 2017-2021 MISSISSIPPI RIVER TO 0.9 MI S OF AVENUE OF THE CITIES IN MOLINE Congestion Mitigation CONSTRUCTION ENGINEERING $4,000,000 ROCK ISLAND 2 2017-2021 MISSISSIPPI RIVER TO 0.9 MI S OF AVENUE OF THE CITIES IN MOLINE Congestion Mitigation CONSTRUCTION ENGINEERING $4,000,000 ROCK ISLAND 1 2017-2021 MISSISSIPPI RIVER TO 0.9 MI S OF AVENUE OF THE CITIES IN MOLINE Congestion Mitigation CONSTRUCTION ENGINEERING $5,000,000 ROCK ISLAND 1 2017-2021 I 74 OVER 1ST AVE TO 7TH AVE IN MOLINE System Maintenance BRIDGE DECK REPAIRS SAFETY PRESERVE SYSTEM $3,000,000 ROCK ISLAND 2 2016 I 80 0.8 MI N OF ILL 5/92 TO HENRY CO LINE Miles = 2.51 System Maintenance RECONSTRUCTION RESURFACING SAFETY PRESERVE SYSTEM $4,000,000 ROCK ISLAND 11 2016 SAFETY PRESERVE SYSTEM $8,000,000 ROCK ISLAND 11 2016 ILL 110 Needs Category BACKLOG I 80 ILL 110 Miles 2.51 Roughness(IRI) ACCEPTABLE Rutting 0.12 AADT 22,618 OVER BNSF RR 1.1 MI S OF ILL 5/92 Bridge Maintenance Truck Pct 39.5 NHS Y BRIDGE REPLACEMENT 2-4 Structure Status STRUCTURAL ACCRUING AADT 10,450 Truck Pct 43 Str Number 0810014 NHS Y FUNCTIONAL BACKLOG 10,450 43 0810015 Y FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street I 80 ILL 110 I 80 ILL 110 Location Improvements OVER BARSTOW RD 1.3 MI S OF ILL 5/92 Bridge Maintenance GREEN RIVER 1.9 MI N OF US 6 Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT $8,600,000 County ROCK ISLAND Past Current 11 2016 Structure Status FUNCTIONAL BACKLOG AADT 10,450 Truck Pct 43 Str Number 0810016 NHS Y FUNCTIONAL BACKLOG 10,450 43 0810017 Y SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT BRIDGE JOINT REPAIR Est. Cost $9,700,000 HENRY 11 2016 Structure Status STRUCTURAL ACCRUING AADT 14,400 Truck Pct 32 Str Number 0370025 NHS Y STRUCTURAL ACCRUING 14,400 32 0370026 Y OVER CLEVELAND RD 2.1 MI N OF JCT US 6 & IAIS RR 1.7 MI N OF JCT US 6 System Maintenance BRIDGE JOINT REPAIR SAFETY PRESERVE SYSTEM $500,000 HENRY 1 2016 ILL 110 I AT I-74 BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM $3,200,000 HENRY 1 2017-2021 I 80 80 Bridge Maintenance ILL 110 Structure Status FUNCTIONAL LONG TERM FUNCTIONAL BACKLOG I 88 ILL 110 Needs Category BACKLOG I 88 0.1 MI E OF SAND RD TO 0.6 MI W OF ILL 78 Miles = 8.58 System Maintenance Miles 8.58 Roughness(IRI) GOOD Rutting 0.09 AADT 11,180 I-88 RAMPS AT ALBANY RD System Maintenance RESURFACING PATCHING Truck Pct 30.2 AADT 10,050 Truck Pct 40 Str Number 0370031 NHS Y 10,050 40 0370032 Y SAFETY PRESERVE SYSTEM $13,700,000 WHITESIDE 2 2017-2021 SAFETY PRESERVE SYSTEM $800,000 WHITESIDE 1 2017-2021 NHS Y RAMP REPAIR 2-5 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street I 280 Location Improvements Objectives SAFETY PRESERVE SYSTEM MISSISSIPPI RIVER SW OF ROCK ISLAND BRIDGE REHABILITATION Bridge Maintenance Est. Cost $1,000,000 County ROCK ISLAND Past Current 1 2017-2021 ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. Structure Status STRUCTURAL ACCRUING I 280 SAFETY PRESERVE SYSTEM MISSISSIPPI RIVER SW OF ROCK ISLAND BRIDGE NEW DECK Bridge Maintenance BRIDGE REHABILITATION AADT 20,400 $25,000,000 Truck Pct 27 Str Number 0810106 ROCK ISLAND NHS Y 6 2017-2021 ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. Structure Status STRUCTURAL ACCRUING I 280 MISSISSIPPI RIVER SW OF ROCK ISLAND P.E. (CONSULTANT PLANS) Bridge Maintenance AADT 20,400 Truck Pct 27 Str Number 0810106 NHS Y $2,200,000 ROCK ISLAND 6 2016 SAFETY PRESERVE SYSTEM $4,900,000 ROCK ISLAND 2 2017-2021 ROCK ISLAND 1 2017-2021 JO DAVIESS 3 2017-2021 ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. I 280 MISSISSIPPI RIVER TO 0.4 MI E OF AIRPORT RD IN MILAN Miles = 3.96 System Maintenance Needs Category BACKLOG Miles 3.25 Roughness(IRI) GOOD BACKLOG 0.71 GOOD RESURFACING PATCHING COLD MILLING Rutting 0.14 AADT 19,207 Truck Pct 27.9 NHS Y 0.11 20,249 21.4 Y I 280 I-280 RAMPS AT ILL 92 & AIRPORT RD System Maintenance RAMP REPAIR SAFETY PRESERVE SYSTEM $1,000,000 US 20 MISSISSIPPI RIVER IN EAST DUBUQUE Bridge Maintenance LIGHTING SAFETY PRESERVE SYSTEM $750,000 IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. 2-6 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street US 20 Location Improvements MISSISSIPPI RIVER IN EAST DUBUQUE Bridge Maintenance Objectives BRIDGE REPAIR Est. Cost County Past Current SAFETY PRESERVE SYSTEM $300,000 JO DAVIESS 1 2017-2021 SAFETY PRESERVE SYSTEM SUSTAINABILITY $9,400,000 JO DAVIESS 12 2017-2021 $1,765,000 JO DAVIESS 12 2017-2021 $900,000 JO DAVIESS 9 2016 $22,000,000 JO DAVIESS 11 2017-2021 IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. US 20 ILL 84 Needs Category BACKLOG US 20 ILL 84 US 20 ILL 84 US 20 Needs Category BACKLOG US 20 GEAR ST TO MAIN ST IN GALENA Miles = 1.06 System Maintenance Miles 1.06 Roughness(IRI) NOT ACCEPTABLE Rutting 0.20 AADT 9,450 RECONSTRUCTION DRAINAGE STORM SEWER (NEW) CULVERT REMOVAL RETAINING WALL Truck Pct 16.7 NHS Y GEAR ST TO MAIN ST IN GALENA System Maintenance UTILITY ADJUSTMENT GEAR ST TO MAIN ST IN GALENA System Maintenance LAND ACQUISITION LOGEMANN RD TO 0.2 MI W OF RUSH ST IN STOCKTON Miles = 3.71 System Maintenance RESURFACING RECONSTRUCTION BRIDGE REPLACEMENT HORIZONTAL REALIGNMENT VERTICAL REALIGNMENT SHOULDER REPAIR CULVERT REPLACEMENT CULVERT REMOVAL Miles 3.71 Roughness(IRI) ACCEPTABLE Rutting 0.13 AADT 4,474 LOGEMANN RD TO 0.2 MI W OF RUSH ST IN STOCKTON System Maintenance Truck Pct 19.5 NHS Y SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Structure Status ADEQUATE LAND ACQUISITION AADT 4,150 $1,000,000 2-7 Truck Pct 19 JO DAVIESS Str Number 0430036 NHS Y 11 2016 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street Location Improvements Objectives US 20 LOGEMANN RD TO 0.2 MI W OF RUSH ST IN STOCKTON System Maintenance UTILITY ADJUSTMENT US 20 US 20: 0.2 MI W OF JODAVIESS CO LINE TO 0.4 MI W OF FLANSBURG RD & ILL 73: GODDARD RD TO 0.1 MI S OF US 20 (CULVERTS) Bridge Maintenance CULVERT REPLACEMENT CULVERT EXTENSION US 20: 0.2 MI W OF JODAVIESS CO LINE TO 0.4 MI W OF FLANSBURG RD & ILL 73: GODDARD RD TO US 20 (CULVERTS) Bridge Maintenance LAND ACQUISITION US 20: 0.2 MI W OF JODAVIESS CO LINE TO 0.4 MI W OF FLANSBURG RD & ILL 73: GODDARD RD TO US 20 (CULVERTS) Bridge Maintenance UTILITY ADJUSTMENT US 20: 0.2 MI W OF JODAVIESS CO LINE TO 0.4 MI W OF FLANSBURG RD & ILL 73: GODDARD RD TO US 20 (CULVERTS) Bridge Maintenance RR INSURANCE RR FLAGGER SAFETY 0.2 MI W OF JODAVIESS CO LINE TO 0.4 MI W OF FLANSBURG RD Miles = 10.70 System Maintenance RESURFACING ILL 73 US 20 ILL 73 US 20 ILL 73 US 20 ILL 73 US 20 Needs Category BACKLOG Miles 0.20 Roughness(IRI) ACCEPTABLE ACCRUING 10.50 GOOD US 20 Rutting 0.16 AADT 6,150 Truck Pct 15.9 NHS Y 0.14 7,155 15.4 Y 0.2 MI W OF JODAVIESS CO LINE TO 0.4 MI W OF FLANSBURG RD System Maintenance Est. Cost $350,000 2-8 Past Current JO DAVIESS 11 2017-2021 $6,070,000 JO DAVIESS STEPHENSON 8 2017-2021 $1,500,000 JO DAVIESS STEPHENSON 8 2017-2021 $100,000 JO DAVIESS STEPHENSON 8 2017-2021 $100,000 JO DAVIESS STEPHENSON 1 2017-2021 SAFETY PRESERVE SYSTEM $3,360,000 STEPHENSON JO DAVIESS 1 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY $4,974,000 JO DAVIESS STEPHENSON 4 2017-2021 SAFETY PRESERVE SYSTEM SHOULDER RECONSTRUCTION GRADING County FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street US 20 Location AT ILL 73 Congestion Mitigation ILL 73 US 20 ILL 2 ROCKFORD BYP Improvements US 20: SIMPSON RD TO ROCK RIVER & ILL 2: S OF SOUTHROCK DR TO S OF US 20 INTCHG Miles = 1.93 Congestion Mitigation Objectives TURNING LANES TRAF SIGNAL INSTALLATION SAFETY MODAL CONNECTIVITY TRANSPORTATION OPS $3,780,000 INTERCHANGE RECONSTRUCTN BRIDGE REPLACEMENT RECONSTRUCTION SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY FREIGHT MOVEMENT TRANSPORTATION OPS $17,270,000 S MAIN ST Needs Category ACCRUING Miles 1.34 Roughness(IRI) GOOD ADEQUATE 0.59 GOOD US 20 ILL 2 ROCKFORD BYP US 20 ROCKFORD BYP ROCKFORD BYP US 20 BUS GALENA AVE US 20 BUS GALENA AVE County Past Current STEPHENSON 6 2017-2021 WINNEBAGO 11 2017-2021 Rutting 0.13 AADT 27,248 Truck Pct 14.3 NHS Y Structure Status STRUCTURAL ACCRUING AADT 11,600 Truck Pct 14 Str Number 1010055 NHS Y 0.08 10,919 13.9 Y FUNCTIONAL BACKLOG 17,250 14 1010056 Y US 20: SIMPSON RD TO ROCK RIVER & ILL 2: S OF SOUTHROCK DR TO S OF US 20 INTCHG Congestion Mitigation LAND ACQUISITION UNDER 20TH ST 0.7 MI E OF ILL 251 IN ROCKFORD Bridge Maintenance BRIDGE REPLACEMENT BRIDGE APPROACH ROADWAY SAFETY PRESERVE SYSTEM Structure Status FUNCTIONAL BACKLOG US 20 Est. Cost UNDER 20TH ST 0.7 MI E OF ILL 251 IN ROCKFORD Bridge Maintenance LAND ACQUISITION 0.1 MI E OF GREENFIELD DR IN FREEPORT Bridge Maintenance CULVERT REPLACEMENT 0.1 MI E OF GREENFIELD DR IN FREEPORT Bridge Maintenance UTILITY ADJUSTMENT $120,000 WINNEBAGO 6 2017-2021 $2,100,000 WINNEBAGO 11 2017-2021 AADT 5,850 $50,000 SAFETY PRESERVE SYSTEM 2-9 Truck Pct 2 Str Number 1010116 NHS N WINNEBAGO 11 2017-2021 $450,000 STEPHENSON 8 2017-2021 $20,000 STEPHENSON 8 2017-2021 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street US 20 BUS W STATE ST Location Improvements DAY AVE TO INDEPENDENCE AVE IN ROCKFORD Miles = 0.57 System Maintenance Objectives RECONSTRUCTION TRAF SIGNAL MODERNIZATION INTERSECTION IMPROVEMENT LANDSCAPING CURB AND GUTTER SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS SUSTAINABILITY Est. Cost $8,000,000 County WINNEBAGO Past Current 6 2017-2021 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT. Needs Category ADEQUATE US 20 BUS US 20 BUSA W STATE ST US 20 BUS US 20 BUSA W STATE ST US 30 CLINTON RD Miles 0.57 Roughness(IRI) ACCEPTABLE Rutting 0.13 AADT 8,296 Truck Pct 3.3 NHS Y DAY AVE TO INDEPENDENCE AVE IN ROCKFORD System Maintenance UTILITY ADJUSTMENT DAY AVE TO INDEPENDENCE AVE IN ROCKFORD System Maintenance LAND ACQUISITION MISSISSIPPI RIVER 1 MI W OF ILL 84 Bridge Maintenance BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM $200,000 WINNEBAGO 6 2017-2021 $2,100,000 WINNEBAGO 2 2017-2021 WHITESIDE 4 2016 $800,000 ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. Structure Status STRUCTURAL ACCRUING US 30 CLINTON RD MISSISSIPPI RIVER 1 MI W OF ILL 84 Bridge Maintenance P.E. (BRIDGE INSPECTION) AADT 11,500 Truck Pct 14 Str Number 0986003 NHS Y $1,200,000 WHITESIDE 4 2016 $1,200,000 HENRY 4 2017-2021 ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. US 34 INDIAN CREEK 0.2 MI W OF ILL 78 JCT Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REHABILITATION Structure Status STRUCTURAL BACKLOG 2 - 10 AADT 2,350 Truck Pct 14 Str Number 0370054 NHS N FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street US 52 ILL 64 ILL 84 Location Improvements MISSISSIPPI RIVER & BNSF RR IN SAVANNA Miles = 0.56 Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT RECONSTRUCTION Est. Cost $78,000,000 County CARROLL Past Current 5 2016 ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Needs Category ACCRUING Miles 0.45 Roughness(IRI) ACCEPTABLE ADEQUATE 0.11 GOOD US 52 ILL 64 ILL 84 Rutting 0.12 AADT 2,930 Truck Pct 11.0 NHS Y 0.09 1,850 4.9 N MISSISSIPPI RIVER & BNSF RR IN SAVANNA Bridge Maintenance Structure Status STRUCTURAL BACKLOG CONSTRUCTION ENGINEERING AADT 1,850 Truck Pct 4 Str Number 0086000 NHS N $500,000 CARROLL 4 2016 $100,000 CARROLL 2 2016 $500,000 CARROLL 1 2017-2021 $500,000 ROCK ISLAND 3 2017-2021 ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. US 52 ILL 64 ILL 84 MISSISSIPPI RIVER & BNSF RR IN SAVANNA Bridge Maintenance UTILITY ADJUSTMENT ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. US 52 ILL 64 ILL 84 MISSISSIPPI RIVER & BNSF RR IN SAVANNA Bridge Maintenance CONSTRUCTION ENGINEERING ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. US 67 ILL 92, RR & MISSISSIPPI RIVER IN ROCK ISLAND Bridge Maintenance PRESERVE SYSTEM SAFETY RIP RAP MISCELLANEOUS ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. 2 - 11 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street US 150 Location Improvements Objectives 0.1 MI N T0 0.8 MI S OF ILL 81 (E); 1.5 MI N RESURFACING TO 0.3 MI S OF OPHIEM RD; & 0.5 MI N OF 500 N TO ILL 17 (W) AT ALPHA Miles = 4.67 System Maintenance Needs Category BACKLOG Miles 0.90 Roughness(IRI) ACCEPTABLE Rutting 0.26 AADT 2,539 Truck Pct 9.8 NHS N BACKLOG 1.79 ACCEPTABLE 0.26 2,467 9.7 N BACKLOG 1.98 ACCEPTABLE 0.26 2,550 9.4 N SAFETY PRESERVE SYSTEM US 150 0.1 MI N TO 0.8 MI S OF ILL 81 (E); 1.5 MI N RR INSURANCE TO 0.3 MI S OF OPHIEM RD; & 0.5 MI N OF RR FLAGGER 500 N TO ILL 17 (W) AT ALPHA System Maintenance SAFETY US 150 0.8 MI S OF ILL 81 (E) TO 1.5 MI N OF RESURFACING OPHIEM RD & 0.3 MI S OF OPHIEM RD TO CULVERT REPLACEMENT 0.5 MI N OF 500 N CULVERT EXTENSION Miles = 1.86 System Maintenance SAFETY PRESERVE SYSTEM Needs Category BACKLOG Miles 0.70 Roughness(IRI) ACCEPTABLE Rutting 0.26 AADT 2,450 Truck Pct 9.8 NHS N BACKLOG 1.16 ACCEPTABLE 0.26 2,550 9.4 N Est. Cost County Past Current $1,560,000 HENRY 7 2017-2021 $35,000 HENRY 6 2017-2021 $4,040,000 HENRY 5 2017-2021 US 150 LAND ACQUISITION 0.8 MI S OF ILL 81 (E) TO 1.5 MI N OF OPHIEM RD & 0.3 MI S OF OPHIEM RD TO 0.5 MI N OF 500 N System Maintenance $400,000 HENRY 5 2016 US 150 UTILITY ADJUSTMENT 0.8 MI S OF ILL 81 (E) TO 1.5 MI N OF OPHIEM RD & 0.3 MI S OF OPHIEM RD TO 0.5 MI N OF 500 N System Maintenance $100,000 HENRY 5 2017-2021 2 - 12 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street Location Improvements ILL 2 BELTLINE RD S OF ROCKFORD TO N OF RIVER RD N OF BYRON (CULVERTS) Miles = 0.01 Bridge Maintenance CULVERT REPLACEMENT CULVERT REPAIR CULVERT REMOVAL RESURFACING ILL 2 BELTLINE RD S OF ROCKFORD TO N OF RIVER RD N OF BYRON (CULVERTS) Bridge Maintenance UTILITY ADJUSTMENT ILL 2 BELTLINE RD S OF ROCKFORD TO N OF RIVER RD N OF BYRON (CULVERTS) Bridge Maintenance LAND ACQUISITION ILL 2 BELTLINE RD S OF ROCKFORD TO N OF RIVER RD N OF BYRON (CULVERTS) Bridge Maintenance CULVERT (NEW) ILL 2 0.8 MI N OF ROSCOE RD TO 0.7 MI N OF LATHAM RD System Expansion LAND ACQUISITION ROCK RIVER IN ROCKTON Bridge Maintenance BRIDGE REPLACEMENT MEDIAN CROSSOVER N MAIN ST ILL 2 Objectives SAFETY PRESERVE SYSTEM SAFETY SAFETY PRESERVE SYSTEM Est. Cost County Past Current $3,710,000 OGLE WINNEBAGO 8 2017-2021 $50,000 OGLE WINNEBAGO 2 2017-2021 $230,000 OGLE WINNEBAGO 2 2016 $660,000 WINNEBAGO 1 2017-2021 $500,000 WINNEBAGO 1 2017-2021 $14,000,000 WINNEBAGO 1 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG STRUCTURAL BACKLOG ILL 2 ROCK RIVER IN ROCKTON Bridge Maintenance P.E. (PHASE I) P.E. (CONSULTANT TSL) AADT 3,100 3,100 Truck Pct 10 Str Number 1010125 NHS Y 10 1010126 Y $700,000 WINNEBAGO 1 2016 $1,000,000 WINNEBAGO 1 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 2 ROCK RIVER IN ROCKTON Bridge Maintenance P.E. (PHASE II) ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. 2 - 13 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street ILL 2 Location ROCK RIVER IN ROCKTON Bridge Maintenance Improvements Objectives CONSTRUCTION ENGINEERING Est. Cost $1,400,000 County Past Current WINNEBAGO 1 2017-2021 $900,000 LEE 8 2016 $30,000 LEE 8 2016 $1,200,000 LEE 8 2016 $30,000 LEE 8 2016 $5,200,000 JO DAVIESS 13 2017-2021 $25,000 JO DAVIESS 13 2017-2021 $380,000 JO DAVIESS 6 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. SAFETY PRESERVE SYSTEM ILL 26 CREEK 0.3 MI N OF UNION RD & DRAINAGE DITCH 0.1 & 0.4 MI S OF UNION RD Bridge Maintenance CULVERT REPLACEMENT ILL 26 CREEK 0.3 MI N OF UNION RD & DRAINAGE DITCH 0.4 MI S OF UNION RD Bridge Maintenance LAND ACQUISITION ILL 26 N OF EASY RD TO 0.5 MI S Bridge Maintenance CULVERT REPLACEMENT DRAINAGE CULVERT REMOVAL SHOULDER RECONSTRUCTION ILL 26 N OF EASY RD TO 0.5 MI S Bridge Maintenance LAND ACQUISITION ILL 35 ILL 35: CHERRY ST TO N SCHOOL ST & CHERRY ST IN EAST DUBUQUE Miles = 0.46 System Expansion NEW CONSTRUCTION RETAINING WALL CURB AND GUTTER STORM SEWER (NEW) CULVERT (NEW) CULVERT EXTENSION WISCONSIN AVE SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT PRESERVE SYSTEM SUSTAINABILITY SAFETY TEA-21 HIGH PRIORITY PROJECT: STATE AND/OR LOCAL PARTICIPATION REQUIRED ILL 35 WISCONSIN AVE ILL 35 WISCONSIN AVE ILL 35: CHERRY ST TO N SCHOOL ST & CHERRY ST IN EAST DUBUQUE System Expansion UTILITY ADJUSTMENT ILL 35: CHERRY ST TO N SCHOOL ST & CHERRY ST IN EAST DUBUQUE System Expansion LAND ACQUISITION 2 - 14 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street ILL 40 Needs Category BACKLOG Location Improvements ILL 78 TO 1ST ST IN CHADWICK Miles = 7.90 System Maintenance Miles 7.90 Roughness(IRI) ACCEPTABLE Rutting 0.16 AADT 757 RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 11.1 ILL 78 TO 0.3 MI W OF MARION AVE IN CHADWICK Bridge Maintenance CULVERT REPLACEMENT ILL 40 ILL 78 TO 0.3 MI W OF MARION AVE IN CHADWICK Bridge Maintenance LAND ACQUISITION ILL 72 STILLMAN RD IN STILLMAN VALLEY TO W RESURFACING OF I-39 PATCHING Miles = 8.03 System Maintenance PEDESTRIAN RAMPS/ADA Miles 8.03 Roughness(IRI) ACCEPTABLE Rutting 0.18 AADT 4,371 Truck Pct 13.5 Est. Cost County Past Current SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $2,730,000 CARROLL 15 2017-2021 SAFETY PRESERVE SYSTEM $1,575,000 CARROLL 8 2017-2021 $80,000 CARROLL 8 2017-2021 $2,700,000 OGLE 11 2017-2021 NHS N ILL 40 Needs Category BACKLOG Objectives SAFETY PRESERVE SYSTEM TRANSPORTATION OPS NHS N ILL 72 STILLMAN RD IN STILLMAN VALLEY TO W RR INSURANCE OF I-39 RR FLAGGER System Maintenance SAFETY $35,000 OGLE 7 2017-2021 ILL 75 AT ILL 70 FLASHING LIGHT MISCELLANEOUS SAFETY $65,000 WINNEBAGO 1 2016 RESURFACING RECONSTRUCTION CURB AND GUTTER STORM SEWER (NEW) DRAINAGE SAFETY PRESERVE SYSTEM $9,750,000 WINNEBAGO 17 2017-2021 System Maintenance ILL 75 BLACKHAWK BLVD Needs Category BACKLOG ROCK RIVER TO ILL 2 IN ROCKTON Miles = 1.37 System Maintenance Miles 1.37 Roughness(IRI) NOT ACCEPTABLE Rutting 0.20 AADT 5,064 Truck Pct 5.5 NHS Y 2 - 15 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street ILL 75 BLACKHAWK BLVD ILL 75 BLACKHAWK BLVD ILL 75 BLACKHAWK BLVD ILL 75 BLACKHAWK BLVD ILL 78 Location Improvements Objectives ROCK RIVER TO ILL 2 IN ROCKTON System Maintenance UTILITY ADJUSTMENT ROCK RIVER TO ILL 2 IN ROCKTON System Maintenance RR INSURANCE RR FLAGGER SAFETY ROCK RIVER TO ILL 2 IN ROCKTON System Maintenance RR CROSSING IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY ROCK RIVER TO ILL 2 IN ROCKTON System Maintenance LAND ACQUISITION PLUM RIVER 6.3 MI S OF US 20 Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG Est. Cost County Past Current $300,000 WINNEBAGO 12 2017-2021 $35,000 WINNEBAGO 7 2017-2021 $200,000 WINNEBAGO 2 2017-2021 $400,000 WINNEBAGO 2 2016 JO DAVIESS 3 2017-2021 $3,300,000 AADT 475 Truck Pct 21 Str Number 0430040 NHS N ILL 78 PLUM RIVER 6.3 MI S OF US 20 Bridge Maintenance LAND ACQUISITION $25,000 JO DAVIESS 3 2017-2021 ILL 78 PLUM RIVER 6.3 MI S OF US 20 Bridge Maintenance UTILITY ADJUSTMENT $20,000 JO DAVIESS 3 2017-2021 ILL 78 CARROLL CO LINE TO US 30 W OF MORRISON Miles = 7.49 System Maintenance RESURFACING WHITESIDE 7 2017-2021 Needs Category BACKLOG Miles 7.49 Roughness(IRI) ACCEPTABLE Rutting 0.15 AADT 927 Truck Pct 19.7 SAFETY PRESERVE SYSTEM NHS N 2 - 16 $2,435,000 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street Location Improvements ILL 78 CARROLL CO LINE TO US 30 (CULVERTS) CULVERT REPLACEMENT Bridge Maintenance CULVERT EXTENSION ILL 78 Objectives SAFETY PRESERVE SYSTEM Est. Cost County Past Current $1,555,000 WHITESIDE 6 2017-2021 CARROLL CO LINE TO US 30 (CULVERTS) LAND ACQUISITION Bridge Maintenance $40,000 WHITESIDE 6 2017-2021 ILL 78 CARROLL CO LINE TO US 30 (CULVERTS) UTILITY ADJUSTMENT Bridge Maintenance $40,000 WHITESIDE 6 2017-2021 ILL 78 DRAINAGE DITCHES 0.3 MI N OF NOBLE RD & 0.1 MI N OF WARD RD Bridge Maintenance CULVERT REPLACEMENT $735,000 WHITESIDE 6 2017-2021 ILL 78 DRAINAGE DITCHES 0.3 MI N OF NOBLE RD & 0.1 MI N OF WARD RD Bridge Maintenance LAND ACQUISITION $40,000 WHITESIDE 6 2017-2021 ILL 78 DRAINAGE DITCHES 0.3 MI N OF NOBLE RD & 0.1 MI N OF WARD RD Bridge Maintenance UTILITY ADJUSTMENT $40,000 WHITESIDE 6 2017-2021 ILL 81 OVER BNSF RR AT LYNN CENTER Miles = 0.01 Bridge Maintenance BRIDGE REPLACEMENT RR FLAGGER WIRE LINE ADJUSTMENTS VERTICAL REALIGNMENT HENRY 4 2016 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Structure Status STRUCTURAL BACKLOG ILL 81 OVER BNSF RR AT LYNN CENTER Bridge Maintenance UTILITY ADJUSTMENT $2,645,000 AADT 1,850 $20,000 2 - 17 Truck Pct 10 HENRY Str Number 0370126 NHS N 1 2016 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street ILL 82 Location Improvements AT IAIS RR IN GENESEO (GRADE SEPARATION STUDY) System Expansion Objectives P.E. (PHASE I) Est. Cost County Past Current $1,000,000 HENRY 6 2017-2021 PRESERVE SYSTEM $1,500,000 ROCK ISLAND 4 2017-2021 SAFETY PRESERVE SYSTEM $1,980,000 ROCK ISLAND 6 2017-2021 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. ILL 92 MISSISSIPPI RIVER Bridge Maintenance BRIDGE PAINTING IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. ILL 92 Needs Category BACKLOG ILL 192 TO S OF BIG BRANCH CREEK Miles = 1.45 System Maintenance Miles 1.45 Roughness(IRI) NOT ACCEPTABLE Rutting 0.19 AADT 725 RESURFACING COLD MILLING Truck Pct 6.9 NHS N ILL 92 ILL 192 TO S OF BIG BRANCH CREEK Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $195,000 ROCK ISLAND 4 2017-2021 ILL 92 N OF 99TH AVE W TO 0.4 MI N OF BRIGHTS CT W OF ANDALUSIA Miles = 1.17 System Maintenance WIDENING & RESURFACING CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $2,475,000 ROCK ISLAND 17 2017-2021 $40,000 ROCK ISLAND 6 2017-2021 Needs Category BACKLOG Miles 1.17 Roughness(IRI) NOT ACCEPTABLE Rutting 0.17 AADT 1,408 Truck Pct 5.6 NHS N ILL 92 N OF 99TH AVE W TO 0.4 MI N OF BRIGHTS CT W OF ANDALUSIA System Maintenance UTILITY ADJUSTMENT ILL 92 N OF 99TH AVE W TO 0.4 MI N OF BRIGHTS CT W OF ANDALUSIA System Maintenance LAND ACQUISITION $450,000 ROCK ISLAND 13 2017-2021 ILL 92 N OF 99TH AVE W TO 0.4 MI N OF BRIGHTS CT W OF ANDALUSIA System Maintenance LAND ACQUISITION $260,000 ROCK ISLAND 1 2016 2 - 18 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street ILL 251 Location Improvements Needs Category ACCRUING 0.2 MI S OF SANDY HOLLOW RD IN RESURFACING ROCKFORD TO 0.2 MI S OF BLACKHAWK RD Miles = 1.98 System Maintenance Miles Roughness(IRI) Rutting AADT Truck Pct NHS 1.91 ACCEPTABLE 0.16 11,123 10.8 N BACKLOG 0.07 ILL 251 NOT ACCEPTABLE 0.26 16,800 DRAINAGE DITCH 1.5 MI S OF US 20 IN ROCKFORD Bridge Maintenance Objectives Est. Cost County Past Current SAFETY PRESERVE SYSTEM $3,300,000 WINNEBAGO 5 2017-2021 SAFETY PRESERVE SYSTEM $1,700,000 WINNEBAGO 9 2017-2021 Y 8.0 BRIDGE REPLACEMENT CULVERT REPLACEMENT Structure Status STRUCTURAL ACCRUING AADT 4,450 Truck Pct 10 Str Number 1010009 NHS N STRUCTURAL ACCRUING 4,450 10 1010010 N STRUCTURAL BACKLOG 1,450 6 1012001 N STRUCTURAL BACKLOG 1,900 21 1012002 N ILL 251 DRAINAGE DITCH 1.5 MI S OF US 20 IN ROCKFORD Bridge Maintenance UTILITY ADJUSTMENT $20,000 WINNEBAGO 9 2017-2021 ILL 251 DRAINAGE DITCH 1.5 MI S OF US 20 IN ROCKFORD Bridge Maintenance LAND ACQUISITION $20,000 WINNEBAGO 9 2017-2021 ILL 251 WINNEBAGO CO LINE TO 0.3 MI N OF FLAGG RD Miles = 14.40 System Maintenance RESURFACING Needs Category BACKLOG Miles 13.65 Roughness(IRI) ACCEPTABLE Rutting 0.20 AADT 3,964 Truck Pct 7.8 NHS N BACKLOG 0.75 ACCEPTABLE 0.23 7,008 8.6 N ILL 251 WINNEBAGO CO LINE TO 0.3 MI N OF FLAGG RD System Maintenance NEW SHOULDERS MILLED RUMBLE STRIP 2 - 19 SAFETY PRESERVE SYSTEM $4,000,000 OGLE 11 2017-2021 SAFETY $3,542,000 OGLE 3 2017-2021 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street ILL 251 ILL 38 SEVENTH ST Location 0.3 MI N OF FLAGG RD TO 0.2 MI S OF ILL 38 (E) IN ROCHELLE Miles = 1.08 Congestion Mitigation Needs Category BACKLOG Miles 0.81 Roughness(IRI) ACCEPTABLE BACKLOG 0.27 NOT ACCEPTABLE ILL 251 Improvements Objectives RECONSTRUCTION BI-DIRECT LEFT TURN LANE CURB AND GUTTER STORM SEWER (NEW) MEDIAN BARRIER BIKEWAY PAVEMENT MARKING Rutting 0.24 AADT 9,333 Truck Pct 6.6 NHS N 0.23 9,378 5.5 Y SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS S OF FLAGG RD TO 0.2 MI S OF ILL 38 (E) IN ROCHELLE Congestion Mitigation UTILITY ADJUSTMENT S OF FLAGG RD TO 0.2 MI S OF ILL 38 (E) IN ROCHELLE Congestion Mitigation LAND ACQUISITION 19TH ST ILL 84/92 TO 0.1 MI S IN SILVIS System Maintenance RETAINING WALL RIP RAP PRESERVE SYSTEM SUSTAINABILITY SAFETY FREEPORT RD JORDON CREEK 0.4 MI N OF LEE / WHITESIDE CO LINE Bridge Maintenance CULVERT (NEW) SAFETY ILL 38 SEVENTH ST ILL 251 ILL 38 SEVENTH ST Est. Cost County Past Current $6,000,000 OGLE 12 2017-2021 $100,000 OGLE 12 2017-2021 $1,500,000 OGLE 5 2017-2021 $1,000,000 ROCK ISLAND 1 2017-2021 $400,000 OGLE WHITESIDE 6 2017-2021 $20,000 OGLE WHITESIDE 7 2017-2021 ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT. FREEPORT RD JORDON CREEK 0.4 MI N OF LEE / WHITESIDE CO LINE Bridge Maintenance LAND ACQUISITION ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT. 2 - 20 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street FREEPORT RD Location JORDON CREEK 0.4 MI N OF LEE / WHITESIDE CO LINE Bridge Maintenance Improvements Objectives UTILITY ADJUSTMENT Est. Cost County Past Current $20,000 OGLE WHITESIDE 6 2017-2021 $400,000 WHITESIDE 6 2017-2021 ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT. FREEPORT RD JORDON CREEK 6 MI N OF STERLING Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT. Structure Status STRUCTURAL ACCRUING FREEPORT RD JORDON CREEK 6 MI N OF STERLING Bridge Maintenance LAND ACQUISITION AADT 1,900 Truck Pct 3 Str Number 0980049 NHS N $20,000 WHITESIDE 7 2017-2021 $20,000 WHITESIDE 6 2017-2021 $3,659,000 WINNEBAGO 9 2016 ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT. FREEPORT RD JORDON CREEK 6 MI N OF STERLING Bridge Maintenance UTILITY ADJUSTMENT ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT. PRAIRIE HILL RD ROCK RIVER 0.4 MI W OF ILL 2 N OF ROCKTON System Maintenance JURISDICTIONAL TRANSFER STRUCTURE AND ROADWAY UNDER NEGOTIATION FOR TRANSFER. VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS System Maintenance SAFETY IMPROVEMENTS SAFETY $4,047,000 DISTRICT-WIDE 6 2016 VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS SAFETY $17,018,000 DISTRICT-WIDE 5 2017-2021 VARIOUS DISTRICT MISCELLANEOUS System Maintenance MISCELLANEOUS PROJECTS $500,000 DISTRICT-WIDE 5 2016 2 - 21 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street Location Improvements Objectives VARIOUS DISTRICT MISCELLANEOUS MISCELLANEOUS PROJECTS VARIOUS BRIDGE DECK SEALING Bridge Maintenance BRIDGE DECK SEALING VARIOUS ARCHAEOLOGICAL SURVEYS System Maintenance VARIOUS Est. Cost County Past Current $2,000,000 DISTRICT-WIDE 4 2017-2021 $675,000 DISTRICT-WIDE 1 2016 ARCHAEOLOGICAL SURVEY $150,000 DISTRICT-WIDE 3 2016 ARCHAEOLOGICAL SURVEYS ARCHAEOLOGICAL SURVEY $550,000 DISTRICT-WIDE 4 2017-2021 VARIOUS PECATONICA WETLAND SW QUADRANT OF US 20 (PECATONICA RIVER) System Maintenance WETLAND MITIGATION LANDSCAPING SUSTAINABILITY $15,000 STEPHENSON 4 2016 VARIOUS PECATONICA WETLAND SW QUADRANT OF US 20 (PECATONICA RIVER) System Maintenance WETLAND MITIGATION LANDSCAPING SUSTAINABILITY $15,000 STEPHENSON 4 2017-2021 VARIOUS SURVEY & RIGHT-OF-WAY DOCUMENTS P.E. (ROW) P.E. SURVEYS (ROW) $1,200,000 DISTRICT-WIDE 3 2016 VARIOUS SURVEY & RIGHT-OF-WAY DOCUMENTS P.E. (ROW) P.E. SURVEYS (ROW) $2,500,000 DISTRICT-WIDE 4 2017-2021 VARIOUS PRE-LAND ACQUISITION ACTIVITY System Maintenance PRE-ACQUISITION ACTIVITY $120,000 DISTRICT-WIDE 5 2016 VARIOUS PRE-LAND ACQUISITION ACTIVITY PRE-ACQUISITION ACTIVITY $600,000 DISTRICT-WIDE 4 2017-2021 PRESERVE SYSTEM 2 - 22 FY 2016-2021 Highway Improvement Program District 2 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS POST-LAND ACQUISITION ACTIVITY System Maintenance POST-ACQUISITION ACTIVITY $100,000 DISTRICT-WIDE 5 2016 VARIOUS POST-LAND ACQUISITION ACTIVITY POST-ACQUISITION ACTIVITY $550,000 DISTRICT-WIDE 4 2017-2021 VARIOUS ON-CALL ENGINEERING System Maintenance P.E. (PHASE I) P.E. (PHASE II) P.E. (CONSULTANT PLANS) $500,000 DISTRICT-WIDE 2 2017-2021 VARIOUS ON-CALL ENGINEERING P.E. (PHASE I) P.E. (PHASE II) P.E. (CONSULTANT PLANS) $1,500,000 DISTRICT-WIDE 4 2016 VARIOUS CONSTRUCTION ENGINEERING System Maintenance CONSTRUCTION ENGINEERING $500,000 DISTRICT-WIDE 2 2016 VARIOUS CONSTRUCTION ENGINEERING System Maintenance CONSTRUCTION ENGINEERING $1,000,000 WINNEBAGO ROCK ISLAND 4 2017-2021 DISTRICT-WIDE 1 2016 ILLINOIS JOBS NOW! PROJECT VARIOUS CHANGE ORDER RESERVE System Maintenance CHANGE ORDERS $500,000 2 - 23 DISTRICT 2 FY 2016-2019 PROPOSED LOCAL PROJECTS FY 2016-2019 Highway Improvement Program District 2 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current 13TH ST ILL 84 TO 13TH AVE Miles = 0.85 RESURFACING SAFETY PRESERVE SYSTEM $860,000 ROCK ISLAND 1 2016 18TH AVE 17TH ST TO MOLINE WCL Miles = 1.82 RESURFACING SAFETY PRESERVE SYSTEM $3,500,000 ROCK ISLAND 4 2016 38TH ST 7TH AVE TO 18TH AVE Miles = 0.76 RECONSTRUCTION RESURFACING SAFETY PRESERVE SYSTEM $2,750,000 ROCK ISLAND 4 2017-2021 38TH ST 18TH AVE TO 31ST AVE Miles = 1.07 RESURFACING SAFETY PRESERVE SYSTEM $1,600,000 ROCK ISLAND 1 2017-2021 BLACK RD ROCK CREEK 2.6 MI & 3 MI W OF ILL 78 JCT BRIDGE REHABILITATION BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,468,000 WHITESIDE 2 2017-2021 CH 23 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. ILL 64 TO FLAGG RD Miles = 5.09 RESURFACING SAFETY PRESERVE SYSTEM $515,000 OGLE 1 2017-2021 S BRANCH KENT CREEK 0.1 MI E OF MERIDIAN RD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $635,000 WINNEBAGO 3 2016 E RIVER ST ARTESIAN PL TO ILL 2 Miles = 0.25 RECONSTRUCTION SAFETY PRESERVE SYSTEM $1,350,000 LEE 1 2016 FREEPORT RD US 52 TO STERLING RD Miles = 6.85 RESURFACING SAFETY PRESERVE SYSTEM $990,000 OGLE WHITESIDE 1 2017-2021 CHANA RD CH 4 CUNNINGHAM RD CH 49 CH 12 2 - 24 FY 2016-2019 Highway Improvement Program District 2 Local Highways MYP Years Route/Street IDEAL RD Location BNSF RR 2 MI W OF MILLEDGEVILLE Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT CH 8 Est. Cost $3,507,000 County CARROLL Past Current 14 2016 12 2016 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY. IDEAL RD BNSF RR 2 MI W OF MILLEDGEVILLE CONSTRUCTION ENGINEERING $161,000 CARROLL CH 8 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY. LAMOILLE RD LAMOILLE RD: MAYTOWN RD TO RESURFACING BUREAU CO LINE; MAYTOWN RD: GREEN WING RD TO LAMOILLE RD; GREEN WING RD: SUBLETTE RD TO MAYTOWN RD Miles = 4.66 SAFETY PRESERVE SYSTEM $600,000 LEE 1 2016 LINCOLN BLVD: WHISTLER AVE TO ILL 26; STEPHENSON ST: WALNUT AVE TO LOCUST AVE; HARLEM AVE: GALENA AVE TO STEPHENSON ST Miles = 0.84 RESURFACING SAFETY PRESERVE SYSTEM $890,000 STEPHENSON 1 2016 BRANCH PLUM CREEK 5.5 MI SW OF PEARL CITY CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 STEPHENSON 1 2016 MACKLIN RD BRANCH STILLMAN CREEK 1.5 MI W OF STILLMAN VALLEY BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 OGLE 1 2016 MASSBACH RD SCRUB CREEK 10 MI SE OF ELIZABETH BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 JO DAVIESS 3 2017-2021 BNSF RR 2 MI NE OF ARGO FAY BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,700,000 CARROLL 1 2017-2021 CH 20 MAYTOWN RD CH 12 GREEN WING RD LINCOLN BLVD STEPHENSON ST HARLEM AVE LORAN RD CH 21 CH 5 MILL RD 2 - 25 FY 2016-2019 Highway Improvement Program District 2 Local Highways MYP Years Route/Street MILLEDGEVILLE RD CH 7 MONTAGUE RD CH 38 N GALENA ST Location Improvements Objectives Est. Cost County Past Current BROOKVILLE RD TO MAPLE ST IN POLO Miles = 5.74 RESURFACING SAFETY PRESERVE SYSTEM $820,000 OGLE 1 2017-2021 ROCK CITY RD TO WINNEBAGO CO LINE Miles = 10.34 RESURFACING SAFETY PRESERVE SYSTEM $690,000 OGLE STEPHENSON WINNEBAGO 1 2017-2021 CARROLL CREEK ON NW SIDE OF MT CARROLL BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,600,000 CARROLL 5 2016 CARROLL 3 2016 CARROLL 1 2017-2021 WHITESIDE 1 2016 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. N GALENA ST CARROLL CREEK ON NW SIDE OF MT CARROLL CONSTRUCTION ENGINEERING $128,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. OLD GALENA TRAIL PLUM RIVER 5 MI NW OF MT CARROLL BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $2,000,000 PROPHET RD STAR RD TO TAMPICO RD COLD IN-PLACE RECYCLING PRESERVE SYSTEM SUSTAINABILITY $560,000 RESURFACING SAFETY PRESERVE SYSTEM $3,280,000 ROCK ISLAND 1 2016 12TH AVE RIVER DR: 23RD ST TO 34TH ST; 16TH ST: 52ND AVE TO JOHN DEERE RD; 12TH AVE: 34TH ST TO 53RD ST Miles = 2.73 RIVERSIDE BLVD LOVES PARK CREEK 0.2 MI E OF ILL 251 BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,300,000 WINNEBAGO 1 2016 SCHAPVILLE RD MILL CREEK 6 MI N OF ELIZABETH BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM $300,000 JO DAVIESS 3 2017-2021 CH 3 RIVER DR 16TH ST 2 - 26 FY 2016-2019 Highway Improvement Program District 2 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost SIDNEY ST MONTGOMERY AVE TO SHERWOOD AVE RECONSTRUCTION Miles = 0.08 SAFETY PRESERVE SYSTEM $160,000 STERLING RD STERLING RD: HARMON RD TO WALTON RD; HARMON RD: STERLING RD TO BALCH RD; WALTON RD: STERLING RD TO VILLAGE OF WALTON Miles = 6.61 SAFETY PRESERVE SYSTEM $1,000,000 CH 14 HARMON RD CH 15 RESURFACING County Past Current JO DAVIESS 1 2016 LEE 1 2017-2021 WALTON RD CH 24 SUMNER RD SUMNER CREEK 1 MI W OF PECATONICA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $584,000 WINNEBAGO 1 2017-2021 WILLOW RD MUDDY PLUM RIVER 5.5 MI SE OF STOCKTON BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 JO DAVIESS 3 2017-2021 CH 6 WILLOW RD US 20 TO KRISE RD COLD IN-PLACE RECYCLING PRESERVE SYSTEM SUSTAINABILITY $600,000 JO DAVIESS 1 2016 CH 6 2 - 27 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE KANE DEKALB D2 COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK PEORIA D4 Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT ADAMS D5 MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 2 District 3 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 2, DISTRICT 3, OTTAWA Overview Highway District 3 encompasses 9 counties in east central Illinois and includes the cities of DeKalb, Kankakee, LaSalle-Peru, Mendota, Morris, Oswego, Ottawa, Pontiac, Princeton, Streator and Watseka, plus many smaller communities which serve as satellites for the larger employment centers or as focal points of this farming area. The state highway system in District 3 consists of 1,691 miles of highways and 781 bridges, supporting 10.7 million vehicle miles of travel daily. State Program The program for state and local highways will average $1.398 billion annually for the FY 2016-2021 period. Approximately $301 million will be provided during FY 2016-2021 for improvements to state highways in District 3. The following table summarizes anticipated accomplishments on the state highway system in District 3 during this time frame. FY 2016-2021 Accomplishments System Maintenance Interstate (miles) Non-Interstate (miles) Safety Locations (number) Bridge Maintenance Interstate (number) Non-Interstate (number) New Bridges (number) Minor Structure Repair (number) Congestion Mitigation Roads (miles) Traffic Improvements (number) System Expansion Roads (miles) Locations (number) 3-i 45 60 0 6 23 3 54 4 0 0 0 Major Highway projects of interest that are tentatively scheduled during the FY 2016-2021 time frame include:  Interstate 55 from 1.7 miles south of Illinois 116 to 4.2 miles north of Illinois 23 in Pontiac. Resurfacing on 9.7 miles, patching, bridge deck repair, culvert repair and underdrains are programmed during FY 2017-2021 at a cost of $27.3 million.  Interstate 55 from 0.3 mile south of Gardner Road to the Will County line in Grundy County. Resurfacing on 7 miles is programmed during FY 2017-2021 at a cost of $16 million.  Interstate 57 from Champaign County line to Iroquois County line in Ford County. Resurfacing on 6.4 miles and bridge and culvert repair are programmed during FY 2017-2021 at a cost of $15.5 million.  Interstate 57 from 0.7 mile north of the Iroquois County line to south of the Illinois 50 Interchange in Bourbonnais. Resurfacing on 11.6 miles, patching, bridge repair, culvert repair and a new bridge deck under Waldron Road at Kankakee and a bridge replacement, bridge approach spans and bridge approach roadway under North Street 2 miles north of Illinois 17 in Bradley are programmed during FY 2017-2021 at a cost of $41.5 million. Also included within this section is engineering for contract plans from 0.9 mile north of the Illinois 17 to south of Waldron Road programmed during FY 2017-2021 at a cost of $3 million.  Interstate 80 from east of Illinois 40 to west of Illinois 26 in Bureau County. Resurfacing on 10.1 miles and bridge repair are programmed in FY 2016 at a cost of $25 million.  US 34 from east of Eldamain Road to Center Parkway in Yorkville. Reconstruction and additional lanes for 2.1 miles, a bridge replacement, culvert extension, land acquisition and construction engineering are programmed during FY 2016-2021 at a cost of $22 million. Of this total, land acquisition is programmed in FY 2016 at a cost of $2.5 million. SAFETEA-LU provided NCII funding for this project. Provides for efficient freight movement.  Illinois 23 from 0.2 miles south of McKinley Road in Ottawa to north of County Highway 5 (Richards Road) in LaSalle County. Resurfacing on 9.6 miles is programmed during FY 2017-2021 at a cost of $4.3 million.  Illinois 71 from west of Illinois 47 east of Illinois 126 in Kendall County. Reconstruction and additional lanes for 1.6 miles, culvert replacement, utility adjustments and construction engineering are programmed during FY 2017-2021 at a cost of $16.1 million. Provides for efficient freight movement.  Illinois 89 over the Illinois River at Spring Valley in Putnam and Bureau Counties. A bridge replacement and construction engineering are programmed in FY 2016 at a cost of $29.5 million. This project has been approved for Illinois Major Bridge Program funding.  Illinois 102 at Rock Creek 6.5 miles northwest of Bourbonnais in Kankakee County. A bridge replacement is programmed in FY 2016 at a cost of $4.3 million.  Illinois 126 from east of Illinois 71 to Will County line in Kendall County. 8.7 miles is programmed during FY 2017-2021 at a cost of $3.3 million.  Illinois 178 over the Illinois River south of Utica. A bridge replacement, land acquisition, utility adjustments and construction engineering are programmed during FY 2016-2021 at a cost of $26.7 million. Of this total, land acquisition and utility adjustments are programmed in FY 2016 at a cost of $150,000. This project has been approved for Illinois Major Bridge Program funding. 3-ii Resurfacing on FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current I 55 VARIOUS LOCATIONS IN LIVINGSTON CO PATCHING System Maintenance COLD MILLING SAFETY PRESERVE SYSTEM $500,000 LIVINGSTON 1 2016 I 55 1.7 MI S OF ILL 116 TO 4.2 MI N OF ILL 23 IN PONTIAC Miles = 9.72 System Maintenance SAFETY PRESERVE SYSTEM $27,310,000 LIVINGSTON 2 2017-2021 SAFETY PRESERVE SYSTEM $3,200,000 LIVINGSTON 1 2017-2021 LIVINGSTON GRUNDY 12 2017-2021 GRUNDY 7 2017-2021 Needs Category BACKLOG I 55 Needs Category ADEQUATE Miles 9.72 Roughness(IRI) GOOD Rutting 0.11 AADT 19,825 1.7 MI S OF ILL 17 TO 1.4 MI S OF ILL 17 Miles = 0.34 System Maintenance Miles 0.34 Roughness(IRI) ACCEPTABLE Rutting 0.10 AADT 19,000 RESURFACING BRIDGE DECK REPAIRS CULVERT REPAIR UNDERDRAINS Truck Pct 34.1 NHS Y RECONSTRUCTION Truck Pct 31.2 NHS Y I 55 1.4 MI S OF ILL 17 TO 1.2 MI N OF ILL 47 System Maintenance PATCHING BRIDGE REPAIR CULVERT REPAIR UNDERDRAINS SAFETY PRESERVE SYSTEM $1,800,000 I 55 0.3 MI S OF GARDNER RD IN GARDNER TO WILL CO LINE (REED RD) Miles = 6.95 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $16,000,000 Needs Category BACKLOG Miles 6.95 Roughness(IRI) GOOD Rutting 0.19 AADT 19,923 Truck Pct 30.5 NHS Y 3-1 FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street I 57 Needs Category BACKLOG Location Improvements CHAMPAIGN CO LINE TO IROQUOIS CO LINE Miles = 6.35 System Maintenance Miles 6.35 Roughness(IRI) GOOD Rutting 0.14 AADT 15,893 Objectives RESURFACING BRIDGE REPAIR CULVERT REPAIR Truck Pct 33.8 Est. Cost SAFETY PRESERVE SYSTEM $15,500,000 County Past Current FORD 7 2017-2021 NHS Y I 57 FORD CO LINE TO 1.2 MI N OF ILL 54 IN ONARGA System Maintenance MICROSURFACING JOINT REPAIR SAFETY PRESERVE SYSTEM $50,000 IROQUOIS 1 2016 I 57 CH 9 AT BUCKLEY INTCHG Bridge Maintenance BRIDGE NEW DECK SAFETY PRESERVE SYSTEM $2,000,000 IROQUOIS 3 2017-2021 Structure Status STRUCTURAL ACCRUING I 57 Needs Category BACKLOG I 57 Needs Category ADEQUATE I 57 0.7 MI N OF IROQUOIS CO LINE TO KANKAKEE RIVER BR Miles = 8.19 System Maintenance Miles 8.19 Roughness(IRI) GOOD Rutting 0.14 AADT 19,865 KANKAKEE RIVER BR TO S OF ILL 50 INTCHG IN BOURBONNAIS Miles = 3.43 System Maintenance Miles 3.43 Roughness(IRI) GOOD Rutting 0.16 AADT 27,163 UNDER WALDRON RD AT KANKAKEE Bridge Maintenance RESURFACING BRIDGE REPAIR CULVERT REPAIR Truck Pct 26.9 Truck Pct N/A Str Number 0380076 NHS N SAFETY PRESERVE SYSTEM $20,500,000 KANKAKEE 2 2017-2021 SAFETY PRESERVE SYSTEM $11,500,000 KANKAKEE 11 2017-2021 SAFETY PRESERVE SYSTEM $1,472,000 KANKAKEE 10 2017-2021 NHS Y RESURFACING PATCHING BRIDGE REPAIR CULVERT REPAIR Truck Pct 22.4 AADT 900 NHS Y BRIDGE NEW DECK Structure Status FUNCTIONAL BACKLOG 3-2 AADT 5,200 Truck Pct 5 Str Number 0460080 NHS N FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street Location Improvements I 57 0.9 MI N OF ILL 17 TO S OF WALDRON RD P.E. (PHASE II) System Maintenance I 57 UNDER NORTH ST 2 MI N OF ILL 17 IN BRADLEY Bridge Maintenance Objectives BRIDGE REPLACEMENT BRIDGE APPROACH SPANS BRIDGE APPROACH ROADWAY SAFETY PRESERVE SYSTEM Structure Status FUNCTIONAL BACKLOG I 57 LARRY POWER RD 1.2 MI N OF ILL 50 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status FUNCTIONAL BACKLOG I 57 LARRY POWER RD 1.2 MI N OF ILL 50 Bridge Maintenance LAND ACQUISITION I 57 UNDER ST GEORGE RD Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Structure Status FUNCTIONAL BACKLOG I 57 UNDER ST GEORGE RD Bridge Maintenance UTILITY ADJUSTMENT I 57 UNDER ST GEORGE RD Bridge Maintenance LAND ACQUISITION 3-3 Est. Cost County Past Current $3,000,000 KANKAKEE 2 2017-2021 $5,000,000 KANKAKEE 11 2017-2021 AADT 7,200 $4,382,000 AADT 8,400 Truck Pct 3 Str Number 0460088 KANKAKEE Truck Pct 5 NHS N 11 Str Number 0460087 2017-2021 NHS N $40,000 KANKAKEE 8 2017-2021 $5,400,000 KANKAKEE 11 2017-2021 AADT 8,300 Truck Pct 12 Str Number 0460081 NHS N $300,000 KANKAKEE 3 2017-2021 $70,000 KANKAKEE 8 2017-2021 FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street I 80 Needs Category BACKLOG Location Improvements E OF ILL 40 TO W OF ILL 26 Miles = 10.07 System Maintenance Miles 10.07 Roughness(IRI) ACCEPTABLE Rutting 0.34 AADT 18,100 Objectives RESURFACING BRIDGE REPAIR Truck Pct 47.7 Est. Cost County Past Current SAFETY PRESERVE SYSTEM $25,000,000 BUREAU 9 2016 SAFETY PRESERVE SYSTEM $7,000,000 GRUNDY KENDALL 5 2017-2021 $100,000 GRUNDY KENDALL 2 2017-2021 NHS Y I 80 UNDER CN RR 0.4 MI E OF MINOOKA INTCHG Bridge Maintenance RR SEPARATION REPLACEMENT I 80 UNDER CN RR 0.4 MI E OF MINOOKA INTCHG Bridge Maintenance LAND ACQUISITION US 6 STREAM 4.3 MI W OF ILL 89 Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 BUREAU 4 2017-2021 US 6 LITTLE VERMILION RIVER E OF BLACKSTONE ST IN LASALLE TO ILL 178 Miles = 4.56 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $1,900,000 LASALLE 1 2017-2021 SAFETY PRESERVE SYSTEM $800,000 LASALLE 6 2016 Needs Category BACKLOG US 6 Miles 4.56 Roughness(IRI) ACCEPTABLE Rutting 0.12 AADT 6,554 MILLIKEN CREEK 1.7 MI E OF ILL 71 Bridge Maintenance Truck Pct 19.0 NHS Y BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG US 30 SOMONAUK CREEK 1.4 MI E OF ILL 23 JCT Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG 3-4 AADT 5,600 $1,300,000 AADT 3,550 Truck Pct 5 Str Number 0500108 DEKALB Truck Pct 13 NHS Y 5 Str Number 0190031 2016 NHS N FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street US 34 Location Improvements LITTLE VERMILION RIVER 2.2 MI E OF ILL 251 Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG US 34 E OF ELDAMAIN RD TO CENTER PKWY IN ADDITIONAL LANES YORKVILLE BRIDGE REPLACEMENT Miles = 2.10 Congestion Mitigation RECONSTRUCTION CULVERT EXTENSION SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT PRESERVE SYSTEM Est. Cost $1,400,000 AADT 6,500 $18,000,000 County LASALLE Truck Pct 9 Past Current 11 Str Number 0500189 KENDALL 2017-2021 NHS Y 3 2017-2021 SAFETEA-LU NATIONAL CORRIDOR INFRASTRUCTURE IMPROVEMENT PROJECT. STATE MATCH REQUIRED. Needs Category ACCRUING Miles 2.10 Roughness(IRI) ACCEPTABLE Rutting 0.21 AADT 17,914 Truck Pct 9.6 NHS Y Structure Status ADEQUATE ADEQUATE US 34 E OF ELDAMAIN RD TO CENTER PKWY IN LAND ACQUISITION YORKVILLE Congestion Mitigation AADT 21,400 Truck Pct 7 Str Number 0470049 NHS Y 16,600 10 0472014 Y $2,500,000 KENDALL 3 2016 $1,500,000 KENDALL 3 2017-2021 SAFETY PRESERVE SYSTEM $1,100,000 KANKAKEE 1 2017-2021 SAFETY PRESERVE SYSTEM $600,000 IROQUOIS 2 2017-2021 SAFETEA-LU NATIONAL CORRIDOR INFRASTRUCTURE IMPROVEMENT PROJECT. STATE MATCH REQUIRED. US 34 E OF ELDAMAIN RD TO CENTER PKWY IN CONSTRUCTION ENGINEERING YORKVILLE Congestion Mitigation SAFETEA-LU NATIONAL CORRIDOR INFRASTRUCTURE IMPROVEMENT PROJECT. STATE MATCH REQUIRED. US 45 US 52 Needs Category BACKLOG US 45 US 52 INDIAN OAKS RD IN BOURBONNAIS TO MANTENO-DESELM RD Miles = 4.02 System Maintenance Miles 4.02 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 10,266 DRAINAGE DITCH 3.5 MI N OF US 52 Bridge Maintenance RESURFACING Truck Pct 14.2 NHS Y BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG 3-5 AADT 4,200 Truck Pct 15 Str Number 0380116 NHS N FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street US 45 Location BIG FOUR DITCH 3 MI S OF ILL 9 Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG US 52 LITTLE VERMILION RIVER 3.1 MI E OF ILL 251 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG Est. Cost $2,700,000 AADT 3,400 $1,700,000 AADT 1,700 County FORD Truck Pct 11 2 Str Number 0270012 LASALLE Truck Pct 41 Past Current 2017-2021 NHS N 6 Str Number 0500052 2017-2021 NHS N US 52 CREEK 0.3 MI E OF ILL 71 Bridge Maintenance CULVERT (NEW) SAFETY $500,000 LASALLE 3 2017-2021 US 52 MISSION CREEK 1.5 MI E OF ILL 71 Bridge Maintenance CULVERT (NEW) SAFETY $500,000 LASALLE 3 2017-2021 US 52 MISSION CREEK 2.1 MI E OF ILL 71 Bridge Maintenance BRIDGE SUPERSTRUCTURE SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $500,000 LASALLE 3 2017-2021 Structure Status STRUCTURAL BACKLOG US 52 SARATOGA CREEK 4.8 MI W OF ILL 47 Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG ILL 1 UNDER CSX RR 0.9 MI N OF MILFORD Bridge Maintenance RR CROSSING IMPROVEMENT 3-6 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY AADT 1,850 $600,000 AADT 1,700 $1,000,000 Truck Pct 14 Str Number 0500060 KENDALL Truck Pct 20 IROQUOIS NHS N 3 Str Number 0470037 2017-2021 NHS N 1 2017-2021 FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current ILL 1 UNDER CSX RR 0.9 MI N OF MILFORD Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $4,500,000 IROQUOIS 2 2017-2021 ILL 1 STREAM 1.5 MI S OF MILFORD Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 IROQUOIS 2 2017-2021 ILL 23 0.5 MI S OF ILL 64 IN SYCAMORE TO 4TH ST IN DEKALB Miles = 4.23 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $3,600,000 DEKALB 1 2017-2021 SAFETY PRESERVE SYSTEM $1,700,000 LASALLE 1 2017-2021 SAFETY PRESERVE SYSTEM $4,300,000 LASALLE 1 2017-2021 SAFETY PRESERVE SYSTEM $3,900,000 BUREAU 10 2017-2021 Needs Category ACCRUING ILL 23 ILL 23 B ILL 71 Miles 4.23 Roughness(IRI) ACCEPTABLE Rutting 0.14 AADT 19,860 FREMONT ST TO 0.2 MI S OF MCKINLEY RD & 0.1 MI S OF LINCOLN PLAZA TO US 6 IN OTTAWA Miles = 3.56 System Maintenance Truck Pct 4.5 NHS Y RESURFACING ILL 71 A Needs Category ACCRUING Miles 2.71 Roughness(IRI) ACCEPTABLE Rutting 0.13 AADT 15,533 Truck Pct 6.1 NHS Y ADEQUATE 0.85 ACCEPTABLE 0.14 12,044 6.9 Y ILL 23 Needs Category BACKLOG ILL 26 0.2 MI S OF MCKINLEY RD IN OTTAWA TO RESURFACING N OF CH 5 (RICHARDS RD) Miles = 9.63 System Maintenance Miles 9.63 Roughness(IRI) GOOD Rutting 0.11 AADT 6,813 BUREAU CREEK N OF PRINCETON Bridge Maintenance Truck Pct 11.5 NHS N BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG 3-7 AADT 3,600 Truck Pct 18 Str Number 0060136 NHS Y FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street ILL 26 Needs Category BACKLOG ILL 38 Needs Category ACCRUING ILL 47 US 6 Needs Category BACKLOG Location Improvements I-80 TO S OF RAILROAD AVE IN PRINCETON Miles = 0.99 System Maintenance Miles 0.99 Roughness(IRI) ACCEPTABLE Rutting 0.30 AADT 10,957 OGLE CO LINE TO 0.5 MI W OF STADIUM DR (W) IN DEKALB Miles = 7.78 System Maintenance Miles 7.78 Roughness(IRI) GOOD Rutting 0.10 AADT 9,061 GORE RD N OF I-80 TO BENTON ST IN MORRIS Miles = 2.05 System Maintenance Miles 2.05 Roughness(IRI) NOT ACCEPTABLE Rutting 0.20 AADT 24,519 Objectives RESURFACING Truck Pct 5.1 Past Current SAFETY PRESERVE SYSTEM $650,000 BUREAU 3 2016 SAFETY PRESERVE SYSTEM $2,912,000 DEKALB 1 2017-2021 SAFETY PRESERVE SYSTEM $2,500,000 GRUNDY 2 2016 FORD 3 2017-2021 NHS N RESURFACING Truck Pct 11.4 County NHS Y RESURFACING Truck Pct 8.4 Est. Cost NHS Y ILL 47 DITCH 1.6 MI N OF ILL 9 (W) Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $350,000 ILL 50 WILL CO LINE TO N OF 6TH ST IN MANTENO Miles = 3.02 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $1,900,000 KANKAKEE 4 2017-2021 SAFETY PRESERVE SYSTEM $2,300,000 KANKAKEE 2 2017-2021 Needs Category BACKLOG ILL 50 ILL 50 A Miles 3.02 Roughness(IRI) ACCEPTABLE Rutting 0.21 AADT 7,384 S OF BROOKMONT BLVD TO US 45/52 & INDIANA AVE TO FAIR ST IN KANKAKEE Miles = 4.07 System Maintenance Truck Pct 10.7 NHS N RESURFACING Needs Category BACKLOG Miles 2.76 Roughness(IRI) NOT ACCEPTABLE Rutting 0.15 AADT 7,549 Truck Pct 6.7 NHS Y BACKLOG 1.31 NOT ACCEPTABLE 0.17 3,795 4.9 Y 3-8 FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street ILL 54 Location Improvements BIG FOUR DITCH 7.7 MI N OF ILL 9 Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 54 DITCH 7.1 MI N OF ILL 9 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 54 DRAINAGE DITCH 2.3 MI N OF ILL 9 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 64 Needs Category BACKLOG ILL 71 ILL 23 (N) IN SYCAMORE TO KANE CO LINE Miles = 4.48 System Maintenance Miles 4.48 Roughness(IRI) ACCEPTABLE Rutting 0.13 AADT 6,957 W OF ILL 47 TO E OF ILL 126 Miles = 1.57 Congestion Mitigation SAFETY PRESERVE SYSTEM RESURFACING Truck Pct 10.5 Miles 1.57 Roughness(IRI) ACCEPTABLE Rutting 0.20 AADT 8,963 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT RECONSTRUCTION ADDITIONAL LANES CULVERT REPLACEMENT Truck Pct 8.2 $1,200,000 AADT 1,350 $500,000 AADT 1,350 $1,200,000 AADT 1,600 $1,400,000 County FORD Truck Pct 19 8 Str Number 0270077 FORD Truck Pct 19 2016 NHS N 3 Str Number 0270021 FORD Truck Pct 14 Past Current 2016 NHS N 8 Str Number 0270070 2016 NHS N DEKALB 1 2017-2021 KENDALL 6 2017-2021 NHS Y ILLINOIS JOBS NOW! PROJECT Needs Category ACCRUING Est. Cost NHS Y 3-9 $14,500,000 FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street ILL 71 Location W OF ILL 47 TO E OF ILL 126 Congestion Mitigation Improvements Objectives UTILITY ADJUSTMENT Est. Cost County Past Current $50,000 KENDALL 6 2017-2021 $1,500,000 KENDALL 6 2017-2021 ILLINOIS JOBS NOW! PROJECT ILL 71 W OF ILL 47 TO E OF ILL 126 Congestion Mitigation CONSTRUCTION ENGINEERING ILLINOIS JOBS NOW! PROJECT ILL 72 TRIB S BRANCH KISHWAUKEE RIVER W OF THURLBY RD IN KINGSTON Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 DEKALB 8 2017-2021 ILL 89 BRUSH CREEK 1.2 MI S OF ARLINGTON Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,200,000 BUREAU 9 2017-2021 Structure Status STRUCTURAL BACKLOG ILL 89 ILLINOIS RIVER BRIDGE AT SPRING VALLEY Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM AADT 1,750 $28,000,000 Truck Pct 10 Str Number 0060106 BUREAU PUTNAM NHS N 5 2016 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG ILL 89 ILLINOIS RIVER BRIDGE AT SPRING VALLEY Bridge Maintenance CONSTRUCTION ENGINEERING ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. 3 - 10 AADT 4,750 $1,500,000 Truck Pct 4 BUREAU PUTNAM Str Number 0780006 NHS N 5 2016 FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street ILL 102 Location ROCK CREEK 6.5 MI NW OF BOURBONNAIS Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 115 GAR CREEK 2 MI SW OF KANKAKEE Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 115 REDDICK CREEK 1.7 MI N OF CABERY Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 115 REDDICK CREEK 0.9 MI N OF CABERY Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG Est. Cost $4,300,000 AADT 4,400 $1,200,000 AADT 3,000 $600,000 AADT 450 $500,000 AADT 450 County KANKAKEE Truck Pct 11 11 Str Number 0460065 KANKAKEE Truck Pct 13 Str Number 0460107 Truck Pct 17 2017-2021 NHS N 4 Str Number 0460067 KANKAKEE 2016 NHS N 5 KANKAKEE Truck Pct 17 Past Current 2016 NHS N 3 Str Number 0460066 2016 NHS N ILL 115 STREAM 4.1 MI S OF US 24 Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 FORD 4 2016 ILL 116 STREAM 1.7 MI W OF I-55 Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $300,000 LIVINGSTON 2 2017-2021 3 - 11 FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current ILL 116 STREAM 3.1 MI W OF ILL 47 Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $300,000 LIVINGSTON 4 2016 ILL 116 DRAINAGE DITCH 2.2 MI W OF I-57 Bridge Maintenance CULVERT (NEW) SAFETY $600,000 IROQUOIS 5 2016 ILL 126 E OF ILL 71 TO WILL CO LINE Miles = 8.74 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $3,300,000 KENDALL 1 2017-2021 SAFETY PRESERVE SYSTEM $752,000 LASALLE 1 2017-2021 SAFETY PRESERVE SYSTEM $3,000,000 LASALLE 2 2017-2021 Needs Category ACCRUING ILL 170 Needs Category BACKLOG ILL 170 Miles 8.74 Roughness(IRI) ACCEPTABLE Rutting 0.20 AADT 6,785 US 6 TO S OF SOUTH ST IN SENECA Miles = 1.19 System Maintenance Miles 1.19 Roughness(IRI) NOT ACCEPTABLE Rutting 0.19 Truck Pct 9.3 RESURFACING AADT 6,000 OVER BNSF RR AT RANSOM Bridge Maintenance NHS N Truck Pct 9.4 NHS N BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 170 OVER BNSF RR AT RANSOM Bridge Maintenance RR FLAGGER MISCELLANEOUS SAFETY ILL 178 ILLINOIS RIVER S OF UTICA Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM AADT 1,200 Truck Pct 20 Str Number 0500073 NHS N $600,000 LASALLE 1 2017-2021 $25,000,000 LASALLE 4 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG 3 - 12 AADT 3,550 Truck Pct 12 Str Number 0500088 NHS N FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street ILL 178 Location Improvements ILLINOIS RIVER S OF UTICA Bridge Maintenance Objectives LAND ACQUISITION Est. Cost County Past Current $100,000 LASALLE 7 2016 $50,000 LASALLE 7 2016 $1,500,000 LASALLE 4 2017-2021 $512,000 LASALLE 1 2017-2021 $2,019,000 DISTRICT-WIDE 1 2016 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 178 ILLINOIS RIVER S OF UTICA Bridge Maintenance UTILITY ADJUSTMENT ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 178 ILLINOIS RIVER S OF UTICA Bridge Maintenance CONSTRUCTION ENGINEERING ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. STARVED ROCK RD Needs Category ACCRUING ILL 178 TO OLD S ENTRANCE Miles = 1.43 System Maintenance Miles 1.43 Roughness(IRI) NOT ACCEPTABLE Rutting 0.13 AADT 997 SAFETY PRESERVE SYSTEM RESURFACING Truck Pct 0.0 NHS N VARIOUS CHANGE ORDER RESERVE System Maintenance CHANGE ORDERS VARIOUS ADA IMPROVEMENTS System Maintenance PEDESTRIAN RAMPS/ADA SAFETY TRANSPORTATION OPS $250,000 DISTRICT-WIDE 1 2016 VARIOUS BRIDGE DECK SEALING Bridge Maintenance BRIDGE DECK SEALING PRESERVE SYSTEM $493,000 DISTRICT-WIDE 1 2016 VARIOUS LOCAL ROADS CONSULTANT System Maintenance P.E. PROJECT MANAGERS $200,000 DISTRICT-WIDE 1 2016 3 - 13 FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street Location Improvements Objectives VARIOUS LOCAL ROADS CONSULTANT P.E. PROJECT MANAGERS VARIOUS ON-CALL ENGINEERING VARIOUS Est. Cost County Past Current $400,000 DISTRICT-WIDE 1 2017-2021 CONSTRUCTION ENGINEERING $2,500,000 DISTRICT-WIDE 5 2016 ON-CALL ENGINEERING CONSTRUCTION ENGINEERING $1,500,000 DISTRICT-WIDE 4 2017-2021 VARIOUS SUBSURFACE UTILITY ENGINEERING System Maintenance P.E. SUBSURFACE UTILITIES $500,000 DISTRICT-WIDE 5 2016 VARIOUS DISTRICT MISCELLANEOUS System Maintenance MISCELLANEOUS PROJECTS $500,000 DISTRICT-WIDE 5 2016 VARIOUS PRE-LAND ACQUISITION ACTIVITY System Maintenance PRE-ACQUISITION ACTIVITY $100,000 DISTRICT-WIDE 5 2016 VARIOUS POST-LAND ACQUISITION ACTIVITY System Maintenance POST-ACQUISITION ACTIVITY $40,000 DISTRICT-WIDE 5 2016 VARIOUS MISCELLANEOUS LAND ACQUISITION System Maintenance LAND ACQUISITION $100,000 DISTRICT-WIDE 1 2016 VARIOUS RAILROAD FLAGGER System Maintenance RR FLAGGER SAFETY $50,000 DISTRICT-WIDE 1 2016 VARIOUS MISCELLANEOUS RR CROSSING IMPROVEMENTS System Maintenance RR CROSSING IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY $200,000 DISTRICT-WIDE 1 2016 3 - 14 FY 2016-2021 Highway Improvement Program District 3 State Highways MYP Years Route/Street Location Improvements VARIOUS MISCELLANEOUS UTILITY RELOCATIONS UTILITY ADJUSTMENT System Maintenance VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS System Maintenance SAFETY IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS Objectives 3 - 15 Est. Cost County Past Current $150,000 DISTRICT-WIDE 1 2016 SAFETY $4,188,000 DISTRICT-WIDE 6 2016 SAFETY $20,940,000 DISTRICT-WIDE 5 2017-2021 DISTRICT FY 2016-2019 Highway Improvement Program District 3 Local Highways MYP Years Route/Street ILL 113 Location Improvements Objectives 0.2 MI E OF WILL RD TO 0.6 MI E OF WILL RD Miles = 0.43 WIDENING & RESURFACING 0.2 MI E OF WILL RD TO 0.6 MI E OF WILL RD CONSTRUCTION ENGINEERING 4-H RD OTTAWA CL TO ADAMS ST Miles = 0.45 RECONSTRUCTION 1200 N RD BRANCH POND CREEK 2 MI S OF WYANET BRIDGE REPLACEMENT BRANCH POND CREEK 2 MI S OF WYANET CONSTRUCTION ENGINEERING CH 24 1225 E RD FOX CREEK 3 MI NW OF MILO BRIDGE REPLACEMENT 1225 E RD FOX CREEK 3 MI NW OF MILO 1300 N RD SAFETY PRESERVE SYSTEM Est. Cost County Past Current $1,136,000 WILL GRUNDY 1 2016 $87,000 WILL GRUNDY 1 2016 SAFETY PRESERVE SYSTEM $1,350,000 LASALLE 3 2017-2021 SAFETY PRESERVE SYSTEM $300,000 BUREAU 3 2017-2021 $12,000 BUREAU 3 2017-2021 $300,000 BUREAU 3 2017-2021 CONSTRUCTION ENGINEERING $12,000 BUREAU 3 2017-2021 E BUREAU CREEK 3.5 MI W OF DEPUE P.E. (PHASE I) $48,000 BUREAU 1 2017-2021 1400 E RD MUD CREEK 3.5 MI NE OF CORNELL BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $300,000 LIVINGSTON 1 2017-2021 1400 N RD SUGAR CREEK BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM $1,476,000 IROQUOIS 1 2017-2021 DIVISION ST ILL 113 DIVISION ST CH 24 1200 N RD SAFETY PRESERVE SYSTEM 3 - 16 FY 2016-2019 Highway Improvement Program District 3 Local Highways MYP Years Route/Street Location Improvements Objectives 1400 N RD SUGAR CREEK CONSTRUCTION ENGINEERING 1710 E RD WOLF CREEK 3 MI N OF PONTIAC BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM 1900 N RD FELKY SLOUGH 6.5 MI E OF PONTIAC BRIDGE REPLACEMENT 2000 W RD OTTO RD TO CH 37 Miles = 3.05 Est. Cost Past Current IROQUOIS 1 2017-2021 $350,000 LIVINGSTON 3 2016 SAFETY PRESERVE SYSTEM $300,000 LIVINGSTON 2 2017-2021 RESURFACING SAFETY PRESERVE SYSTEM $806,000 KANKAKEE 2 2017-2021 BRANCH W BUREAU CREEK 6 MI NW OF PRINCETON BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $300,000 BUREAU 4 2017-2021 BRANCH W BUREAU CREEK 6 MI NW OF PRINCETON CONSTRUCTION ENGINEERING $12,000 BUREAU 4 2017-2021 CH 12 2425 N RD IDA CREEK 1 MI SE OF CORNELL BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $300,000 LIVINGSTON 1 2017-2021 2500 N RD HENRY CO LINE TO NEW BEDFORD CL Miles = 7.15 RESURFACING SAFETY PRESERVE SYSTEM $1,400,000 BUREAU 3 2017-2021 2750 E RD BRANCH E BUREAU CREEK 6.5 MI N OF DEPUE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $300,000 BUREAU 5 2017-2021 BRANCH E BUREAU CREEK 6.5 MI N OF DEPUE CONSTRUCTION ENGINEERING $12,000 BUREAU 5 2017-2021 CH 58 2200 N RD CH 12 2200 N RD CH 19 2750 E RD CH 19 3 - 17 $65,000 County FY 2016-2019 Highway Improvement Program District 3 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current 2500 E RD / CH 37 TO 4000 E RD / CH 3 Miles = 1.46 RESURFACING SAFETY PRESERVE SYSTEM $264,000 KANKAKEE 2 2017-2021 CH 37 750 E RD SPRING CREEK 1.5 MI SE OF ONARGA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $700,000 IROQUOIS 1 2017-2021 950 N RD ROOKS CREEK 2 MI NE OF CHENOA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $400,000 LIVINGSTON 3 2016 ANCONA RD ILL 17 TO LONG POINT SPUR Miles = 3.77 RESURFACING SAFETY PRESERVE SYSTEM $900,000 LIVINGSTON 3 2016 US 34 TO CH 19 Miles = 3.31 RESURFACING SAFETY PRESERVE SYSTEM $370,000 BUREAU 1 2016 CH 33 ARCH ST ROCKY RUN CREEK IN TISKILWA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $210,000 BUREAU 1 2017-2021 ARCH ST ROCKY RUN CREEK IN TISKILWA CONSTRUCTION ENGINEERING $8,000 BUREAU 1 2017-2021 ARLINGTON RD US 34 TO ILL 89 Miles = 5.21 RESURFACING SAFETY PRESERVE SYSTEM $1,000,000 BUREAU 1 2016 CH 12 BACKBONE RD BUREAU CREEK 2 MI NW OF PRINCETON BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,400,000 BUREAU 2 2016 ILL 23 TO PEACE RD IN DEKALB Miles = 0.75 SAFETY PRESERVE SYSTEM $850,000 DEKALB 2 2017-2021 7000 S RD CH 16 ANGLING RD CH 9 BARBER GREENE RD CH 27 WIDENING & RESURFACING 3 - 18 FY 2016-2019 Highway Improvement Program District 3 Local Highways MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM Est. Cost BASE LINE RD COON CREEK 0.3 MI W OF KANE CO LINE BRIDGE REPLACEMENT BROOKMONT BLVD CONRAIL RR VIADUCT BETWEEN WASHINGTON AVE & SCHUYLER AVE P.E. (PHASE I) BRYCE RD WOODLAND RD TO MILFORD RD Miles = 5.90 RESURFACING SAFETY PRESERVE SYSTEM $1,825,000 CABERY RD FORD CO LINE TO ILL 115 Miles = 2.02 RESURFACING SAFETY PRESERVE SYSTEM $400,000 CAMPUS RD 2700 N RD TO 2100 N RD Miles = 6.01 RESURFACING SAFETY PRESERVE SYSTEM 2100 N RD TO 1700 N RD Miles = 4.02 RESURFACING ILL 17 TO CH 1 Miles = 5.04 County Past Current $450,000 DEKALB 1 2017-2021 $378,000 KANKAKEE 1 2016 IROQUOIS 4 2016 FORD KANKAKEE 6 2017-2021 $1,500,000 LIVINGSTON 3 2016 SAFETY PRESERVE SYSTEM $1,060,000 LIVINGSTON 1 2017-2021 RESURFACING SAFETY PRESERVE SYSTEM $1,375,000 LIVINGSTON 1 2017-2021 ILL 71 TO I-80 Miles = 3.49 WIDENING & RESURFACING SAFETY PRESERVE SYSTEM $3,150,000 LASALLE 4 2017-2021 WYANET-WALNUT RD TO TISKILWA SPUR / 1795 ST E Miles = 4.08 RESURFACING SAFETY PRESERVE SYSTEM $850,000 BUREAU 1 2017-2021 LOCK 11 RD CH 42 TRIB OF LITTLE MUD CREEK AT 900 N RD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $400,000 IROQUOIS 5 2016 CH 43 CH 3 CAMPUS RD CH 3 CAMPUS RD CH 3 CH 15 NATE FLEMING RD CH 24 1000 E RD 3 - 19 FY 2016-2019 Highway Improvement Program District 3 Local Highways MYP Years Route/Street CH 8 Location Improvements MAPLE CREEK 2 MI N OF WYANET BRIDGE REPLACEMENT MAPLE CREEK 2 MI N OF WYANET CORNELIA ST Objectives SAFETY PRESERVE SYSTEM Est. Cost County Past Current $415,000 BUREAU 5 2017-2021 CONSTRUCTION ENGINEERING $11,000 BUREAU 5 2017-2021 US 6 TO E ST PAUL ST P.E. (PHASE I) $14,000 BUREAU 1 2016 CORNELIA ST US 6 TO E ST PAUL ST Miles = 0.21 RESURFACING $250,000 BUREAU 1 2017-2021 CORNELIA ST US 6 TO E ST PAUL ST CONSTRUCTION ENGINEERING $14,000 BUREAU 1 2017-2021 E 1251ST RD VERMILION RIVER 1.2 MI N OF 18TH RD BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM $1,860,000 LASALLE 2 2017-2021 E 1830 N RD OLD RT 66 TO DIVISION ST Miles = 0.78 WIDENING & RESURFACING SAFETY PRESERVE SYSTEM $625,000 LIVINGSTON 4 2016 E 19TH RD COVEL CREEK 1.5 MI E OF GRAND RIDGE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $360,000 LASALLE 2 2016 E 22ND RD CH 6 TO ILL 18 Miles = 8.05 RESURFACING SAFETY PRESERVE SYSTEM $4,900,000 LASALLE 1 2017-2021 CH 15 E 2750TH RD MISSION CREEK 2.5 MI SE OF SHERIDAN BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $375,000 LASALLE 1 2017-2021 WYANET-WALNUT RD CH 8 WYANET-WALNUT RD SAFETY PRESERVE SYSTEM CH 57 3 - 20 FY 2016-2019 Highway Improvement Program District 3 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current E MAIN ST ILL 251 TO MERIDEN ST Miles = 0.61 WIDENING & RESURFACING SAFETY PRESERVE SYSTEM $952,000 LASALLE 3 2017-2021 ED HAND HWY VERMILION RIVER AT OGLESBY CL BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $4,000,000 LASALLE 5 2016 CH 23 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. ELLIOTT RD UNNAMED STREAM NE OF GIBSON CITY BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $330,000 FORD 1 2016 EPPERSON RD EPPERSON RUN AT W EDGE OF PRINCETON BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $400,000 BUREAU 1 2017-2021 EPPERSON RD EPPERSON RUN AT W EDGE OF PRINCETON CONSTRUCTION ENGINEERING $12,000 BUREAU 1 2017-2021 FIRST AVE FIRST CREEK AT 9TH ST BRIDGE REPLACEMENT $1,449,000 LASALLE 5 2017-2021 LASALLE 4 2017-2021 $1,600,000 KENDALL 1 2016 $916,000 GRUNDY 1 2017-2021 CH 4 SAFETY PRESERVE SYSTEM ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. FIRST AVE FIRST CREEK AT 9TH ST CONSTRUCTION ENGINEERING $129,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. FOX RD FOX RIVER DR TO POPLAR DR SAFETY IMPROVEMENTS SAFETY NETTLE CREEK BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM CH 1 GOULD PARK DR 3 - 21 FY 2016-2019 Highway Improvement Program District 3 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost HOBBIE AVE ILL 50 TO ILL 17 P.E. (PHASE I) JEFFERSON ST ROCKY RUN CREEK IN TISKILWA BRIDGE REPLACEMENT JEFFERSON ST ROCKY RUN CREEK IN TISKILWA CONSTRUCTION ENGINEERING KEMPTON RD 1200 E RD / CO LINE RD TO ILL 115 Miles = 1.98 RESURFACING SAFETY PRESERVE SYSTEM $400,000 SANDY FORD BRIDGE AT VERMILION RIVER BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $3,440,000 CH 9 LEONORE BLKTP SAFETY PRESERVE SYSTEM County Past Current $480,000 KANKAKEE 1 2017-2021 $180,000 BUREAU 1 2017-2021 $8,000 BUREAU 1 2017-2021 FORD 1 2017-2021 LASALLE 2 2017-2021 $200,000 LASALLE 1 2017-2021 FORD 1 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. LEONORE BLKTP SANDY FORD BRIDGE AT VERMILION RIVER CONSTRUCTION ENGINEERING LODA LAKE RD ILL 54 TO CH 4 / ELLIOTT RD Miles = 2.28 RESURFACING SAFETY PRESERVE SYSTEM $460,000 N 800 E RD TO ILL 49 Miles = 4.05 RESURFACING SAFETY PRESERVE SYSTEM $1,800,000 IROQUOIS 3 2017-2021 WALNUT DITCH AT SW EDGE OF WALNUT BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,058,000 BUREAU 3 2017-2021 CH 2 LODA RD CH 10 MAIN ST ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. 3 - 22 FY 2016-2019 Highway Improvement Program District 3 Local Highways MYP Years Route/Street MAIN ST Location WALNUT DITCH AT SW EDGE OF WALNUT Improvements Objectives Est. Cost CONSTRUCTION ENGINEERING $94,000 County Past Current BUREAU 3 2017-2021 $1,185,000 KENDALL 1 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. SAFETY PRESERVE SYSTEM MAIN ST BIG ROCK CREEK BRIDGE REPLACEMENT MAIN ST BIG ROCK CREEK CONSTRUCTION ENGINEERING $80,000 KENDALL 1 2017-2021 MARQUETTE ST CRI&P RR IN DEPUE BRIDGE REMOVAL/DEMOLITION $250,000 BUREAU 2 2017-2021 MCNEAL RD S BRANCH KISHWAUKEE RIVER E OF COUNTY LINE RD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $3,000,000 DEKALB 2 2017-2021 MELMS RD COON CREEK 0.3 MI W OF NEW LEBANON RD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $750,000 DEKALB 2 2016 N 17TH RD WOLF CREEK BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,343,000 LASALLE 1 2017-2021 WOLF CREEK CONSTRUCTION ENGINEERING $110,000 LASALLE 1 2017-2021 SPRING CREEK 2.5 MI W OF TROY GROVE BRIDGE REPLACEMENT $440,000 LASALLE 2 2016 CH 5 N 17TH RD CH 5 N 37TH RD SAFETY PRESERVE SYSTEM 3 - 23 FY 2016-2019 Highway Improvement Program District 3 Local Highways MYP Years Route/Street N 42ND RD Location SOMONAUK CREEK 0.5 MI N OF SHERIDAN Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Est. Cost $1,510,000 County Past Current LASALLE 3 2017-2021 LASALLE 3 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. N 42ND RD SOMONAUK CREEK 0.5 MI N OF SHERIDAN CONSTRUCTION ENGINEERING $104,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. N 47TH RD INDIAN CREEK 3 MI NW OF EARLVILLE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $350,000 LASALLE 1 2017-2021 N EUCLID AVE ELM PL TO CENTRAL AVE IN PRINCETON RECONSTRUCTION Miles = 0.63 SAFETY PRESERVE SYSTEM $1,900,000 BUREAU 3 2017-2021 N EUCLID AVE ELM PL TO CENTRAL AVE IN PRINCETON CONSTRUCTION ENGINEERING $182,000 BUREAU 3 2017-2021 NORTH ST C&EI RR TO 4TH ST IN WATSEKA P.E. (PHASE I) $102,000 IROQUOIS 2 2017-2021 NORTH ST C&EI RR TO 4TH ST IN WATSEKA Miles = 0.28 RECONSTRUCTION $850,000 IROQUOIS 2 2017-2021 NORTH ST C&EI RR TO 4TH ST IN WATSEKA CONSTRUCTION ENGINEERING $54,000 IROQUOIS 2 2017-2021 PEACE RD MACOM DR TO I-88 Miles = 0.71 WIDENING & RESURFACING DEKALB 1 2017-2021 SAFETY PRESERVE SYSTEM 3 - 24 SAFETY PRESERVE SYSTEM $1,400,000 FY 2016-2019 Highway Improvement Program District 3 Local Highways MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM PEARL ST S BRANCH KISHWAUKEE RIVER BRIDGE REHABILITATION PEARL ST S BRANCH KISHWAUKEE RIVER CONSTRUCTION ENGINEERING PLANK RD LINDGREN RD TO ILL 23 Miles = 0.73 RESURFACING W MONDAMIN ST TO MCEVILLY RD IN MINOOKA Miles = 0.50 Est. Cost County Past Current $1,575,000 DEKALB 1 2017-2021 $180,000 DEKALB 1 2017-2021 SAFETY PRESERVE SYSTEM $310,000 DEKALB 1 2016 WIDENING & RESURFACING SAFETY PRESERVE SYSTEM $6,000,000 GRUNDY 4 2017-2021 PERRY RD TO ILL 30 Miles = 6.03 RESURFACING SAFETY PRESERVE SYSTEM $1,000,000 DEKALB 2 2016 MALTA SCL TO PERRY RD Miles = 6.28 RESURFACING SAFETY PRESERVE SYSTEM $1,250,000 DEKALB 1 2017-2021 CH 6 ST GEORGE RD I-57 2.2 MI N OF ILL 50 BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $420,000 KANKAKEE 5 2017-2021 ST GEORGE RD I-57 2.2 MI N OF ILL 50 CONSTRUCTION ENGINEERING $50,000 KANKAKEE 5 2017-2021 SUYDAM RD ROLLO RD TO ILL 23 Miles = 7.71 RESURFACING SAFETY PRESERVE SYSTEM $1,500,000 DEKALB 1 2017-2021 SYCAMORE ST ILL 72 TO HILL ST IN GENOA Miles = 0.26 RESURFACING SAFETY PRESERVE SYSTEM $159,000 DEKALB 4 2017-2021 CH 15 RIDGE RD CH V37 SHABBONA RD CH 6 SHABBONA RD 3 - 25 FY 2016-2019 Highway Improvement Program District 3 Local Highways MYP Years Route/Street Location Improvements Objectives SYCAMORE ST ILL 72 TO HILL ST IN GENOA CONSTRUCTION ENGINEERING TERRA COTTA RD N OF I-80 OVERPASS TO US 6 Miles = 1.23 WIDENING & RESURFACING SAFETY PRESERVE SYSTEM VARIOUS VARIOUS LOCATIONS IN DEKALB TRAF SIGNAL REPLACEMENT SAFETY PRESERVE SYSTEM W ACCESS RDS AT NIU CAMPUS Miles = 1.00 PAVING PRESERVE SYSTEM TRANSPORTATION OPS TR 160 KISHWAUKEE RIVER BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM TR 160 KISHWAUKEE RIVER CONSTRUCTION ENGINEERING E 15TH RD Est. Cost $16,000 County Past Current DEKALB 4 2017-2021 $2,850,000 LASALLE 2 2017-2021 $1,200,000 DEKALB 3 2017-2021 $293,000 DEKALB 4 2017-2021 $1,100,000 DEKALB 1 2017-2021 $44,000 DEKALB 1 2017-2021 CH 42 3 - 26 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE KANE DEKALB D2 COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK PEORIA D4 Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT ADAMS D5 MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 3 District 4 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 3, DISTRICT 4, PEORIA Overview Highway District 4 encompasses 12 counties in west central Illinois and includes the cities of Peoria, Canton, Chillicothe, Galesburg, Macomb, Monmouth and Pekin, plus many smaller communities which serve as satellites for the larger employment areas or as focal points of this farming area. The state highway system in District 4 consists of 1,629 miles of highways and 689 bridges, supporting 9.1 million vehicle miles of travel daily. State Program The program for state and local highways will average $1.398 billion annually for the FY 2016-2021 period. Approximately $482 million will be provided during FY 2016-2021 for improvements to state highways in District 4. The following table summarizes anticipated accomplishments on the state highway system in District 4 during this time frame. FY 2016-2021 Accomplishments System Maintenance Interstate (miles) Non-Interstate (miles) Safety Locations (number) Bridge Maintenance Interstate (number) Non-Interstate (number) New Bridges (number) Minor Structure Repair (number) Congestion Mitigation Roads (miles) Traffic Improvements (miles) System Expansion Roads (miles) Locations (number) 4-i 27 59 1 10 32 0 2 1 2 0 0 Major Highway projects of interest that are tentatively scheduled during the FY 2016-2021 time frame include:  Interstate 74 at the Burlington Northern Railroad and Lincoln Street in Galesburg. A bridge replacement and railroad flagger are programmed in FY 2016 at a cost of $6.4 million.  Interstate 74 at County Highway 9 Interchange north of Knoxville in Knox County. A bridge replacement and bridge approach roadway are programmed in FY 2016 at a cost of $7 million.  Interstate 74 from Spoon River to east of Illinois 78 in Knox and Peoria Counties. Resurfacing on 9 miles and construction engineering are programmed during FY 2017-2021 at a cost of $13.6 million.  Interstate 74 at Pinecrest Drive in East Peoria. A bridge deck replacement, ramp repair, bridge superstructure, construction engineering, engineering and engineering for contract plans are programmed during FY 2017-2021 at a cost of $7.3 million.  Interstate 74 from Tazewell County line to McLean County line in Woodford County. Rubblization with an overlay on 9.2 miles and construction engineering are programmed during FY 2017-2021 at a cost of $38.6 million.  Interstate 474/US 24 at the Illinois River in Peoria County. Bridge painting and construction engineering are programmed during FY 2017-2021 at a cost of $15.6 million. This project has been approved for Illinois Major Bridge Program funding.  Interstate 474/US 24 from Illinois River to Interstate 74 near Morton in Tazewell County. Resurfacing on 5.9 miles is programmed in FY 2016 at a cost of $8 million.  th US 34/US 67/Illinois 110/Illinois 164 from Junction of US 34 (south) to 11 Street in Monmouth. Resurfacing and patching on 3.9 miles are programmed during FY 2017-2021 at a cost of $4.5 million.  US 67/Illinois 135 from Illinois 135/Alexis Road to US 34 in Monmouth. Resurfacing and new shoulders on 4.6 miles, from Alexis Road to 270th Avenue, widening and resurfacing and new shoulders on 6.9 miles from 270th Avenue to US 34, land acquisition and engineering for contract plans are programmed during FY 2016-2021 at a cost of $16.2 million. Of this total, engineering for contract plans is programmed in FY 2016 at a cost of $200,000.  US 150 (War Memorial Drive) eastbound over the Illinois River. A bridge replacement, engineering for contract plans, land acquisition, utility adjustments, construction engineering and railroad flagger are programmed during FY 2016-2021 at a cost of $196.6 million. Of this total, engineering for contract plans is programmed in FY 2016 at a cost of $8.5 million. This project has been approved for Illinois Major Bridge Program funding.  Illinois 8/Illinois 116 (Cedar Street) over the Illinois River and Tazewell and Peoria Railroad Incorporated in Peoria and East Peoria. Bridge rehabilitation, construction engineering and railroad flagger are programmed during FY 2016-2021 at a cost of $11.0 million. Of this total, bridge rehabilitation and construction engineering are programmed in FY 2016 at a cost of $10.5 million. This project has been approved for Illinois Major Bridge Program funding.  Illinois 8/Illinois 116 (Cedar Street Extension) over Peoria & Pekin Union Railway in East Peoria. A bridge replacement, interchange reconstruction, railroad flagger, land acquisition, engineering for location, environmental and design studies, engineering for contract plans, construction engineering, utility adjustments and hazardous material mitigation are programmed during FY 2016-2021 at a cost of $32.2 million. Of this total, engineering for location, environmental 4-ii and design studies is programmed in FY 2016 at a cost of $1.5 million. This project has been approved for Illinois Major Bridge Program funding.  Illinois 17 over the Edwards River 4.6 miles west of Joy. A bridge replacement, scour mitigation and construction engineering are programmed during FY 2016-2021 at a cost of $7.3 million. Of this total, construction engineering is programmed in FY 2016 at a cost of $540,000. This project has been approved for Illinois Major Bridge Program funding.  Illinois 29 under the Burlington Northern Santa Fe Railroad north of Chillicothe. Land acquisition and a bridge replacement are programmed during FY 2017-2021 at a cost of $11.7 million.  Illinois 116 (Harmon Highway) over the Chicago and North Western Railroad/Kickapoo Creek 0.1 mile east of Airport Road in Peoria County. A bridge replacement, land acquisition, engineering for contract plans, construction engineering and railroad flagger are programmed during FY 2016-2021 at a cost of $13.5 million. Of this total, engineering for contract plans is programmed in FY 2016 at a cost of $500,000. This project has been approved for Illinois Major Bridge Program funding.  Illinois 167 from 0.1 mile west of West Street in Victoria to Illinois 180 in Knox County. Resurfacing on 3.3 miles, culvert replacement, land acquisition, utility adjustments and construction engineering are programmed during FY 2016-2021 at a cost of $5.3 million. Of this total, land acquisition is programmed in FY 2016 at a cost of $186,000.  Farmington Road over Kickapoo Creek and at Kickapoo Creek Road west of Peoria. A bridge replacement, bridge approach roadway, horizontal realignment for 0.5 mile, intersection reconstruction and land acquisition are programmed during FY 2016-2021 at a cost of $13.9 million. Of this total, land acquisition is programmed in FY 2016 at a cost of $300,000. Provides for efficient freight movement. 4-iii FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street I 74 ILL 29 I 74 ILL 110 Location Improvements Objectives 74 SAFETY PRESERVE SYSTEM $1,500,000 PEORIA TAZEWELL 2 2017-2021 POPE CREEK 1 MI S OF HENRY CO LINE Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $2,700,000 KNOX 11 2017-2021 BN RR & LINCOLN ST IN GALESBURG Bridge Maintenance BRIDGE REPLACEMENT 6,550 SAFETY PRESERVE SYSTEM $6,200,000 I 74 BN RR & LINCOLN ST IN GALESBURG Bridge Maintenance RR FLAGGER SAFETY I 74 N OF US 34 TO 0.4 MI N OF MAIN ST IN GALESBURG Miles = 2.57 System Maintenance RESURFACING COLD MILLING I 74 Miles 2.57 Roughness(IRI) ACCEPTABLE Rutting 0.20 AADT 15,886 AT CH 9 INTCHG N OF KNOXVILLE Bridge Maintenance Truck Pct 27.1 AADT 6,550 STRUCTURAL BACKLOG STRUCTURAL BACKLOG Needs Category BACKLOG Past Current BRIDGE REPAIR BRIDGE JOINT REPAIR Structure Status STRUCTURAL BACKLOG ILL 110 County ILLINOIS RIVER (MURRAY BAKER BRIDGE) System Maintenance Structure Status STRUCTURAL BACKLOG I Est. Cost AADT 8,200 Truck Pct 35 Str Number 0480001 NHS Y 35 0480002 Y KNOX 12 2016 Truck Pct 25 Str Number 0480005 NHS Y 25 0480006 Y 8,200 $200,000 KNOX 1 2016 SAFETY PRESERVE SYSTEM $5,000,000 KNOX 8 2017-2021 SAFETY PRESERVE SYSTEM $7,000,000 KNOX 14 2016 NHS Y BRIDGE REPLACEMENT BRIDGE APPROACH ROADWAY Structure Status STRUCTURAL BACKLOG STRUCTURAL BACKLOG 4-1 AADT 4,650 4,650 Truck Pct 13 Str Number 0480044 NHS N 13 0480045 N FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street I 74 Location Improvements SPOON RIVER TO E OF ILL 78 Miles = 8.95 System Maintenance Needs Category BACKLOG Miles 6.46 Roughness(IRI) GOOD BACKLOG 2.49 GOOD Objectives SAFETY PRESERVE SYSTEM RESURFACING Rutting 0.27 AADT 13,800 Truck Pct 29.7 NHS Y 0.24 13,800 29.7 Y I 74 SPOON RIVER TO E OF ILL 78 System Maintenance CONSTRUCTION ENGINEERING I 74 BELL SCHOOL RD 3 MI E OF KNOX CO LINE Bridge Maintenance BRIDGE NEW DECK BRIDGE REPAIR SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG I 74 MAHER RD NEAR BRIMFIELD Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE NEW DECK BRIDGE REPAIR Structure Status STRUCTURAL BACKLOG I 74 I 474 I 74 ILL 29 Est. Cost County Past Current $13,000,000 KNOX PEORIA 10 2017-2021 $600,000 KNOX PEORIA 7 2017-2021 $2,000,000 PEORIA 2 2017-2021 AADT 2,050 $2,000,000 AADT 2,250 Truck Pct 10 Str Number 0720073 PEORIA Truck Pct 7 NHS N 1 Str Number 0720076 2017-2021 NHS N ILLINOIS RIVER TO I-74 NEAR MORTON System Maintenance RAMP REPAIR SAFETY PRESERVE SYSTEM $4,000,000 TAZEWELL 1 2016 PINECREST DR IN EAST PEORIA Bridge Maintenance BRIDGE NEW DECK RAMP REPAIR BRIDGE SUPERSTRUCTURE SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $6,700,000 TAZEWELL 4 2017-2021 Structure Status STRUCTURAL BACKLOG 4-2 AADT 4,850 Truck Pct 7 Str Number 0900091 NHS N FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current I 74 PINECREST DR IN EAST PEORIA Bridge Maintenance CONSTRUCTION ENGINEERING $250,000 TAZEWELL 3 2017-2021 I 74 PINECREST DR IN EAST PEORIA Bridge Maintenance P.E. (PHASE II) P.E. (CONSULTANT PLANS) $350,000 TAZEWELL 3 2017-2021 I 74 MULLER RD TO E OF I-155 IN MORTON System Maintenance CONSTRUCTION ENGINEERING $1,050,000 TAZEWELL 1 2016 $37,000,000 WOODFORD 3 2017-2021 $1,600,000 WOODFORD 2 2017-2021 $2,750,000 PEORIA 6 2017-2021 I 155 I 74 Needs Category BACKLOG I 74 I 474 SAFETY PRESERVE SYSTEM TAZEWELL CO LINE TO MCLEAN CO LINE RUBBLIZATION/OVERLAY Miles = 9.24 System Maintenance Miles 9.24 Roughness(IRI) GOOD Rutting 0.11 AADT 24,471 Truck Pct 20.2 NHS Y TAZEWELL CO LINE TO MCLEAN CO LINE CONSTRUCTION ENGINEERING System Maintenance UNDER AIRPORT RD Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE NEW DECK BRIDGE REPAIR Structure Status STRUCTURAL BACKLOG I 474 ILLINOIS RIVER PRESERVE SYSTEM BRIDGE PAINTING AADT 12,200 $14,306,000 Truck Pct 4 Str Number 0720126 NHS Y PEORIA 5 2017-2021 PEORIA TAZEWELL 5 2017-2021 System Maintenance US 24 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 474 US 24 ILLINOIS RIVER CONSTRUCTION ENGINEERING System Maintenance ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. 4-3 $1,244,000 FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street I 474 US 24 Needs Category BACKLOG US 24 ILL 100 US 24 ILL 100 US 24 ILL 100 US 24 ILL 9 Location ILLINOIS RIVER TO I-74 NEAR MORTON Miles = 5.90 System Maintenance Miles 5.90 AADT 17,516 Truck Pct 19.5 LAND ACQUISITION AT ILL 100 (MAIN ST) IN LEWISTOWN Congestion Mitigation UTILITY ADJUSTMENT ILL 9 TO S OF TUSCARORA RD & N OF CILCO LN TO PFIEFFER RD Miles = 3.48 System Maintenance RESURFACING BACKLOG Roughness(IRI) GOOD Rutting 0.16 AADT 15,598 Truck Pct 7.7 NHS Y 2.35 ACCEPTABLE 0.14 16,354 11.5 Y 0.27 NOT ACCEPTABLE 0.19 13,400 6.5 Y CENTER ST TO RUESCHE ST Miles = 1.27 System Maintenance Miles 1.27 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 23,871 RESURFACING Truck Pct 7.0 Est. Cost County Past Current SAFETY PRESERVE SYSTEM $8,000,000 TAZEWELL 9 2016 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $1,360,000 FULTON 3 2016 $200,000 FULTON 1 2016 $50,000 FULTON 1 2016 SAFETY PRESERVE SYSTEM $3,750,000 PEORIA 1 2017-2021 SAFETY PRESERVE SYSTEM $1,000,000 TAZEWELL 1 2016 NHS Y AT ILL 100 (MAIN ST) IN LEWISTOWN Congestion Mitigation BACKLOG Needs Category BACKLOG Rutting 0.18 RESURFACING INTERSECTION RECONSTN Miles 0.86 ILL 29 Roughness(IRI) GOOD Objectives AT ILL 100 (MAIN ST) IN LEWISTOWN Congestion Mitigation Needs Category BACKLOG US 24 Improvements NHS Y 4-4 FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street US 24 ILL 9 Location Improvements BANNER TO KINGSTON MINES Miles = 7.90 System Maintenance RESURFACING Needs Category BACKLOG Miles 5.49 Roughness(IRI) ACCEPTABLE Rutting 0.13 AADT 9,124 Truck Pct 11.2 NHS Y BACKLOG 2.41 ACCEPTABLE 0.12 8,548 10.7 Y US 34 US 67 Objectives JCT US 34 (S) TO 11TH ST IN MONMOUTH RESURFACING Miles = 3.89 System Maintenance PATCHING Est. Cost County Past Current SAFETY PRESERVE SYSTEM $2,300,000 PEORIA FULTON 1 2017-2021 SAFETY PRESERVE SYSTEM $4,500,000 WARREN 1 2017-2021 SAFETY PRESERVE SYSTEM $400,000 HENDERSON 1 2017-2021 SAFETY PRESERVE SYSTEM $6,000,000 WARREN 3 2017-2021 SAFETY PRESERVE SYSTEM $1,170,000 MERCER 8 2017-2021 ILL 110 ILL 164 Needs Category BACKLOG Miles 2.89 Roughness(IRI) ACCEPTABLE Rutting 0.26 AADT 8,293 Truck Pct 18.1 NHS Y BACKLOG 1.00 ACCEPTABLE 0.24 11,917 12.1 Y US 34 MISSISSIPPI RIVER AT GULFPORT / BURLINGTON Bridge Maintenance BRIDGE REPAIR BRIDGE DECK SEALING PIER REPAIR IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. US 34 ILL 110 Needs Category ACCRUING US 67 0.3 MI W OF CAMERON RD TO KNOX CO LINE Miles = 4.52 System Maintenance Miles 4.52 Roughness(IRI) ACCEPTABLE Rutting 0.16 AADT 9,471 POPE CREEK 3 MI S OF VIOLA Bridge Maintenance RESURFACING Truck Pct 14.2 NHS Y BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG US 67 POPE CREEK 3 MI S OF VIOLA Bridge Maintenance LAND ACQUISITION AADT 2,750 $55,000 4-5 Truck Pct 17 MERCER Str Number 0660003 NHS Y 7 2017-2021 FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street Location Improvements US 67 POPE CREEK 3 MI S OF VIOLA Bridge Maintenance UTILITY ADJUSTMENT US 67 HENDERSON CREEK 6.7 MI S OF VIOLA Bridge Maintenance BRIDGE REPLACEMENT Objectives SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG Est. Cost County Past Current $55,000 MERCER 7 2017-2021 $2,300,000 MERCER 9 2017-2021 AADT 2,600 Truck Pct 13 Str Number 0660004 NHS Y US 67 HENDERSON CREEK 6.7 MI S OF VIOLA Bridge Maintenance LAND ACQUISITION $125,000 MERCER 9 2017-2021 US 67 HENDERSON CREEK 6.7 MI S OF VIOLA Bridge Maintenance UTILITY ADJUSTMENT $120,000 MERCER 8 2017-2021 US 67 ILL 135 / ALEXIS RD TO 270TH AVE / CH 3 Miles = 4.59 System Maintenance RESURFACING NEW SHOULDERS $6,800,000 WARREN MERCER 4 2017-2021 ILL 135 Needs Category BACKLOG US 67 ILL 135 US 67 ILL 135 US 67 Needs Category BACKLOG Miles 4.59 Roughness(IRI) ACCEPTABLE Rutting 0.19 AADT 2,587 Truck Pct 14.1 SAFETY PRESERVE SYSTEM NHS Y ILL 135 / ALEXIS RD TO 270TH AVE / CH 3 System Maintenance LAND ACQUISITION $300,000 WARREN MERCER 6 2017-2021 ILL 135 / ALEXIS RD TO US 34 AT MONMOUTH System Maintenance P.E. (PHASE II) $200,000 WARREN MERCER 1 2016 270TH AVE / CH 3 TO US 34 IN MONMOUTH Miles = 6.90 System Maintenance WIDENING & RESURFACING NEW SHOULDERS $8,600,000 WARREN MERCER 1 2017-2021 Miles 6.90 Roughness(IRI) ACCEPTABLE Rutting 0.19 AADT 3,320 Truck Pct 12.6 NHS Y 4-6 SAFETY PRESERVE SYSTEM FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street US 67 US 150 Location Improvements 270TH AVE / CH 3 TO US 34 W OF N MAIN ST IN MONMOUTH System Maintenance LAND ACQUISITION Needs Category BACKLOG HENDERSON ST TO CEDAR ST & RESURFACING SUMNER ST TO E OF 5TH ST IN GALESBURG Miles = 2.52 System Maintenance Miles Roughness(IRI) Rutting AADT Truck Pct NHS NOT ACCEPTABLE 0.57 1.59 5,594 6.7 N BACKLOG 0.59 NOT ACCEPTABLE 0.14 9,424 4.4 N BACKLOG 0.34 NOT ACCEPTABLE 0.43 8,721 5.2 N MAIN ST GRAND AVE US 150 BN RR 0.2 MI E OF GALESBURG Bridge Maintenance Objectives $300,000 BRIDGE REPLACEMENT BN RR 0.2 MI E OF GALESBURG Bridge Maintenance RR FLAGGER US 150 BN RR 0.2 MI E OF GALESBURG Bridge Maintenance UTILITY ADJUSTMENT US 150 BN RR 0.2 MI E OF GALESBURG Bridge Maintenance LAND ACQUISITION US 150 ILLINOIS RIVER BRIDGE REPLACEMENT WAR MEMORIAL DR Past Current WARREN MERCER 1 2017-2021 $1,800,000 KNOX 9 2017-2021 SAFETY PRESERVE SYSTEM $5,500,000 KNOX 9 2017-2021 SAFETY SAFETY PRESERVE SYSTEM Bridge Maintenance County SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG US 150 Est. Cost AADT 4,450 Truck Pct 8 Str Number 0480013 NHS N $150,000 KNOX 9 2017-2021 $55,000 KNOX 8 2017-2021 $100,000 KNOX 1 2016 PEORIA TAZEWELL 3 2017-2021 $170,000,000 (EASTBOUND) ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG 4-7 AADT 20,700 Truck Pct 2 Str Number 0900070 NHS Y FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street US 150 Location Improvements ILLINOIS RIVER Objectives CONSTRUCTION ENGINEERING Est. Cost Past Current $17,000,000 PEORIA TAZEWELL 3 2017-2021 $100,000 PEORIA TAZEWELL 3 2017-2021 $500,000 PEORIA TAZEWELL 3 2017-2021 $8,500,000 PEORIA TAZEWELL 3 2016 $500,000 PEORIA TAZEWELL 3 2017-2021 $3,000,000 TAZEWELL 5 2017-2021 $105,000 TAZEWELL 5 2017-2021 Bridge Maintenance WAR MEMORIAL DR County (EASTBOUND) ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. US 150 ILLINOIS RIVER UTILITY ADJUSTMENT Bridge Maintenance WAR MEMORIAL DR (EASTBOUND) ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. US 150 ILLINOIS RIVER LAND ACQUISITION Bridge Maintenance WAR MEMORIAL DR (EASTBOUND) ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. US 150 ILLINOIS RIVER P.E. (CONSULTANT PLANS) Bridge Maintenance WAR MEMORIAL DR (EASTBOUND) ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. US 150 WAR MEMORIAL DR ILLINOIS RIVER SAFETY RR FLAGGER Bridge Maintenance (EASTBOUND) ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. US 150 AT JACKSON ST & MAIN ST IN MORTON Congestion Mitigation INTERSECTION RECONSTN US 150 AT JACKSON ST & MAIN ST IN MORTON Congestion Mitigation UTILITY ADJUSTMENT 4-8 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street ILL 6 (SOUTHBOUND) Needs Category BACKLOG ILL 8 Location Improvements N OF MOSSVILLE RD TO 0.7 MI N OF HOERR'S POND Miles = 5.53 System Maintenance Miles 5.53 Roughness(IRI) ACCEPTABLE Rutting 0.14 AADT 19,936 HICKORY CREEK 0.7 MI E OF ILL 97 Bridge Maintenance Objectives RESURFACING PATCHING SHOULDER REPAIR Truck Pct 8.9 Est. Cost SAFETY PRESERVE SYSTEM $5,000,000 SAFETY PRESERVE SYSTEM $935,000 County Past Current PEORIA 3 2017-2021 KNOX 8 2017-2021 NHS Y BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG AADT 950 Truck Pct 10 Str Number 0480017 NHS N ILL 8 HICKORY CREEK 0.7 MI E OF ILL 97 Bridge Maintenance LAND ACQUISITION $95,000 KNOX 8 2017-2021 ILL 8 HICKORY CREEK 0.7 MI E OF ILL 97 Bridge Maintenance UTILITY ADJUSTMENT $95,000 KNOX 8 2017-2021 ILL 8 OVER BN RR AT EDWARDS Bridge Maintenance BRIDGE REPLACEMENT PEORIA 8 2017-2021 SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG ILL 8 OVER BN RR AT EDWARDS Bridge Maintenance CONSTRUCTION ENGINEERING ILL 8 OVER BN RR AT EDWARDS Bridge Maintenance RR FLAGGER ILL 8 OVER BN RR AT EDWARDS Bridge Maintenance LAND ACQUISITION SAFETY 4-9 $7,000,000 AADT 2,400 Truck Pct 4 Str Number 0720049 NHS N $310,000 PEORIA 8 2017-2021 $200,000 PEORIA 1 2017-2021 $300,000 PEORIA 1 2016 FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street ILL 8 Location DRY RUN CREEK E OF STERLING AVE IN WEST PEORIA Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 8 ILL 116 ILLINOIS RIVER & TZPR RR INC. Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REHABILITATION Est. Cost $2,620,000 AADT 11,200 $10,000,000 County PEORIA Truck Pct 3 Past Current 8 Str Number 0720056 TAZEWELL PEORIA 2017-2021 NHS N 6 2016 CEDAR ST ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG ILL 8 ILL 116 ILLINOIS RIVER & TZPR RR INC. Bridge Maintenance CONSTRUCTION ENGINEERING AADT 12,400 Truck Pct 4 Str Number 0900030 NHS Y $500,000 TAZEWELL PEORIA 6 2016 $500,000 TAZEWELL PEORIA 6 2017-2021 $26,000,000 TAZEWELL 1 2017-2021 CEDAR ST ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 8 ILL 116 ILLINOIS RIVER & TZPR RR INC. Bridge Maintenance RR FLAGGER SAFETY CEDAR ST ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 8 ILL 116 OVER P&PU RR IN EAST PEORIA Bridge Maintenance BRIDGE REPLACEMENT INTERCHANGE RECONSTRUCTN CEDAR ST EXT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY FREIGHT MOVEMENT TRANSPORTATION OPS ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG AADT 13,600 Truck Pct 6 Str Number 0900034 NHS Y STRUCTURAL BACKLOG 13,600 6 0900035 Y 4 - 10 FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street ILL 8 ILL 116 Location OVER P&PU RR & ILL 29 IN EAST PEORIA Bridge Maintenance Improvements Objectives SAFETY RR FLAGGER Est. Cost County Past Current $200,000 TAZEWELL 1 2017-2021 $500,000 TAZEWELL 1 2017-2021 $1,500,000 TAZEWELL 1 2017-2021 $1,500,000 TAZEWELL 1 2016 $1,800,000 TAZEWELL 1 2017-2021 $500,000 TAZEWELL 1 2017-2021 $200,000 TAZEWELL 1 2017-2021 CEDAR ST EXT ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 8 ILL 116 OVER P&PU RR & ILL 29 IN EAST PEORIA Bridge Maintenance LAND ACQUISITION CEDAR ST EXT ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 8 ILL 116 OVER P&PU RR & ILL 29 IN EAST PEORIA Bridge Maintenance P.E. (PHASE II) CEDAR ST EXT ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 8 ILL 116 OVER P&PU RR & ILL 29 IN EAST PEORIA Bridge Maintenance P.E. (PHASE I) CEDAR ST EXT ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 8 ILL 116 OVER P&PU RR & ILL 29 IN EAST PEORIA Bridge Maintenance CONSTRUCTION ENGINEERING CEDAR ST EXT ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 8 ILL 116 OVER P&PU RR & ILL 29 IN EAST PEORIA Bridge Maintenance UTILITY ADJUSTMENT CEDAR ST EXT ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 8 ILL 116 OVER P&PU RR & ILL 29 IN EAST PEORIA Bridge Maintenance HAZ MATERIAL MITIGATION CEDAR ST EXT ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. 4 - 11 SAFETY SUSTAINABILITY FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street Location Improvements ILL 9 STREAM AT TR 250 2 MI W OF US 67 Bridge Maintenance CULVERT REPLACEMENT ILL 9 STREAM AT TR 250 2 MI W OF US 67 Bridge Maintenance ILL 9 ILL 9 Objectives SAFETY PRESERVE SYSTEM Needs Category ADEQUATE ILL 17 Needs Category BACKLOG ILL 17 County Past Current $370,000 MCDONOUGH 7 2017-2021 UTILITY ADJUSTMENT $13,000 MCDONOUGH 7 2017-2021 STREAM AT TR 250 2 MI W OF US 67 Bridge Maintenance LAND ACQUISITION $25,000 MCDONOUGH 7 2017-2021 N FORK LAMOINE RIVER 2 MI W OF BUSHNELL Bridge Maintenance BRIDGE REPLACEMENT $2,000,000 MCDONOUGH 14 2017-2021 SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG ILL 9 Est. Cost WCL OF TREMONT TO W OF I-155 RAMPS BI-DIRECT LEFT TURN LANE Miles = 1.08 Congestion Mitigation RESURFACING Miles 1.08 Roughness(IRI) GOOD Rutting 0.11 AADT 5,984 W OF 19TH AVE TO 220TH ST E OF ALEDO Miles = 3.35 System Maintenance Miles 3.35 Roughness(IRI) ACCEPTABLE Rutting 0.10 Truck Pct 9.0 EDWARDS RIVER 4.6 MI W OF JOY Bridge Maintenance Truck Pct 8.1 Truck Pct 10 Str Number 0550015 NHS N SAFETY MODAL CONNECTIVITY PRESERVE SYSTEM $2,400,000 TAZEWELL 6 2017-2021 SAFETY PRESERVE SYSTEM $1,400,000 MERCER 1 2016 SAFETY PRESERVE SYSTEM $6,755,000 MERCER 10 2017-2021 NHS N RESURFACING PATCHING AADT 4,035 AADT 2,300 NHS N BRIDGE REPLACEMENT SCOUR MITIGATION ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG 4 - 12 AADT 1,950 Truck Pct 7 Str Number 0660006 NHS N FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street ILL 17 Location EDWARDS RIVER 4.6 MI W OF JOY Bridge Maintenance Improvements Objectives CONSTRUCTION ENGINEERING Est. Cost $540,000 County Past Current MERCER 8 2016 STARK 7 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 17 INDIAN CREEK 0.3 MI W OF TOULON Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG $1,575,000 AADT 1,400 Truck Pct 9 Str Number 0880001 NHS N ILL 17 INDIAN CREEK 0.3 MI W OF TOULON Bridge Maintenance UTILITY ADJUSTMENT $50,000 STARK 7 2017-2021 ILL 17 INDIAN CREEK 0.3 MI W OF TOULON Bridge Maintenance LAND ACQUISITION $55,000 STARK 7 2017-2021 ILL 17 SPOON RIVER 0.6 MI W OF WYOMING Bridge Maintenance BRIDGE REPLACEMENT $3,900,000 STARK 9 2017-2021 ILL 91 SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG ILL 17 ILL 91 ILL 17 ILL 91 ILL 29 AADT 1,700 Truck Pct 5 Str Number 0880002 NHS N SPOON RIVER 0.6 MI W OF WYOMING Bridge Maintenance LAND ACQUISITION $100,000 STARK 1 2017-2021 SPOON RIVER 0.6 MI W OF WYOMING Bridge Maintenance UTILITY ADJUSTMENT $100,000 STARK 1 2017-2021 ROOSEVELT RD TO 0.2 MI N OF LORENZ ST System Maintenance STORM SEWER REPAIR DRAINAGE EROSION CONTROL $800,000 PEORIA 1 2017-2021 PRESERVE SYSTEM SAFETY SUSTAINABILITY 4 - 13 FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street ILL 29 Location Improvements SENACHWINE CREEK OVERFLOW 1.3 MI N OF PUTNAM Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REHABILITATION Structure Status STRUCTURAL BACKLOG ILL 29 UNDER BNSF RR N OF CHILLICOTHE System Expansion LAND ACQUISITION ILL 29 UNDER BNSF RR N OF CHILLICOTHE System Expansion BRIDGE REPLACEMENT ILL 29 DICKISON RUN CREEK 0.3 MI N OF ILL 6 Bridge Maintenance BRIDGE REPLACEMENT BNSF RR S OF EDELSTEIN Bridge Maintenance $11,575,000 PEORIA 3 2017-2021 SAFETY PRESERVE SYSTEM $1,700,000 PEORIA 6 2017-2021 RR FLAGGER SAFETY ILL 41 S OF MONMOUTH BLVD IN GALESBURG TO S OF W HUNTER ST IN ABINGDON Miles = 8.43 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM Rutting 0.21 AADT 6,096 Truck Pct 5.2 NHS N 4 - 14 NHS Y SAFETY PRESERVE SYSTEM BNSF RR S OF EDELSTEIN Bridge Maintenance Roughness(IRI) ACCEPTABLE Str Number 0780004 2017-2021 2017-2021 ILL 40 Miles 8.43 Truck Pct 13 10 3 Structure Status STRUCTURAL BACKLOG Needs Category BACKLOG AADT 2,900 PUTNAM Past Current PEORIA SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT $200,000 County $170,000 Structure Status STRUCTURAL BACKLOG ILL 40 Est. Cost AADT 11,650 $1,410,000 AADT 3,200 $25,000 $2,975,000 Truck Pct 5 Str Number 0720015 PEORIA Truck Pct 9 NHS Y 10 Str Number 0720028 2017-2021 NHS N PEORIA 8 2017-2021 KNOX 5 2017-2021 FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street ILL 78 Location INDIAN CREEK 0.4 MI S OF US 34 Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 78 WALNUT CREEK TRIB 0.8 MI N OF WEST JERSEY Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING ILL 78 KICKAPOO CREEK 1 MI S OF ILL 8 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG Est. Cost $2,100,000 AADT 3,000 $605,000 AADT 2,350 $1,215,000 AADT 1,750 County HENRY Truck Pct 8 10 Str Number 0370072 STARK Truck Pct 12 2017-2021 NHS N 7 Str Number 0880012 KNOX Truck Pct 6 Past Current 2017-2021 NHS N 8 Str Number 0480018 2017-2021 NHS N ILL 78 KICKAPOO CREEK 1 MI S OF ILL 8 Bridge Maintenance LAND ACQUISITION $115,000 KNOX 7 2017-2021 ILL 78 KICKAPOO CREEK 1 MI S OF ILL 8 Bridge Maintenance UTILITY ADJUSTMENT $115,000 KNOX 7 2017-2021 ILL 89 STREAM 2 MI S OF ILL 18 Bridge Maintenance CULVERT REPLACEMENT $800,000 MARSHALL 1 2017-2021 ILL 89 STREAM 2 MI S OF ILL 18 Bridge Maintenance LAND ACQUISITION $10,000 MARSHALL 1 2016 ILL 89 STREAM 2 MI S OF ILL 18 Bridge Maintenance UTILITY ADJUSTMENT $10,000 MARSHALL 1 2017-2021 SAFETY PRESERVE SYSTEM 4 - 15 FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street Location Improvements Objectives ILL 89 BNSF RR & CROW CREEK 4.8 MI S OF ILL CONSTRUCTION ENGINEERING 17 Bridge Maintenance ILL 90 PRINCE CREEK 0.3 MI E OF PRINCEVILLE BRIDGE REPLACEMENT Bridge Maintenance ILL 91 SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG ILL 90 ILL 91 ILL 95 PRINCE CREEK 0.3 MI E OF PRINCEVILLE UTILITY ADJUSTMENT Bridge Maintenance OVER BNSF RR E OF ILL 41 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT HAW CREEK TRIB 6.5 MI N OF MAQUON Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 97 LITTLE HAW CREEK 4 MI N OF MAQUON Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 98 STREAM 0.4 MI E OF PARKWAY DR Bridge Maintenance SAFETY PRESERVE SYSTEM CULVERT REPLACEMENT 4 - 16 County Past Current $200,000 MARSHALL 1 2016 $970,000 PEORIA 10 2017-2021 AADT 3,450 $25,000 Structure Status STRUCTURAL BACKLOG ILL 97 Est. Cost $2,680,000 AADT 1,700 $1,200,000 AADT 2,250 $1,420,000 AADT 1,800 $800,000 Truck Pct 9 Str Number 0720020 NHS N PEORIA 8 2017-2021 MCDONOUGH 9 2016 Truck Pct 7 Str Number 0550017 KNOX Truck Pct 7 9 Str Number 0480014 KNOX Truck Pct 9 TAZEWELL NHS N 2016 NHS N 9 Str Number 0480015 2016 NHS N 1 2017-2021 FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current ILL 98 STREAM 0.4 MI E OF PARKWAY DR Bridge Maintenance LAND ACQUISITION $10,000 TAZEWELL 1 2017-2021 ILL 98 STREAM 0.4 MI E OF PARKWAY DR Bridge Maintenance UTILITY ADJUSTMENT $10,000 TAZEWELL 1 2017-2021 ILL 98 CREEK 0.1 MI E OF COLE HOLLOW RD Bridge Maintenance CULVERT REPLACEMENT $1,900,000 TAZEWELL 1 2017-2021 ILL 98 CREEK 0.1 MI E OF COLE HOLLOW RD Bridge Maintenance LAND ACQUISITION $10,000 TAZEWELL 1 2017-2021 ILL 98 CREEK 0.1 MI E OF COLE HOLLOW RD Bridge Maintenance UTILITY ADJUSTMENT $10,000 TAZEWELL 1 2017-2021 ILL 116 JCT ILL 117 (N) TO JCT I-39 Miles = 5.27 System Maintenance RESURFACING $2,000,000 WOODFORD 1 2016 $400,000 HENDERSON WARREN 3 2016 PEORIA 2 2017-2021 Needs Category BACKLOG Miles 5.27 Roughness(IRI) ACCEPTABLE Rutting 0.14 AADT 1,664 Truck Pct 17.9 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM NHS N ILL 116 E OF MEDIA TO 0.9 MI W OF US 67 System Maintenance CONSTRUCTION ENGINEERING ILL 116 OVER C&NW RR / KICKAPOO CREEK 0.1 MI E OF AIRPORT RD Bridge Maintenance BRIDGE REPLACEMENT HARMON HWY SAFETY PRESERVE SYSTEM $11,800,000 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG 4 - 17 AADT 10,800 Truck Pct 7 Str Number 0720037 NHS Y FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street ILL 116 HARMON HWY Location OVER C&NW RR / KICKAPOO CREEK 0.1 MI E OF AIRPORT RD Bridge Maintenance Improvements Objectives LAND ACQUISITION Est. Cost County Past Current $200,000 PEORIA 2 2017-2021 $500,000 PEORIA 2 2016 $900,000 PEORIA 2 2017-2021 SAFETY $100,000 PEORIA 2 2017-2021 SAFETY PRESERVE SYSTEM $695,000 WOODFORD 8 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 116 HARMON HWY OVER C&NW RR / KICKAPOO CREEK 0.1 MI E OF AIRPORT RD Bridge Maintenance P.E. (PHASE II) P.E. (CONSULTANT TSL) ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 116 HARMON HWY OVER C&NW RR / KICKAPOO CREEK 0.1 MI E OF AIRPORT RD Bridge Maintenance CONSTRUCTION ENGINEERING ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 116 HARMON HWY OVER C&NW RR / KICKAPOO CREEK 0.1 MI E OF AIRPORT RD Bridge Maintenance RR FLAGGER ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 116 ILL 117 W BRANCH PANTHER CREEK IN ROANOKE Bridge Maintenance BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 116 ILL 117 ILL 116 ILL 117 ILL 117 AADT 2,650 Truck Pct 22 Str Number 1020042 NHS N W BRANCH PANTHER CREEK IN ROANOKE Bridge Maintenance UTILITY ADJUSTMENT $20,000 WOODFORD 8 2017-2021 W BRANCH PANTHER CREEK IN ROANOKE Bridge Maintenance LAND ACQUISITION $10,000 WOODFORD 8 2017-2021 CR 700 N NEAR EUREKA TO N OF RAYMOND ST IN GOODFIELD System Maintenance NEW SHOULDERS MILLED RUMBLE STRIP $1,010,000 WOODFORD 1 2017-2021 SAFETY 4 - 18 FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street ILL 164 Location Improvements CEDAR CREEK 1.5 MI E OF US 34 Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT BRIDGE NEW DECK Structure Status STRUCTURAL BACKLOG ILL 167 Needs Category BACKLOG 0.1 MI W OF WEST ST IN VICTORIA TO ILL RESURFACING 180 CULVERT REPLACEMENT Miles = 3.30 System Maintenance Miles 3.30 Roughness(IRI) GOOD Rutting 0.00 AADT 828 Truck Pct 7.1 SAFETY PRESERVE SYSTEM Est. Cost $1,850,000 AADT 1,350 County WARREN Truck Pct 3 Past Current 6 Str Number 0940009 2016 NHS N $4,430,000 KNOX 8 2017-2021 NHS N ILL 167 0.1 MI W OF WEST ST IN VICTORIA TO ILL LAND ACQUISITION 180 System Maintenance $186,000 KNOX 7 2016 ILL 167 0.1 MI W OF WEST ST IN VICTORIA TO ILL CONSTRUCTION ENGINEERING 180 System Maintenance $355,000 KNOX 3 2017-2021 ILL 167 0.1 MI W OF WEST ST IN VICTORIA TO ILL UTILITY ADJUSTMENT 180 System Maintenance $280,000 KNOX 3 2017-2021 ILL 336 US 136 (W) TO US 67 (N) System Expansion CONSTRUCTION ENGINEERING $1,500,000 MCDONOUGH 1 2016 US 136 (W) TO US 67 (N) System Expansion CONSTRUCTION ENGINEERING $700,000 MCDONOUGH 1 2017-2021 US 136 ILL 110 NW MACOMB BYP ILL 336 US 136 ILL 110 NW MACOMB BYP 4 - 19 FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street ILL 336 MACOMB TO Location Improvements W OF HANNA CITY TO I-474 System Expansion Objectives P.E. (PHASE II) P.E. (CONSULTANT PLANS) Est. Cost $300,000 County PEORIA Past Current 6 2016 PEORIA SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT. ILL 336 MACOMB TO W OF HANNA CITY TO I-474 System Expansion P.E. (PHASE II) P.E. (CONSULTANT PLANS) $800,000 PEORIA 1 2017-2021 PEORIA SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT. DICKSON MOUNDS RD DICKSON CREEK 0.9 MI W OF ILL 78 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG DICKSON MOUNDS RD DICKSON CREEK 0.9 MI W OF ILL 78 Bridge Maintenance LAND ACQUISITION EASTERN BYP ILL 6 TO I-74 P.E. SURVEYS (PHASE I) P.E. (PHASE I) System Expansion FARMINGTON RD AT KICKAPOO CREEK RD W OF PEORIA Miles = 0.50 Bridge Maintenance AT KICKAPOO CREEK RD W OF PEORIA Bridge Maintenance AADT 600 $20,000 $1,000,000 BRIDGE REPLACEMENT BRIDGE APPROACH ROADWAY HORIZONTAL REALIGNMENT INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT Structure Status STRUCTURAL BACKLOG FARMINGTON RD $480,000 LAND ACQUISITION $13,085,000 AADT 10,800 $300,000 4 - 20 FULTON Truck Pct 5 8 Str Number 0290049 2017-2021 NHS N FULTON 7 2017-2021 TAZEWELL WOODFORD 3 2017-2021 PEORIA 11 2017-2021 Truck Pct 3 PEORIA Str Number 0720063 NHS N 11 2016 FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost FARMINGTON RD AT KICKAPOO CREEK RD W OF PEORIA Bridge Maintenance LAND ACQUISITION GRANGE HALL RD ILL 91 TO S OF VAN WINKLE WAY System Maintenance JURISDICTIONAL TRANSFER VARIOUS CHANGE ORDER RESERVE System Maintenance CHANGE ORDERS VARIOUS VARIOUS LOCATIONS IN CITY OF PEORIA System Maintenance PATCHING SAFETY PRESERVE SYSTEM $1,150,000 VARIOUS BRIDGE DECK SEALING Bridge Maintenance BRIDGE DECK SEALING PRESERVE SYSTEM VARIOUS PRE-LAND ACQUISITION ACTIVITY System Maintenance VARIOUS County Past Current $500,000 PEORIA 6 2017-2021 $2,000,000 PEORIA 2 2016 DISTRICT-WIDE 1 2016 PEORIA 1 2016 $545,000 VARIOUS 1 2016 PRE-ACQUISITION ACTIVITY $140,000 DISTRICT-WIDE 5 2016 PRE-LAND ACQUISITION ACTIVITY PRE-ACQUISITION ACTIVITY $230,000 DISTRICT-WIDE 4 2017-2021 VARIOUS POST-LAND AQUISITION ACTIVITY System Maintenance POST-ACQUISITION ACTIVITY $70,000 DISTRICT-WIDE 5 2016 VARIOUS POST-LAND AQUISITION ACTIVITY POST-ACQUISITION ACTIVITY $250,000 DISTRICT-WIDE 4 2017-2021 VARIOUS MISCELLANEOUS LAND ACQUISITION System Maintenance LAND ACQUISITION $100,000 DISTRICT-WIDE 6 2016 ALLEN RD $400,000 4 - 21 FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION $300,000 DISTRICT-WIDE 4 2017-2021 VARIOUS ON-CALL CONSTRUCTION INSPECTION System Maintenance CONSTRUCTION ENGINEERING $500,000 DISTRICT-WIDE 3 2016 VARIOUS ON-CALL CONSTRUCTION ENGINEERING CONSTRUCTION ENGINEERING $1,500,000 DISTRICT-WIDE 6 2017-2021 VARIOUS ON-CALL ENGINEERING P.E. (PHASE I) P.E. (PHASE II) P.E. SOILS (PHASE I) $1,500,000 DISTRICT-WIDE 1 2016 VARIOUS ON-CALL ENGINEERING P.E. (PHASE I) P.E. (PHASE II) P.E. SOILS (PHASE I) $1,000,000 DISTRICT-WIDE 4 2017-2021 VARIOUS MISCELLANEOUS SURVEY ENGINEERING PRELIMINARY ENGINEERING P.E. SURVEYS (PHASE I) P.E. SURVEYS (PHASE II) P.E. SURVEYS (ROW) $2,050,000 DISTRICT-WIDE 3 2017-2021 VARIOUS LOCAL ROADS CONSULTANT System Maintenance P.E. PROJECT MANAGERS $700,000 DISTRICT-WIDE 5 2016 VARIOUS LOCAL ROADS CONSULTANT System Maintenance P.E. PROJECT MANAGERS $800,000 DISTRICT-WIDE 1 2017-2021 VARIOUS CONSULTANT MANAGERS MATERIALSGEOTECH System Maintenance P.E. PROJECT MANAGERS $250,000 DISTRICT-WIDE 3 2017-2021 4 - 22 FY 2016-2021 Highway Improvement Program District 4 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS CONSULTANT MANAGERS MATERIALS P.E. PROJECT MANAGERS $1,000,000 DISTRICT-WIDE 4 2016 VARIOUS CONSULTANT MANAGERS MATERIALS P.E. PROJECT MANAGERS $1,000,000 DISTRICT-WIDE 4 2017-2021 VARIOUS DISTRICT MISCELLANEOUS System Maintenance MISCELLANEOUS PROJECTS $300,000 DISTRICT-WIDE 4 2016 VARIOUS DISTRICT MISCELLANEOUS System Maintenance MISCELLANEOUS PROJECTS $358,000 DISTRICT-WIDE 3 2017-2021 VARIOUS ON CALL SOIL BORINGS System Maintenance P.E. SOILS (PHASE I) P.E. SOILS (PHASE II) $500,000 DISTRICT-WIDE 5 2017-2021 VARIOUS UTILITY ADJUSTMENTS System Maintenance UTILITY ADJUSTMENT $71,000 DISTRICT-WIDE 6 2016 VARIOUS UTILITY ADJUSTMENTS UTILITY ADJUSTMENT $175,000 DISTRICT-WIDE 4 2017-2021 VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS System Maintenance SAFETY IMPROVEMENTS SAFETY $2,754,000 DISTRICT-WIDE 6 2016 VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS SAFETY $13,770,000 DISTRICT-WIDE 5 2017-2021 4 - 23 DISTRICT FY 2016-2019 Highway Improvement Program District 4 Local Highways MYP Years Route/Street ILL 117 Location Improvements Objectives SAFETY PRESERVE SYSTEM US 24 TO REAGAN DR IN EUREKA Miles = 0.65 RESURFACING MAIN ST ILL 117 US 24 TO REAGAN DR IN EUREKA CONSTRUCTION ENGINEERING 1900 E RD S OF ILL 116 TO RARITAN RD Miles = 2.50 RESURFACING BRIMFIELD-JUBILEE JUBILEE CREEK 2.7 MI E OF BRIMFIELD BROADWAY RD Est. Cost County Past Current $290,000 WOODFORD 3 2016 $32,000 WOODFORD 3 2016 SAFETY PRESERVE SYSTEM $750,000 HENDERSON 14 2017-2021 BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,700,000 PEORIA 1 2017-2021 VETERANS RD TO SPRINGFIELD RD Miles = 2.50 WIDENING & RESURFACING SHOULDER REPAIR SAFETY PRESERVE SYSTEM $3,300,000 TAZEWELL 1 2017-2021 CABLE RD CAMP CREEK 3 MI S OF SHERRARD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $200,000 MERCER 10 2017-2021 CABLE RD CAMP CREEK 3 MI S OF SHERRARD CONSTRUCTION ENGINEERING $24,000 MERCER 5 2017-2021 CANDY LN E JACKSON ST TO GRANT ST Miles = 0.77 RECONSTRUCTION SAFETY PRESERVE SYSTEM $3,000,000 MCDONOUGH 4 2017-2021 CH 1 ILL 89 TO CH 2 Miles = 1.63 RECONSTRUCTION WIDENING & RESURFACING SAFETY PRESERVE SYSTEM $1,334,000 WOODFORD MARSHALL 1 2016 MAIN ST RD CH 11 TR 112A 4 - 24 FY 2016-2019 Highway Improvement Program District 4 Local Highways MYP Years Route/Street CH 1 Location Improvements Objectives ILL 89 TO CH 2 CONSTRUCTION ENGINEERING RECONSTRUCTION DUNCAN RD PEORIA CO LINE TO ILL 91 Miles = 3.49 SAFETY PRESERVE SYSTEM CH 4 WALNUT CREEK 0.5 MI W OF ALTONA BRIDGE REPLACEMENT CH 4 CH 15 TO ILL 17 Miles = 2.87 CH 8 CH 9 Est. Cost $40,000 County Past Current WOODFORD 1 2016 $450,000 STARK 1 2017-2021 SAFETY PRESERVE SYSTEM $200,000 KNOX 9 2016 RECONSTRUCTION SAFETY PRESERVE SYSTEM $3,000,000 KNOX 3 2017-2021 BRUSH CREEK 5 MI E OF ABINGDON BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $200,000 KNOX 4 2017-2021 130TH AVE TO 160TH AVE P.E. (PHASE I) P.E. (PHASE II) $24,000 MERCER 1 2017-2021 130TH AVE TO 160TH AVE CULVERT REPLACEMENT $600,000 MERCER 1 2017-2021 130TH AVE TO 160TH AVE CONSTRUCTION ENGINEERING $72,000 MERCER 1 2017-2021 CH 9 160TH AVE TO ROCK ISLAND CO LINE P.E. (PHASE I) P.E. (PHASE II) $20,000 MERCER 1 2017-2021 CH 9 160TH AVE TO ROCK ISLAND CO LINE CULVERT REPLACEMENT DRAINAGE $450,000 MERCER 1 2017-2021 CH 11 TR 112A CH 10 110TH ST CH 9 SAFETY PRESERVE SYSTEM 110TH ST CH 9 110TH ST SAFETY PRESERVE SYSTEM 4 - 25 FY 2016-2019 Highway Improvement Program District 4 Local Highways MYP Years Route/Street Location Improvements Objectives CH 9 160TH AVE TO ROCK ISLAND CO LINE CONSTRUCTION ENGINEERING CH R25 E BRANCH COPPERAS CREEK BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM DETROIT AVE JACKSON ST TO 0.3 MI S Miles = 0.30 PAVING DIRKSEN PKWY AIRPORT RD TO MIDDLE RD Miles = 0.73 GRANT ST Est. Cost Past Current MERCER 1 2017-2021 $1,700,000 PEORIA 2 2017-2021 PRESERVE SYSTEM TRANSPORTATION OPS $2,668,000 TAZEWELL 4 2016 RECONSTRUCTION LIGHTING SIDEWALKS SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $4,000,000 PEORIA 1 2017-2021 E OF CANDY LN TO US 67 Miles = 1.47 WIDENING & RESURFACING SAFETY PRESERVE SYSTEM $1,000,000 MCDONOUGH 12 2017-2021 JOY RD 130TH AVE TO JOY CL P.E. (PHASE II) $48,000 MERCER 1 2016 JOY RD EDWARDS RIVER N OF JOY P.E. (PHASE I) $64,000 MERCER 1 2016 JOY RD 130TH AVE TO JOY CL DRAINAGE SAFETY PRESERVE SYSTEM $700,000 MERCER 1 2016 JOY RD EDWARDS RIVER N OF JOY BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM $500,000 MERCER 1 2016 TRIVOLI RD $54,000 County CH 9 CH 9 4 - 26 FY 2016-2019 Highway Improvement Program District 4 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current JOY RD 130TH AVE TO JOY CL CONSTRUCTION ENGINEERING $32,000 MERCER 1 2016 JOY RD EDWARDS RIVER N OF JOY CONSTRUCTION ENGINEERING $56,000 MERCER 1 2016 CAMP CREEK N OF JOY P.E. (PHASE I) $72,000 MERCER 1 2017-2021 CAMP CREEK N OF JOY BRIDGE REHABILITATION $600,000 MERCER 1 2017-2021 CAMP CREEK N OF JOY CONSTRUCTION ENGINEERING $72,000 MERCER 1 2017-2021 BRANCH LAMARSH CREEK BRIDGE REPLACEMENT PEORIA 2 2017-2021 $272,000 PEORIA 1 2017-2021 $5,500,000 PEORIA 2 2017-2021 PEORIA 2 2017-2021 CH 9 JOY RD CH 9 JOY RD SAFETY PRESERVE SYSTEM CH 9 JOY RD CH 9 LANCASTER RD SAFETY PRESERVE SYSTEM $3,000,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. LANCASTER RD BRANCH LAMARSH CREEK CONSTRUCTION ENGINEERING MACARTHUR HWY ROMEO B. GARRETT AVE IN PEORIA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. MACARTHUR HWY ROMEO B. GARRETT AVE IN PEORIA CONSTRUCTION ENGINEERING $440,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. 4 - 27 FY 2016-2019 Highway Improvement Program District 4 Local Highways MYP Years Route/Street MANITO RD Location MACKINAW RIVER Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Est. Cost $7,570,000 County Past Current TAZEWELL 4 2017-2021 TAZEWELL 4 2017-2021 $63,000 WARREN 1 2016 $528,000 WARREN 1 2016 $42,000 WARREN 1 2016 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. MANITO RD MACKINAW RIVER CONSTRUCTION ENGINEERING $360,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. N 6TH ST 0.3 MI S OF 210TH AVE TO 0.1 MI N OF US P.E. (PHASE I) 34 P.E. (PHASE II) N 6TH ST 0.3 MI S OF 210TH AVE TO 0.1 MI N OF US PAVING 34 Miles = 0.35 N 6TH ST 0.3 MI S OF 210TH AVE TO 0.1 MI N OF US CONSTRUCTION ENGINEERING 34 N EDEN RD NIXON RUN BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $2,070,000 PEORIA 9 2016 N FARNHAM ST BNSF RR 0.3 MI N OF E MAIN ST BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM $1,100,000 KNOX 1 2017-2021 N VALLEY RD ILL 91 TO ILL 40 Miles = 6.51 RESURFACING SAFETY PRESERVE SYSTEM $1,700,000 STARK MARSHALL 9 2017-2021 N VALLEY RD CAMP CREEK 6 MI SE OF WYOMING BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $850,000 STARK 2 2016 PRESERVE SYSTEM TRANSPORTATION OPS 4 - 28 FY 2016-2019 Highway Improvement Program District 4 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current NORTHMOOR RD HAMILTON RD TO W EDGE OF UNIVERSITY AVE IN PEORIA Miles = 0.70 RECONSTRUCTION SAFETY PRESERVE SYSTEM $9,250,000 PEORIA 3 2017-2021 POWER PLANT RD ILLINOIS POWER ON RIVER TO ILL 26 Miles = 3.64 RESURFACING SAFETY PRESERVE SYSTEM $1,320,000 PUTNAM 8 2017-2021 S CASTLETON RD CASTLETON RD TO ILL 17 Miles = 2.86 RECONSTRUCTION SAFETY PRESERVE SYSTEM $280,000 STARK 3 2017-2021 SHERIDAN RD DRY RUN CREEK S OF RICHMOND AVE IN PEORIA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $2,000,000 PEORIA 5 2016 $1,750,000 PEORIA 1 2017-2021 $144,000 PEORIA 1 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. SAFETY PRESERVE SYSTEM SMITHVILLE RD BRANCH OF COPPERAS CREEK 0.6 MI W OF TRIVOLI RD BRIDGE REPLACEMENT SMITHVILLE RD BRANCH OF COPPERAS CREEK 0.6 MI W OF TRIVOLI RD CONSTRUCTION ENGINEERING TAX SCHOOL RD CH 16 TO ILL 89 P.E. (PHASE I) $80,000 MARSHALL 2 2017-2021 CH 16 TO ILL 89 LAND ACQUISITION $50,000 MARSHALL 2 2017-2021 CH 16 TO ILL 89 Miles = 3.54 RESURFACING $1,500,000 MARSHALL 2 2017-2021 CH 12 TAX SCHOOL RD CH 12 TAX SCHOOL RD CH 12 SAFETY PRESERVE SYSTEM 4 - 29 FY 2016-2019 Highway Improvement Program District 4 Local Highways MYP Years Route/Street TAX SCHOOL RD Location Improvements Objectives CH 16 TO ILL 89 CONSTRUCTION ENGINEERING TOWERLINE RD MACKINAW RIVER BRIDGE REHABILITATION TR 1A CAMP CREEK 0.5 MI E OF DALLAS CITY VARIOUS Est. Cost County Past Current $80,000 MARSHALL 2 2017-2021 SAFETY PRESERVE SYSTEM $1,300,000 TAZEWELL 3 2016 BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 HENDERSON MERCER 1 2017-2021 VARIOUS LOCATIONS IN STARK CO BIT SURFACE TREATMENT-A1 SAFETY PRESERVE SYSTEM $280,000 STARK 3 2016 VARIOUS VARIOUS LOCATIONS IN WARREN CO BIT SURFACE TREATMENT-A2 SAFETY PRESERVE SYSTEM $600,000 WARREN 1 2017-2021 VARIOUS VARIOUS LOCATIONS IN HENDERSON CO BIT SURFACE TREATMENT-A1 SAFETY PRESERVE SYSTEM $200,000 HENDERSON 1 2016 VARIOUS VARIOUS LOCATIONS IN MCDONOUGH CO BIT SURFACE TREATMENT-A1 SAFETY PRESERVE SYSTEM $489,000 MCDONOUGH 1 2016 VARIOUS VARIOUS LOCATIONS IN FULTON CO BIT SURFACE TREATMENT-A3 SAFETY PRESERVE SYSTEM $400,000 FULTON 1 2016 VARIOUS VARIOUS LOCATIONS IN FULTON CO CONSTRUCTION ENGINEERING $54,000 FULTON 1 2016 VARIOUS VARIOUS LOCATIONS IN FULTON CO BIT SURFACE TREATMENT-A1 $350,000 FULTON 1 2016 CH 12 4 - 30 SAFETY PRESERVE SYSTEM FY 2016-2019 Highway Improvement Program District 4 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS VARIOUS LOCATIONS IN FULTON CO BIT SURFACE TREATMENT-A1 SAFETY PRESERVE SYSTEM $350,000 FULTON 1 2017-2021 VARIOUS VARIOUS LOCATIONS IN FULTON CO BIT SURFACE TREATMENT-A1 SAFETY PRESERVE SYSTEM $350,000 FULTON 1 2017-2021 WESTERN AVE 2.5 MI W OF ILL 29 TO 3.5 MI W OF ILL 29 P.E. (PHASE I) P.E. (PHASE II) $410,000 MARSHALL STARK 1 2017-2021 2.5 MI W OF ILL 29 TO 3.5 MI W OF ILL 29 LAND ACQUISITION $240,000 MARSHALL STARK 1 2017-2021 2.5 MI W OF ILL 29 TO 3.5 MI W OF ILL 29 BRIDGE REPLACEMENT CURVE CORRECTIONS $6,417,000 MARSHALL STARK 1 2017-2021 2.5 MI W OF ILL 29 TO 3.5 MI W OF ILL 29 CONSTRUCTION ENGINEERING $642,000 MARSHALL STARK 1 2017-2021 CH 6 WESTERN AVE CH 6 WESTERN AVE CH 6 WESTERN AVE SAFETY PRESERVE SYSTEM CH 6 4 - 31 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE KANE DEKALB D2 COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK PEORIA D4 Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT ADAMS D5 MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 3 District 5 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 3, DISTRICT 5, PARIS Overview Highway District 5 encompasses 7 counties in eastern Illinois and includes the cities of Bloomington-Normal, Champaign-Urbana, Clinton, Danville and Tuscola, plus many smaller communities which serve as satellites for the larger employment areas or as focal points of this farming area. The state highway system in District 5 consists of 1,306 miles of highways and 675 bridges, supporting 9.3 million vehicle miles of travel daily. State Program The program for state and local highways will average $1.398 billion annually for the FY 2016-2021 period. Approximately $211 million will be provided during FY 2016-2021 for improvements to state highways in District 5. The following table summarizes anticipated accomplishments on the state highway system in District 5 during this time frame. FY 2016-2021 Accomplishments System Maintenance Interstate (miles) Non-Interstate (miles) Safety Locations (number) Bridge Maintenance Interstate (number) Non-Interstate (number) New Bridges (number) Minor Structure Repair (number) Congestion Mitigation Roads (miles) Traffic Improvements (number) System Expansion Roads (miles) Locations (number) 5-i 44 135 0 6 12 6 29 0 0 0 0 Major Highway projects of interest that are tentatively scheduled during the FY 2016-2021 time frame include:  Interstate 55 from south of Lexington to Livingston County line in McLean County. Resurfacing on 10.1 miles, ramp repairs and bridge repair are programmed during FY 2017-2021 at a cost of $17.2 million.  Interstate 57 from Sadorus Road to 1 mile south of Interstate 74 in Champaign. Resurfacing on 12.1 miles, ramp repairs and bridge deck repair are programmed in FY 2016 at a cost of $15.1 million.  Interstate 57 at Curtis Road southwest of Champaign. A pedestrian overpass is programmed during FY 2017-2021 at a cost of $1.3 million. This project is contingent upon local agencies constructing a bike path.  Interstate 57 under Mattis Avenue, Interstate 74 under Mattis Avenue and Interstate 57 under US 150 northwest of Champaign. Bridge replacements, land acquisition, utility adjustments and construction engineering are programmed during FY 2017-2021 at a cost of $28.6 million. This project has been approved for Illinois Major Bridge Program funding.  Interstate 57 under Bradley Avenue west of Champaign. A bridge replacement is programmed during FY 2017-2021 at a cost of $4.5 million.  Interstate 74 from University Avenue in Urbana to 2 miles east of the St. Joseph Interchange in Champaign. Resurfacing on 8.6 miles and bridge deck repair are programmed during FY 2017-2021 at a cost of $13.0 million.  Interstate 74 from US 150 west of Danville to Middle Fork Vermilion River in Danville. Reconstruction on 5.8 miles is programmed during FY 2017-2021 at a cost of $23.0 million.  Interstate 74 at Salt Fork Vermilion River west of Danville in Vermilion County. Bridge rehabilitation and construction engineering are programmed during FY 2017-2021 at a cost of $18 million. This project has been approved for Illinois Major Bridge Program funding.  US 45 from Saline Branch Ditch south of Thomasboro to University Avenue in Urbana. Resurfacing on 5.3 miles is programmed during FY 2017-2021 at a cost of $5.6 million.  US 45/Cunningham Avenue from north of Interstate 74 to University Avenue in Urbana. Resurfacing on 1.5 mile and pedestrian ramps/ADA are programmed during FY 2017-2021 at a cost of $1.7 million.  US 45 from the north corporate limits of Tolono to Interstate 57 at Pesotum. Resurfacing on 6.8 miles, pedestrian ramps/ADA and guardrails are programmed during FY 2016 at a cost of $1.8 million.  US 150/Illinois 1 from US 36 to 0.5 mile south of Gibson Road south of Paris. Resurfacing on 16.7 miles, cold milling, pedestrian ramps/ADA, guardrails and bridge deck overlays at Brouilletts Creek and South Fork Brouilletts Creek are programmed during FY 2016-2021 at a cost of $5.1 million. Of this total, resurfacing for 10.2 miles and guardrail from US 36 to Moss Road and bridge deck overlays at Brouilletts Creek and South Fork Brouilletts Creek are programmed in FY 2016 at a cost of $2.7 million.  Illinois 1 from Iroquois County line to 0.2 miles north of Rossville south corporate limits and Creek 2 miles south of Hoopeston and North Fork Vermillion River 1.4 miles north of Rossville. Resurfacing on 8.2 miles, cold milling, guardrails, pedestrian ramps/ADA and bridge deck overlay are programmed during FY 2017-2021 at a cost of $4.0 million. 5-ii  Illinois 9 from Arrowsmith Road to the Ford County line. Resurfacing and safety improvements on 10.5 miles are programmed during FY 2017-2021 at a cost of $6.1 million.  Illinois 130 over Embarras River in Villa Grove. A bridge replacement is programmed during FY 2017-2021 at a cost of $3.7 million.  Illinois 133 from US 45 in Arcola to Coles County line. Resurfacing on 13.5 miles, pedestrian ramps/ADA and culvert replacements 0.4 mile and 2.7 miles west of Illinois 130 are programmed during FY 2017-2021 at a cost of $4.2 million 5-iii FY 2016-2021 Highway Improvement Program District 5 State Highways MYP Years Route/Street I 55 Needs Category BACKLOG Location Improvements S OF LEXINGTON TO LIVINGSTON CO LINE Miles = 10.05 System Maintenance Miles 10.05 Roughness(IRI) GOOD Rutting 0.13 AADT 23,530 Objectives RESURFACING BRIDGE REPAIR Truck Pct 25.6 Est. Cost County Past Current SAFETY PRESERVE SYSTEM $16,000,000 MCLEAN 1 2017-2021 NHS Y I 55 S OF LEXINGTON TO LIVINGSTON CO LINE System Maintenance RAMP REPAIR SAFETY PRESERVE SYSTEM $1,200,000 MCLEAN 1 2017-2021 I 55 BUS COMMERCE PKWY TO CLEARWATER AVE Miles = 3.52 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $5,150,000 MCLEAN 1 2017-2021 $2,500,000 MCLEAN 5 2017-2021 Needs Category ACCRUING I 55 BUS VETERANS PKWY I 57 Needs Category ACCRUING I 57 I 72 I 57 Miles 3.52 Roughness(IRI) GOOD Rutting 0.21 AADT 37,047 Truck Pct 1.9 NHS Y AT ILL 9 IN BLOOMINGTON Congestion Mitigation P.E. (PHASE I) SADORUS RD TO 1 MI S OF I-74 IN CHAMPAIGN Miles = 12.11 System Maintenance RESURFACING BRIDGE DECK REPAIRS Miles 12.11 Roughness(IRI) GOOD Rutting 0.14 AADT 22,873 Truck Pct 28.9 SAFETY PRESERVE SYSTEM $13,575,000 CHAMPAIGN 2 2016 NHS Y SADORUS RD TO 1 MI S OF I-74 IN CHAMPAIGN System Maintenance RAMP REPAIR SAFETY PRESERVE SYSTEM $1,550,000 CHAMPAIGN 1 2016 AT CURTIS RD SW OF CHAMPAIGN Congestion Mitigation PEDESTRIAN OVERPASS SAFETY MODAL CONNECTIVITY $1,250,000 CHAMPAIGN 12 2017-2021 SCHEDULING CONTINGENT UPON LOCAL AGENCY CONSTRUCTING A BIKE PATH. 5-1 FY 2016-2021 Highway Improvement Program District 5 State Highways MYP Years Route/Street I 57 I 74 Location Improvements I-57 & I-74 UNDER MATTIS AVE & I-57 UNDER US 150 NW OF CHAMPAIGN Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Est. Cost $26,075,000 County CHAMPAIGN Past Current 1 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status ADEQUATE I 57 I 74 US 150 I-57 & I-74 UNDER MATTIS AVE & I-57 UNDER US 150 NW OF CHAMPAIGN Bridge Maintenance AADT 7,450 Truck Pct 11 Str Number 0100050 NHS Y STRUCTURAL ACCRUING 5,800 9 0100100 N ADEQUATE 16,400 7 0100270 N LAND ACQUISITION $1,050,000 CHAMPAIGN 1 2017-2021 $500,000 CHAMPAIGN 1 2017-2021 $1,000,000 CHAMPAIGN 1 2017-2021 $4,500,000 CHAMPAIGN 1 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 57 I 74 US 150 I-57 & I-74 UNDER MATTIS AVE & I-57 UNDER US 150 NW OF CHAMPAIGN Bridge Maintenance UTILITY ADJUSTMENT ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 57 I 74 US 150 I-57 UNDER MATTIS AVE AND US 150 & I-74 UNDER MATTIS AVE NW OF CHAMPAIGN Bridge Maintenance CONSTRUCTION ENGINEERING ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 57 SAFETY PRESERVE SYSTEM UNDER BRADLEY AVE W OF CHAMPAIGN BRIDGE REPLACEMENT Bridge Maintenance Structure Status FUNCTIONAL BACKLOG I 74 Needs Category BACKLOG WOODFORD CO LINE TO CARLOCK Miles = 1.69 System Maintenance Miles 1.69 Roughness(IRI) GOOD Rutting 0.12 AADT 24,218 SAFETY PRESERVE SYSTEM RESURFACING BRIDGE DECK REPAIRS BRIDGE NEW DECK Truck Pct 19.1 NHS Y 5-2 AADT 7,300 $4,060,000 Truck Pct 3 MCLEAN Str Number 0100174 NHS N 1 2016 FY 2016-2021 Highway Improvement Program District 5 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current I 74 WOODFORD CO LINE TO CARLOCK System Maintenance RAMP REPAIR SAFETY PRESERVE SYSTEM $600,000 MCLEAN 1 2016 I 74 US 150 TO E OF FARMER CITY Bridge Maintenance BRIDGE DECK OVERLAY SAFETY PRESERVE SYSTEM $4,050,000 DEWITT 1 2017-2021 I 74 OVER ILL 47 & SANGAMON RIVER AT MAHOMET, & UNDER LINDSEY RD & DUNCAN RD NW OF CHAMPAIGN Bridge Maintenance BRIDGE DECK OVERLAY BRIDGE JOINT REPAIR BRIDGE DECK REPAIRS SAFETY PRESERVE SYSTEM $1,400,000 CHAMPAIGN 1 2016 I 74 UNIVERSITY AVE IN URBANA TO 2 MI E OF ST JOSEPH INTCHG Miles = 8.55 System Maintenance RESURFACING BRIDGE DECK REPAIRS SAFETY PRESERVE SYSTEM $13,025,000 CHAMPAIGN 6 2017-2021 SAFETY PRESERVE SYSTEM $7,400,000 CHAMPAIGN VERMILION 7 2017-2021 Needs Category BACKLOG I 74 Miles 8.55 Roughness(IRI) GOOD Rutting 0.14 AADT 30,982 2 MI E OF ST JOSEPH INTCHG TO ILL 49 (N) Miles = 5.53 System Maintenance Needs Category BACKLOG Miles 3.50 Roughness(IRI) GOOD BACKLOG 2.03 GOOD Truck Pct 22.3 NHS Y RESURFACING GUARDRAIL Rutting 0.11 AADT 26,061 Truck Pct 26.9 NHS Y 0.11 25,200 27.1 Y I 74 2 MI E OF ST JOSEPH INTCHG TO ILL 49 (N) System Maintenance RAMP REPAIR SAFETY PRESERVE SYSTEM $1,200,000 CHAMPAIGN VERMILION 1 2017-2021 I 74 US 150 W OF DANVILLE TO MIDDLE FORK VERMILION RIVER IN DANVILLE Miles = 5.80 System Maintenance RECONSTRUCTION SAFETY PRESERVE SYSTEM $23,000,000 VERMILION 2 2017-2021 Needs Category ACCRUING Miles 5.80 Roughness(IRI) GOOD Rutting 0.15 AADT 21,810 Truck Pct 29.7 NHS Y 5-3 FY 2016-2021 Highway Improvement Program District 5 State Highways MYP Years Route/Street I 74 Location Improvements SALT FORK VERMILION RIVER W OF DANVILLE Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REHABILITATION Est. Cost $16,224,000 County VERMILION Past Current 1 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 74 SALT FORK VERMILION RIVER TO ILL 1 AT DANVILLE Bridge Maintenance Structure Status STRUCTURAL ACCRUING AADT 10,200 Truck Pct 32 Str Number 0920006 NHS Y STRUCTURAL ACCRUING 10,200 32 0920007 Y CONSTRUCTION ENGINEERING $1,736,000 VERMILION 1 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. US 24 DITCH 1 MI & 1.2 MI E OF EL PASO & 2.5 MI E OF WOODFORD CO LINE Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $1,125,000 MCLEAN 7 2017-2021 US 24 INTERMITTENT STREAM 1 MI W OF CHENOA Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,555,000 MCLEAN 6 2017-2021 Structure Status STRUCTURAL BACKLOG US 36 E OF CAMARGO CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM RESURFACING SHOULDER RECONSTRUCTION GUARDRAIL PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Bridge Maintenance US 45 FORD CO LINE TO US 136 IN RANTOUL Miles = 6.84 System Maintenance Needs Category BACKLOG Miles 5.49 Roughness(IRI) ACCEPTABLE Rutting 0.14 AADT 3,685 Truck Pct 6.7 NHS N BACKLOG 1.35 ACCEPTABLE 0.13 5,280 6.7 N 5-4 AADT 3,300 $300,000 $3,150,000 Truck Pct 29 Str Number 0570070 NHS Y DOUGLAS 1 2017-2021 CHAMPAIGN 7 2016 FY 2016-2021 Highway Improvement Program District 5 State Highways MYP Years Route/Street US 45 Needs Category BACKLOG US 45 CUNNINGHAM AVE Needs Category ACCRUING US 45 Needs Category BACKLOG US 45 Needs Category ADEQUATE Location Improvements SALINE BRANCH DITCH S OF THOMASBORO TO N OF I-74 AT URBANA Miles = 5.28 System Maintenance Miles 5.28 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 10,127 N OF I-74 TO UNIVERSITY AVE IN URBANA Miles = 1.52 System Maintenance Miles 1.52 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 21,239 NCL OF TOLONO TO I-57 AT PESOTUM Miles = 6.82 System Maintenance Miles 6.82 Roughness(IRI) ACCEPTABLE Rutting 0.16 AADT 5,626 I-57 AT PESOTUM TO US 36 AT TUSCOLA Miles = 8.39 System Maintenance Rutting 0.13 AADT 2,950 Objectives RESURFACING Truck Pct 5.6 SAFETY PRESERVE SYSTEM $5,610,000 CHAMPAIGN 2 2017-2021 SAFETY TRANSPORTATION OPS PRESERVE SYSTEM $1,680,000 CHAMPAIGN 1 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $1,842,000 CHAMPAIGN 7 2016 SAFETY PRESERVE SYSTEM $1,870,000 CHAMPAIGN DOUGLAS 10 2016 NHS N RESURFACING GUARDRAIL Truck Pct 5.8 Past Current NHS Y RESURFACING GUARDRAIL PEDESTRIAN RAMPS/ADA Truck Pct 5.5 County NHS N PEDESTRIAN RAMPS/ADA RESURFACING Truck Pct 6.1 Est. Cost Miles 2.13 Roughness(IRI) GOOD NHS N ACCRUING 6.14 ACCEPTABLE 0.16 2,832 6.5 N ACCRUING 0.12 ACCEPTABLE 0.15 3,400 4.7 N 5-5 FY 2016-2021 Highway Improvement Program District 5 State Highways MYP Years Route/Street US 51 US 51 BUS Location Improvements WOODRIG RD IN BLOOMINGTON TO COUNTRY ACRES RD Miles = 3.02 System Maintenance RESURFACING GUARDRAIL Needs Category BACKLOG Miles 0.57 Roughness(IRI) ACCEPTABLE Rutting 0.16 AADT 14,100 Truck Pct 5.9 NHS Y BACKLOG 2.45 ACCEPTABLE 0.11 14,828 13.4 Y US 136 Needs Category ACCRUING US 136 Needs Category BACKLOG US 136 MAIN ST US 150 TO ILL 54 Miles = 7.28 System Maintenance Miles 7.28 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 1,021 FISHER TO DEWEY Miles = 3.52 System Maintenance Miles 3.52 Roughness(IRI) NOT ACCEPTABLE Rutting 0.19 AADT 2,700 E OF LICK CREEK IN DANVILLE TO INDIANA STATE LINE Miles = 2.29 System Maintenance RESURFACING Truck Pct 23.9 RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 15.9 RESURFACING Roughness(IRI) ACCEPTABLE Rutting 0.16 AADT 6,777 Truck Pct 8.0 NHS Y BACKLOG 1.08 ACCEPTABLE 0.24 4,450 11.8 N Needs Category BACKLOG Miles 7.23 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 1,604 Past Current SAFETY PRESERVE SYSTEM $2,835,000 MCLEAN 7 2016 SAFETY PRESERVE SYSTEM $1,060,000 MCLEAN 1 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $822,000 CHAMPAIGN 1 2016 SAFETY PRESERVE SYSTEM $920,000 VERMILION 5 2016 MCLEAN 1 2017-2021 SAFETY PRESERVE SYSTEM TRANSPORTATION OPS RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 7.2 County NHS N Miles 1.21 LEROY TO DEWITT CO LINE Miles = 7.23 System Maintenance Est. Cost NHS N Needs Category ACCRUING US 150 Objectives NHS N 5-6 $2,410,000 FY 2016-2021 Highway Improvement Program District 5 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current US 150 DITCH SE OF MAHOMET & DITCH NW OF CHAMPAIGN Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $600,000 CHAMPAIGN 9 2017-2021 US 150 MARKET ST IN CHAMPAIGN TO BERRINGER CIRCLE IN URBANA System Maintenance PEDESTRIAN RAMPS/ADA SAFETY TRANSPORTATION OPS $250,000 CHAMPAIGN 1 2016 US 150 SCL OF GEORGETOWN TO NCL OF RIDGE FARM Miles = 4.33 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $1,300,000 VERMILION 2 2016 SAFETY PRESERVE SYSTEM $2,300,000 EDGAR 4 2016 $415,000 EDGAR 1 2016 $2,345,000 EDGAR 6 2017-2021 ILL 1 Needs Category ACCRUING US 150 ILL 1 Needs Category BACKLOG US 150 ILL 1 US 150 ILL 1 Miles 4.33 Roughness(IRI) GOOD Rutting 0.14 AADT 4,347 US 36 TO MOSS RD N OF PARIS Miles = 10.15 System Maintenance Miles 10.15 Roughness(IRI) ACCEPTABLE Rutting 0.20 AADT 3,088 Truck Pct 8.7 NHS Y RESURFACING GUARDRAIL Truck Pct 15.0 NHS Y BROUILLETTS CREEK 1 MI S OF US 36 & 6 MI N OF PARIS Bridge Maintenance BRIDGE DECK OVERLAY SAFETY PRESERVE SYSTEM MOSS RD TO 0.5 MI S OF GIBSON RD S OF PARIS Miles = 6.58 System Maintenance RESURFACING COLD MILLING GUARDRAIL PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Needs Category BACKLOG Miles 4.76 Roughness(IRI) ACCEPTABLE Rutting 0.14 AADT 5,357 Truck Pct 10.8 NHS Y BACKLOG 1.82 ACCEPTABLE 0.15 4,791 7.2 Y 5-7 FY 2016-2021 Highway Improvement Program District 5 State Highways MYP Years Route/Street ILL 1 Needs Category BACKLOG Location Improvements IROQUOIS CO LINE TO 0.2 MI N OF ROSSVILLE SCL Miles = 8.24 System Maintenance Miles 8.24 Roughness(IRI) ACCEPTABLE Rutting 0.15 AADT 5,039 Objectives SAFETY PRESERVE SYSTEM TRANSPORTATION OPS RESURFACING COLD MILLING GUARDRAIL PEDESTRIAN RAMPS/ADA Truck Pct 10.7 Est. Cost County Past Current $3,570,000 VERMILION 3 2017-2021 VERMILION 2 2017-2021 NHS Y ILL 1 CREEK 2 MI S OF HOOPESTON & N FORK BRIDGE DECK OVERLAY VERMILION RIVER 1.4 MI N OF ROSSVILLE Bridge Maintenance SAFETY PRESERVE SYSTEM $390,000 ILL 9 E OF I-74 TO ROYAL POINTE DR IN BLOOMINGTON Miles = 5.05 System Maintenance SAFETY PRESERVE SYSTEM $2,620,000 MCLEAN 1 2017-2021 $405,000 MCLEAN 9 2017-2021 $6,100,000 MCLEAN FORD 6 2017-2021 CHAMPAIGN 5 2017-2021 US 150 Needs Category BACKLOG Miles 5.05 Roughness(IRI) NOT ACCEPTABLE Rutting 0.18 AADT 13,645 RESURFACING Truck Pct 7.3 NHS Y ILL 9 MACKINAW CREEK 9.6 MI E OF ILL 165 Bridge Maintenance CULVERT (NEW) SAFETY ILL 9 ARROWSMITH RD TO FORD CO LINE Miles = 10.53 System Maintenance RESURFACING SAFETY IMPROVEMENTS SAFETY PRESERVE SYSTEM Needs Category ACCRUING Miles 0.44 Roughness(IRI) ACCEPTABLE Rutting 0.18 AADT 1,500 Truck Pct 18.3 NHS N BACKLOG 10.09 ACCEPTABLE 0.14 1,546 11.1 N ILL 10 N OF SEYMOUR CULVERT (NEW) SAFETY Bridge Maintenance 5-8 $827,000 FY 2016-2021 Highway Improvement Program District 5 State Highways MYP Years Route/Street ILL 10 Location Improvements COPPER SLOUGH E OF DUNCAN RD AT W EDGE OF CHAMPAIGN Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 32 Needs Category BACKLOG ILL 105 TO US 36 Miles = 4.19 System Maintenance Miles 4.19 Roughness(IRI) ACCEPTABLE Rutting 0.22 AADT 1,350 RESURFACING Truck Pct 20.7 Est. Cost $910,000 AADT 12,300 SAFETY PRESERVE SYSTEM $1,010,000 County CHAMPAIGN Truck Pct 9 Past Current 5 Str Number 0100135 2017-2021 NHS Y PIATT 1 2016 NHS N ILL 48 1.3 MI N OF ILL 10 AT WELDON & S OF WELDON Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $515,000 DEWITT 6 2016 ILL 49 DRAINAGE DITCH 0.5 MI N OF US 136 (E) Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 VERMILION 1 2017-2021 Structure Status STRUCTURAL BACKLOG ILL 49 BRUSHY FORK CREEK 1 MI N OF US 36 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REHABILITATION Structure Status STRUCTURAL BACKLOG ILL 49 CATFISH CREEK 2.5 MI N OF ILL 133 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING 5-9 AADT 2,000 $880,000 AADT 800 $2,000,000 AADT 1,200 Truck Pct 18 Str Number 0920060 EDGAR Truck Pct 17 6 Str Number 0230018 EDGAR Truck Pct 22 NHS N NHS N 6 Str Number 0230019 2016 2017-2021 NHS N FY 2016-2021 Highway Improvement Program District 5 State Highways MYP Years Route/Street ILL 122 Needs Category BACKLOG ILL 130 Location Improvements TAZEWELL CO LINE TO ILL 9 Miles = 7.69 System Maintenance Miles 7.69 Roughness(IRI) GOOD Rutting 0.20 AADT 1,668 EMBARRAS RIVER IN VILLA GROVE Bridge Maintenance Objectives RESURFACING GUARDRAIL Truck Pct 7.3 Needs Category BACKLOG US 45 IN ARCOLA TO COLES CO LINE Miles = 13.46 System Maintenance Miles 13.46 Roughness(IRI) ACCEPTABLE Rutting 0.12 AADT 2,522 Past Current $2,300,000 MCLEAN 7 2017-2021 SAFETY PRESERVE SYSTEM $3,680,000 DOUGLAS 4 2017-2021 NHS N BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM TRANSPORTATION OPS RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 12.1 County SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL ACCRUING ILL 133 Est. Cost AADT 4,900 Truck Pct 4 Str Number 0210028 NHS N $3,742,000 DOUGLAS 8 2017-2021 $454,000 DOUGLAS 6 2017-2021 NHS N ILL 133 DITCH 0.4 & 2.7 MI W OF ILL 130 Bridge Maintenance CULVERT (NEW) SAFETY ILL 165 COLFAX TO FORD CO LINE Miles = 8.77 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $2,575,000 MCLEAN 1 2017-2021 SAFETY PRESERVE SYSTEM $160,000 MCLEAN 1 2017-2021 Needs Category BACKLOG ILL 165 Miles 8.77 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 545 NE OF ANCHOR Truck Pct 17.1 NHS N CULVERT REPLACEMENT Bridge Maintenance 5 - 10 FY 2016-2021 Highway Improvement Program District 5 State Highways MYP Years Route/Street CH 12 Location SALT FORK RIVER 0.5 MI NE OF SIDNEY Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG CH 12 E BRANCH EMBARRAS RIVER 2 MI N OF LONGVIEW Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING CH 5 SANGAMON CREEK 1.4 MI S OF ILL 9 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REHABILITATION Structure Status STRUCTURAL ACCRUING LEVERETT RD STREAM AT I-57 N OF CHAMPAIGN Bridge Maintenance SAFETY PRESERVE SYSTEM CULVERT REPLACEMENT Structure Status STRUCTURAL ACCRUING LEVERETT RD DITCH W OF LEVERETT Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG OLD ILL 47 SANGAMON RIVER NW OF MONTICELLO System Maintenance JURISDICTIONAL TRANSFER SIGNED LETTER OF INTENT 5 - 11 Est. Cost $1,160,000 AADT 900 $800,000 AADT 750 $640,000 AADT 900 $725,000 AADT 2,850 $800,000 AADT 2,350 $6,044,000 County CHAMPAIGN Truck Pct 11 2 Str Number 0100090 CHAMPAIGN Truck Pct 12 Str Number 0100107 Truck Pct 10 Str Number 0570195 Truck Pct 8 PIATT 2017-2021 NHS N 6 Str Number 0102010 CHAMPAIGN 2017-2021 NHS N 2 CHAMPAIGN 2017-2021 NHS N 6 MCLEAN Truck Pct 14 Past Current 2016 NHS N 5 Str Number 0100131 2016 NHS N 6 2016 FY 2016-2021 Highway Improvement Program District 5 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current OLD US 51 0.4 MI S OF US 136 TO 3 MI N OF HEYWORTH Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $1,448,000 MCLEAN 7 2017-2021 OLD US 51 0.6 MI N OF US 136 Bridge Maintenance RIP RAP PRESERVE SYSTEM SAFETY $122,000 MCLEAN 1 2017-2021 OLD US 66 STREAM AT NCL OF LEXINGTON Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $613,000 MCLEAN 11 2017-2021 Structure Status STRUCTURAL BACKLOG OLD US 66 STREAM 6.2 MI S OF US 24 Bridge Maintenance BRIDGE REMOVAL/DEMOLITION VARIOUS PRELIMINARY ENGINEERING System Maintenance VARIOUS AADT 1,750 Truck Pct 6 Str Number 0570037 NHS N $62,000 MCLEAN 1 2017-2021 P.E. (PHASE I) P.E. (PHASE II) $400,000 VARIOUS 1 2016 ON-CALL ENGINEERING System Maintenance CONSTRUCTION ENGINEERING $500,000 DISTRICT-WIDE 1 2016 VARIOUS BRIDGE DECK SEALING Bridge Maintenance BRIDGE DECK SEALING $370,000 VARIOUS 2 2016 VARIOUS MISCELLANEOUS LAND ACQUISITION System Maintenance LAND ACQUISITION $25,000 DISTRICT-WIDE 1 2016 VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS System Maintenance SAFETY IMPROVEMENTS $2,658,000 DISTRICT-WIDE 6 2016 PRESERVE SYSTEM SAFETY 5 - 12 FY 2016-2021 Highway Improvement Program District 5 State Highways MYP Years Route/Street Location Improvements Objectives SAFETY VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS VARIOUS DISTRICT MISCELLANEOUS System Maintenance MISCELLANEOUS PROJECTS 5 - 13 Est. Cost County Past Current $13,290,000 DISTRICT-WIDE 5 2017-2021 $585,000 DISTRICT-WIDE 1 2016 DISTRICT FY 2016-2019 Highway Improvement Program District 5 Local Highways MYP Years Route/Street US 36 Location Improvements Objectives US 36: 0.3 MI W OF N 750E RD TO 0.5 MI E; N 750E RD: CSX RR TO US 36 LAND ACQUISITION US 36: 0.3 MI W OF N 750E RD TO 0.5 MI E; N 750E RD: CSX RR TO US 36 Miles = 0.93 RECONSTRUCTION US 45: 0.3 MI N OF E 1050N RD TO 0.5 MI S; E 1050N RD / E 529N RD: 0.3 MI W OF US 45 TO CNRR LAND ACQUISITION US 45: 0.3 MI N OF E 1050N RD TO 0.5 MI S; E 1050N RD / E 529N RD: 0.3 MI W OF US 45 TO CNRR Miles = 0.93 RECONSTRUCTION SAFETY PRESERVE SYSTEM AT E 1200TH RD (HIGH SCHOOL RD) IN PARIS INTERSECTION IMPROVEMENT ILL 1 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS 1130 E RD FAYETTE CREEK 4.5 MI SW OF CATLIN BRIDGE REPLACEMENT 1200 N RD UNNAMED STREAM 0.2 MI W OF HAWBUCK RD 1340 E RD 1450 N RD N 750 E RD US 36 N 750 E RD US 45 E 1050 N RD E 529 N RD US 45 E 1050 N RD E 529 N RD US 150 Est. Cost County Past Current $105,000 DOUGLAS 1 2016 $2,403,000 DOUGLAS 1 2016 $123,000 DOUGLAS 1 2016 $3,211,000 DOUGLAS 1 2016 $519,000 EDGAR 1 2016 SAFETY PRESERVE SYSTEM $275,000 VERMILION 6 2017-2021 BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $225,000 VERMILION 2 2017-2021 LITTLE VERMILION RIVER 2 MI NW OF VERMILION GROVE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $652,000 VERMILION 4 2016 JORDAN CREEK 0.5 MI W OF 750 E RD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $275,000 VERMILION 3 2016 SAFETY PRESERVE SYSTEM 5 - 14 FY 2016-2019 Highway Improvement Program District 5 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current 350 E RD UNNAMED STREAM 0.5 MI S OF ARMSTRONG BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $225,000 VERMILION 1 2017-2021 470 E RD BLUE GRASS CREEK BRANCH 0.2 MI N OF 3550 N RD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $225,000 VERMILION 2 2017-2021 BURR OAK RD LONG POINT CREEK 4.8 MI NW OF WAPELLA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,000,000 DEWITT 15 2017-2021 UPPER SALT CREEK 0.1 MI N OF RANTOUL BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,170,000 CHAMPAIGN 5 2016 CHAMPAIGN 5 2016 $210,000 DOUGLAS 1 2016 $5,159,000 DOUGLAS 1 2016 $319,000 DOUGLAS 1 2016 MCLEAN 3 2017-2021 625 E RD CH 55 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. CH 55 UPPER SALT CREEK 0.1 MI N OF RANTOUL CONSTRUCTION ENGINEERING $104,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. E 1050 N RD N 750 E RD E 1050 N RD N 750 E RD E 1050 N RD N 750 E RD E 1400 N RD CH 24 E 1050N RD: N 750E RD TO 1.7 MI E; N 750E RD: E 1075N RD TO CSX RR LAND ACQUISITION E 1050N RD: N 750E RD TO 1.7 MI E; N 750E RD: E 1075N RD TO CSX RR Miles = 2.47 RECONSTRUCTION E 1050N RD: N 750E RD TO 1.7 MI E; N 750E RD: E 1075N RD TO CSX RR CONSTRUCTION ENGINEERING TAZEWELL CO LINE TO ILL 122 Miles = 4.05 RESURFACING SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 5 - 15 $1,250,000 FY 2016-2019 Highway Improvement Program District 5 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current S JEFFERSON ST IN TOWANDA TO N 2300 E RD Miles = 3.82 RESURFACING SAFETY PRESERVE SYSTEM $1,350,000 MCLEAN 1 2017-2021 E 500 N RD BRANCH SALT CREEK W OF 3600 E RD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $800,000 MCLEAN 3 2016 E WASHINGTON ST ILL 54 TO MAGILL ST IN CLINTON Miles = 0.24 RECONSTRUCTION SAFETY PRESERVE SYSTEM $640,000 DEWITT 7 2017-2021 FIRST ST GREGORY DR TO KIRBY AVE IN CHAMPAIGN Miles = 0.42 RECONSTRUCTION SAFETY PRESERVE SYSTEM $900,000 CHAMPAIGN 1 2016 FIRST ST GREGORY DR TO KIRBY AVE IN CHAMPAIGN CONSTRUCTION ENGINEERING $180,000 CHAMPAIGN 1 2016 FOURTH ST KIRBY AVE TO ST MARY'S RD IN CHAMPAIGN Miles = 0.24 RECONSTRUCTION $1,300,000 CHAMPAIGN 1 2016 FOURTH ST KIRBY AVE TO ST MARY'S RD IN CHAMPAIGN CONSTRUCTION ENGINEERING $260,000 CHAMPAIGN 1 2016 INDIAN SPRINGS RD UNNAMED STREAM 1.1 MI NW OF 2300 N RD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $225,000 VERMILION 2 2017-2021 JERRY WHITE RD BIG CREEK 1.5 MI NE OF BELL RIDGE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,200,000 EDGAR 5 2016 E 1900 N RD TOWANDA EAST RD E HELY ST SAFETY PRESERVE SYSTEM N 1200TH ST ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. 5 - 16 FY 2016-2019 Highway Improvement Program District 5 Local Highways MYP Years Route/Street JERRY WHITE RD Location BIG CREEK 1.5 MI NE OF BELL RIDGE Improvements Objectives Est. Cost CONSTRUCTION ENGINEERING $86,000 County Past Current EDGAR 5 2016 $275,000 VERMILION 4 2017-2021 $512,000 CHAMPAIGN 1 2016 $80,000 CHAMPAIGN 1 2016 $2,500,000 CHAMPAIGN 4 2016 $160,000 CHAMPAIGN 1 2016 $200,000 CHAMPAIGN 1 2016 $300,000 CHAMPAIGN 1 2016 $1,600,000 CHAMPAIGN 1 2017-2021 N 1200TH ST ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. SAFETY PRESERVE SYSTEM KINGSDALE AVE GRAPE CREEK ON SW SIDE OF TILTON BRIDGE REPLACEMENT LINCOLN AVE OLYMPIAN DR TO SALINE CT IN URBANA LAND ACQUISITION LINCOLN AVE OLYMPIAN DR TO SALINE CT IN URBANA UTILITY ADJUSTMENT LINCOLN AVE OLYMPIAN DR TO SALINE CT IN URBANA Miles = 0.70 NEW CONSTRUCTION LINCOLN AVE OLYMPIAN DR TO SALINE CT IN URBANA CONSTRUCTION ENGINEERING MAIN ST RICHARD ST TO JENNIFER ST & DIVISION ST TO W OF LINCOLN ST IN MAHOMET Miles = 0.38 RESURFACING PENNSYLVANIA AVE FOURTH ST TO 0.3 MI E P.E. (PHASE I) P.E. (PHASE II) PENNSYLVANIA AVE FOURTH ST TO 0.3 MI E Miles = 0.26 RECONSTRUCTION TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 5 - 17 FY 2016-2019 Highway Improvement Program District 5 Local Highways MYP Years Route/Street Location Improvements Objectives PENNSYLVANIA AVE FOURTH ST TO 0.3 MI E CONSTRUCTION ENGINEERING PROSPECT AVE WINDSOR RD TO N OF CURTIS RD IN SAVOY Miles = 0.89 RECONSTRUCTION RAAB RD 0.7 MI E OF AIRPORT RD TO W OF N TOWANDA-BARNES RD IN NORMAL Miles = 0.49 NEW CONSTRUCTION SIDEWALKS RIDGE RD Est. Cost County Past Current $320,000 CHAMPAIGN 1 2017-2021 SAFETY PRESERVE SYSTEM $4,000,000 CHAMPAIGN 3 2017-2021 TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT SAFETY PRESERVE SYSTEM $1,000,000 MCLEAN 2 2016 ECL OF MONTICELLO TO CHAMPAIGN CO WIDENING & RESURFACING LINE Miles = 4.69 SAFETY PRESERVE SYSTEM $4,005,000 PIATT 5 2016 SUNNY ACRES RD US 150 TO S OF OAK CREEK RD AT VILLAGE LIMITS Miles = 0.42 RESURFACING SAFETY PRESERVE SYSTEM $320,000 CHAMPAIGN 1 2017-2021 THOMPSON AVE MARKET ST TO NINTH ST IN HOOPESTON P.E. (PHASE I) P.E. (PHASE II) $44,000 VERMILION 3 2017-2021 THOMPSON AVE MARKET ST TO NINTH ST IN HOOPESTON Miles = 0.64 RESURFACING $684,000 VERMILION 3 2017-2021 THOMPSON AVE MARKET ST TO NINTH ST IN HOOPESTON CONSTRUCTION ENGINEERING $77,000 VERMILION 3 2017-2021 VARIOUS VARIOUS LOCATIONS IN MONTICELLO Miles = 2.03 RESURFACING PIATT 1 2016 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 5 - 18 $923,000 FY 2016-2019 Highway Improvement Program District 5 Local Highways MYP Years Route/Street Location Improvements Objectives VARIOUS VARIOUS LOCATIONS IN MONTICELLO CONSTRUCTION ENGINEERING VOORHEES ST STONEY CREEK AT JACKSON ST IN DANVILLE BRIDGE REHABILITATION Est. Cost $54,000 SAFETY PRESERVE SYSTEM $1,576,000 County Past Current PIATT 1 2016 VERMILION 3 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. W MAIN ST WESTERN HILLS DR TO N DIANNE LN IN MAHOMET Miles = 0.38 RESURFACING SAFETY PRESERVE SYSTEM $100,000 CHAMPAIGN 1 2017-2021 WALNUT AVE COLLISON BRANCH AT E EDGE OF COLLISON BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $623,000 VERMILION 2 2016 REVERE RD (CH 1) TO OSPUR RD (CH 15) Miles = 3.30 WIDENING & RESURFACING SAFETY PRESERVE SYSTEM $3,250,000 DEWITT 8 2017-2021 CH 21 WELDON SPRINGS RD 5 - 19 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE KANE DEKALB D2 COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK PEORIA D4 Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT ADAMS D5 MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 4 District 6 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 4, DISTRICT 6, SPRINGFIELD Overview Highway District 6 encompasses 15 counties in west central Illinois and includes the cities of Springfield, Quincy, Jacksonville, Lincoln and Taylorville, plus many smaller communities which serve as satellites for the larger employment areas or as focal points of this farming area. The state highway system in District 6 consists of 2,084 miles of highways and 846 bridges, supporting 10.3 million vehicle miles of travel daily. State Program The program for state and local highways will average $1.398 billion annually for the FY 2016-2021 period. Approximately $249 million will be provided during FY 2016-2021 for improvements to state highways in District 6. The following table summarizes anticipated accomplishments on the state highway system in District 6 during this time frame. FY 2016-2021 Accomplishments System Maintenance Interstate (miles) Non-Interstate (miles) Safety Locations (number) Bridge Maintenance Interstate (number) Non-Interstate (number) New Bridges (number) Minor Structure Repair (number) Congestion Mitigation Roads (miles) Traffic Improvements (number) System Expansion Roads (miles) Locations (number) 6-i 30 103 15 7 24 6 24 1 8 0 0 Major Highway projects of interest that are tentatively scheduled during the FY 2016-2021 time frame include:  Interstate 55 from 0.6 miles north of Illinois 108 to 0.7 miles south of County Highway 17 at Farmersville in Montgomery County. Resurfacing on 10.2 miles, bridge repair, bridge joint repair, ditch cleaning and rip rap are programmed during FY 2017-2021 at a cost of $18.6 million.  Interstate 55 and Interstate 72 additional lanes, reconstruction and interchange reconstruction around Springfield. Engineering for contract plans for the reconstruction of the mainline pavement, interchange reconstruction and additional lanes in each direction on Interstate 55 from south of the 6th Street Interchange to the Sherman Interchange, on Interstate 72 from Illinois 4 to Interstate 55 south of Springfield and on Interstate 72 from Interstate 55 east of Springfield to Old US 36 are programmed during FY 2017-2021 at an estimated cost of $25 million. Phase I engineering for location, environmental and design studies is under way and is expected to be completed by 2017. The total unfunded cost for construction, construction engineering, land acquisition and utility adjustments for the project is estimated to range between $600-$650 million including $33 million for major work needed prior to the interstate work on Interstate 55 Business/6th Street from Interstate 72 to Stanford Avenue and an intersection improvement at Sangamon Avenue and Dirksen Parkway.  Interstate 55/Interstate 55 Business from 1.2 miles south of Interstate 55 Business to 0.3 miles north of Illinois 10 west of Lincoln on Interstate 55 and on Interstate 55 Business from 900th Avenue to south of 1056 Avenue in Logan County. Resurfacing on 6.6 miles and bridge joint repair are programmed during FY 2017-2021 at a cost of $14 million.  Interstate 72/US 36 from 0.7 miles east of Matson Road to 0.5 mile west of the New Berlin Interchange in Morgan and Sangamon Counties. Resurfacing on 9.7 miles, bridge repair, bridge substructure, bridge joint repair, slopewall repair and bridge approach roadway are programmed in FY 2016 at a cost of $18 million.  Interstate 72 over Wabash Avenue and over Northern Southern Railroad 1.2 miles east of Wabash Avenue Interchange in Springfield. A bridge new deck, slopewall repair and bridge painting are programmed during FY 2017-2021 at a cost of $12 million.  Interstate 72 Business/Illinois 104 (Morton Avenue) from 0.1 mile east of Mound Road to 0.2 mile east of Hardin Avenue in Jacksonville. Resurfacing, bridge repair at Town Brook, bridge deck repair and bridge joint repair at Mauvaise Terre Creek, traffic signal modernization, pedestrian ramps/ADA and miscellaneous work on 3.8 miles through Jacksonville are programmed in FY 2016 at a cost of $8.3 million.  Interstate 155 from 2 miles south of US 136 to Tazewell County line in Logan County. Resurfacing on 3.1 miles and bridge repair are programmed during FY 2017-2021 at a cost of $7 million.  US 54 over the Mississippi River Bridge at Louisiana, Missouri in Pike County. A bridge replacement and engineering for contract plans are programmed during FY 2016-2021 at a cost of $30.8 million. Of this total, engineering for contract plans is programmed in FY 2016 at a cost of $750,000. Missouri is the lead agency for this project with Illinois sharing equally in the costs. This project has been approved for Illinois Major Bridge Program funding.  US 136 over the Mississippi River at Keokuk in Hancock County. Bridge deck overlay and bridge joint repair are programmed during FY 2016-2021 at a cost of $10.3 million. Of this total, bridge joint repair is programmed in FY 2016 at a cost of $300,000. 6-ii  Illinois 29 (J. David Jones Parkway) from north of Fisher Road south of Cantrall to 0.2 mile north of the Capital Airport entrance in Springfield. Resurfacing on 6.2 miles, shoulder reconstruction and milled rumble strip are programmed during FY 2017-2021 at a cost of $6.3 million.  Illinois 57 from south of York Street in Quincy to south of Marblehead in Adams County. Resurfacing on 7 miles is programmed during FY 2017-2021 at a cost of $4.1 million.  Illinois 97 from east of Illinois 125 to east of Koke Mill Road in Springfield. Resurfacing on 4.2 miles, shoulder reconstruction and milled rumble strip are programmed in FY 2016 at a cost of $2.6 million.  Illinois 123 from Illinois 29 east of Athens to 0.6 mile west of Interstate 55 in Sangamon County. Resurfacing on 6.1 miles, culvert replacement 0.1 mile east of Illinois 29 and a bridge replacement at Fancy Creek 2.7 miles east of Illinois 29 are programmed during FY 2017-2021 at a cost of $4.5 million.  Illinois 125 from 0.2 mile east of South Bluff Springs Road to Illinois 78 in Virginia. Resurfacing on 7.8 miles, shoulder reconstruction and milled rumble strip are programmed during FY 2017-2021 at a cost of $3.9 million.  Illinois 125 from the east corporate limits of Pleasant Plains to Illinois 97 in Sangamon County. Resurfacing on 6.7 miles, shoulder reconstruction, milled rumble strip, land acquisition and utility adjustments are programmed during FY 2017-2021 at a cost of $6.1 million. 6-iii FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street I 55 Needs Category ACCRUING I 55 Needs Category ACCRUING Location Improvements 0.6 MI N OF ILL 108 TO 1.3 MI S OF WAGGONER Miles = 5.03 System Maintenance Miles 5.03 Roughness(IRI) GOOD Rutting 0.15 AADT 26,249 1.3 MI S OF WAGGONER TO 0.7 MI S OF CH 17 AT FARMERSVILLE Miles = 5.21 System Maintenance Miles 5.21 Roughness(IRI) GOOD Rutting 0.15 AADT 27,500 Objectives RESURFACING BRIDGE JOINT REPAIR DITCH CLEANING RIP RAP Truck Pct 27.7 County Past Current SAFETY PRESERVE SYSTEM $9,200,000 MONTGOMERY 2 2017-2021 SAFETY PRESERVE SYSTEM $9,400,000 MONTGOMERY 5 2017-2021 LOGAN 1 2016 NHS Y RESURFACING BRIDGE REPAIR Truck Pct 25.3 Est. Cost NHS Y I 55 SANGAMON CO LINE TO 0.3 MI N OF ILL 10 System Maintenance PATCHING SAFETY PRESERVE SYSTEM $750,000 I 55 OVER ILL 29 (S GRAND AVE) IN SPRINGFIELD Bridge Maintenance BRIDGE DECK OVERLAY BRIDGE JOINT REPAIR SAFETY PRESERVE SYSTEM $1,600,000 SANGAMON 2 2016 I 55 $4,750,000 SANGAMON 3 2017-2021 I 72 P.E. (PHASE II) I-55: S OF 6TH ST INTCHG TO WEST LAKE SHORE DR; I-72: E OF MACARTHUR BLVD TO I-55 Congestion Mitigation I-55: WEST LAKE SHORE DR TO N OF P.E. (PHASE II) CLEAR LAKE AVE; I-72: I-55 TO OLD US 36 Congestion Mitigation $10,500,000 SANGAMON 3 2017-2021 $3,500,000 SANGAMON 3 2017-2021 I 55 I 72 I 55 N OF I-72 (CLEAR LAKE AVE INTCHG) TO SANGAMON RIVER Congestion Mitigation P.E. (PHASE II) 6-1 FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street I 55 I 55 I 55 BUS Needs Category BACKLOG I Improvements SANGAMON RIVER TO N OF SHERMAN INTCHG Congestion Mitigation I-55: 1.2 MI S OF I-55 BUS TO 0.3 MI N OF RESURFACING ILL 10 W OF LINCOLN; I-55 BUS: 900TH BRIDGE JOINT REPAIR AVE TO S OF 1056TH AVE Miles = 6.64 System Maintenance Miles Roughness(IRI) Rutting AADT Truck Pct NHS 4.70 GOOD 0.11 28,157 25.6 Y 1.56 ACCEPTABLE 0.13 4,655 8.2 N 0.38 ACCEPTABLE 0.14 375 5.3 N LINCOLN PKWY Needs Category BACKLOG 72 US 36 KENWOOD DR TO S OF ILL 10 IN LINCOLN Miles = 1.21 System Maintenance Miles 1.21 Roughness(IRI) ACCEPTABLE Rutting 0.18 AADT 5,734 0.7 MI E OF MATSON RD TO 0.5 MI W OF NEW BERLIN INTCHG Miles = 9.73 System Maintenance Needs Category BACKLOG Miles 6.93 Roughness(IRI) GOOD ACCRUING 2.80 GOOD RESURFACING Truck Pct 6.6 Est. Cost $4,500,000 ACCRUING 55 BUS Objectives P.E. (PHASE II) BACKLOG OLD US 66 I Location County Past Current SANGAMON 3 2017-2021 SAFETY PRESERVE SYSTEM $14,000,000 LOGAN 1 2017-2021 SAFETY PRESERVE SYSTEM $1,000,000 LOGAN 6 2017-2021 MORGAN SANGAMON 1 2016 NHS N RESURFACING BRIDGE REPAIR BRIDGE SUBSTRUCTURE BRIDGE JOINT REPAIR SLOPEWALL REPAIR BRIDGE APPROACH ROADWAY Rutting 0.21 AADT 13,800 Truck Pct 20.1 NHS Y 0.23 13,800 20.1 Y SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Structure Status ADEQUATE STRUCTURAL ACCRUING 6-2 $18,000,000 AADT 6,900 6,900 Truck Pct 20 Str Number 0690048 NHS Y 20 0690049 Y FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street I 72 Location Improvements OVER WABASH AVE & OVER NS RR 1.2 MI E OF WABASH AVE INTCHG IN SPRINGFIELD Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE NEW DECK SLOPEWALL REPAIR BRIDGE PAINTING Structure Status ADEQUATE I 72 ILL 4 TO E OF MACARTHUR BLVD Congestion Mitigation P.E. (PHASE II) I 72 OVER I-55 BUS (6TH ST) IN SPRINGFIELD System Maintenance BRIDGE DECK OVERLAY BRIDGE DECK REPAIRS 0.1 MI E OF MOUND RD TO 0.2 MI E OF HARDIN AVE IN JACKSONVILLE Miles = 3.76 System Maintenance RESURFACING US 36 I 72 BUS ILL 104 MORTON AVE I Needs Category BACKLOG Miles 0.75 Roughness(IRI) ACCEPTABLE Rutting 0.18 AADT 7,500 Truck Pct 8.3 NHS Y BACKLOG 3.01 ACCEPTABLE 0.33 17,916 4.7 Y 72 BUS ILL 104 MORTON AVE I 72 BUS ILL 104 MORTON AVE $12,000,000 AADT 9,500 County SANGAMON Past Current 3 2017-2021 Truck Pct 16 Str Number 0840127 NHS Y Y STRUCTURAL ACCRUING 9,500 16 0840128 ADEQUATE 7,550 19 0840148 Y ADEQUATE 9,500 16 0840149 Y $1,750,000 SANGAMON 3 2017-2021 SAFETY PRESERVE SYSTEM $1,500,000 SANGAMON 1 2017-2021 SAFETY PRESERVE SYSTEM $4,350,000 MORGAN 5 2016 $125,000 MORGAN 1 2016 $3,601,000 MORGAN 1 2016 0.1 MI E OF MOUND RD TO 0.2 MI E OF HARDIN AVE IN JACKSONVILLE System Maintenance PEDESTRIAN RAMPS/ADA SAFETY TRANSPORTATION OPS 0.1 MI E OF MOUND RD TO 0.2 MI E OF HARDIN AVE IN JACKSONVILLE System Maintenance TRAF SIGNAL MODERNIZATION MISCELLANEOUS SAFETY PRESERVE SYSTEM 6-3 Est. Cost FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street I 72 BUS ILL 104 MORTON AVE I 72 BUS ILL 104 MORTON AVE I 155 Needs Category BACKLOG US 24 US 136 Location Improvements Objectives Est. Cost County Past Current TOWN BROOK 1.2 MI W OF ILL 267 IN JACKSONVILLE Bridge Maintenance BRIDGE REPAIR SAFETY PRESERVE SYSTEM $50,000 MORGAN 4 2016 MAUVAISE TERRE CREEK IN JACKSONVILLE Bridge Maintenance BRIDGE DECK REPAIRS BRIDGE JOINT REPAIR SAFETY PRESERVE SYSTEM $170,000 MORGAN 1 2016 2 MI S OF US 136 TO TAZEWELL CO LINE Miles = 3.05 System Maintenance RESURFACING BRIDGE REPAIR SAFETY PRESERVE SYSTEM $7,000,000 LOGAN 2 2017-2021 PRESERVE SYSTEM $80,000 ADAMS HANCOCK 1 2016 PRESERVE SYSTEM $80,000 ADAMS HANCOCK 1 2017-2021 PRESERVE SYSTEM $80,000 ADAMS HANCOCK 1 2017-2021 PRESERVE SYSTEM $80,000 ADAMS HANCOCK 1 2017-2021 Miles 3.05 Roughness(IRI) GOOD Rutting 0.15 AADT 9,113 MISSISSIPPI RIVER BRIDGES: QUINCY MEMORIAL, QUINCY BAYVIEW, & KEOKUK Bridge Maintenance Truck Pct 20.4 NHS Y BRIDGE CLEANING ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. US 24 US 136 MISSISSIPPI RIVER BRIDGES: QUINCY MEMORIAL, QUINCY BAYVIEW, & KEOKUK Bridge Maintenance BRIDGE CLEANING ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. US 24 US 136 MISSISSIPPI RIVER BRIDGES: QUINCY MEMORIAL, QUINCY BAYVIEW, & KEOKUK Bridge Maintenance BRIDGE CLEANING ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. US 24 US 136 MISSISSIPPI RIVER BRIDGES: QUINCY MEMORIAL, QUINCY BAYVIEW, & KEOKUK Bridge Maintenance BRIDGE CLEANING ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. 6-4 FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street US 24 US 136 Location MISSISSIPPI RIVER BRIDGES: QUINCY MEMORIAL, QUINCY BAYVIEW, & KEOKUK Bridge Maintenance Improvements Objectives BRIDGE CLEANING Est. Cost County Past Current PRESERVE SYSTEM $80,000 ADAMS HANCOCK 1 2017-2021 PRESERVE SYSTEM $80,000 ADAMS HANCOCK 1 2017-2021 SAFETY PRESERVE SYSTEM $2,000,000 ADAMS 2 2016 $200,000 ADAMS 3 2016 $1,000,000 ADAMS 3 2017-2021 $800,000 ADAMS 3 2017-2021 ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. US 24 US 136 MISSISSIPPI RIVER BRIDGES: QUINCY MEMORIAL, QUINCY BAYVIEW, & KEOKUK Bridge Maintenance BRIDGE CLEANING ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. US 24 MAINE ST QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER Bridge Maintenance BRIDGE REPAIR ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. US 24 MAINE ST QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER Bridge Maintenance P.E. (PHASE I) ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. US 24 MAINE ST QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER Bridge Maintenance P.E. (PHASE II) ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. US 24 MAINE ST QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER Bridge Maintenance P.E. (PHASE II) ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. US 24 MAINE ST US 24 MAINE ST QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER Bridge Maintenance ARCHAEOLOGICAL SURVEY $300,000 ADAMS 2 2017-2021 QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER Bridge Maintenance P.E. (PHASE II) $500,000 ADAMS 2 2017-2021 ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. 6-5 FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street US 24 BROADWAY ST Location Improvements QUINCY BAYVIEW BRIDGE AT MISSISSIPPI RIVER Bridge Maintenance Objectives PRESERVE SYSTEM BRIDGE DECK SEALING Est. Cost County Past Current ADAMS 2 2016 $600,000 CHRISTIAN 5 2017-2021 $80,000 ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. US 51 DITCH 0.9 MI N OF ILL 16 Bridge Maintenance CULVERT (NEW) SAFETY US 51 PINE ST IN PANA TO SHELBY CO LINE Miles = 3.62 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $1,500,000 CHRISTIAN 1 2017-2021 SAFETY PRESERVE SYSTEM $1,800,000 PIKE 6 2016 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $1,300,000 PIKE 1 2017-2021 $150,000 PIKE 1 2017-2021 $200,000 PIKE 1 2017-2021 ILL 16 Needs Category BACKLOG US 54 Needs Category BACKLOG US 54 ILL 106 Needs Category BACKLOG US 54 ILL 106 US 54 ILL 106 Miles 3.62 Roughness(IRI) ACCEPTABLE Rutting 0.14 AADT 4,762 S OF I-72 TO 0.1 MI N OF N MONROE ST IN PITTSFIELD Miles = 4.38 System Maintenance Miles 4.38 Roughness(IRI) ACCEPTABLE Rutting 0.22 AADT 4,883 0.1 MI N OF N MONROE ST TO W OF ARCHER ST IN PITTSFIELD Miles = 1.62 System Maintenance Miles 1.62 Roughness(IRI) ACCEPTABLE Rutting 0.20 AADT 7,252 Truck Pct 12.8 NHS Y RESURFACING MISCELLANEOUS Truck Pct 18.7 NHS Y RESURFACING INTERSECTION IMPROVEMENT Truck Pct 9.2 NHS Y 0.1 MI N OF N MONROE ST TO W OF ARCHER ST IN PITTSFIELD System Maintenance LAND ACQUISITION 0.1 MI N OF N MONROE ST TO W OF ARCHER ST IN PITTSFIELD System Maintenance PEDESTRIAN RAMPS/ADA SAFETY TRANSPORTATION OPS 6-6 FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street Location Improvements Objectives US 54 AT I-72 N OF PITTSFIELD Congestion Mitigation RIGHT TURN LANE SAFETY TRANSPORTATION OPS US 54 MISSISSIPPI RIVER BRIDGE AT LOUISIANA MISSOURI Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Est. Cost County Past Current $300,000 PIKE 7 2016 $30,000,000 PIKE 2 2017-2021 MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST. ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG US 54 MISSISSIPPI RIVER BRIDGE AT LOUISIANA MISSOURI Bridge Maintenance P.E. (PHASE II) AADT 3,400 Truck Pct 16 Str Number 0759900 NHS Y $750,000 PIKE 2 2016 SAFETY PRESERVE SYSTEM $300,000 HANCOCK 1 2016 SAFETY PRESERVE SYSTEM $10,000,000 HANCOCK 1 2017-2021 MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST. ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. US 136 MISSISSIPPI RIVER BRIDGE AT KEOKUK Bridge Maintenance BRIDGE JOINT REPAIR ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. US 136 MISSISSIPPI RIVER BRIDGE AT KEOKUK Bridge Maintenance BRIDGE DECK OVERLAY ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY. Structure Status STRUCTURAL ACCRUING 6-7 AADT 12,400 Truck Pct 6 Str Number 0340062 NHS Y FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street Location Improvements Needs Category BACKLOG US 136: ILL RIVER BRIDGE TO 0.1 MI N OF RESURFACING PROMENADE ST; ILL 97: US 136 TO S PEDESTRIAN RAMPS/ADA MCKINLEY ST; ILL 78: US 136 TO N OF IM RR Miles = 1.71 System Maintenance Miles Roughness(IRI) Rutting AADT Truck Pct NHS NOT ACCEPTABLE 0.17 0.70 7,719 10.5 Y BACKLOG 0.09 ACCEPTABLE 0.16 3,550 11.0 N BACKLOG 0.92 ACCEPTABLE 0.15 3,376 9.7 N US 136 ILL 78 ILL 97 ILL 4 Needs Category BACKLOG NCL OF AUBURN TO 0.1 MI S OF ILL 104 Miles = 1.35 System Maintenance Miles 1.35 Roughness(IRI) ACCEPTABLE Rutting 0.13 AADT 6,440 Objectives SAFETY PRESERVE SYSTEM TRANSPORTATION OPS SAFETY PRESERVE SYSTEM RESURFACING MILLED RUMBLE STRIP Truck Pct 3.3 Est. Cost $1,545,000 County Past Current MASON 1 2017-2021 $950,000 SANGAMON 5 2017-2021 NHS N ILL 4 AT ILL 104 IN AUBURN Congestion Mitigation INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $1,150,000 SANGAMON 5 2017-2021 ILL 4 0.1 MI S OF ILL 104 IN AUBURN TO MACOUPIN CO LINE Miles = 4.51 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $2,000,000 SANGAMON 2 2017-2021 $550,000 SANGAMON 5 2017-2021 $100,000 SANGAMON 2 2017-2021 Needs Category BACKLOG Miles 4.51 Roughness(IRI) ACCEPTABLE Rutting 0.13 AADT 6,753 Truck Pct 6.2 NHS N ILL 4 AT WEST DIVERNON RD S OF AUBURN Congestion Mitigation LEFT TURN LANES RIGHT TURN LANE ILL 4 AT WEST DIVERNON RD S OF AUBURN Congestion Mitigation LAND ACQUISITION SAFETY MODAL CONNECTIVITY TRANSPORTATION OPS 6-8 FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street ILL 4 Needs Category BACKLOG Location Improvements SANGAMON CO LINE TO GEORGE ST IN VIRDEN Miles = 2.02 System Maintenance Miles 2.02 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 8,564 Objectives RESURFACING PARKING IMPROVEMENT Truck Pct 6.5 Est. Cost County Past Current SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY $1,300,000 MACOUPIN 4 2017-2021 NHS N ILL 4 PEDESTRIAN RAMPS / ADA COMPLIANCE PEDESTRIAN RAMPS/ADA REPAIRS IN THE CITY OF VIRDEN System Maintenance SAFETY TRANSPORTATION OPS $110,000 MACOUPIN 1 2017-2021 ILL 4 DITCH N OF W NORTH ST IN GIRARD (S OF HIGH SCHOOL ENTRANCE) Miles = 0.09 Bridge Maintenance CULVERT (NEW) RESURFACING INTERSECTION IMPROVEMENT SIDEWALKS SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $800,000 MACOUPIN 7 2017-2021 ILL 10 0.1 MI E OF MASON CO LINE TO 2.5 MI E OF NEW HOLLAND Miles = 4.35 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $1,500,000 LOGAN 3 2017-2021 $600,000 LOGAN 5 2017-2021 MACOUPIN 6 2017-2021 Needs Category BACKLOG Miles 4.35 Roughness(IRI) ACCEPTABLE Rutting 0.19 AADT 1,948 Truck Pct 11.0 NHS N ILL 10 DITCH 0.8 MI E OF MASON CO LINE Bridge Maintenance CULVERT (NEW) SAFETY ILL 16 PIASA CREEK 0.2 MI W OF PIASA Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL ACCRUING ILL 16 SAFETY PIASA CREEK TRIB 3.2 MI W OF SHIPMAN CULVERT (NEW) Bridge Maintenance 6-9 $1,500,000 AADT 2,600 $500,000 Truck Pct 8 MACOUPIN Str Number 0590001 NHS Y 6 2017-2021 FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street ILL 16 Location Improvements PIASA CREEK 3.1 MI W OF SHIPMAN Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING ILL 16 S FORK SANGAMON RIVER 2.4 MI E OF ELM ST IN NOKOMIS Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING ILL 16 SANGAMON CREEK WCL OF OHLMAN Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING ILL 16 DITCH 0.3 MI NE OF MONTGOMERY CO LINE Bridge Maintenance CULVERT (NEW) SAFETY ILL 29 MENARD CO LINE TO N OF FISHER RD S OF CANTRALL Miles = 3.07 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM ILL 123 Needs Category BACKLOG Miles 3.07 Roughness(IRI) ACCEPTABLE Rutting 0.19 AADT 6,343 Truck Pct 6.1 N OF FISHER RD S OF CANTRALL TO 0.2 RESURFACING MI N OF CAPITAL AIRPORT ENTRANCE IN SHOULDER RECONSTRUCTION J DAVID JONES PKWY SPRINGFIELD MILLED RUMBLE STRIP Miles = 6.18 System Maintenance Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS BACKLOG 5.16 ACCEPTABLE 0.20 6,739 6.8 N 1.02 ACCEPTABLE 0.14 8,912 6.8 $1,400,000 AADT 2,850 $1,000,000 AADT 1,550 $1,400,000 AADT 1,500 $950,000 County MACOUPIN Truck Pct 9 6 Str Number 0590002 MONTGOMERY Truck Pct 10 2017-2021 NHS Y 8 Str Number 0680016 MONTGOMERY Truck Pct 10 Past Current 2017-2021 NHS Y 8 Str Number 0680017 2017-2021 NHS Y CHRISTIAN 7 2017-2021 $3,000,000 SANGAMON 4 2017-2021 $6,300,000 SANGAMON 6 2017-2021 NHS N ILL 29 BACKLOG Est. Cost Y 6 - 10 FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street ILL 29 ANDREW RD ILL 29 Location Improvements $1,250,000 SANGAMON 2 2017-2021 N OF MAGNOLIA ST TO US 51 (E JACKSON ST) IN PANA Miles = 1.84 System Maintenance RESURFACING PEDESTRIAN RAMPS/ADA SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $1,100,000 CHRISTIAN 1 2017-2021 Rutting 0.14 AADT 4,675 Truck Pct 12.5 NHS Y BACKLOG 0.58 ACCEPTABLE 0.15 3,701 11.9 N MCDONALD ST ILL 54 S OF 700TH ST TO MCDONALD ST E OF MT PULASKI Miles = 1.23 System Maintenance Miles 1.23 Roughness(IRI) ACCEPTABLE Rutting 0.10 AADT 1,150 RESURFACING Truck Pct 17.4 SAFETY PRESERVE SYSTEM $750,000 LOGAN 2 2017-2021 NHS N AT MCDONALD ST (ILL 54 SPUR) SE OF MT PULASKI Miles = 0.35 Congestion Mitigation INTERSECTION IMPROVEMENT LEFT TURN LANES RIGHT TURN LANE RESURFACING SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $725,000 LOGAN 5 2017-2021 ILL 121 & IC RR AT SE EDGE OF MT PULASKI Bridge Maintenance BRIDGE REHABILITATION BRIDGE SUPERSTRUCTURE SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $2,500,000 LOGAN 8 2017-2021 Structure Status ADEQUATE ILL 54 Past Current SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS Roughness(IRI) ACCEPTABLE ILL 54 County INTERSECTION IMPROVEMENT LEFT TURN LANES Miles 1.26 Needs Category BACKLOG Est. Cost AT ANDREW RD 3.4 MI N OF SPRINGFIELD Congestion Mitigation Needs Category BACKLOG ILL 54 Objectives WOLF CREEK 1.6 MI E OF BARCLAY Miles = 0.27 Bridge Maintenance SAFETY PRESERVE SYSTEM TRANSPORTATION OPS CULVERT REPLACEMENT VERTICAL REALIGNMENT Structure Status STRUCTURAL BACKLOG 6 - 11 AADT 1,150 $2,400,000 AADT 3,050 Truck Pct 17 Str Number 0540030 SANGAMON Truck Pct 8 NHS N 11 Str Number 0842002 2017-2021 NHS N FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street ILL 57 Location Improvements S OF YORK ST IN QUINCY TO S OF MARBLEHEAD Miles = 6.96 System Maintenance RESURFACING Needs Category BACKLOG Miles 2.49 Roughness(IRI) ACCEPTABLE Rutting 0.32 AADT 6,621 Truck Pct 14.5 NHS Y BACKLOG 4.47 ACCEPTABLE 0.31 4,580 14.5 N ILL 57 PAYSON AVE 0.5 MI S OF US 24 IN QUINCY Bridge Maintenance Objectives BRIDGE NEW DECK BRIDGE REPAIR CURTIS CREEK 1.6 MI S OF US 24 IN QUINCY Bridge Maintenance BRIDGE NEW DECK BRIDGE REHABILITATION BRIDGE APPROACH ROADWAY BRIDGE JOINT REPAIR ADAMS 12 2017-2021 SAFETY PRESERVE SYSTEM $1,800,000 ADAMS 12 2017-2021 SAFETY PRESERVE SYSTEM AADT 7,400 $550,000 AADT 5,500 ILL 57 MILL CREEK AT MARBLEHEAD Bridge Maintenance BRIDGE DECK WATERPROOFING PRESERVE SYSTEM SAFETY BRIDGE DECK REPAIRS BRIDGE JOINT REPAIR $250,000 ILL 96 N OF SUTTER RD TO ADAMS CO LINE Miles = 5.62 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $1,900,000 Miles 5.62 Roughness(IRI) GOOD Rutting 0.23 AADT 1,900 Truck Pct 12.3 NHS N 6 - 12 Past Current $4,060,000 Structure Status ADEQUATE Needs Category BACKLOG County SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG ILL 57 Est. Cost Truck Pct 14 Str Number 0010012 ADAMS Truck Pct 15 NHS Y 5 Str Number 0010013 2017-2021 NHS Y ADAMS 1 2017-2021 HANCOCK 1 2016 FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street Location Improvements Objectives ILL 96 DITCH 1 MI N OF KOCHS LN N OF QUINCY Bridge Maintenance CULVERT (NEW) SAFETY ILL 96 CEDAR CREEK 0.1 MI N OF WISMAN LN IN QUINCY Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG ILL 96 Needs Category BACKLOG ILL 96 STATE ST S OF ALDO BLVD TO N OF KOCHS LN IN QUINCY Miles = 2.67 System Maintenance Miles 2.67 Roughness(IRI) ACCEPTABLE Rutting 0.20 AADT 8,507 EMERY CREEK 0.3 MI E OF 24TH ST IN QUINCY Bridge Maintenance RESURFACING PEDESTRIAN RAMPS/ADA Truck Pct 4.6 DEARBORN ST Needs Category BACKLOG ILL 97 ILL 123 Needs Category BACKLOG E OF S MCKINLEY ST IN HAVANA TO 0.3 MI N OF E CR 800 Miles = 8.55 System Maintenance Miles 8.55 Roughness(IRI) ACCEPTABLE Rutting 0.16 AADT 2,386 N OF WARING RD S OF ATTERBERRY TO 0.1 MI N OF LAKE PETERSBURG RD Miles = 5.73 System Maintenance Miles 5.73 Roughness(IRI) ACCEPTABLE Rutting 0.16 AADT 3,572 RESURFACING $600,000 ADAMS 4 2017-2021 $1,200,000 ADAMS 3 2017-2021 AADT 6,450 Truck Pct 5 Str Number 0010032 NHS N $1,800,000 ADAMS 1 2017-2021 SAFETY PRESERVE SYSTEM $1,000,000 ADAMS 5 2016 AADT 11,100 Truck Pct 3 Str Number 0010033 NHS N SAFETY PRESERVE SYSTEM $3,200,000 MASON 2 2016 SAFETY PRESERVE SYSTEM $2,370,000 MENARD 6 2017-2021 NHS N RESURFACING Truck Pct 10.8 Past Current NHS N BRIDGE REPLACEMENT Truck Pct 16.7 County SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Structure Status STRUCTURAL ACCRUING ILL 97 Est. Cost NHS N 6 - 13 FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street ILL 97 Location Improvements E OF ILL 125 TO E OF KOKE MILL RD IN SPRINGFIELD Miles = 4.15 System Maintenance RESURFACING SHOULDER RECONSTRUCTION MILLED RUMBLE STRIP Needs Category BACKLOG Miles 2.76 Roughness(IRI) ACCEPTABLE Rutting 0.31 AADT 10,300 Truck Pct 5.6 NHS N BACKLOG 1.39 ACCEPTABLE 0.31 10,300 5.6 Y ILL 100 ILL 106 ILL 103 Objectives ILLINOIS RIVER AT E EDGE OF FLORENCE Bridge Maintenance P.E. (PHASE I) COAL DITCH TRIB 1.4 MI W OF US 67 Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG ILL 104 Needs Category BACKLOG 0.2 MI W OF ILL 4 IN AUBURN TO ECL OF AUBURN Miles = 1.73 System Maintenance Miles 1.73 Roughness(IRI) ACCEPTABLE Rutting 0.16 AADT 5,967 RESURFACING PARKING IMPROVEMENT Truck Pct 10.9 Est. Cost $2,600,000 County Past Current SANGAMON 3 2016 $500,000 SCOTT 1 2016 $600,000 SCHUYLER 8 2017-2021 AADT 1,300 Truck Pct 13 Str Number 0850028 NHS N SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY $1,000,000 SANGAMON 4 2017-2021 NHS N ILL 104 PEDESTRIAN RAMPS / ADA COMPLIANCE PEDESTRIAN RAMPS/ADA REPAIRS IN THE CITY OF AUBURN System Maintenance SAFETY TRANSPORTATION OPS $40,000 SANGAMON 1 2017-2021 ILL 108 JOE'S CREEK 0.7 MI E OF GREENE CO LINE Bridge Maintenance SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $750,000 MACOUPIN 1 2017-2021 BRIDGE SUPERSTRUCTURE Structure Status STRUCTURAL BACKLOG 6 - 14 AADT 700 Truck Pct 18 Str Number 0590048 NHS N FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street ILL 111 Location Improvements PIASA CREEK 0.2 MI S OF ILL 16 Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING ILL 111 LITTLE PIASA CREEK 3.7 MI S OF ILL 16 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status FUNCTIONAL BACKLOG ILL 111 LITTLE PIASA CREEK 4 MI S OF ILL 16 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status FUNCTIONAL LONG TERM ILL 121 MCDONALD ST Needs Category BACKLOG ILL 121 MCDONALD ST ILL 121 Needs Category BACKLOG AT MCDONALD ST (ILL 54 SPUR) SE OF MT PULASKI Miles = 0.74 Congestion Mitigation Miles 0.74 Roughness(IRI) ACCEPTABLE Rutting 0.14 AADT 3,650 AT MCDONALD ST (ILL 54 SPUR) SE OF MT PULASKI Congestion Mitigation INTERSECTION IMPROVEMENT LEFT TURN LANES RIGHT TURN LANE RESURFACING Truck Pct 21.0 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS Est. Cost $1,975,000 AADT 4,100 $1,325,000 AADT 6,000 $1,375,000 AADT 6,000 County MACOUPIN Truck Pct 10 18 Str Number 0590017 MACOUPIN Truck Pct 6 2017-2021 NHS N 18 Str Number 0590019 MACOUPIN Truck Pct 6 Past Current 2017-2021 NHS N 18 Str Number 0590020 2017-2021 NHS N $1,350,000 LOGAN 5 2017-2021 $200,000 LOGAN 3 2017-2021 $2,600,000 LOGAN 2 2016 NHS Y LAND ACQUISITION 0.1 MI SE OF ILL 54 TO 0.6 MI W OF RESURFACING BEASON RD / CHESTNUT RD W OF SHOULDER RECONSTRUCTION LATHAM Miles = 4.67 System Maintenance Miles Roughness(IRI) Rutting AADT Truck Pct NHS 4.67 ACCEPTABLE 0.20 3,478 23.0 Y 6 - 15 SAFETY PRESERVE SYSTEM FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street ILL 123 Location Improvements RICHLAND CREEK 0.6 MI N OF ILL 125 Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING ILL 123 Needs Category BACKLOG ILL 123 ILL 29 E OF ATHENS TO 0.6 MI W OF I-55 Miles = 6.09 System Maintenance Miles 6.09 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 2,205 DITCH 0.1 MI E OF ILL 29 Bridge Maintenance RESURFACING Truck Pct 13.6 FANCY CREEK 2.7 MI E OF ILL 29 Bridge Maintenance Needs Category BACKLOG 0.2 MI E OF S BLUFF SPRINGS RD TO ILL 78 IN VIRGINIA Miles = 7.75 System Maintenance Miles 7.75 Roughness(IRI) ACCEPTABLE Rutting 0.15 AADT 3,806 Truck Pct 9 10 Str Number 0840090 2017-2021 NHS N SANGAMON 5 2017-2021 SAFETY PRESERVE SYSTEM $600,000 SANGAMON 5 2017-2021 NHS N CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT RESURFACING SHOULDER RECONSTRUCTION MILLED RUMBLE STRIP Truck Pct 10.3 AADT 1,000 SANGAMON Past Current $1,900,000 Structure Status STRUCTURAL ACCRUING ILL 125 $700,000 County SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG ILL 123 Est. Cost NHS N 6 - 16 SAFETY PRESERVE SYSTEM AADT 2,100 $2,000,000 AADT 2,100 $3,900,000 Truck Pct 14 Str Number 0847099 SANGAMON Truck Pct 14 CASS NHS N 5 Str Number 0840097 2017-2021 NHS N 2 2017-2021 FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street ILL 125 Needs Category BACKLOG Location Improvements ECL OF PLEASANT PLAINS TO ILL 97 Miles = 6.72 System Maintenance Miles 6.72 Roughness(IRI) ACCEPTABLE Rutting 0.31 AADT 5,631 Objectives RESURFACING SHOULDER RECONSTRUCTION MILLED RUMBLE STRIP Truck Pct 14.3 SAFETY PRESERVE SYSTEM Est. Cost County Past Current $5,400,000 SANGAMON 6 2017-2021 NHS N ILL 125 ECL OF PLEASANT PLAINS TO ILL 97 System Maintenance LAND ACQUISITION $500,000 SANGAMON 6 2017-2021 ILL 125 ECL OF PLEASANT PLAINS TO ILL 97 System Maintenance UTILITY ADJUSTMENT $200,000 SANGAMON 6 2017-2021 ILL 138 ILL 4 TO 8TH ST IN BENLD Miles = 0.76 System Maintenance RESURFACING MISCELLANEOUS SAFETY PRESERVE SYSTEM $300,000 MACOUPIN 3 2017-2021 MACOUPIN 3 2017-2021 MONTGOMERY 5 2016 Needs Category ACCRUING Miles 0.76 Roughness(IRI) ACCEPTABLE Rutting 0.12 AADT 3,784 Truck Pct 4.4 NHS N ILL 159 AT ALTON ST IN BUNKER HILL System Maintenance DRAINAGE SAFETY PRESERVE SYSTEM $100,000 ILL 185 MCDAVID BRANCH 1 MI W OF COFFEEN Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,300,000 Structure Status STRUCTURAL ACCRUING 6 - 17 AADT 3,000 Truck Pct 9 Str Number 0680026 NHS N FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street ILL 185 Location BAYOU CREEK 1.3 MI E OF COFFEEN Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING Est. Cost $1,500,000 AADT 1,850 7TH ST DITCH S OF ILL 97 IN PETERSBURG Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $400,000 I 55 W FR RD KICKAPOO CREEK 0.3 MI NE OF LAWNDALE Bridge Maintenance BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM $3,100,000 Structure Status STRUCTURAL BACKLOG AADT 1,700 County MONTGOMERY Truck Pct 10 Past Current 5 Str Number 0680027 2016 NHS N MENARD 5 2017-2021 LOGAN 10 2017-2021 Truck Pct 7 Str Number 0540002 NHS N LINCOLN TRAIL DITCH E OF WOODBINE RD IN TAYLORVILLE Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 CHRISTIAN 5 2017-2021 MACARTHUR BLVD AT ASH ST IN SPRINGFIELD Congestion Mitigation INTERSECTION IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $600,000 SANGAMON 7 2017-2021 MACARTHUR BLVD AT ASH ST IN SPRINGFIELD Congestion Mitigation LAND ACQUISITION $150,000 SANGAMON 5 2017-2021 MACARTHUR BLVD AT LAUREL ST IN SPRINGFIELD Congestion Mitigation INTERSECTION RECONSTN $1,200,000 SANGAMON 2 2017-2021 6 - 18 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street Location Improvements MACARTHUR BLVD AT LAUREL ST IN SPRINGFIELD Congestion Mitigation LAND ACQUISITION MCDONALD ST ILL 54 TO ILL 121 IN MT PULASKI Miles = 0.32 System Maintenance RESURFACING Needs Category ACCRUING SHIPMAN BLKTP Miles 0.32 Roughness(IRI) NOT ACCEPTABLE Rutting 0.10 AADT 1,100 COOPS CREEK 2.6 MI N OF ILL 16 IN SHIPMAN Miles = 0.16 Bridge Maintenance Truck Pct 12.7 Objectives SAFETY PRESERVE SYSTEM Est. Cost County Past Current $350,000 SANGAMON 3 2017-2021 $225,000 LOGAN 5 2017-2021 MACOUPIN 5 2017-2021 NHS N SAFETY PRESERVE SYSTEM TRANSPORTATION OPS BRIDGE REPLACEMENT VERTICAL REALIGNMENT Structure Status STRUCTURAL BACKLOG $1,600,000 AADT 1,400 Truck Pct 18 Str Number 0590029 NHS N VARIOUS LOCAL ROADS CONSULTANTS System Maintenance PRELIMINARY ENGINEERING $300,000 DISTRICT-WIDE 1 2016 VARIOUS LOCAL ROADS CONSULTANTS System Maintenance PRELIMINARY ENGINEERING $200,000 DISTRICT-WIDE 1 2017-2021 VARIOUS POST-LAND ACQUISITION ACTIVITY POST-ACQUISITION ACTIVITY $250,000 DISTRICT-WIDE 2 2017-2021 VARIOUS VARIOUS STRUCTURES IN LOGAN AND SANGAMON COUNTIES (OUTSIDE SPRINGFIELD MPO) Bridge Maintenance BRIDGE DECK SEALING PRESERVE SYSTEM $100,000 LOGAN SANGAMON 2 2016 VARIOUS VARIOUS STRUCTURES IN SANGAMON CO (INSIDE SPRINGFIELD MPO) Bridge Maintenance BRIDGE DECK SEALING PRESERVE SYSTEM $100,000 SANGAMON 2 2016 6 - 19 FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS VARIOUS STRUCTURES BRIDGE DECK SEALING PRESERVE SYSTEM $700,000 VARIOUS 3 2016 VARIOUS VARIOUS STRUCTURES BRIDGE DECK SEALING PRESERVE SYSTEM $700,000 VARIOUS 3 2017-2021 VARIOUS VARIOUS GUARDRAIL REPAIRS System Maintenance GUARDRAIL SAFETY $154,000 VARIOUS 4 2016 VARIOUS PRE-LAND ACQUISITION ACTIVITY System Maintenance PRE-ACQUISITION ACTIVITY $150,000 DISTRICT-WIDE 5 2016 VARIOUS PRE-LAND ACQUISITION ACTIVITY PRE-ACQUISITION ACTIVITY $350,000 DISTRICT-WIDE 3 2017-2021 VARIOUS POST-LAND ACQUISITION ACTIVITY System Maintenance POST-ACQUISITION ACTIVITY $150,000 DISTRICT-WIDE 5 2016 VARIOUS POST-LAND ACQUISITION ACTIVITY System Maintenance POST-ACQUISITION ACTIVITY $100,000 DISTRICT-WIDE 3 2017-2021 VARIOUS MISCELLANEOUS LAND ACQUISITION System Maintenance LAND ACQUISITION $500,000 DISTRICT-WIDE 5 2016 VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION $930,000 DISTRICT-WIDE 3 2017-2021 VARIOUS LAND ACQUISITION SURVEYS System Maintenance P.E. SURVEYS (ROW) $150,000 DISTRICT-WIDE 5 2016 6 - 20 FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS LAND ACQUISITION SURVEYS P.E. SURVEYS (ROW) $400,000 DISTRICT-WIDE 3 2017-2021 VARIOUS DESIGN SURVEYS System Maintenance P.E. SURVEYS (PHASE I) P.E. SURVEYS (PHASE II) $100,000 DISTRICT-WIDE 5 2016 VARIOUS DESIGN SURVEYS P.E. SURVEYS (PHASE I) P.E. SURVEYS (PHASE II) $300,000 DISTRICT-WIDE 3 2017-2021 VARIOUS DISTRICT MISCELLANEOUS System Maintenance MISCELLANEOUS PROJECTS $500,000 DISTRICT-WIDE 5 2016 VARIOUS DISTRICT MISCELLANEOUS MISCELLANEOUS PROJECTS $1,450,000 DISTRICT-WIDE 2 2017-2021 VARIOUS ON-CALL ENGINEERING System Maintenance PRELIMINARY ENGINEERING P.E. (CONSULTANT PLANS) $500,000 DISTRICT-WIDE 6 2016 VARIOUS ON-CALL ENGINEERING PRELIMINARY ENGINEERING P.E. (CONSULTANT PLANS) $1,250,000 DISTRICT-WIDE 5 2017-2021 VARIOUS ON-CALL ENGINEERING System Maintenance CONSTRUCTION ENGINEERING $750,000 DISTRICT-WIDE 1 2016 VARIOUS ON-CALL ENGINEERING CONSTRUCTION ENGINEERING $1,400,000 DISTRICT-WIDE 3 2017-2021 VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS $16,255,000 DISTRICT-WIDE 6 2017-2021 SAFETY 6 - 21 FY 2016-2021 Highway Improvement Program District 6 State Highways MYP Years Route/Street VARIOUS Location Improvements SOIL BORINGS System Maintenance Objectives P.E. SOILS (PHASE I) P.E. SOILS (PHASE II) SUSTAINABILITY Est. Cost County Past Current $200,000 DISTRICT-WIDE 5 2017-2021 $300,000 VARIOUS 6 2016 VARIOUS LAGRANGE WETLAND BANK IN BROWN CO System Maintenance WETLAND MITIGATION VARIOUS CHANGE ORDER RESERVE System Maintenance CHANGE ORDERS $310,000 DISTRICT-WIDE 3 2016 VARIOUS CHANGE ORDER RESERVE System Maintenance CHANGE ORDERS $270,000 DISTRICT-WIDE 3 2017-2021 VARIOUS UTILITY ADJUSTMENTS System Maintenance UTILITY ADJUSTMENT $500,000 DISTRICT-WIDE 5 2016 VARIOUS UTILITY ADJUSTMENTS UTILITY ADJUSTMENT $750,000 DISTRICT-WIDE 3 2017-2021 6 - 22 DISTRICT FY 2016-2019 Highway Improvement Program District 6 Local Highways MYP Years Route/Street 5TH ST Location WCL OF LINCOLN AT I-55 TO LINCOLN PKWY IN LINCOLN Miles = 4.92 Improvements Objectives SAFETY PRESERVE SYSTEM RECONSTRUCTION Est. Cost $5,002,000 County Past Current LOGAN 1 2017-2021 $160,000 SANGAMON 1 2016 $4,500,000 SANGAMON 10 2016 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. THIS EARMARK WILL BE FUNDED SEPARATELY. ILLINOIS JOBS NOW! PROJECT 11TH ST E KNOX AVE TO LINCOLNSHIRE RD IN SPRINGFIELD UTILITY ADJUSTMENT 11TH ST E KNOX AVE TO LINCOLNSHIRE RD IN SPRINGFIELD Miles = 0.92 GRADING PAVING TRANSPORTATION OPS MODAL CONNECTIVITY PRESERVE SYSTEM SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT. THIS EARMARK WILL BE FUNDED SEPARATELY. 11TH ST E KNOX AVE TO LINCOLNSHIRE RD IN SPRINGFIELD CONSTRUCTION ENGINEERING $320,000 SANGAMON 1 2016 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT. THIS EARMARK WILL BE FUNDED SEPARATELY. 223RD LN FALL CREEK E OF 1150 E RD BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM $1,000,000 LAMOINE RIVER 3 MI SW OF LAHARPE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM LAMOINE RIVER 3 MI SW OF LAHARPE CONSTRUCTION ENGINEERING BASCO TO ILL 336 Miles = 3.91 MICROSURFACING 1 PASS CH 51 2500 N RD TR 71 2500 N RD ADAMS 2 2017-2021 $600,000 HANCOCK 1 2017-2021 $22,000 HANCOCK 1 2017-2021 $200,000 HANCOCK 1 2017-2021 TR 71 BASCO RD CH 11 6 - 23 SAFETY PRESERVE SYSTEM FY 2016-2019 Highway Improvement Program District 6 Local Highways MYP Years Route/Street BASCO RD Location BEAR CREEK 1.7 MI W OF BASCO Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Est. Cost $932,000 County Past Current HANCOCK 5 2016 HANCOCK 5 2016 $1,700,000 CHRISTIAN 1 2016 $80,000 CHRISTIAN 1 2016 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. BASCO RD BEAR CREEK 1.7 MI W OF BASCO CONSTRUCTION ENGINEERING $93,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. BEAR CREEK RD N 1250 E RD / CH 1 TO ILL 29 Miles = 10.70 RESURFACING CH 12 SAFETY PRESERVE SYSTEM BEAR CREEK RD N 1250 E RD / CH 1 TO ILL 29 CONSTRUCTION ENGINEERING BRIGHTON TO BUNKER HILL Miles = 9.50 RECONSTRUCTION SAFETY PRESERVE SYSTEM $165,000 MACOUPIN 12 2016 BRIGHTON TO BUNKER HILL Miles = 9.50 RECONSTRUCTION SAFETY PRESERVE SYSTEM $2,500,000 MACOUPIN 3 2016 SANGAMON 1 2017-2021 ADAMS 5 2017-2021 CH 12 BRIGHTON RD BUNKER HILL RD BRIGHTON RD BUNKER HILL RD SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. THIS EARMARK WILL BE FUNDED SEPARATELY. BROWNING RD CH 59 CAMP POINT BLKTP SPRING CREEK 0.5 MI SE OF ILL 4 IN SPRINGFIELD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,200,000 N 1600TH AVE TO 1400TH PL Miles = 2.49 RESURFACING SAFETY PRESERVE SYSTEM $450,000 6 - 24 FY 2016-2019 Highway Improvement Program District 6 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current ILL 125 IN ASHLAND TO MORGAN CO LINE Miles = 2.04 RESURFACING SAFETY PRESERVE SYSTEM $267,000 CASS 3 2017-2021 ILL 104 TO CH 45 (N 250TH AVE) Miles = 1.79 RESURFACING SAFETY PRESERVE SYSTEM $320,000 ADAMS 4 2017-2021 CH 20 1950 E RD TO 2450 E RD N OF TOPEKA Miles = 4.96 COLD IN-PLACE RECYCLING CAPE SEAL PRESERVE SYSTEM SUSTAINABILITY SAFETY $1,215,000 MASON 1 2017-2021 CH 20 2450 E RD TO WCL OF FOREST CITY Miles = 3.69 COLD IN-PLACE RECYCLING CAPE SEAL PRESERVE SYSTEM SUSTAINABILITY SAFETY $800,000 MASON 1 2017-2021 CH 24 OTTER CREEK 5.5 MI W OF NILWOOD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $650,000 MACOUPIN 1 2017-2021 OTTER CREEK 5.5 MI W OF NILWOOD CONSTRUCTION ENGINEERING $40,000 MACOUPIN 1 2017-2021 CH 25 US 136 TO WCL OF ATLANTA P.E. (PHASE I) P.E. (PHASE II) $140,000 LOGAN 2 2016 CH 25 US 136 TO WCL OF ATLANTA Miles = 4.22 RESURFACING $2,500,000 LOGAN 2 2017-2021 CH 25 US 136 TO WCL OF ATLANTA CONSTRUCTION ENGINEERING $160,000 LOGAN 2 2017-2021 CH 123 N ATHENS ST E WASHINGTON ST FREMONT ST OLD ILL 123 CH 14 E 2775TH ST QUARTON RD CH 24 QUARTON RD SAFETY PRESERVE SYSTEM 6 - 25 FY 2016-2019 Highway Improvement Program District 6 Local Highways MYP Years Route/Street CH 27 Location Improvements Objectives DURHAM RD CH 3 DURHAM RD CH 37 PAWNEE / County Past Current US 24 TO ELLINGTON RD COLD IN-PLACE RECYCLING PRESERVE SYSTEM SUSTAINABILITY $425,000 ADAMS 2 2016 WEAVER CREEK 3.5 MI E OF DALLAS CITY CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $200,000 HANCOCK 2 2016 WEAVER CREEK 3.5 MI E OF DALLAS CITY CONSTRUCTION ENGINEERING $20,000 HANCOCK 2 2016 60TH ST CH 3 Est. Cost CH 40 (NEW CITY RD) TO TR 111 (E 1800N RESURFACING RD) SAFETY PRESERVE SYSTEM $1,310,000 SANGAMON CHRISTIAN 3 2017-2021 HADLEY CREEK 1.7 MI N OF I-72 SAFETY PRESERVE SYSTEM $1,185,000 PIKE 6 2017-2021 PIKE 4 2017-2021 PIKE 3 2016 NEW CITY RD CH 4 BRIDGE REPLACEMENT 1700 E RD ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. CH 4 HADLEY CREEK 1.7 MI N OF I-72 CONSTRUCTION ENGINEERING $100,000 1700 E RD ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. CH 4 BULL RUN CREEK 3.5 MI S OF BARRY BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 TAZEWELL CO LINE TO WILLOW ST IN FOREST CITY Miles = 5.11 COLD IN-PLACE RECYCLING CAPE SEAL PRESERVE SYSTEM SUSTAINABILITY SAFETY $1,000,000 MASON 1 2016 SCL OF FOREST CITY TO US 136 Miles = 4.33 CAPE SEAL SAFETY PRESERVE SYSTEM $336,000 MASON 1 2017-2021 EL DARA RD CH 4 CH 13 CH 4 6 - 26 FY 2016-2019 Highway Improvement Program District 6 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost US 54 IN PITTSFIELD TO INDEPENDENCE COLD IN-PLACE RECYCLING PRESERVE SYSTEM SUSTAINABILITY $1,200,000 CH 8 ILL 99 TO TR 128 / N 900 E ST Miles = 1.98 BIT SURFACE TREATMENT-A3 SAFETY PRESERVE SYSTEM CH 8 ILL 99 TO TR 128 / N 900 E ST CONSTRUCTION ENGINEERING CHANDLERVILLE RD BEARDSTOWN TO N BLUFF SPRINGS RD Miles = 4.08 RESURFACING SAFETY PRESERVE SYSTEM CHANDLERVILLE RD HICKORY RD TO ILL 78 Miles = 4.42 RESURFACING CHANDLERVILLE RD N BLUFF SPRINGS RD TO HICKORY RD Miles = 4.92 E 2050TH ST CH 7 County Past Current PIKE 2 2017-2021 $522,000 BROWN 1 2017-2021 $26,000 BROWN 1 2017-2021 $1,230,000 CASS 12 2016 SAFETY PRESERVE SYSTEM $730,000 CASS 9 2017-2021 RESURFACING SAFETY PRESERVE SYSTEM $700,000 CASS 9 2017-2021 MCCRANEY CREEK 4 MI E OF PLAINVILLE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $800,000 ADAMS 1 2017-2021 E 850N RD COTTONWOOD CREEK 2 MI SW OF OWANECO BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $300,000 CHRISTIAN 3 2016 E 850N RD COTTONWOOD CREEK 2 MI SW OF OWANECO CONSTRUCTION ENGINEERING $32,000 CHRISTIAN 3 2016 E 900 N RD LAKE FORK CREEK 0.5 MI E OF US 51 BRIDGE REPLACEMENT $305,000 CHRISTIAN 1 2016 FAYETTE ST MONROE ST TR 350 SAFETY PRESERVE SYSTEM 6 - 27 FY 2016-2019 Highway Improvement Program District 6 Local Highways MYP Years Route/Street Location Improvements Objectives E 900 N RD LAKE FORK CREEK 0.5 MI E OF US 51 CONSTRUCTION ENGINEERING EL DARA RD KISER CREEK 3.5 MI SE OF BARRY BRIDGE REPLACEMENT Est. Cost $32,000 SAFETY PRESERVE SYSTEM County Past Current CHRISTIAN 1 2016 PIKE 2 2017-2021 PIKE 1 2017-2021 $4,000,000 LOGAN 12 2017-2021 $256,000 LOGAN 2 2017-2021 SANGAMON 1 2017-2021 $1,198,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. EL DARA RD KISER CREEK 3.5 MI SE OF BARRY CONSTRUCTION ENGINEERING $96,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. SAFETY PRESERVE SYSTEM FIFTH ST RD CH 15 (100TH AVE) TO LINCOLN QUARRY RD / 700TH AVE Miles = 6.23 RECONSTRUCTION FIFTH ST RD CH 15 (100TH AVE) TO LINCOLN QUARRY RD / 700TH AVE CONSTRUCTION ENGINEERING ILES AVE RECONSTRUCTION ILES AVE: 0.1 MI E OF BURGESS DR TO MEADOWBROOK RD; ARCHER SIDEWALKS ELEVATOR RD: 0.1 MI S OF BARRINGTON BIKEWAY DR TO N OF FIELDING DR IN SPRINGFIELD Miles = 0.98 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS ILL 78 TO STRAWN CROSSING RD Miles = 4.39 RESURFACING SAFETY PRESERVE SYSTEM $826,000 MORGAN 11 2017-2021 MIDDLETOWN BLKTP ILL 29 TO LOGAN CO LINE Miles = 7.48 RESURFACING SAFETY PRESERVE SYSTEM $1,200,000 MENARD 6 2017-2021 N 24TH AVE DRAINAGE DITCH 2.5 MI E OF HARVEL BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $310,000 MONTGOMERY CHRISTIAN 16 2017-2021 ARCHER ELEVATOR RD LIBERTY RD PRENTICE RD 6 - 28 $4,001,000 FY 2016-2019 Highway Improvement Program District 6 Local Highways MYP Years Route/Street Location Improvements Objectives N 24TH AVE DRAINAGE DITCH 2.5 MI E OF HARVEL CONSTRUCTION ENGINEERING N 400TH AVE PIGEON CREEK 1.5 MI E OF PAYSON BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM N MAIN ST WALNUT ST TO BNSF RR IN JACKSONVILLE Miles = 0.50 RESURFACING SIDEWALKS N SCOTTVILLE RD BIG APPLE CREEK 1.8 MI N OF SCOTTVILLE BRIDGE REPLACEMENT CONSTRUCTION ENGINEERING CH 38 BIG APPLE CREEK 1.8 MI N OF SCOTTVILLE NICHOLSON RD SUGAR CREEK 4.4 MI N OF LINCOLN BRIDGE REHABILITATION SUGAR CREEK 4.4 MI N OF LINCOLN CONSTRUCTION ENGINEERING SUGAR CREEK 4 MI W OF VIRDEN CULVERT REPLACEMENT SUGAR CREEK 4 MI W OF VIRDEN CONSTRUCTION ENGINEERING CH 22 CH 38 N SCOTTVILLE RD NICHOLSON RD $32,000 County Past Current MONTGOMERY CHRISTIAN 5 2017-2021 $500,000 ADAMS 2 2016 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $800,000 MORGAN 1 2016 SAFETY PRESERVE SYSTEM $640,000 MACOUPIN 2 2017-2021 $40,000 MACOUPIN 2 2017-2021 $800,000 LOGAN 2 2017-2021 $51,000 LOGAN 2 2017-2021 $1,300,000 MACOUPIN 8 2017-2021 $80,000 MACOUPIN 1 2017-2021 SAFETY PRESERVE SYSTEM CH 2 Est. Cost CH 2 NINE MILE RD SAFETY PRESERVE SYSTEM CH 37 NINE MILE RD CH 37 6 - 29 FY 2016-2019 Highway Improvement Program District 6 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current E OF MCKIBBIN LN TO E OF BRADFORDTON RD Miles = 0.45 WIDENING & RESURFACING SAFETY PRESERVE SYSTEM $2,700,000 SANGAMON 6 2017-2021 OLD SALEM LN LITTLE SPRING CREEK 2.3 MI W OF BRADFORDTON RD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $600,000 SANGAMON 8 2016 PRIMM RD DEER CREEK 1.5 MI S OF LINCOLN BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,984,000 LOGAN 2 2017-2021 LOGAN 1 2017-2021 OLD JACKSONVILLE RD CH 9 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. PRIMM RD DEER CREEK 1.5 MI S OF LINCOLN CONSTRUCTION ENGINEERING $127,000 CH 9 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. PRIMM RD SALT CREEK 6.4 MI N OF ILL 54 BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM $250,000 LOGAN 1 2016 MAUVAISE TERRE CREEK 2 MI SW OF EXETER BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $600,000 SCOTT 1 2017-2021 BIG BRANCH CREEK 0.3 MI W OF SAWYERVILLE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 MACOUPIN 2 2017-2021 BIG BRANCH CREEK 0.3 MI W OF SAWYERVILLE CONSTRUCTION ENGINEERING $40,000 MACOUPIN 2 2017-2021 FOX BRIDGE RD TO TAYLOR AVE Miles = 0.66 NEW CONSTRUCTION SANGAMON 4 2016 CH 9 RATTLESNAKE HOLLOW TR 60 SAWYERVILLE HILLS RD CH 26 SAWYERVILLE HILLS RD CH 26 STANFORD AVE TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT 6 - 30 $3,625,000 FY 2016-2019 Highway Improvement Program District 6 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current STANFORD AVE 11TH ST TO FOX BRIDGE RD Miles = 0.61 WIDENING & RESURFACING SIDEWALKS BIKEWAY SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $3,900,000 SANGAMON 1 2017-2021 TAYLORVILLE RD CHRISTIAN CO LINE TO NOKOMIS BLKTP Miles = 2.98 RESURFACING SAFETY PRESERVE SYSTEM $1,600,000 MONTGOMERY 7 2016 TR 116 BRUSH CREEK 3 MI NE OF PALMER BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $300,000 CHRISTIAN 8 2016 BRUSH CREEK 3 MI NE OF PALMER CONSTRUCTION ENGINEERING $32,000 CHRISTIAN 4 2016 MOSQUITO CREEK 3 MI E OF MT AUBURN BRIDGE REPLACEMENT $800,000 CHRISTIAN 5 2017-2021 MOSQUITO CREEK 3 MI E OF MT AUBURN CONSTRUCTION ENGINEERING $40,000 CHRISTIAN 5 2017-2021 TR 175 LA MOINE RIVER 4.5 MI NE OF CARTHAGE BRIDGE REPLACEMENT $800,000 HANCOCK 1 2017-2021 TR 175 LA MOINE RIVER 4.5 MI NE OF CARTHAGE CONSTRUCTION ENGINEERING $40,000 HANCOCK 1 2017-2021 TR 229 BRUSH CREEK 1.5 MI NE OF CLARKSDALE BRIDGE REPLACEMENT $550,000 CHRISTIAN 6 2017-2021 N 1150 E RD TR 116 N 1150 E RD TR 13 E 2850 N RD TR 13 E 2850 N RD E 1025 N RD SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 6 - 31 FY 2016-2019 Highway Improvement Program District 6 Local Highways MYP Years Route/Street TR 229 Location Improvements Objectives BRUSH CREEK 1.5 MI NE OF CLARKSDALE CONSTRUCTION ENGINEERING ROCK CREEK 2 MI NE OF FOUNTAIN GREEN BRIDGE REPLACEMENT ROCK CREEK 2 MI NE OF FOUNTAIN GREEN CONSTRUCTION ENGINEERING ACHENBACH BRANCH 3.5 MI N OF PALMER BRIDGE REPLACEMENT ACHENBACH BRANCH 3.5 MI N OF PALMER CONSTRUCTION ENGINEERING VANDALIA RD LINCOLN AVE TO S DIAMOND ST IN JACKSONVILLE Miles = 0.49 RECONSTRUCTION SAFETY PRESERVE SYSTEM VARIOUS VARIOUS LOCATIONS IN PIKE CO BIT SURFACE TREATMENT-A1 VARIOUS VARIOUS LOCATIONS IN HANCOCK CO BIT SURFACE TREATMENT-A1 W NICHOLAS ST CHILES ST TO N OAK ST IN CARLINVILLE P.E. (PHASE I) P.E. (PHASE II) W NICHOLAS ST CHILES ST TO N OAK ST IN CARLINVILLE Miles = 0.19 WIDENING & RESURFACING DRAINAGE E 1025 N RD TR 366 N 2900 RD TR 366 N 2900 RD TR 82 N 700 E RD TR 82 N 700 E RD County Past Current $32,000 CHRISTIAN 4 2017-2021 $750,000 HANCOCK 3 2017-2021 $60,000 HANCOCK 3 2017-2021 $200,000 CHRISTIAN 9 2017-2021 $32,000 CHRISTIAN 5 2017-2021 $275,000 MORGAN 10 2017-2021 SAFETY PRESERVE SYSTEM $792,000 PIKE 2 2017-2021 SAFETY PRESERVE SYSTEM $400,000 HANCOCK 1 2017-2021 $106,000 MACOUPIN 1 2016 $326,000 MACOUPIN 1 2017-2021 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 6 - 32 Est. Cost SAFETY PRESERVE SYSTEM FY 2016-2019 Highway Improvement Program District 6 Local Highways MYP Years Route/Street Location Improvements Objectives W NICHOLAS ST CHILES ST TO N OAK ST IN CARLINVILLE CONSTRUCTION ENGINEERING WALSHVILLE TRAIL MIDDLE FORK SHOAL CREEK 1.4 MI W OF ILL 127 SW OF HILLSBORO BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM JACKSONVILLE BRANCH LAGOON / SPILLWAY IN SPRINGFIELD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM JACKSONVILLE BRANCH LAGOON / SPILLWAY IN SPRINGFIELD CONSTRUCTION ENGINEERING WESLEY CHAPEL RD LICK CREEK 1.4 MI S OF SPAULDING ORCHARD RD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM WOODSIDE RD WOODSIDE RD: 0.2 MI E OF OLD CHATHAM RD TO MACARTHUR RD EXT; IRON BRIDGE RD: UPRR OVERPASS AT WOODSIDE RD TO 0.4 MI S IN SPRINGFIELD Miles = 0.81 PAVING WIDENING & RESURFACING WOODSIDE RD: 0.2 MI E OF OLD CHATHAM RD TO MACARTHUR RD EXT; IRON BRIDGE RD: UPRR OVERPASS AT WOODSIDE RD TO 0.4 MI S IN SPRINGFIELD BRIDGE (NEW) CH 11 WASHINGTON PARK RING RD WASHINGTON PARK RING RD IRON BRIDGE RD WOODSIDE RD IRON BRIDGE RD WOODSIDE RD CH 23 ILL 4 TO 0.2 MI E OF OLD CHATHAM RD IN WIDENING & RESURFACING SPRINGFIELD Miles = 0.90 6 - 33 Est. Cost $62,000 County Past Current MACOUPIN 1 2017-2021 $1,000,000 MONTGOMERY 6 2016 $1,421,000 SANGAMON 4 2016 $163,000 SANGAMON 4 2016 $600,000 SANGAMON 3 2016 PRESERVE SYSTEM TRANSPORTATION OPS SAFETY $1,570,000 SANGAMON 1 2017-2021 TRANSPORTATION OPS FREIGHT MOVEMENT $8,730,000 SANGAMON 3 2017-2021 SAFETY PRESERVE SYSTEM $5,580,000 SANGAMON 1 2017-2021 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE KANE DEKALB D2 COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK PEORIA D4 Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT ADAMS D5 MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 4 District 7 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 4, DISTRICT 7, EFFINGHAM Overview Highway District 7 encompasses 16 counties in southeastern Illinois and includes the cities of Decatur, Charleston, Mattoon, Effingham, Sullivan and Vandalia, plus many smaller communities which serve as satellites for the larger employment areas or as focal points of this farming area. The state highway system in District 7 consists of 1,626 miles of highways and 774 bridges, supporting 8.7 million vehicle miles of travel daily. State Program The program for state and local highways will average $1.398 billion annually for the FY 2016-2021 period. Approximately $205 million will be provided during FY 2016-2021 for improvements to state highways in District 7. The following table summarizes anticipated accomplishments on the state highway system in District 7 during this time frame. FY 2016-2021 Accomplishments System Maintenance Interstate (miles) Non-Interstate (miles) Safety Locations (number) Bridge Maintenance Interstate (number) Non-Interstate (number) New Bridges (number) Minor Structure Repair (number) Congestion Mitigation Roads (miles) Traffic Improvements (number) System Expansion Roads (miles) Locations (number) 7-i 34 16 1 3 29 0 21 0 0 0 0 Major Highway projects of interest that are tentatively scheduled during the FY 2016-2021 time frame include:  Interstate 57 from Marion County Line to Clay County Line in Fayette County. Resurfacing on 8.5 miles, ramp repair at Farina interchange, bridge deck repair, bridge joint repair and rip rap are programmed in FY 2016 at a cost of $17 million.  Interstate 70 from abandoned railroad bridge at Altamont to Little Wabash River west of Effingham. Rubblization with an overlay on 9.1 miles, ramp repair at Altamont interchange, bridge joint repair, bridge deck repair, bridge repair, rip rap and wing wall repair are programmed during FY 2017-2021 at a cost of $34.1 million.  Interstate 70 from Township Road 258 2.1 miles east of US 45 Interchange to Cumberland County line in Effingham County. Rubblization with an overlay on 7.1 miles, a bridge new deck, bridge repair, culvert rehabilitation and repair and bridge deck repair are programmed during FY 2017-2021 at a cost of $28.1 million.  Interstate 70 from Effingham County line to 7.5 miles east in Cumberland County. Resurfacing and safety improvements on 7.5 miles are programmed during FY 2017-2021 at a cost of $16.7 million.  US 50 over Little Muddy Creek 0.8 mile west of the Richland County line and Big Muddy Creek at the Clay County line. Bridge replacements are programmed during FY 2017-2021 at a cost of $17.3 million. These projects have been approved for Illinois Major Bridge Program funding.  US 51 over the Sangamon River 1 mile south of Harristown (northbound and southbound). A bridge superstructure replacement is programmed during FY 2016 at a cost of $17 million. This project has been approved for Illinois Major Bridge Program funding.  Illinois 1 at Embarras River Overflow 0.5 miles north of US 50 and at Embarras River Overflow 1.0 miles north of US 50. Bridge replacements are programmed during FY 2017-2021 at a cost of $13.4 million. These projects have been approved for Illinois Major Bridge Program funding.  Illinois 16 at Pinhook Creek 2.3 miles west of Illinois 32 in Shelby County. superstructure replacement is programmed during FY 2017-2021 at a cost of $1.2 million.  Illinois 121 from Logan County line to 0.6 miles northwest of Interstate 72. Resurfacing on 8.2 miles is programmed during FY 2016 at a cost of $3.4 million.  Illinois 121 at Long Point Creek 4.4 miles south of US 45 Junction in Cumberland County. A bridge replacement is programmed during FY 2016 at a cost of $1.7 million.  Illinois 121 at Long Point Branch 1.3 miles east of Montrose Road in Cumberland County. A bridge replacement is programmed during FY 2017-2021 at a cost of $1.0 million. 7-ii A bridge FY 2016-2021 Highway Improvement Program District 7 State Highways MYP Years Route/Street I 57 Needs Category BACKLOG I 57 Location Improvements MARION CO LINE TO CLAY CO LINE Miles = 8.47 System Maintenance Miles 8.47 Roughness(IRI) GOOD Rutting 0.12 AADT 15,049 FARINA INTCHG Objectives 70 UNDER ILL 49 70 (WESTBOUND) CSXT RR 1.5 MI W OF BROWNSTOWN INTCHG Bridge Maintenance FAYETTE 5 2016 RAMP REPAIR SAFETY PRESERVE SYSTEM $550,000 FAYETTE 1 2016 BRIDGE REPAIR SAFETY PRESERVE SYSTEM $790,000 CLARK 1 2016 BRIDGE WIDENING BRIDGE REHABILITATION SAFETY TRANSPORTATION OPS PRESERVE SYSTEM FAYETTE 5 2017-2021 Truck Pct 53.4 NHS Y Structure Status STRUCTURAL ACCRUING I 70 Needs Category BACKLOG I 70 ABANDONED RR BRIDGE AT ALTAMONT TO LITTLE WABASH RIVER W OF EFFINGHAM Miles = 9.05 System Maintenance Miles 9.05 Roughness(IRI) GOOD Rutting 0.09 AADT 19,988 ALTAMONT INTCHG System Maintenance Past Current $16,490,000 System Maintenance I County SAFETY PRESERVE SYSTEM RESURFACING BRIDGE DECK REPAIRS BRIDGE JOINT REPAIR RIP RAP System Maintenance I Est. Cost RUBBLIZATION/OVERLAY BRIDGE JOINT REPAIR BRIDGE DECK REPAIRS BRIDGE REPAIR RIP RAP WING WALL REPAIR Truck Pct 39.8 $4,310,000 AADT 9,950 Truck Pct 37 Str Number 0260022 NHS Y SAFETY PRESERVE SYSTEM $33,060,000 EFFINGHAM 2 2017-2021 SAFETY PRESERVE SYSTEM $1,000,000 EFFINGHAM 1 2017-2021 NHS Y RAMP REPAIR 7-1 FY 2016-2021 Highway Improvement Program District 7 State Highways MYP Years Route/Street I 70 Needs Category BACKLOG Location Improvements TR 258 2.1 MI E OF US 45 INTCHG TO CUMBERLAND CO LINE Miles = 7.06 System Maintenance Miles 7.06 Roughness(IRI) GOOD Rutting 0.09 AADT 19,229 Objectives RUBBLIZATION/OVERLAY BRIDGE NEW DECK CULVERT REHABILITATION BRIDGE REPAIR CULVERT REPAIR BRIDGE DECK REPAIRS Truck Pct 55.1 NHS Y SAFETY PRESERVE SYSTEM Structure Status ADEQUATE ADEQUATE I 70 Needs Category BACKLOG I 70 Needs Category BACKLOG US 36 EFFINGHAM CO LINE TO 7.5 MI E Miles = 7.50 System Maintenance Miles 7.50 Roughness(IRI) GOOD Rutting 0.21 AADT 18,600 CUMBERLAND CO LINE TO 2 MI E Miles = 2.00 System Maintenance Miles 2.00 Roughness(IRI) GOOD Rutting 0.24 AADT 18,819 OVER US 51 IN HARRISTOWN Bridge Maintenance SAFETY IMPROVEMENTS RESURFACING Truck Pct 49.2 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM EFFINGHAM Past Current 1 2017-2021 Truck Pct 49 Str Number 0250016 NHS Y 49 0250017 Y CUMBERLAND 1 2017-2021 $4,100,000 CLARK 1 2016 $1,960,000 MACON 3 2017-2021 NHS Y BRIDGE NEW DECK BRIDGE DECK REPAIRS BRIDGE REPAIR ILL 48 TO CHURCH ST IN DECATUR & ILL 48 TO W ELDORADO ST Miles = 1.22 System Maintenance 9,300 $16,700,000 STRUCTURAL ACCRUING ELDORADO ST AADT 9,300 SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL ACCRUING US 36 $28,110,000 County NHS Y RESURFACING Truck Pct 49.7 Est. Cost SAFETY PRESERVE SYSTEM RESURFACING Needs Category BACKLOG Miles 1.11 Roughness(IRI) NOT ACCEPTABLE Rutting 0.27 AADT 14,886 Truck Pct 7.0 NHS Y BACKLOG 0.11 NOT ACCEPTABLE 0.13 5,100 4.2 N 7-2 AADT 2,450 2,475 $1,000,000 Truck Pct 11 Str Number 0580107 NHS Y 12 0580106 Y MACON 2 2017-2021 FY 2016-2021 Highway Improvement Program District 7 State Highways MYP Years Route/Street Location Improvements Objectives US 40 CNRL RR N OF MARSHALL Bridge Maintenance BRIDGE REMOVAL/DEMOLITION US 45 GREEN CREEK 1.5 MI S OF SHELBY CO LINE Bridge Maintenance BRIDGE REPLACEMENT $2,900,000 SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG US 50 CH 6 MARION CO LINE TO CH 6 AT XENIA & US RESURFACING 50 TO OLD US 50 Miles = 4.17 System Maintenance Needs Category BACKLOG Miles 3.78 Roughness(IRI) ACCEPTABLE ACCRUING 0.39 NOT ACCEPTABLE US 50 Rutting 0.22 AADT 2,300 Truck Pct 26.4 NHS Y 0.13 1,400 6.4 N LITTLE MUDDY CREEK 0.8 MI W OF RICHLAND CO LINE Bridge Maintenance BRIDGE REPLACEMENT Est. Cost $750,000 AADT 3,550 County Past Current CLARK 6 2016 EFFINGHAM 11 2016 Truck Pct 7 Str Number 0250024 NHS N SAFETY PRESERVE SYSTEM $2,160,000 CLAY 2 2016 SAFETY PRESERVE SYSTEM $7,080,000 CLAY 12 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG US 50 BIG MUDDY CREEK AT CLAY CO LINE Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT AADT 4,150 $10,210,000 Truck Pct 22 Str Number 0130005 RICHLAND NHS Y 4 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG 7-3 AADT 4,150 Truck Pct 22 Str Number 0800001 NHS Y FY 2016-2021 Highway Improvement Program District 7 State Highways MYP Years Route/Street US 50 Location OVER ABANDONED RR 0.1 MI E OF ILL 1 Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG US 50 OVER CH 12 0.5 MI E OF ILL 1 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REHABILITATION Structure Status STRUCTURAL ACCRUING US 50 SAFETY PRESERVE SYSTEM OTTER POND DITCH 1.5 MI E OF ILL 1 INT BRIDGE REPLACEMENT Bridge Maintenance Structure Status STRUCTURAL BACKLOG US 50 WABASH RIVER AT VINCENNES, IND. Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPAIR Est. Cost $1,500,000 AADT 4,800 $700,000 AADT 4,800 $6,248,000 AADT 4,800 County LAWRENCE Truck Pct 17 10 Str Number 0510013 LAWRENCE Truck Pct 17 2017-2021 NHS Y 9 Str Number 0510014 LAWRENCE Truck Pct 17 Past Current 2017-2021 NHS Y 9 Str Number 0510015 2017-2021 NHS Y $250,000 LAWRENCE 2 2016 $1,500,000 LAWRENCE 1 2017-2021 $600,000 LAWRENCE 7 2016 $25,000 LAWRENCE 1 2016 INDIANA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. US 50 0.3 MI W OF ILL 1 TO 1400E E OF LAWRENCEVILLE System Expansion P.E. (PHASE II) US 50 BUS TR 209 & WABASH RIVER AT VINCENNES BRIDGE REPAIR INDIANA Bridge Maintenance SAFETY PRESERVE SYSTEM INDIANA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. US 50 BUS TR 209 & WABASH RIVER AT VINCENNES P.E. (PHASE I) INDIANA Bridge Maintenance INDIANA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. 7-4 FY 2016-2021 Highway Improvement Program District 7 State Highways MYP Years Route/Street US 51 Location Improvements SANGAMON RIVER 1 MI S OF HARRISTOWN (NB & SB) Bridge Maintenance BRIDGE SUPERSTRUCTURE Objectives Est. Cost SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $17,000,000 County MACON Past Current 6 2016 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG US 51 Needs Category BACKLOG SHOBONIER SPUR TO MARION CO LINE Miles = 2.46 System Maintenance Miles 2.46 Roughness(IRI) ACCEPTABLE Rutting 0.21 AADT 2,850 RESURFACING Truck Pct 16.0 CHRISTIAN CO LINE TO FAYETTE CO LINE System Expansion P.E. (PHASE II) ILL 1 SUGAR CREEK 2.3 MI N OF JORDON JCT Bridge Maintenance BRIDGE REPLACEMENT NHS Y 22 0580099 Y 2,125 SAFETY PRESERVE SYSTEM $1,000,000 FAYETTE 5 2016 $3,000,000 SHELBY 1 2017-2021 $1,110,000 CRAWFORD 8 2017-2021 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING ILL 1 Str Number 0580098 STRUCTURAL BACKLOG Structure Status STRUCTURAL BACKLOG SUGAR CREEK 0.5 MI N OF GORDON JCT Bridge Maintenance Truck Pct 22 NHS Y US 51 ILL 1 AADT 2,125 SUGAR CREEK 1 MI N OF LAWRENCE CO BRIDGE REPLACEMENT LINE Bridge Maintenance SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG 7-5 AADT 2,200 $1,670,000 AADT 2,600 $1,970,000 AADT 3,450 Truck Pct 20 Str Number 0170003 CRAWFORD Truck Pct 14 8 Str Number 0170004 CRAWFORD Truck Pct 18 NHS Y NHS Y 7 Str Number 0170005 2017-2021 2017-2021 NHS Y FY 2016-2021 Highway Improvement Program District 7 State Highways MYP Years Route/Street ILL 1 Location EMBARRAS RIVER OVERFLOW 1 MI N OF US 50 Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Est. Cost $4,120,000 County LAWRENCE Past Current 1 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL ACCRUING ILL 1 EMBARRAS RIVER OVERFLOW 0.5 MI N OF US 50 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT AADT 4,800 $9,310,000 Truck Pct 15 Str Number 0510004 LAWRENCE NHS Y 1 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL ACCRUING AADT 4,800 ILL 1 STREAM 1.1 & 1.5 MI S OF BIRDS RD Bridge Maintenance RIP RAP BRIDGE REPLACEMENT PRESERVE SYSTEM SAFETY $410,000 ILL 15 DRY FORK 1.8 MI E OF SIMS RD Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,960,000 Structure Status STRUCTURAL ACCRUING ILL 15 WABASH RIVER AT MT. CARMEL Bridge Maintenance BRIDGE DECK SEALING PRESERVE SYSTEM ILL 16 PINHOOK CREEK 2.3 MI W OF ILL 32 Bridge Maintenance BRIDGE SUPERSTRUCTURE SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Structure Status STRUCTURAL BACKLOG 7-6 AADT 3,000 $80,000 $1,170,000 AADT 3,900 Truck Pct 15 Str Number 0510005 NHS Y LAWRENCE 5 2017-2021 WAYNE 7 2017-2021 Truck Pct 10 Str Number 0960007 NHS N WABASH 1 2016 SHELBY 4 2017-2021 Truck Pct 9 Str Number 0870024 NHS Y FY 2016-2021 Highway Improvement Program District 7 State Highways MYP Years Route/Street ILL 16 Location Improvements LITTLE WABASH CREEK 2 MI W OF MATTOON Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 16 AT LOXA RD System Maintenance ILL 33 LAMOTTE CREEK SE CL OF PALESTINE Bridge Maintenance TRAF SIGNAL INSTALLATION LIGHTING SAFETY TRANSPORTATION OPS PRESERVE SYSTEM BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG Est. Cost $920,000 AADT 3,450 $250,000 $1,890,000 AADT 900 County COLES Truck Pct 8 Past Current 2 Str Number 0150013 2017-2021 NHS Y COLES 1 2016 CRAWFORD 8 2017-2021 Truck Pct 13 Str Number 0170007 NHS N ILL 49 SCL OF CASEY TO JASPER CO LINE System Maintenance NEW SHOULDERS SAFETY IMPROVEMENTS SAFETY $1,800,000 CLARK CUMBERLAND 1 2016 ILL 121 LOGAN CO LINE TO 0.6 MI NW OF I-72 Miles = 8.23 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $3,400,000 MACON 1 2016 SAFETY PRESERVE SYSTEM $2,360,000 MOULTRIE 6 2017-2021 Needs Category BACKLOG ILL 121 Miles 8.23 Roughness(IRI) ACCEPTABLE Rutting 0.21 AADT 4,734 JONATHAN CREEK 3 MI E OF SULLIVAN Bridge Maintenance Truck Pct 19.9 NHS Y BRIDGE NEW DECK Structure Status STRUCTURAL BACKLOG 7-7 AADT 5,550 Truck Pct 10 Str Number 0700003 NHS Y FY 2016-2021 Highway Improvement Program District 7 State Highways MYP Years Route/Street ILL 121 Location LONG POINT CREEK 4.4 MI S OF US 45 JCT Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 121 LONG POINT BRANCH 1.3 MI E OF MONTROSE RD Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING Est. Cost $1,740,000 AADT 2,550 $1,020,000 AADT 1,450 County CUMBERLAND Truck Pct 15 9 Str Number 0180012 CUMBERLAND Truck Pct 15 Past Current 2016 NHS N 4 Str Number 0180028 2017-2021 NHS N ILL 130 DOUGLAS CO LINE TO FAIRGRANGE RD System Maintenance NEW SHOULDERS SAFETY IMPROVEMENTS SAFETY $1,150,000 COLES 1 2016 ILL 130 BRUSH CREEK 0.9 MI S OF NEWTON Bridge Maintenance BRIDGE SUPERSTRUCTURE SAFETY PRESERVE SYSTEM TRANSPORTATION OPS $1,910,000 JASPER 2 2017-2021 Structure Status STRUCTURAL BACKLOG ILL 130 ILL 250 CSXT RR UNDERPASS IN OLNEY Bridge Maintenance P.E. (PHASE II) STREAM 0.8 MI S OF ALBION Bridge Maintenance BRIDGE REPLACEMENT AADT 4,250 Truck Pct 25 Str Number 0400018 NHS N $1,500,000 RICHLAND 9 2017-2021 $700,000 EDWARDS 5 2016 WEST ST ILL 130 SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG 7-8 AADT 3,450 Truck Pct 26 Str Number 0240008 NHS N FY 2016-2021 Highway Improvement Program District 7 State Highways MYP Years Route/Street ILL 130 Location STREAM 2.8 MI S OF ALBION Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM CULVERT REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 133 JONATHAN BRANCH 2.5 MI E OF LOVINGTON Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 250 STREAM 0.7 MI W OF BRIDGEPORT Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG 900 N RILEY CREEK BRANCH 0.8 MI NW OF LOXA Bridge Maintenance BRIDGE SUPERSTRUCTURE SAFETY PRESERVE SYSTEM TRANSPORTATION OPS Structure Status STRUCTURAL BACKLOG HUTSONVILLE RD WABASH RIVER AT HUTSONVILLE Bridge Maintenance BRIDGE REPAIR SAFETY PRESERVE SYSTEM Est. Cost $840,000 AADT 3,450 $680,000 AADT 1,800 $800,000 AADT 2,400 $420,000 AADT 2,200 County EDWARDS Truck Pct 26 4 Str Number 0242002 MOULTRIE Truck Pct 15 Str Number 0700027 Truck Pct 9 2017-2021 NHS N 11 Str Number 0510051 COLES 2016 NHS N 4 LAWRENCE Truck Pct 4 Past Current 2016 NHS N 1 Str Number 0150070 2017-2021 NHS N $900,000 CRAWFORD 7 2016 $110,000 CRAWFORD 2 2016 INDIANA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. HUTSONVILLE RD WABASH RIVER AT HUTSONVILLE Bridge Maintenance P.E. (PHASE I) INDIANA LEAD AGENCY; ILLINOIS' SHARE OF THE COST. 7-9 FY 2016-2021 Highway Improvement Program District 7 State Highways MYP Years Route/Street MONTROSE BLACKTOP Location BRUSH CREEK 1.5 MI S OF ILL 121 Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM TRANSPORTATION OPS BRIDGE SUPERSTRUCTURE Structure Status STRUCTURAL BACKLOG Est. Cost $730,000 AADT 1,600 County CUMBERLAND Truck Pct 15 Past Current 1 Str Number 0180056 2017-2021 NHS N VARIOUS ON-CALL ENGINEERING Bridge Maintenance P.E. (PHASE II) P.E. (PHASE I) PRELIMINARY ENGINEERING $500,000 DISTRICT-WIDE 5 2016 VARIOUS ON-CALL ENGINEERING P.E. (PHASE II) P.E. (PHASE I) PRELIMINARY ENGINEERING $1,500,000 DISTRICT-WIDE 3 2017-2021 VARIOUS ON-CALL ENGINEERING Bridge Maintenance P.E. (PHASE II) P.E. (PHASE I) PRELIMINARY ENGINEERING P.E. (CONSULTANT TSL) $500,000 DISTRICT-WIDE 3 2017-2021 VARIOUS CONSULTANT SERVICES FOR LAND ACQUISITION System Maintenance LAND ACQUISITION $200,000 DISTRICT-WIDE 1 2016 VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS System Maintenance SAFETY IMPROVEMENTS SAFETY $415,000 DISTRICT-WIDE 6 2016 VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS SAFETY $18,075,000 DISTRICT-WIDE 4 2017-2021 VARIOUS CHANGE ORDER RESERVE System Maintenance CHANGE ORDERS $500,000 DISTRICT-WIDE 1 2016 7 - 10 FY 2016-2021 Highway Improvement Program District 7 State Highways MYP Years Route/Street Location Improvements VARIOUS BRIDGE DECK SEALING Bridge Maintenance BRIDGE DECK SEALING VARIOUS MISCELLANEOUS UTILITY ADJUSTMENTS System Maintenance VARIOUS Objectives PRESERVE SYSTEM Est. Cost County Past Current $270,000 DISTRICT-WIDE 4 2016 UTILITY ADJUSTMENT $200,000 DISTRICT-WIDE 5 2016 MISCELLANEOUS UTILITY ADJUSTMENTS UTILITY ADJUSTMENT $800,000 DISTRICT-WIDE 3 2017-2021 VARIOUS MISCELLANEOUS RAILROAD FLAGGERS System Maintenance RR FLAGGER SAFETY $100,000 DISTRICT-WIDE 5 2016 VARIOUS MISCELLANEOUS RAILROAD FLAGGERS RR FLAGGER SAFETY $400,000 DISTRICT-WIDE 3 2017-2021 VARIOUS PRE-LAND ACQUISITION ACTIVITY System Maintenance PRE-ACQUISITION ACTIVITY $50,000 DISTRICT-WIDE 5 2016 VARIOUS PRE-LAND ACQUISITION ACTIVITY PRE-ACQUISITION ACTIVITY $200,000 DISTRICT-WIDE 3 2017-2021 VARIOUS POST-LAND ACQUISITION ACTIVITY System Maintenance POST-ACQUISITION ACTIVITY $50,000 DISTRICT-WIDE 5 2016 VARIOUS POST-LAND ACQUISITION ACTIVITY POST-ACQUISITION ACTIVITY $200,000 DISTRICT-WIDE 3 2017-2021 VARIOUS MISCELLANEOUS LAND ACQUISITION System Maintenance LAND ACQUISITION $200,000 DISTRICT-WIDE 5 2016 7 - 11 FY 2016-2021 Highway Improvement Program District 7 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION $800,000 DISTRICT-WIDE 3 2017-2021 VARIOUS DISTRICT MISCELLANEOUS System Maintenance MISCELLANEOUS PROJECTS $500,000 DISTRICT-WIDE 4 2016 VARIOUS DISTRICT MISCELLANEOUS MISCELLANEOUS PROJECTS $2,000,000 DISTRICT-WIDE 3 2017-2021 7 - 12 DISTRICT FY 2016-2019 Highway Improvement Program District 7 Local Highways MYP Years Route/Street 0N Location Improvements Objectives SAFETY PRESERVE SYSTEM MITCHELL CREEK 3 MI E OF HERRICK BRIDGE REPLACEMENT MITCHELL CREEK 3 MI E OF HERRICK CONSTRUCTION ENGINEERING OAK ST: COLLEGE DR TO POPLAR ST & ILL 15 TO W 3RD ST; 5TH ST: OAK ST TO N MULBERRY ST Miles = 2.30 RESURFACING INTERMITTENT 13TH ST JOHNSTON ST TO 0.1 MI N IN ST FRANCISVILLE 13TH ST 85TH ST Est. Cost County Past Current $1,500,000 FAYETTE SHELBY 1 2016 $80,000 FAYETTE 1 2016 $600,000 WABASH 1 2016 BRIDGE REMOVAL/DEMOLITION $150,000 LAWRENCE 5 2017-2021 JOHNSTON ST TO 0.1 MI N IN ST FRANCISVILLE CONSTRUCTION ENGINEERING $12,000 LAWRENCE 4 2017-2021 UNNAMED STREAM 2 MI SE OF LONG CREEK BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $2,000,000 MACON 9 2017-2021 CH 57 100 N RD ELM CREEK 4 MI SE OF FLORA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $300,000 CLAY 3 2016 ELM CREEK 4 MI SE OF FLORA CONSTRUCTION ENGINEERING $12,000 CLAY 1 2016 1050 E RD DRAINAGE DITCH 2 MI E OF BONE GAP BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $135,000 EDWARDS 4 2017-2021 1100 E RD CLAY CO LINE TO 1800 N RD Miles = 6.09 RESURFACING SAFETY PRESERVE SYSTEM $1,430,000 WAYNE 4 2017-2021 CH 14 0N CH 14 5TH ST OAK ST WATERCRESS LN 100 N RD SAFETY PRESERVE SYSTEM WATERCRESS LN 7 - 13 FY 2016-2019 Highway Improvement Program District 7 Local Highways MYP Years Route/Street Location Improvements Objectives 1100 E RD CLAY CO LINE TO 1800 N RD CONSTRUCTION ENGINEERING 1100 N RD LITTLE DRY FORK 3 MI NE OF SIMS BRIDGE REPLACEMENT 1100 N RD RICHLAND CREEK 2.3 MI NW OF STRASBURG 1200TH AVE 1275 E RD Est. Cost County Past Current $64,000 WAYNE 3 2017-2021 SAFETY PRESERVE SYSTEM $300,000 WAYNE 3 2016 BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $240,000 SHELBY 1 2017-2021 ROCK CREEK 2 MI NW OF ALTAMONT BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $200,000 EFFINGHAM 2 2017-2021 TRIB OF LINN CREEK 3 MI NE OF CORRECTIONAL CENTER BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $275,000 FAYETTE 1 2016 1300 N RD RACCOON CREEK 2.5 MI SW OF VANDALIA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $250,000 FAYETTE 5 2017-2021 1400N RD COTTONWOOD CREEK 1 MI E OF JANESVILLE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $200,000 CUMBERLAND COLES 4 2016 1420 N RD BRANCH ELM RIVER 3.5 MI SW OF MT ERIE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $250,000 WAYNE 2 2017-2021 150 E RD UNNAMED CREEK 2.5 MI NW OF XENIA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $270,000 CLAY 3 2017-2021 1600 E RD BEAVER POND DRAINAGE DITCH 3 MI E OF PINKSTAFF BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $150,000 LAWRENCE 9 2017-2021 TR 290 7 - 14 FY 2016-2019 Highway Improvement Program District 7 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current 1600 N RD CROOKED CREEK 1.5 MI SE OF ROSE HILL BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $240,000 JASPER 10 2017-2021 1610 N RD FORDICE CREEK 2 MI SE OF GARDS POINT BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $225,000 WABASH 4 2017-2021 1670 E RD WHITLEY CREEK 2.7 MI N OF GAYS BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $250,000 MOULTRIE 1 2017-2021 1700 N RD PANTHER CREEK 2 MI S OF HORD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $270,000 CLAY 2 2017-2021 1700 N RD JONATHAN CREEK 2 MI S OF CADWELL BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $325,000 MOULTRIE 1 2017-2021 1800 N RD JONATHAN CREEK 1 MI S OF CADWELL BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $300,000 MOULTRIE 4 2017-2021 1920 E RD HOG CREEK 2.5 MI NW OF WRIGHTS CORNER BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $250,000 FAYETTE 5 2017-2021 200 E RD EDGEWOOD LN TO E 400TH AVE Miles = 5.86 RESURFACING SAFETY PRESERVE SYSTEM $3,000,000 CRAWFORD 3 2016 200 N RD UNNAMED STREAM 4.5 MI SW OF STEWARDSON BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $280,000 SHELBY 12 2017-2021 2100 N RD MARROW BONE CREEK 3.4 MI S OF WEST LAKE CITY BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $300,000 MOULTRIE 4 2016 CH 9 7 - 15 FY 2016-2019 Highway Improvement Program District 7 Local Highways MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM 225 N RD BECKS CREEK 2.6 MI NW OF HERRICK BRIDGE REPLACEMENT 225 N RD BECKS CREEK 2.6 MI NW OF HERRICK CONSTRUCTION ENGINEERING 250 E RD BRUSH CREEK 0.5 MI S OF ETNA BRIDGE REPLACEMENT 2500 N RD UNNAMED STREAM 3.7 MI SE OF MOWEAQUA 2600 E RD Est. Cost County Past Current $440,000 SHELBY 3 2017-2021 $25,000 SHELBY 3 2017-2021 SAFETY PRESERVE SYSTEM $250,000 COLES 2 2017-2021 BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $280,000 SHELBY 11 2017-2021 RICHLAND CREEK 2 MI W OF STRASBURG BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $280,000 SHELBY 1 2017-2021 2600 E RD WOLF CREEK 2.8 MI SW OF STEWARDSON BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $280,000 SHELBY 8 2017-2021 2650 E RD EFFINGHAM CO LINE TO ILL 37 Miles = 4.92 RESURFACING SAFETY PRESERVE SYSTEM $1,800,000 FAYETTE 1 2017-2021 2650 E RD EFFINGHAM CO LINE TO ILL 37 CONSTRUCTION ENGINEERING $80,000 FAYETTE 1 2017-2021 300 N RD HONEY CREEK 2 MI SE OF HARDINVILLE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $400,000 CRAWFORD 6 2017-2021 LITTLE WABASH RIVER 4.7 MI W OF SIGEL BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $280,000 SHELBY 10 2017-2021 CH 8 3000 E RD 7 - 16 FY 2016-2019 Highway Improvement Program District 7 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current LITTLE CREEK TRIB 3.5 MI N OF RAMSEY BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $275,000 FAYETTE 1 2016 350 N RD BECKS CREEK 5.4 MI SE OF OCONEE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $440,000 SHELBY 12 2017-2021 400 E RD 1750 N RD TO 1400 N RD COLD IN-PLACE RECYCLING PRESERVE SYSTEM SUSTAINABILITY $700,000 WABASH 7 2017-2021 400 E RD 1750 N RD TO 1300 N RD Miles = 4.57 RESURFACING SAFETY PRESERVE SYSTEM $1,355,000 WABASH 4 2017-2021 400 N RD MITCHELL CREEK 2.8 MI NW OF COWDEN BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $300,000 SHELBY 2 2016 420TH ST 420TH ST: 400TH RD TO CRAWFORD CO LINE; 400TH RD: ILL 49 TO 420TH ST Miles = 5.34 RESURFACING SAFETY PRESERVE SYSTEM $2,239,000 CLARK 2 2017-2021 400TH RD 450 E RD SLOUGH 3 MI SE OF CHAUNCEY BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $750,000 LAWRENCE 1 2016 450TH ST COON CREEK 1 MI E OF ALTAMONT BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $150,000 EFFINGHAM 2 2017-2021 650 E RD DRAINAGE DITCH 1.5 MI S OF KEENSBURG BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $293,000 WABASH 2 2017-2021 650 N RD UNNAMED CREEK 1.7 MI NE OF PIERCEBURG BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $400,000 CRAWFORD 9 2017-2021 3200 N RD TR 19 7 - 17 FY 2016-2019 Highway Improvement Program District 7 Local Highways MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM Est. Cost 650 N RD CROOKED CREEK 3 MI E OF FARINA BRIDGE REPLACEMENT 650 N RD CROOKED CREEK 3 MI E OF FARINA CONSTRUCTION ENGINEERING 800 E RD 1300 N RD TO ILL 15 Miles = 4.11 RESURFACING SAFETY PRESERVE SYSTEM $960,000 800 E RD US 50 TO 700 N RD Miles = 4.00 RESURFACING SAFETY PRESERVE SYSTEM $2,250,000 900 N RD BRUSH CREEK 0.5 MI SE OF NEWTON BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM 900 N RD RICHLAND CREEK 1.9 MI W OF STRASBURG BRIDGE REPLACEMENT BONE GAP RD 0.8 MI S OF BONE GAP TO ILL 15 Miles = 2.05 RECONSTRUCTION BONE GAP RD County Past Current $600,000 FAYETTE 1 2017-2021 $50,000 FAYETTE 1 2017-2021 EDWARDS 5 2017-2021 LAWRENCE 1 2017-2021 $200,000 JASPER 6 2017-2021 SAFETY PRESERVE SYSTEM $360,000 SHELBY 2 2017-2021 SAFETY PRESERVE SYSTEM $340,000 EDWARDS 4 2017-2021 SURFACE TRANSPORTATION PRIORITIES PROJECT. THIS EARMARK WILL BE FUNDED SEPARATELY. BONE GAP RD 0.8 MI S OF BONE GAP TO ILL 15 Miles = 2.05 RECONSTRUCTION SAFETY PRESERVE SYSTEM $845,000 EDWARDS 9 2017-2021 BROADWAY ST ILL 121 TO W MAIN ST Miles = 0.29 RECONSTRUCTION SAFETY PRESERVE SYSTEM $955,000 MACON 1 2017-2021 7 - 18 FY 2016-2019 Highway Improvement Program District 7 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current E 450N RD TO ILL 1 Miles = 2.42 RESURFACING SAFETY PRESERVE SYSTEM $576,000 EDWARDS 1 2017-2021 RESURFACING SAFETY PRESERVE SYSTEM $1,300,000 MOULTRIE 11 2017-2021 CH 4 ILL 32 TO 2 MI E Miles = 1.99 CH 23 SHOBONIER TO SAINT PETER CULVERT EXTENSION SAFETY PRESERVE SYSTEM $800,000 FAYETTE 1 2017-2021 CH 23 SHOBONIER TO SAINT PETER CONSTRUCTION ENGINEERING $80,000 FAYETTE 1 2017-2021 CH 6 BEACH RD TO ILL 32/33 P.E. (PHASE I) P.E. (PHASE II) $80,000 EFFINGHAM 2 2016 BEACH RD TO ILL 32/33 Miles = 2.03 RESURFACING $2,500,000 EFFINGHAM 3 2017-2021 BEACH RD TO ILL 32/33 CONSTRUCTION ENGINEERING $64,000 EFFINGHAM 2 2017-2021 CLINE ORCHARD RD I-70 TO EDGAR CO LINE Miles = 7.41 RESURFACING SAFETY PRESERVE SYSTEM $2,053,000 CLARK 5 2016 COUNTY LINE RD OWL CREEK N OF MULBERRY GROVE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $138,000 FAYETTE 1 2017-2021 BROWNS-GRAYVILLE RD CH 12 BRUCE-FINDLAY RD E 1600TH AVE N 1000TH ST CH 6 E 1600TH AVE SAFETY PRESERVE SYSTEM N 1000TH ST CH 6 E 1600TH AVE N 1000TH ST 7 - 19 FY 2016-2019 Highway Improvement Program District 7 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost SUGAR CREEK 2.5 MI N OF DARWIN BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM $350,000 E 1200 RD N 2200 BLVD TO ILL 1 Miles = 4.78 RESURFACING SAFETY PRESERVE SYSTEM $1,475,000 E 1250 N RD LAKE MATTOON 1.5 MILES N OF NEOGA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM E 1320 N RD DRAINAGE DITCH 3 MI E OF GEFF BRIDGE REPLACEMENT E 1400 N RD LITTLE DRY FORK 6 MI N OF SIMS E 1600TH AVE DARWIN RD County Past Current CLARK 1 2016 WABASH 2 2017-2021 $500,000 CUMBERLAND 1 2017-2021 SAFETY PRESERVE SYSTEM $250,000 WAYNE 2 2017-2021 BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $150,000 WAYNE 7 2017-2021 LAKE SARA 3 MI SE OF SHUMWAY BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM $375,000 EFFINGHAM 12 2017-2021 E 1700 AVE MINT CREEK 1 MI S OF GILA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $135,000 JASPER 1 2016 EAST ST MACK AVE TO HALL ST Miles = 0.25 WIDENING & RESURFACING SAFETY PRESERVE SYSTEM $400,000 RICHLAND 7 2017-2021 HENTON RD ANGEL BRANCH 2.1 MI W OF HENTON BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,300,000 SHELBY 3 2017-2021 CH 3 CH 18 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. 7 - 20 FY 2016-2019 Highway Improvement Program District 7 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current HIGGIN SWITCH RD SUGAR CREEK TRIB 2.5 MI E OF NOBLE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $200,000 RICHLAND 8 2017-2021 KENNEY RD SOUTH FORK CREEK 3 MI NW OF WARRENSBURG BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 MACON 3 2017-2021 LAKE FORK RD DRAINAGE DITCH 5.2 MI N OF ARGENTA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $140,000 MACON 7 2017-2021 MARSHALL AVE 9TH ST TO 6TH ST IN MATTOON Miles = 0.23 PAVING PRESERVE SYSTEM TRANSPORTATION OPS $750,000 COLES 1 2017-2021 MOUND RD SPRING CREEK IN DECATUR BRIDGE REHABILITATION SAFETY PRESERVE SYSTEM $660,000 MACON 1 2016 MT GILEAD LN FOX RIVER 2.5 MI SW OF DUNDAS BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $875,000 RICHLAND 10 2017-2021 N 1775 RD E STATE ST TO ILL 33 Miles = 1.50 RESURFACING SAFETY PRESERVE SYSTEM $300,000 EFFINGHAM 1 2017-2021 CH 19 N 1775 RD E STATE ST TO ILL 33 CONSTRUCTION ENGINEERING $64,000 EFFINGHAM 1 2017-2021 N 1775 TH ST UNNAMED CREEK 1.5 MI NW OF STE MARIE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $140,000 JASPER 1 2017-2021 N 1800 BLVD CRAWFISH CREEK 0.5 MI W OF PATTON BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $410,000 WABASH 1 2016 CH 19 7 - 21 FY 2016-2019 Highway Improvement Program District 7 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current N 1900 BLVD CRAWFISH CREEK 1.5 MI NW OF PATTON BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $328,000 WABASH 1 2016 N 1900 BLVD UNNAMED CREEK 3 MI S OF LANCASTER BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $138,000 WABASH 5 2017-2021 OCONEE RD MONTGOMERY CO LINE TO US 51 Miles = 2.12 RESURFACING SAFETY PRESERVE SYSTEM $1,685,000 SHELBY 8 2016 REAS BRIDGE RD W SIDE OF LAKE DECATUR N OF US 36 BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,000,000 MACON 3 2017-2021 REAS BRIDGE RD E SIDE OF LAKE DECATUR N OF US 36 BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,000,000 MACON 3 2017-2021 SAILOR SPRINGS RD LITTLE WABASH RIVER 0.5 MI E OF LOUISVILLE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $5,520,000 CLAY 1 2017-2021 SAILOR SPRINGS RD LITTLE WABASH RIVER 0.5 MI E OF LOUISVILLE CONSTRUCTION ENGINEERING $180,000 CLAY 1 2017-2021 TR 76 LITTLE CREEK 2 MI E OF PIERCEBURG BRIDGE REPLACEMENT $300,000 CRAWFORD 1 2017-2021 VARIOUS VARIOUS LOCATIONS IN OREANA MISCELLANEOUS MACON 4 2017-2021 VARIOUS VARIOUS LOCATIONS IN ROBINSON RECONSTRUCTION CRAWFORD 2 2017-2021 N 3RD ST CH 14 SAFETY PRESERVE SYSTEM N 400 ST $1,500,000 SAFETY PRESERVE SYSTEM 7 - 22 $335,000 FY 2016-2019 Highway Improvement Program District 7 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS VARIOUS BRIDGE INSPECTIONS IN LAWRENCE CO P.E. (BRIDGE INSPECTION) $20,000 LAWRENCE 2 2016 VARIOUS VARIOUS BRIDGE INSPECTIONS COUNTYWIDE P.E. (BRIDGE INSPECTION) $16,000 CLAY 1 2016 VARIOUS VARIOUS BRIDGE INSPECTIONS IN LAWRENCE CO P.E. (BRIDGE INSPECTION) $20,000 LAWRENCE 1 2017-2021 VARIOUS VARIOUS LOCATIONS IN JASPER CO BIT SURFACE TREATMENT-A1 SAFETY PRESERVE SYSTEM $255,000 JASPER 1 2017-2021 VARIOUS VARIOUS LOCATIONS IN JASPER CO BIT SURFACE TREATMENT-A1 SAFETY PRESERVE SYSTEM $242,000 JASPER 1 2017-2021 VARIOUS VARIOUS LOCATIONS IN JASPER CO BIT SURFACE TREATMENT-A1 SAFETY PRESERVE SYSTEM $255,000 JASPER 1 2017-2021 W EVERGREEN EXT NAZARENE CHURCH RD TO LAKE SARA RD Miles = 0.95 NEW CONSTRUCTION TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT $2,000,000 EFFINGHAM 10 2017-2021 W EVERGREEN EXT NAZARENE CHURCH RD TO LAKE SARA RD CONSTRUCTION ENGINEERING $64,000 EFFINGHAM 9 2017-2021 W JOHNSON ST 5TH ST TO 4TH ST IN VANDALIA Miles = 0.07 RECONSTRUCTION $250,000 FAYETTE 5 2017-2021 W JOHNSON ST 5TH ST TO 4TH ST IN VANDALIA CONSTRUCTION ENGINEERING $14,000 FAYETTE 5 2017-2021 SAFETY PRESERVE SYSTEM 7 - 23 FY 2016-2019 Highway Improvement Program District 7 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current WHITTLE AVE RAILROAD ST TO ILL 130 Miles = 1.36 WIDENING & RESURFACING SAFETY PRESERVE SYSTEM $1,000,000 RICHLAND 1 2017-2021 WOOD ST SIR RR IN SHELBYVILLE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,060,000 SHELBY 4 2017-2021 4 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, RAILROAD AND LOCAL AGENCY. WOOD ST SIR RR IN SHELBYVILLE CONSTRUCTION ENGINEERING $94,000 SHELBY ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, RAILROAD AND LOCAL AGENCY. S MARTIN LUTHER KING JR DR & E WOOD ST INT IN DECATUR Miles = 0.20 ADDITIONAL LANES SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT $1,500,000 MACON 2 2017-2021 WYCKLES RD I-72 TO ILL 121 Miles = 2.31 RECONSTRUCTION SAFETY PRESERVE SYSTEM $3,720,000 MACON 7 2017-2021 CH ELM CREEK 2.5 MI SE OF FLORA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $420,000 CLAY 7 2017-2021 TR 257 WABASH RIVER OVERFLOW BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $6,880,000 LAWRENCE 1 2017-2021 TR 257 WABASH RIVER OVERFLOW CONSTRUCTION ENGINEERING $280,000 LAWRENCE 1 2017-2021 WOOD ST M L KING JR DR 12 7 - 24 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE KANE DEKALB D2 COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK PEORIA D4 Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT ADAMS D5 MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 5 District 8 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 5, DISTRICT 8, COLLINSVILLE Overview Highway District 8 encompasses 11 counties in southwestern Illinois and includes the cities of Centralia, East St. Louis, Alton, Belleville, Edwardsville, Jerseyville, Highland, Greenville, Mascoutah and Chester, plus many smaller communities which serve as satellites for the larger employment centers. The state highway system in District 8 consists of 1,803 miles of highways and 995 bridges, supporting 15.6 million vehicle miles of travel daily. State Program The program for state and local highways will average $1.398 billion annually for the FY 2016-2021 period. Approximately $474 million will be provided during FY 2016-2021 for improvements to state highways in District 8. The following table summarizes anticipated accomplishments on the state highway system in District 8 during this time frame. FY 2016-2021 Accomplishments System Maintenance Interstate (miles) Non-Interstate (miles) Safety Locations (number) Bridge Maintenance Interstate (number) Non-Interstate (number) New Bridges (number) Minor Structure Repair (number) Congestion Mitigation Roads (miles) Traffic Improvements (number) System Expansion Roads (miles) Locations (number) 8-i 36 142 0 14 14 1 15 1 3 7 0 Major Highway projects of interest that are tentatively scheduled during the FY 2016-2021 time frame include:  Interstate 55/Interstate 64/US 40 at Poplar Street Bridge and Illinois Approach in St. Clair County. Bridge widening, bridge deck overlay, bridge repair and bridge joint repair are programmed in FY 2016 at a cost of $25.1 million. This is the department’s participation in the project in which Missouri is the lead agency. Provides for efficient movement.  Interstate 55/Interstate 64/US 40 at Poplar Street Collector Distributor (westbound) 0.1 mile east and 0.8 miles east of Poplar Street Bridge in St. Clair County. Engineering for design, location and environmental studies, engineering for contract plans, engineering for bridge inspection, bridge deck overlay and pier repair are programmed during FY 2016-2021 at a cost of $31.2 million. Of this total, engineering for design, location and environmental studies, engineering for contract plans and engineering for bridge inspection is programmed in FY 2016 at a cost of $2 million. Provides for efficient movement.  Interstate 57 from Jefferson County line to 0.5 miles north of Cross Road in Marion County. Resurfacing on 9.5 miles, ramp repairs at Illinois 161 interchange, bridge deck repair, bridge joint repair, bridge approach roadway, bridge deck sealing and rip rap are programmed during FY 2017-2021 at a cost of $22 million.  Interstate 64 from west of Illinois 157 to west of Greenmount Road in St. Clair County. Resurfacing on 4 miles from west of Illinois 157 to Illinois 159 and microsurfacing on 2.5 miles from west of Illinois 159 to Greenmount Road are programmed in FY 2016 at a cost of $8.6 million.  Interstate 70/US 40 from 0.1 miles west of Prairie Road to Bond County line in Madison and Bond Counties. Resurfacing on 6.4 miles, ramp repairs, bridge painting, bridge joint repair, bridge deck sealing, rip rap, a bridge replacement, bridge deck overlay and bridge repair are programmed during FY 2017-2021 at a cost of $24 million.  Interstate 70 from 0.3 mile west of Sugar Loaf Road to Burlington Northern Railroad in Bond County. Resurfacing on 9.2 miles, ramp repairs, bridge repair, bridge painting, bridge joint repair, bridge new deck, bridge deck sealing and rip rap are programmed during FY 2017-2021 at a cost of $32 million.  US 67 at Delhi Bypass in Jersey County. New construction of 3.2 miles of a four lane expressway for the bypass around Delhi including grading, paving, drainage, signing, and lighting are programmed during FY 2017-2021 at a cost of $23 million. Provides for efficient movement.  Illinois 3 from Vandebrook Drive to Randolph County line in Monroe County. Resurfacing on 9.6 miles is programmed in FY 2016 at a cost of $4.1 million.  Illinois 13/Illinois 15 from Rodgers Drive in Freeburg to 0.1 mile south of Kaskaskia River in St. Clair County. Resurfacing on 8.9 miles is programmed during FY 2017-2021 at a cost of $4.7 million.  Illinois 16/Illinois 100 at Joe Page Bridge in Greene County. Bridge repair is programmed in FY 2016 at a cost of $4.5 million.  Illinois 96 from Hamburg Road to Illinois 100 in Calhoun County. Resurfacing on 7.4 miles is programmed during FY 2017-2021 at a cost of $2.6 million. 8-ii  Illinois 143 over Shoal Creek 0.9 mile east of Pierron. A bridge replacement, land acquisition and utility adjustments are programmed during FY 2016-2021 at a cost of $19.5 million. Of this total, land acquisition and utility adjustments are programmed in FY 2016 at a cost of $1 million. This project has been approved for Illinois Major Bridge Program funding.  Illinois 157 from Illinois 140 in Hamel to 0.1 mile north of Illinois143/Illinois157 (Vandalia Street) east Junction in Edwardsville. Resurfacing and shoulder reconstruction on 7.9 miles are programmed in FY 2016 at a cost of $4.8 million.  Illinois 161 over Crooked Creek 8.6 miles east of Illinois 127 and 1 mile west of Centralia in Clinton County. A bridge replacement, land acquisition and utility adjustments at Crooked Creek and culvert replacement at a creek 1 mile west of Centralia are programmed during FY 2017-2021 at a cost of $21 million. This project has been approved for Illinois Major Bridge Program funding.  King Bridge Ramps over Interstate 55/64/70 westbound, Missouri Avenue, Relocated Illinois 3, Terminal Railroad Association and Union Pacific Railroads in East St. Louis 0.7 mile east of the Mississippi River. Engineering for contract plans, land acquisition, utility adjustments and a bridge replacement are programmed during FY 2016-2021 at a cost of $36.5 million. Of this total, engineering for contract plans is programmed in FY 2016 at a cost of $2 million. This project has been approved for Illinois Major Bridge Program funding. Provides for efficient freight movement. 8-iii FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street I 55 I 64 Location POPLAR ST BRIDGE & ILL APPROACH Bridge Maintenance US 40 VARIOUS Improvements BRIDGE WIDENING BRIDGE DECK OVERLAY BRIDGE REPAIR BRIDGE JOINT REPAIR Objectives Est. Cost SAFETY TRANSPORTATION OPS PRESERVE SYSTEM $25,100,000 County ST. CLAIR Past Current 3 2016 MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST. I 55 I 64 US 40 55 I 64 US 40 55 I 64 I 64 WB CD Truck Pct 10 Str Number 0820004 NHS Y FUNCTIONAL BACKLOG 114,100 10 0820005 Y P.E. (PHASE I) P.E. (PHASE II) P.E. (CONSULTANT TSL) P.E. (CONSULTANT PLANS) P.E. (BRIDGE INSPECTION) $2,000,000 ST. CLAIR 1 2016 POPLAR ST BRIDGE COMPLEX & ASSOCIATED ROADWAYS Bridge Maintenance P.E. (PHASE I) P.E. (PHASE II) P.E. (CONSULTANT TSL) P.E. (CONSULTANT PLANS) P.E. (BRIDGE INSPECTION) $1,250,000 ST. CLAIR 1 2017-2021 POPLAR ST COLLECTOR- DISTRIBUTOR (WB) 0.1 MI E OF POPLAR ST BRIDGE Bridge Maintenance BRIDGE DECK OVERLAY PIER REPAIR $21,300,000 ST. CLAIR 9 2017-2021 ILL 3 I AADT 114,100 POPLAR ST BRIDGE COMPLEX & ASSOCIATED ROADWAYS Bridge Maintenance ILL 3 I Structure Status STRUCTURAL BACKLOG SAFETY PRESERVE SYSTEM I 70 Structure Status STRUCTURAL BACKLOG I 55 I 64 I 64 WB CD POPLAR ST COLLECTOR- DISTRIBUTOR (WB) 0.8 MI E OF POPLAR ST BRIDGE Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE DECK OVERLAY AADT 3,000 $6,600,000 Truck Pct 6 Str Number 0820141 ST. CLAIR NHS Y 9 2017-2021 I 70 Structure Status ADEQUATE 8-1 AADT 16,500 Truck Pct 33 Str Number 0820254 NHS Y FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street I 55 Location Improvements I-55 AT I-64 Objectives MISCELLANEOUS Est. Cost Past Current $100,000 MADISON ST. CLAIR 5 2016 $11,400,000 MADISON 7 2017-2021 System Maintenance US 40 County VARIOUS I I 55 KEEBLER RD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Bridge Maintenance 70 US 40 I 57 Needs Category BACKLOG I 57 JEFFERSON CO LINE TO 0.5 MI N OF CROSS RD Miles = 9.50 System Maintenance Miles 9.50 Roughness(IRI) GOOD Rutting 0.09 AADT 17,508 ILL 161 INTCHG 64 MRB I 64 US 50 Needs Category ACCRUING Truck Pct 40.2 RAMP REPAIR ARCHAEOLOGICAL SURVEY W OF ILL 157 TO ILL 159 Miles = 3.87 System Maintenance RESURFACING Roughness(IRI) GOOD Rutting 0.17 AADT 77,740 Truck Pct 19 Str Number 0600016 NHS Y FUNCTIONAL BACKLOG 21,550 19 0600017 Y Truck Pct 10.9 SAFETY PRESERVE SYSTEM $21,200,000 MARION 4 2017-2021 SAFETY PRESERVE SYSTEM $800,000 MARION 1 2017-2021 $2,000,000 ST. CLAIR 3 2016 $6,000,000 ST. CLAIR 1 2016 NHS Y NEW MISSISSIPPI RIVER BRIDGE AT ST. LOUIS TO I-64 AT 20TH ST Congestion Mitigation Miles 3.87 AADT 21,550 RESURFACING BRIDGE DECK REPAIRS BRIDGE JOINT REPAIR BRIDGE APPROACH ROADWAY BRIDGE DECK SEALING RIP RAP System Maintenance I Structure Status FUNCTIONAL BACKLOG SAFETY PRESERVE SYSTEM NHS Y 8-2 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street I 64 US 50 I 70 Location Improvements Objectives Est. Cost County Past Current W OF ILL 159 TO W OF GREENMOUNT RD MICROSURFACING 2 PASS Miles = 2.54 System Maintenance SAFETY PRESERVE SYSTEM $2,600,000 ST. CLAIR 1 2016 MISSISSIPPI RIVER System Maintenance PRESERVE SYSTEM $50,000 ST. CLAIR 2 2017-2021 SAFETY PRESERVE SYSTEM $10,000,000 MADISON 1 2017-2021 SAFETY PRESERVE SYSTEM $21,700,000 MADISON BOND 4 2017-2021 BRIDGE DECK SEALING MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST. I 70 Needs Category ACCRUING I 70 US 40 Needs Category BACKLOG I 70 I-55 TO 2.5 MI E OF I-55/70/270 INTCHG Miles = 2.56 System Maintenance Miles 2.56 Roughness(IRI) GOOD Rutting 0.12 AADT 33,751 0.1 MI W OF PRAIRIE RD TO BOND CO LINE Miles = 6.35 System Maintenance Miles 6.35 Roughness(IRI) GOOD Rutting 0.24 AADT 22,700 0.1 MI W OF PRAIRIE RD TO BOND CO LINE System Maintenance RESURFACING Truck Pct 26.2 NHS Y RESURFACING BRIDGE PAINTING BRIDGE REPAIR BRIDGE REPLACEMENT BRIDGE JOINT REPAIR BRIDGE DECK SEALING RIP RAP BRIDGE DECK OVERLAY Truck Pct 35.2 NHS Y Structure Status ADEQUATE SAFETY PRESERVE SYSTEM RAMP REPAIR 8-3 AADT 175 $2,300,000 Truck Pct 14 MADISON BOND Str Number 0030042 NHS N 1 2017-2021 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street I 70 Needs Category BACKLOG I 70 I 270 Location Improvements 0.3 MI W OF SUGAR LOAF RD TO BN RR Miles = 9.17 System Maintenance Miles 9.17 Roughness(IRI) GOOD Rutting 0.17 AADT 21,874 Objectives SAFETY PRESERVE SYSTEM RESURFACING BRIDGE PAINTING BRIDGE REPAIR BRIDGE JOINT REPAIR BRIDGE DECK SEALING RIP RAP BRIDGE NEW DECK Truck Pct 39.7 NHS Y Structure Status ADEQUATE Est. Cost $30,200,000 County BOND Past Current 7 2017-2021 AADT 10,700 Truck Pct 40 Str Number 0030007 NHS Y STRUCTURAL ACCRUING 10,700 40 0030008 Y STRUCTURAL BACKLOG 10,350 42 0030011 Y ADEQUATE 10,350 42 0030012 Y STRUCTURAL BACKLOG 10,350 42 0030013 Y 0.3 MI W OF SUGAR LOAF RD TO BN RR System Maintenance RAMP REPAIR SAFETY PRESERVE SYSTEM $1,800,000 MISSISSIPPI RIVER BRIDGE N OF GRANITE CITY System Maintenance BRIDGE DECK SEALING PRESERVE SYSTEM BOND 1 2017-2021 $300,000 MADISON 4 2016 $2,000,000 MADISON 2 2016 $2,000,000 MADISON 2 2017-2021 ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. I 270 MISSISSIPPI RIVER Bridge Maintenance P.E. (PHASE I) P.E. (CONSULTANT TSL) P.E. SURVEYS (PHASE I) ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. I 270 MISSISSIPPI RIVER Bridge Maintenance P.E. (PHASE I) P.E. (CONSULTANT TSL) P.E. SURVEYS (PHASE I) ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. 8-4 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street I 270 Location Improvements MISSISSIPPI RIVER Bridge Maintenance Objectives P.E. (CONSULTANT TSL) P.E. (PHASE II) P.E. (CONSULTANT PLANS) P.E. SURVEYS (PHASE II) Est. Cost County Past Current $2,000,000 MADISON 2 2017-2021 $2,000,000 MADISON 2 2017-2021 $1,000,000 MADISON 2 2017-2021 SAFETY PRESERVE SYSTEM $1,600,000 MADISON 2 2016 ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. I 270 MISSISSIPPI RIVER Bridge Maintenance P.E. (CONSULTANT TSL) P.E. (PHASE II) P.E. (CONSULTANT PLANS) P.E. SURVEYS (PHASE II) ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. I 270 MISSISSIPPI RIVER Bridge Maintenance P.E. (CONSULTANT TSL) P.E. (PHASE II) P.E. (CONSULTANT PLANS) P.E. SURVEYS (PHASE II) ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. I 270 MISSISSIPPI RIVER TO 1.5 MI E & ILL 3 TO RESURFACING ST. THOMAS RD Miles = 1.95 System Maintenance Needs Category ACCRUING Miles 1.50 Roughness(IRI) ACCEPTABLE ACCRUING 0.45 GOOD Rutting 0.22 AADT 52,300 Truck Pct 16.5 NHS Y 0.18 50,300 18.4 Y I 270 MISSISSIPPI RIVER TO 1.5 MI E & ILL 3 TO FOG SEAL ST. THOMAS RD Miles = 0.01 System Maintenance SAFETY PRESERVE SYSTEM $300,000 MADISON 1 2016 US 40 0.2 MI W OF FORMOSA RD TO 0.2 MI E OF BETHANY LN Miles = 3.32 System Maintenance SAFETY PRESERVE SYSTEM $2,400,000 MADISON 1 2017-2021 Needs Category ACCRUING Miles 3.32 Roughness(IRI) ACCEPTABLE Rutting 0.23 AADT 10,980 RESURFACING Truck Pct 7.6 NHS Y 8-5 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street US 40 Location Improvements Needs Category BACKLOG US 40: POKEY RD TO OVERPASS RD; RESURFACING MILLERSBURG RD: US 40 TO S FR RD; N FR RD: US 40 TO 0.1 MI E Miles = 6.67 System Maintenance Miles Roughness(IRI) Rutting AADT Truck Pct NHS 6.31 ACCEPTABLE 0.14 1,249 5.6 N ADEQUATE 0.25 ACCEPTABLE 0.15 950 0.0 N BACKLOG 0.11 NOT ACCEPTABLE 0.00 25 0.0 N MILLERSBURG RD N FR RD US 50 Needs Category BACKLOG US 50 ILL 127 ILL 4 N JCT IN LEBANON TO 0.3 MI W OF OLD US 50 Miles = 2.17 System Maintenance Miles 2.17 Roughness(IRI) ACCEPTABLE Miles 7.63 Roughness(IRI) ACCEPTABLE ADEQUATE 0.10 GOOD Needs Category BACKLOG AADT 8,804 ILL 127: BOND CO LINE TO 0.2 MI N OF WILLIAMS RD; US 50: 0.1 MI W OF ILL 127 Miles = 7.73 System Maintenance Needs Category BACKLOG US 50 Rutting 0.23 Miles 9.59 Roughness(IRI) ACCEPTABLE RESURFACING Truck Pct 11.3 RESURFACING PATCHING AADT 3,987 Truck Pct 19.1 NHS N 0.18 4,850 13.1 Y Rutting 0.22 AADT 5,066 RESURFACING Truck Pct 14.6 Est. Cost County Past Current SAFETY PRESERVE SYSTEM $2,400,000 BOND 1 2017-2021 SAFETY PRESERVE SYSTEM $1,500,000 ST. CLAIR 1 2017-2021 SAFETY PRESERVE SYSTEM $3,900,000 CLINTON 1 2016 SAFETY PRESERVE SYSTEM $3,600,000 CLINTON 1 2017-2021 SAFETY PRESERVE SYSTEM $500,000 CLINTON 1 2017-2021 $50,000 CLINTON 1 2017-2021 NHS Y Rutting 0.15 11TH ST IN CARLYLE TO SHATTUC RD Miles = 9.59 System Maintenance Objectives NHS Y US 50 DRAINAGE DITCH 0.5 MI E OF HUEY RD Bridge Maintenance CULVERT REPLACEMENT US 50 DRAINAGE DITCH 0.5 MI E OF HUEY RD Bridge Maintenance LAND ACQUISITION 8-6 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street Location Improvements US 50 DRAINAGE DITCH 0.5 MI E OF HUEY RD Bridge Maintenance UTILITY ADJUSTMENT US 50 BRUBAKER CREEK 2.3 MI E OF SALEM Bridge Maintenance BRIDGE REPLACEMENT Objectives Est. Cost $50,000 SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG $1,600,000 AADT 4,700 County Past Current CLINTON 1 2017-2021 MARION 7 2016 Truck Pct 13 Str Number 0610065 NHS Y US 50 BRUBAKER CREEK 2.3 MI E OF SALEM Bridge Maintenance LAND ACQUISITION $50,000 MARION 1 2016 US 50 BRUBAKER CREEK 2.3 MI E OF SALEM Bridge Maintenance UTILITY ADJUSTMENT $50,000 MARION 1 2016 US 50 METCALF RD TO CLAY CO LINE Miles = 7.14 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $3,200,000 MARION 1 2016 SAFETY PRESERVE SYSTEM $2,900,000 MARION 1 2017-2021 PRESERVE SYSTEM $300,000 MADISON 4 2017-2021 $800,000 JERSEY 4 2017-2021 Needs Category BACKLOG US 51 Needs Category BACKLOG US 67 CLARK BRIDGE Miles 7.14 Roughness(IRI) ACCEPTABLE Rutting 0.24 AADT 2,978 0.1 MI S OF BRITT RD TO 0.1 MI N OF US 50 Miles = 8.00 System Maintenance Miles 8.00 Roughness(IRI) ACCEPTABLE Rutting 0.20 AADT 3,330 MISSISSIPPI RIVER Bridge Maintenance Truck Pct 20.1 NHS Y RESURFACING Truck Pct 13.0 NHS Y BRIDGE DECK SEALING ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. US 67 MADISON CO LINE TO JERSEYVILLE System Expansion UTILITY ADJUSTMENT 8-7 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street Location Improvements Objectives US 67 MADISON CO LINE TO JERSEYVILLE System Expansion LAND ACQUISITION US 67 DELHI BYP Miles = 3.15 NEW CONSTRUCTION GRADING PAVING DRAINAGE SIGNING (NEW) LIGHTING TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT PRESERVE SYSTEM SAFETY System Expansion Est. Cost County Past Current $500,000 JERSEY 4 2017-2021 $23,000,000 JERSEY 5 2017-2021 ILL 3 0.1 MI S OF ILL 143 IN WOOD RIVER TO 0.2 MI N OF NEW POAG RD Miles = 3.67 System Maintenance MICROSURFACING 1 PASS PATCHING SAFETY PRESERVE SYSTEM $1,500,000 MADISON 1 2016 ILL 3 VANDEBROOK DR TO RANDOLPH CO LINE Miles = 9.62 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $4,100,000 MONROE 1 2016 SAFETY PRESERVE SYSTEM $3,700,000 RANDOLPH 1 2017-2021 SAFETY PRESERVE SYSTEM $3,500,000 MADISON 8 2016 Needs Category BACKLOG ILL 3 Needs Category BACKLOG ILL 4 Miles 9.62 Roughness(IRI) ACCEPTABLE Rutting 0.22 AADT 7,780 MONROE CO LINE TO 0.2 MI S OF 1ST ST IN RUMA Miles = 7.97 System Maintenance Miles 7.97 Roughness(IRI) ACCEPTABLE Rutting 0.23 AADT 6,886 SILVER CREEK 0.7 MI N OF US 40 Bridge Maintenance Truck Pct 12.8 NHS Y RESURFACING Truck Pct 8.5 NHS Y BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 4 SILVER CREEK 0.7 MI N OF US 40 Bridge Maintenance LAND ACQUISITION AADT 6,750 $30,000 8-8 Truck Pct 18 MADISON Str Number 0600109 NHS Y 3 2016 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street Location Improvements ILL 4 SILVER CREEK 0.7 MI N OF US 40 Bridge Maintenance UTILITY ADJUSTMENT ILL 4 CREEK 2.5 MI & 3 MI S OF ILL 13 INT Bridge Maintenance BRIDGE REPLACEMENT ILL 4 CREEK 2.5 MI & 3 MI S OF ILL 13 INT Bridge Maintenance ILL 4 ILL 4 ILL 150 Needs Category ADEQUATE ILL 13 ILL 158 Objectives Est. Cost Past Current MADISON 3 2016 $1,000,000 RANDOLPH 1 2017-2021 LAND ACQUISITION $50,000 RANDOLPH 1 2017-2021 CREEK 2.5 MI & 3 MI S OF ILL 13 INT Bridge Maintenance UTILITY ADJUSTMENT $50,000 RANDOLPH 1 2017-2021 0.2 MI E OF ILL 4 TO LOCUST ST IN STEELEVILLE Miles = 2.51 System Maintenance RESURFACING $1,300,000 RANDOLPH 1 2017-2021 $150,000 ST. CLAIR 1 2017-2021 Miles 2.51 Roughness(IRI) ACCEPTABLE Rutting 0.46 AADT 5,351 AT FREEBURG AVE Congestion Mitigation Truck Pct 30.0 $70,000 County SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM NHS N INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT RESURFACING SAFETY PRESERVE SYSTEM $4,700,000 ST. CLAIR 1 2017-2021 BRIDGE DECK WATERPROOFING PRESERVE SYSTEM $500,000 ST. CLAIR 1 2017-2021 IDOT PARTICIPATION IN PROJECT. ILL 13 ILL 15 Needs Category ACCRUING ILL 13 RODGERS DR IN FREEBURG TO 0.1 MI S OF KASKASKIA RIVER Miles = 8.91 System Maintenance Miles 8.91 Roughness(IRI) ACCEPTABLE Rutting 0.20 AADT 8,382 KASKASKIA RIVER Bridge Maintenance Truck Pct 6.1 NHS N 8-9 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street ILL 13 Location Improvements ICG RR Objectives RICHLAND CREEK 1 MI E OF JCT ILL 159 Bridge Maintenance $500,000 ST. CLAIR 1 2017-2021 BRIDGE NEW DECK SAFETY PRESERVE SYSTEM $3,500,000 ST. CLAIR 1 2017-2021 ADEQUATE ILL 100 ILL 96 Needs Category BACKLOG ILL 96 ILL 3 ILL 108 AADT 6,750 6,750 Truck Pct 8 Str Number 0820049 NHS Y 8 0820050 Y JOE PAGE BRIDGE AT HARDIN Bridge Maintenance BRIDGE REPAIR SAFETY PRESERVE SYSTEM $4,500,000 GREENE 2 2016 HAMBURG RD TO ILL 100 Miles = 7.35 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $2,600,000 CALHOUN 1 2017-2021 SAFETY PRESERVE SYSTEM $400,000 CALHOUN 1 2017-2021 Miles 7.35 Roughness(IRI) GOOD Rutting 0.15 AADT 500 CREEK IN KAMPSVILLE Bridge Maintenance Truck Pct 14.0 NHS Y BRIDGE NEW DECK Structure Status STRUCTURAL ACCRUING ILL 100 Past Current SAFETY PRESERVE SYSTEM Structure Status ADEQUATE ILL 16 County BRIDGE REPAIR Bridge Maintenance ILL 15 Est. Cost AADT 775 ILL 100: 0.2 MI E OF SKI LIFT RD TO VINE ST IN GRAFTON; ILL 3: 0.2 MI N OF GRAFTON HILLS DR TO ILL 100 Miles = 3.36 System Maintenance CAPE SEAL SAFETY PRESERVE SYSTEM $600,000 ILLINOIS RIVER TO 0.1 MI W OF 11TH ST IN CARROLLTON Miles = 10.51 System Maintenance CAPE SEAL SAFETY PRESERVE SYSTEM $1,800,000 8 - 10 Truck Pct 9 Str Number 0070014 NHS Y JERSEY 1 2016 GREENE 1 2016 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street ILL 109 Location Improvements AT W COUNTY RD Congestion Mitigation Objectives LEFT TURN LANES TRAF SIGNAL INSTALLATION SAFETY MODAL CONNECTIVITY TRANSPORTATION OPS RESURFACING SAFETY PRESERVE SYSTEM Est. Cost $110,000 County Past Current JERSEY 1 2017-2021 $3,000,000 BOND 1 2016 SAFETY PRESERVE SYSTEM $2,100,000 WASHINGTON 1 2017-2021 SAFETY PRESERVE SYSTEM $6,100,000 MADISON 3 2017-2021 IDOT PARTICIPATION IN PROJECT. ILL 127 Needs Category BACKLOG ILL 127 Needs Category BACKLOG ILL 143 SALE BARN AVE TO CLINTON CO LINE Miles = 8.05 System Maintenance Miles 8.05 Roughness(IRI) ACCEPTABLE Rutting 0.12 AADT 2,655 ILL 177 TO 0.4 MI N OF MOCKINGBIRD RD IN NASHVILLE Miles = 4.11 System Maintenance Miles 4.11 Roughness(IRI) ACCEPTABLE Rutting 0.22 Truck Pct 18.3 RESURFACING AADT 4,101 INDIAN CREEK 0.3 MI E OF WANDA RD Bridge Maintenance NHS N Truck Pct 15.0 NHS N BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG AADT 10,400 Truck Pct 7 Str Number 0600082 NHS Y ILL 143 INDIAN CREEK 0.3 MI E OF WANDA RD Bridge Maintenance LAND ACQUISITION $250,000 MADISON 1 2017-2021 ILL 143 INDIAN CREEK 0.3 MI E OF WANDA RD Bridge Maintenance UTILITY ADJUSTMENT $100,000 MADISON 1 2017-2021 ILL 143 SHOAL CREEK 0.9 MI E OF PIERRON Bridge Maintenance BRIDGE REPLACEMENT BOND 4 2017-2021 SAFETY PRESERVE SYSTEM $18,500,000 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG 8 - 11 AADT 1,700 Truck Pct 14 Str Number 0030034 NHS N FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street ILL 143 Location Improvements SHOAL CREEK 0.9 MI E OF PIERRON Bridge Maintenance Objectives LAND ACQUISITION Est. Cost County Past Current $500,000 BOND 3 2016 $500,000 BOND 3 2016 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 143 SHOAL CREEK 0.9 MI E OF PIERRON Bridge Maintenance UTILITY ADJUSTMENT ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 153 Needs Category BACKLOG ILL 13 IN COULTERVILLE TO ILL 154 Miles = 6.02 System Maintenance Miles 5.81 Roughness(IRI) ACCEPTABLE Rutting 0.31 AADT 1,913 RESURFACING Truck Pct 8.5 SAFETY PRESERVE SYSTEM $2,200,000 RANDOLPH 1 2017-2021 RANDOLPH 1 2016 NHS N ILL 155 0.3 MI W OF FORT DE CHARTRES TO 0.1 MI W OF MARKET ST IN PRAIRIE DU ROCHER Miles = 3.87 System Maintenance CAPE SEAL SAFETY PRESERVE SYSTEM $800,000 ILL 156 ILL 159 TO ILL 13 Miles = 4.85 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $1,700,000 ST. CLAIR 1 2016 SAFETY PRESERVE SYSTEM $4,800,000 MADISON 5 2016 Needs Category BACKLOG ILL 157 Miles 4.85 Roughness(IRI) ACCEPTABLE Rutting 0.20 AADT 2,362 Truck Pct 10.1 NHS N Needs Category BACKLOG ILL 140 IN HAMEL TO 0.1 MI N OF ILL RESURFACING 143/157 (VANDALIA ST) E JCT IN SHOULDER RECONSTRUCTION EDWARDSVILLE Miles = 7.87 System Maintenance Miles Roughness(IRI) Rutting AADT Truck Pct NHS 7.09 GOOD 0.20 3,366 3.2 N BACKLOG 0.78 ACCEPTABLE 0.19 5,687 4.4 N 8 - 12 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street ILL 157 Location Improvements SILVER CREEK TRIB S OF HAMEL CL Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG Est. Cost $1,100,000 AADT 2,750 County MADISON Truck Pct 3 Past Current 1 Str Number 0602454 2017-2021 NHS N ILL 157 SILVER CREEK TRIB S OF HAMEL CL Bridge Maintenance LAND ACQUISITION $50,000 MADISON 1 2017-2021 ILL 157 SILVER CREEK TRIB S OF HAMEL CL Bridge Maintenance UTILITY ADJUSTMENT $50,000 MADISON 1 2017-2021 ILL 159 DOUGLAS CREEK 0.8 MI N OF SMITHTON Bridge Maintenance BRIDGE REPLACEMENT $2,100,000 ST. CLAIR 6 2017-2021 SAFETY PRESERVE SYSTEM Structure Status FUNCTIONAL BACKLOG AADT 10,900 Truck Pct 4 Str Number 0820071 NHS N ILL 159 DOUGLAS CREEK 0.8 MI N OF SMITHTON Bridge Maintenance LAND ACQUISITION $100,000 ST. CLAIR 6 2017-2021 ILL 159 DOUGLAS CREEK 0.8 MI N OF SMITHTON Bridge Maintenance UTILITY ADJUSTMENT $100,000 ST. CLAIR 6 2017-2021 ILL 160 FOURTH ST IN TRENTON TO ILL 161 Miles = 5.09 System Maintenance RESURFACING CLINTON 1 2017-2021 Needs Category BACKLOG Miles 5.09 Roughness(IRI) GOOD Rutting 0.15 AADT 3,858 Truck Pct 9.4 SAFETY PRESERVE SYSTEM NHS N 8 - 13 $1,900,000 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street ILL 160 Needs Category BACKLOG ILL 161 Location Improvements ILL 161 TO ILL 177 Miles = 3.78 System Maintenance Miles 3.78 Roughness(IRI) GOOD Rutting 0.14 RESURFACING AADT 1,794 CROOKED CREEK 8.6 MI E OF ILL 127 & CREEK 1 MI W OF CENTRALIA Bridge Maintenance Objectives Truck Pct 11.3 Est. Cost County Past Current SAFETY PRESERVE SYSTEM $1,300,000 CLINTON 1 2017-2021 SAFETY PRESERVE SYSTEM $20,000,000 CLINTON 11 2017-2021 NHS N BRIDGE REPLACEMENT CULVERT REPLACEMENT ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL BACKLOG STRUCTURAL BACKLOG ILL 161 CROOKED CREEK 8.6 MI E OF ILL 127 Bridge Maintenance LAND ACQUISITION AADT 5,950 5,950 Truck Pct 7 Str Number 0140025 NHS N 7 0142001 N $500,000 CLINTON 2 2017-2021 $500,000 CLINTON 2 2017-2021 $450,000 ST. CLAIR 2 2016 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 161 CROOKED CREEK 8.6 MI E OF ILL 127 Bridge Maintenance UTILITY ADJUSTMENT ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. ILL 177 AT ILL 4 INTERSECTION RECONSTN Congestion Mitigation IDOT PARTICIPATION IN PROJECT. 8 - 14 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street ALTON-GODFREY Location Improvements Objectives Est. Cost County Past Current TRANSPORTATION OPS MODAL CONNECTIVITY PRESERVE SYSTEM FREIGHT MOVEMENT SAFETY $110,000,000 MADISON 5 2017-2021 CONNECTOR US 67 S OF ALTON SQUARE TO N OF ILL 255 Miles = 4.00 System Expansion GRADING PAVING BRIDGE (NEW) LAND ACQUISITION UTILITY ADJUSTMENT CONSTRUCTION ENGINEERING DRAINAGE GATEWAY I-55/70 TO I-255 LAND ACQUISITION $10,000 MADISON ST. CLAIR MONROE 4 2016 LAND ACQUISITION $10,000 MADISON ST. CLAIR MONROE 4 2017-2021 LAND ACQUISITION $10,000 MADISON ST. CLAIR MONROE 4 2017-2021 $8,000,000 ST. CLAIR 3 2017-2021 $170,000 ST. CLAIR 4 2017-2021 System Expansion CONNECTOR GATEWAY I-55/70 TO I-255 System Expansion CONNECTOR GATEWAY I-55/70 TO I-255 System Expansion CONNECTOR GREEN MOUNT RD ILL 161 TO ILL 177 Miles = 1.00 Congestion Mitigation ADDITIONAL LANES RESURFACING SAFETY TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT PRESERVE SYSTEM CONTINGENT UPON A JURISDICTIONAL TRANSFER. Needs Category ADEQUATE ILLINOIS AVE Miles 1.00 Roughness(IRI) ACCEPTABLE Rutting 0.15 AADT 19,276 MLK BRIDGE IN EAST ST. LOUIS Bridge Maintenance Truck Pct 0.2 NHS N PRESERVE SYSTEM BRIDGE DECK SEALING ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. 8 - 15 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street KING BRIDGE RAMPS Location Improvements Objectives SAFETY PRESERVE SYSTEM I-55/64 (WB), MISSOURI AVE, BRIDGE REPLACEMENT RELOCATED ILL 3, TRRA & UP RR IN E ST. LOUIS 0.7 MI E OF MISSISSIPPI RIVER Bridge Maintenance Est. Cost $32,000,000 County ST. CLAIR Past Current 3 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status FUNCTIONAL BACKLOG KING BRIDGE RAMPS I-55/64/70 (WB), MISSOURI AVE, P.E. (PHASE II) RELOCATED ILL 3, TRRA & UP RR IN E ST. LOUIS 0.7 MI E OF MISSISSIPPI RIVER Bridge Maintenance AADT 13,300 Truck Pct 12 Str Number 0826003 NHS Y $2,000,000 ST. CLAIR 3 2016 $500,000 ST. CLAIR 3 2017-2021 $2,000,000 ST. CLAIR 3 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. KING BRIDGE RAMPS I-55/64/70 (WB), MISSOURI AVE, LAND ACQUISITION RELOCATED ILL 3, TRRA & UP RR IN E ST. LOUIS 0.7 MI E OF MISSISSIPPI RIVER Bridge Maintenance ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. KING BRIDGE RAMPS I-55/64/70 (WB), MISSOURI AVE, UTILITY ADJUSTMENT RELOCATED ILL 3, TRRA & UP RR IN E ST. LOUIS 0.7 MI E OF MISSISSIPPI RIVER Bridge Maintenance ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. LEBANON BYP ILL 4 TO US 50 E OF LEBANON System Expansion P.E. (PHASE II) P.E. (CONSULTANT PLANS) $1,100,000 ST. CLAIR 2 2017-2021 LEBANON BYP ILL 4 TO US 50 E OF LEBANON System Expansion P.E. (PHASE II) P.E. (CONSULTANT PLANS) $1,500,000 ST. CLAIR 2 2016 MCKINLEY BRIDGE MISSISSIPPI RIVER Bridge Maintenance BRIDGE DECK SEALING $175,000 MADISON 3 2017-2021 SALISBURY ST PRESERVE SYSTEM 8 - 16 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street N SIU ENT RD NB & SB Location CAHOKIA CREEK 0.5 MI S OF ILL 143 Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM TRANSPORTATION OPS BRIDGE NEW DECK BRIDGE SUPERSTRUCTURE Structure Status STRUCTURAL BACKLOG STRUCTURAL BACKLOG VARIOUS VARIOUS ADA RAMPS System Maintenance SIDEWALKS VARIOUS CHANGE ORDER RESERVE System Maintenance CHANGE ORDERS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS System Maintenance SAFETY IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS VARIOUS ON-CALL ENGINEERING System Maintenance VARIOUS VARIOUS SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS Est. Cost $3,700,000 AADT 2,900 2,900 County MADISON Past Current 1 2017-2021 Truck Pct 2 Str Number 0600140 NHS N 2 0600141 N $750,000 DISTRICT-WIDE 1 2017-2021 $2,620,000 DISTRICT-WIDE 1 2016 SAFETY $5,470,000 DISTRICT-WIDE 6 2016 SAFETY $27,350,000 DISTRICT-WIDE 5 2017-2021 PRELIMINARY ENGINEERING $500,000 DISTRICT-WIDE 1 2016 ON-CALL ENGINEERING System Maintenance P.E. SURVEYS (ROW) P.E. SURVEYS (PHASE I) P.E. SURVEYS (PHASE II) $250,000 DISTRICT-WIDE 1 2016 ON-CALL ENGINEERING System Maintenance P.E. SURVEYS (ROW) $250,000 DISTRICT-WIDE 1 2016 8 - 17 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street Location Improvements VARIOUS ON-CALL ENGINEERING System Maintenance P.E. SURVEYS (ROW) VARIOUS ON-CALL ENGINEERING VARIOUS Objectives Est. Cost County Past Current $250,000 DISTRICT-WIDE 1 2017-2021 PRELIMINARY ENGINEERING $1,200,000 DISTRICT-WIDE 5 2016 ON-CALL ENGINEERING PRELIMINARY ENGINEERING $1,600,000 DISTRICT-WIDE 3 2017-2021 VARIOUS ON-CALL ENGINEERING - MATERIALS INSPECTION System Maintenance CONSTRUCTION ENGINEERING $200,000 DISTRICT-WIDE 2 2016 VARIOUS ON-CALL ENGINEERING GEOTECHNICAL SERVICES System Maintenance CONSTRUCTION ENGINEERING $150,000 DISTRICT-WIDE 2 2016 VARIOUS DESIGN & LAND SURVEYS System Maintenance P.E. SURVEYS (ROW) $100,000 DISTRICT-WIDE 2 2016 VARIOUS CONSTRUCTION ENGINEERING System Maintenance CONSTRUCTION ENGINEERING $500,000 DISTRICT-WIDE 3 2017-2021 VARIOUS SUBSURFACE UTILITY ENGINEERING System Maintenance P.E. SUBSURFACE UTILITIES $500,000 DISTRICT-WIDE 4 2016 VARIOUS SUBSURFACE UTILITY ENGINEERING COORDINATION - PTB 171 System Maintenance P.E. SUBSURFACE UTILITIES $250,000 DISTRICT-WIDE 2 2017-2021 VARIOUS LOCAL ROADS CONSULTANT System Maintenance P.E. PROJECT MANAGERS $200,000 DISTRICT-WIDE 2 2016 8 - 18 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS LOCAL ROADS CONSULTANT P.E. PROJECT MANAGERS $400,000 DISTRICT-WIDE 2 2017-2021 VARIOUS DEEP WELL & PUMP REPAIRS System Maintenance MISCELLANEOUS $100,000 MADISON ST. CLAIR 3 2017-2021 VARIOUS ENVIRONMENTAL MAINTENANCE & TREE MISCELLANEOUS MITIGATION System Maintenance $20,000 DISTRICT-WIDE 5 2016 VARIOUS ENVIRONMENTAL MAINTENANCE & TREE MISCELLANEOUS MITIGATION System Maintenance $20,000 DISTRICT-WIDE 3 2017-2021 VARIOUS MISCELLANEOUS LAND ACQUISITION System Maintenance LAND ACQUISITION $50,000 DISTRICT-WIDE 5 2016 VARIOUS MISCELLANEOUS LAND ACQUISITION System Maintenance LAND ACQUISITION $50,000 DISTRICT-WIDE 3 2017-2021 VARIOUS PRE-LAND ACQUISITION ACTIVITY System Maintenance PRE-ACQUISITION ACTIVITY $250,000 DISTRICT-WIDE 5 2016 VARIOUS PRE-LAND ACQUISITION ACTIVITY System Maintenance PRE-ACQUISITION ACTIVITY $250,000 DISTRICT-WIDE 3 2017-2021 VARIOUS POST-LAND ACQUISITION ACTIVITY System Maintenance POST-ACQUISITION ACTIVITY $1,000,000 DISTRICT-WIDE 5 2016 VARIOUS POST-LAND ACQUISITION ACTIVITY System Maintenance POST-ACQUISITION ACTIVITY $1,000,000 DISTRICT-WIDE 3 2017-2021 8 - 19 FY 2016-2021 Highway Improvement Program District 8 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS VARIOUS LOCATIONS (ITARP) System Maintenance ARCHAEOLOGICAL SURVEY $500,000 DISTRICT-WIDE 1 2016 VARIOUS VARIOUS LOCATIONS (ITARP) System Maintenance ARCHAEOLOGICAL SURVEY $1,000,000 DISTRICT-WIDE 1 2017-2021 VARIOUS DISTRICT MISCELLANEOUS System Maintenance MISCELLANEOUS PROJECTS $500,000 DISTRICT-WIDE 5 2016 VARIOUS DISTRICT MISCELLANEOUS System Maintenance MISCELLANEOUS PROJECTS $500,000 DISTRICT-WIDE 3 2017-2021 VARIOUS PAVEMENT PATCHING PATCHING SAFETY PRESERVE SYSTEM $1,250,000 DISTRICT-WIDE 5 2016 VARIOUS PAVEMENT PATCHING PATCHING SAFETY PRESERVE SYSTEM $1,250,000 DISTRICT-WIDE 3 2017-2021 VARIOUS GUARDRAIL & MEDIAN CABLE INSTALLATION System Maintenance GUARDRAIL MEDIAN CABLE SAFETY $400,000 DISTRICT-WIDE 5 2016 VARIOUS GUARDRAIL & MEDIAN CABLE INSTALLATION System Maintenance GUARDRAIL MEDIAN CABLE SAFETY $400,000 DISTRICT-WIDE 3 2017-2021 VARIOUS CONGESTION MITIGATION AIR QUALITY System Maintenance MISCELLANEOUS PROJECTS $562,000 DISTRICT-WIDE 6 2016 VARIOUS CONGESTION MITIGATION AIR QUALITY MISCELLANEOUS PROJECTS $2,810,000 DISTRICT-WIDE 5 2017-2021 8 - 20 DISTRICT FY 2016-2019 Highway Improvement Program District 8 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current RECONSTRUCTION ILL 3: 0.1 MI N OF KASKASKIA RD TO 0.1 MI S OF OLD RED BUD RD; OLD RED BUD RD: ILL 3 TO 0.6 MI E; KASKASKIA RD: ILL 3 TO 0.1 MI W Miles = 0.95 SAFETY PRESERVE SYSTEM $1,250,000 MONROE 1 2017-2021 6TH ST E EDWARDSVILLE RD TO WOODLAND AVE Miles = 0.65 RESURFACING SAFETY PRESERVE SYSTEM $922,000 MADISON 1 2017-2021 ASHLAND AVE EXT HARTMAN LN TO CENTRAL PARK DR IN O'FALLON Miles = 0.30 NEW CONSTRUCTION TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT $1,613,000 ST. CLAIR 1 2017-2021 BERKSHIRE BLVD 0.1 MI W OF WOOD RIVER AVE TO 0.3 MI E Miles = 0.29 RESURFACING SAFETY PRESERVE SYSTEM $561,000 MADISON 1 2017-2021 BOULDER RD AT US 50 INTERSECTION IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $800,000 CLINTON 1 2016 BROADWAY ST: 0.1 MI E OF BELCHIK RESURFACING MEM PKWY TO ALLEN ST & W OF HENRY ST TO MONUMENT AVE; HENRY ST: S OF BROADWAY ST; RIDGE ST: S OF BROADWAY ST Miles = 0.76 SAFETY PRESERVE SYSTEM $851,000 MADISON 1 2017-2021 STATE ST TO HANCOCK ST IN CHESTER Miles = 0.31 SAFETY PRESERVE SYSTEM $1,200,000 RANDOLPH 2 2016 ILL 3 OLD RED BUD RD CH 1 KASKASKIA RD CH 3 BROADWAY ST HENRY ST RIDGE ST BUENA VISTA ST TAYLOR ST RECONSTRUCTION BISSELL ST 8 - 21 FY 2016-2019 Highway Improvement Program District 8 Local Highways MYP Years Route/Street CARGILL ELEVATOR RD Location ILL 3 TO MISSISSIPPI RIVER BARGE DOCK (FOX TERMINAL) Miles = 1.08 Improvements Objectives SAFETY PRESERVE SYSTEM RECONSTRUCTION Est. Cost $1,700,000 County ST. CLAIR Past Current 6 2016 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT. THIS EARMARK WILL BE FUNDED SEPARATELY. CENTREVILLE AVE STATE ST TO WASHINGTON ST IN BELLEVILLE Miles = 0.51 RESURFACING BIKEWAY SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY $720,000 ST. CLAIR 2 2017-2021 CH 13 CH 15 TO TR 64 / N 650E RD Miles = 2.54 RESURFACING SAFETY PRESERVE SYSTEM $420,000 GREENE 1 2017-2021 CH 21 ILL 15 TO CLEVELAND RD AT OAKDALE ECL Miles = 6.27 RESURFACING SAFETY PRESERVE SYSTEM $2,250,000 WASHINGTON 3 2016 CH 23 US 51 TO VILLAGE OF RADOM Miles = 1.53 RESURFACING SAFETY PRESERVE SYSTEM $875,000 WASHINGTON 1 2017-2021 CH 3 NS RR TO GALLATIN ST Miles = 0.08 RESURFACING SAFETY PRESERVE SYSTEM $125,000 MARION 1 2017-2021 WALNUT HILL RD CH 5 JIM'S CREEK 4 MI SE OF PATOKA P.E. (PHASE I) P.E. (PHASE II) $160,000 MARION 1 2017-2021 JIM'S CREEK 4 MI SE OF PATOKA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,500,000 MARION 2 2017-2021 N MORRISON AVE TO COMBS ST IN COLLINSVILLE Miles = 0.54 RESURFACING SAFETY PRESERVE SYSTEM $473,000 MADISON 3 2016 WALKERVILLE RD MARSHALL CREEK RD CH 5 MARSHALL CREEK RD CLAY ST 8 - 22 FY 2016-2019 Highway Improvement Program District 8 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current COTTONWOOD RD JUNCTION DR TO FALCONCREST DR IN GLEN CARBON Miles = 0.60 RESURFACING SAFETY PRESERVE SYSTEM $201,000 MADISON 2 2016 COUNTY LINE RD OWL CREEK AT N EDGE OF MULBERRY GROVE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $138,000 BOND 1 2017-2021 DAVIS ST FERRY RD AT I-255 IN DUPO UTILITY ADJUSTMENT $400,000 ST. CLAIR 10 2017-2021 $19,075,000 ST. CLAIR 9 2017-2021 $1,399,000 MADISON 1 2017-2021 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. DAVIS ST FERRY RD AT I-255 IN DUPO INTERCHANGE CONSTRUCTION TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT ECONOMIC DEVELOP SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. E MAIN ST LAKEVIEW ACRES RD W 0.3 MI Miles = 0.26 RECONSTRUCTION SAFETY PRESERVE SYSTEM EAST ALTON AVE S OF ST. LOUIS AVE TO PICKER AVE IN EAST ALTON Miles = 0.30 RESURFACING CURB AND GUTTER SIDEWALKS SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $451,000 MADISON 2 2017-2021 EAST CENTRAL ST LONGFELLOW ST TO MORELAND RD Miles = 0.33 RESURFACING SAFETY PRESERVE SYSTEM $650,000 MADISON 1 2017-2021 FALLING SPRINGS MONSANTO AVE TO QUEENY AVE IN SAUGET Miles = 0.80 RESURFACING SAFETY PRESERVE SYSTEM $287,000 ST. CLAIR 2 2016 RD 8 - 23 FY 2016-2019 Highway Improvement Program District 8 Local Highways MYP Years Route/Street FRANK SCOTT PKWY Location CROSS ST IN SHILOH TO ILL 158 Miles = 1.60 Improvements Objectives NEW CONSTRUCTION TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT Est. Cost $6,400,000 County ST. CLAIR Past Current 7 2016 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT. THIS EARMARK WILL BE FUNDED SEPARATELY. FRANK SCOTT PKWY CROSS ST IN SHILOH TO ILL 158 Miles = 1.60 NEW CONSTRUCTION TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT FRANK SCOTT PKWY E OF ILL 159 TO W OF OLD COLLINSVILLE RD Miles = 0.77 RESURFACING HAMACHER ST BRADFORD LN HAMACHER ST: RODGERS ST TO OSTERHAGE DR; OSTERHAGE DR: HAMACHER ST TO BRIARCLIFF DR; BRADFORD LN: MARKET ST (OLD ILL 3) TO RODGERS ST IN WATERLOO Miles = 1.12 HAMMEL RD $400,000 ST. CLAIR 8 2016 SAFETY PRESERVE SYSTEM $2,000,000 ST. CLAIR 2 2017-2021 RESURFACING SAFETY PRESERVE SYSTEM $524,000 MONROE 2 2017-2021 PRAIRIE CREEK 1.5 MI SE OF HUEY BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $400,000 CLINTON 1 2017-2021 HUNTWOOD DR ILL 159 TO GRIMMIG RD IN SWANSEA Miles = 0.05 NEW CONSTRUCTION TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT ST. CLAIR 6 2017-2021 IDLER LN SAMUEL W ANDREWS DR TO ILL 127 Miles = 0.11 WIDENING & RESURFACING SAFETY PRESERVE SYSTEM $400,000 BOND 2 2017-2021 ILLINOIS ST N OF MAIN ST TO BOONE ST IN SALEM SIDEWALKS SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $200,000 MARION 2 2017-2021 OSTERHAGE DR 8 - 24 $1,159,000 FY 2016-2019 Highway Improvement Program District 8 Local Highways MYP Years Route/Street Location Improvements Objectives JAMESTOWN RD AT HOLY CROSS RD IN BREESE INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT JEFFERSON ST ILL 158 TO DOUGLAS RD Miles = 2.27 RESURFACING SAFETY PRESERVE SYSTEM JOSEPH DR ASHLAND AVE TO CHATEAU DR / ARCHWAY DR Miles = 0.48 RESURFACING KELL RD HORSE CREEK LEVEE RD Est. Cost Past Current CLINTON 3 2016 $750,000 ST. CLAIR 1 2017-2021 SAFETY PRESERVE SYSTEM $469,000 ST. CLAIR 3 2016 BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $400,000 MARION 2 2016 CARR CREEK LEVEE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $250,000 MONROE 2 2017-2021 MARYVILLE RD ILL 162 TO TERMINAL AVE Miles = 0.85 RESURFACING SAFETY PRESERVE SYSTEM $854,000 MADISON 1 2017-2021 MOCKINGBIRD LN ILL 162 TO TERMINAL RR Miles = 0.27 RECONSTRUCTION CURB AND GUTTER SIDEWALKS SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $476,000 MADISON 2 2016 MUNIE RD OLD COLLINSVILLE RD TO W OF EIFFEL BLVD IN SWANSEA Miles = 0.35 RECONSTRUCTION SIDEWALKS BIKEWAY SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $871,000 ST. CLAIR 2 2016 FLORAVILLE RD 8 - 25 $1,250,000 County FY 2016-2019 Highway Improvement Program District 8 Local Highways MYP Years Route/Street Location Improvements Objectives MUNIE RD SMELTING WORKS RD TO EIFFEL BLVD IN SWANSEA Miles = 0.34 RESURFACING SAFETY PRESERVE SYSTEM N MAIN ST ILL 3 TO CRESTVIEW DR IN COLUMBIA Miles = 0.64 RESURFACING SIDEWALKS SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS N RODGERS AVE W FORK WOOD RIVER IN ALTON BRIDGE REPLACEMENT NEW DOUGLAS AVE DRY FORK CREEK 1.5 MI SW OF SORENTO BRIDGE REPLACEMENT Est. Cost $1,041,000 County Past Current ST. CLAIR 2 2016 $515,000 MONROE 3 2016 SAFETY PRESERVE SYSTEM $500,000 MADISON 3 2016 SAFETY PRESERVE SYSTEM $2,428,000 BOND 4 2017-2021 BOND 4 2017-2021 $901,000 ST. CLAIR 1 2017-2021 $180,000 BOND 2 2017-2021 CLINTON 4 2017-2021 ST. CLAIR 2 2017-2021 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. NEW DOUGLAS AVE DRY FORK CREEK 1.5 MI SW OF SORENTO CONSTRUCTION ENGINEERING $343,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. OAK ST OAK ST: A ST TO E MAIN ST; A ST: ILL 159 TO N OAK ST Miles = 0.48 RESURFACING A ST OLD RIPLEY RD SHOAL CREEK 2.8 MI N OF OLD RIPLEY P.E. (PHASE I) OLD STATE RD SHOAL CREEK NW OF BREESE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM $1,430,000 ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS. PORTER RD SIMMONS RD TO OBERNUEFEMANN RD IN O'FALLON Miles = 0.38 SAFETY PRESERVE SYSTEM RECONSTRUCTION CURB AND GUTTER 8 - 26 $441,000 FY 2016-2019 Highway Improvement Program District 8 Local Highways MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM S MAIN ST CHERRY ST TO ILL 3 Miles = 0.64 RESURFACING S SIEMEN ST S OF WILLOW ST TO SORENTO RD IN SORENTO P.E. (PHASE I) E TAYLOR ST SEMINARY RD HONEY BRANCH TRIB BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM SHAMROCK AVE N OF OLIN INDUSTRIAL DR TO ST LOUIS AVE IN EAST ALTON Miles = 0.50 RESURFACING SHILOH STATION RD JOHNSON RD TO STONEWALL LN Miles = 0.21 SPRING VALLEY RD SPRINGER AVE Est. Cost Past Current MONROE 1 2017-2021 BOND 2 2017-2021 $1,216,000 MADISON 2 2016 SAFETY PRESERVE SYSTEM $534,000 MADISON 3 2016 WIDENING & RESURFACING DRAINAGE BIKEWAY SAFETY PRESERVE SYSTEM TRANSPORTATION OPS MODAL CONNECTIVITY $500,000 ST. CLAIR 2 2017-2021 0.1 MI N OF AUSTIN DR TO 0.1 MI S OF CHARLESTON DR IN TROY Miles = 0.25 RECONSTRUCTION SIDEWALKS SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $829,000 MADISON 4 2017-2021 ILL 143 TO JEFFERSON RD IN EDWARDSVILLE Miles = 0.67 RESURFACING SAFETY PRESERVE SYSTEM $460,000 MADISON 3 2016 ST LOUIS ST ELM ST TO ILL 157 IN EDWARDSVILLE Miles = 0.28 RESURFACING SAFETY PRESERVE SYSTEM $700,000 MADISON 1 2017-2021 ST ROSE RD BAUMANN RD / MADISON CO LINE TO OLD US 50 Miles = 10.19 RESURFACING SAFETY PRESERVE SYSTEM $1,500,000 CLINTON 2 2017-2021 SHERIDAN AVE $610,000 County $80,000 8 - 27 FY 2016-2019 Highway Improvement Program District 8 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current STAMPER LN KING ARTHUR LN TO W OF ILL 111 / US 67 IN GODFREY Miles = 0.46 RESURFACING SAFETY PRESERVE SYSTEM $900,000 MADISON 2 2017-2021 SUGAR LOAF RD ILL 157 TO 0.2 MI E INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $395,000 MADISON 1 2017-2021 SUMMERFIELD ST ALTON ST TO MONROE ST IN LEBANON Miles = 0.19 RECONSTRUCTION SAFETY PRESERVE SYSTEM $413,000 ST. CLAIR 6 2017-2021 TENTH ST MISSOURI AVE TO SUMMIT AVE IN EAST ST LOUIS Miles = 0.54 RESURFACING SIDEWALKS SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $577,000 ST. CLAIR 3 2016 TR 82 ELM POINT BRANCH 2 MI S OF PANAMA BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $600,000 BOND 1 2017-2021 VARIOUS DISTRICTWIDE CMAQ PROJECTS MISCELLANEOUS $3,000,000 DISTRICT-WIDE 4 2016 VARIOUS DISTRICTWIDE CMAQ PROJECTS MISCELLANEOUS $3,000,000 DISTRICT-WIDE 3 2017-2021 VARIOUS DISTRICTWIDE CMAQ PROJECTS MISCELLANEOUS $3,000,000 DISTRICT-WIDE 2 2017-2021 RENO RD 8 - 28 FY 2016-2019 Highway Improvement Program District 8 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current W MAIN ST ST LOUIS RD TO LEBANON RD IN COLLINSVILLE Miles = 0.99 RESURFACING SIDEWALKS SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $614,000 MADISON 2 2017-2021 W SCHWARZ ST ILL 157 TO S BUCHANAN ST IN EDWARDSVILLE Miles = 0.65 RESURFACING CURB AND GUTTER SIDEWALKS SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS $551,000 MADISON 2 2017-2021 WALNUT ST US 40 TO BROADWAY IN HIGHLAND Miles = 0.64 RESURFACING SAFETY PRESERVE SYSTEM $550,000 MADISON 3 2016 WOODBURN RD TRIB E FORK OF WOOD RIVER CREEK BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,216,000 MADISON 3 2017-2021 WOODY RD E OF ELDRED RD TO 700 E RD (CH 19) Miles = 3.22 RESURFACING SAFETY PRESERVE SYSTEM $625,000 GREENE 3 2016 WOODY RD TR 90 TO TR 52 Miles = 2.81 RESURFACING SAFETY PRESERVE SYSTEM $450,000 GREENE 2 2017-2021 8 - 29 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE KANE DEKALB D2 COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK PEORIA D4 Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT ADAMS D5 MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Region 5 District 9 SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 5, DISTRICT 9, CARBONDALE Overview Highway District 9 encompasses 16 counties in southern Illinois and includes the cities of Carbondale, Mt. Vernon, Marion, Herrin, Harrisburg, Murphysboro, West Frankfort, Benton and Pinckneyville, plus many smaller communities which serve as satellites for the larger employment centers or as focal points of this farming and recreational area. The state highway system in District 9 consists of 1,471 miles of highways and 758 bridges, supporting 8.2 million vehicle miles of travel daily. State Program The program for state and local highways will average $1.398 billion annually for the FY 2016-2021 period. Approximately $219 million will be provided during FY 2016-2021 for improvements to state highways in District 9. The following table summarizes anticipated accomplishments on the state highway system in District 9 during this time frame. FY 2016-2021 Accomplishments System Maintenance Interstate (miles) Non-Interstate (miles) Safety Locations (number) Bridge Maintenance Interstate (number) Non-Interstate (number) New Bridges (number) Minor Structure Repair (number) Congestion Mitigation Roads (miles) Traffic Improvements (number) System Expansion Roads (miles) Locations (number) 9-i 11 169 0 18 28 0 2 0 2 0 0 Major Highway projects of interest that are tentatively scheduled during the FY 2016-2021 time frame include:  Interstate 57/US 51 at Township Road 277 1.2 miles north of Pulaski County line in Union County. A bridge replacement is programmed during FY 2017-2021 at a cost of $5 million.  Interstate 57 at Illinois 146 Interchange in Union County. A bridge replacement is programmed during FY 2017-2021 at a cost of $6.1 million.  Interstate 57 (northbound) from 0.5 miles north of Illinois 146 to Interstate 24 in Union and Johnson Counties. Reconstruction on 12.7 miles of the northbound lanes is programmed during FY 2017-2021 at a cost of $18.1 million.  Interstate 57 at Atchinson Creek 2 miles north of Ina Interchange in Jefferson County. A bridge replacement is programmed during FY 2017-2021 at a cost of $6 million.  Interstate 64 from Interstate 57 to Illinois 142 east of Mt. Vernon in Jefferson County. Resurfacing on 4.4 miles is programmed during FY 2017-2021 at a cost of $6.9 million.  Interstate 64 at Wabash River in White County. A bridge replacement, engineering for contract plans and construction engineering are programmed during FY 2016-2021 at a cost of $76.5 million. Of this total, engineering for contract plans is programmed in FY 2016 at a cost of $500,000. Indiana and Illinois will share the cost equally with Illinois being the lead agency. This project has been approved for Illinois Major Bridge Program funding.  US 51 from Makanda Road to Illinois 146 in Anna in Jackson and Union Counties. Resurfacing on 10.9 miles is programmed in FY 2016 at a cost of $2.8 million.  Illinois 4 from Illinois 151 in Ava to Illinois 127 in Jackson County. Resurfacing on 10.8 miles is programmed in FY 2016 at a cost of $2.7 million.  Illinois 13 from Saline County line to Kentucky State line in Gallatin County. Resurfacing on 13.9 miles is programmed during FY 2016-2021 at a cost of $4 million. Of that total, resurfacing on 4.9 miles from Saline County line to Illinois 1 in Equality is programmed in FY 2016 at a cost of $1.5 million.  Illinois 34 from Raleigh Road to 0.6 miles south of Ellis Road in Saline County. Reconstruction and widening and resurfacing on 2.9 miles and culvert replacement 0.4 miles south of Raleigh Road are programmed in FY 2016 at a cost of $3.7 million.  Illinois 127 (Bridge Street) over Big Muddy River at the east corporate limits of Murphysboro in Jackson County. A bridge superstructure replacement is programmed in FY 2016 at a cost of $3 million.  Illinois 141 from New Haven to 2 miles east of New Haven in White County. Grading, culvert extension and slope stabilization are programmed in FY 2016 at a cost of $3.4 million.  Illinois 142 from Illinois 14 in McLeansboro to Saline County line in Hamilton County. Resurfacing on 13.6 miles is programmed during FY 2017-2021 at a cost of $3.4 million. 9-ii FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street I 24 Location Improvements 2 MI N OF US 45 Objectives SAFETY PRESERVE SYSTEM BRIDGE NEW DECK Bridge Maintenance Structure Status STRUCTURAL ACCRUING ADEQUATE I 24 OHIO RIVER BRIDGE AT ECL OF METROPOLIS System Maintenance BRIDGE ELECTRICAL WORK NAVIGATION LGHTNG REPAIRS INFRASTR SECURITY MODAL CONNECTIVITY SAFETY SUSTAINABILITY FREIGHT MOVEMENT Est. Cost $3,000,000 AADT 8,450 County MASSAC Past Current 2 2017-2021 Truck Pct 38 Str Number 0640027 NHS Y 8,450 38 0640028 Y $400,000 MASSAC 3 2017-2021 $80,000 MASSAC 3 2017-2021 $500,000 ALEXANDER 3 2017-2021 $1,000,000 ALEXANDER 3 2017-2021 $200,000 ALEXANDER 3 2016 ILLINOIS LEAD AGENCY; KENTUCKY AND ILLINOIS WILL SHARE COST EQUALLY. I 24 OHIO RIVER BRIDGE AT ECL OF METROPOLIS System Maintenance P.E. (PHASE I) P.E. (PHASE II) ILLINOIS LEAD AGENCY; KENTUCKY AND ILLINOIS WILL SHARE COST EQUALLY. I 57 MISSISSIPPI RIVER BRIDGE AT WCL OF CAIRO System Maintenance SAFETY PRESERVE SYSTEM BRIDGE JOINT REPAIR ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. I 57 MISSISSIPPI RIVER BRIDGE AT WCL OF CAIRO System Maintenance NAVIGATION LGHTNG REPAIRS SAFETY MODAL CONNECTIVITY INFRASTR SECURITY SUSTAINABILITY FREIGHT MOVEMENT ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. I 57 MISSISSIPPI RIVER BRIDGE AT WCL OF CAIRO System Maintenance P.E. (PHASE I) P.E. (PHASE II) ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY. 9-1 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street I 57 US 51 Location Improvements UNDER CH 7 4.3 MI S OF UNION CO LINE Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING I 57 US 51 TR 277 1.2 MI N OF PULASKI CO LINE Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status FUNCTIONAL BACKLOG I 57 BIG CREEK 2 MI N OF DONGOLA Bridge Maintenance BRIDGE REPLACEMENT 57 AT ILL 146 INTCHG Bridge Maintenance BRIDGE REPLACEMENT 57 (NORTHBOUND) 0.5 MI N OF ILL 146 TO I-24 (NB ONLY) Miles = 12.66 System Maintenance Needs Category BACKLOG Miles 4.25 Roughness(IRI) GOOD BACKLOG 8.41 GOOD RECONSTRUCTION Rutting 0.14 AADT 13,216 Truck Pct 45.1 NHS Y 0.21 12,076 44.5 Y 9-2 AADT 1,750 $5,000,000 AADT 5,550 5,550 SAFETY PRESERVE SYSTEM $5,000,000 AADT 5,350 STRUCTURAL BACKLOG 5,350 SAFETY PRESERVE SYSTEM $6,140,000 Structure Status STRUCTURAL ACCRUING I $2,000,000 STRUCTURAL BACKLOG Structure Status STRUCTURAL BACKLOG I Est. Cost AADT 5,750 STRUCTURAL BACKLOG 5,750 SAFETY PRESERVE SYSTEM $18,090,000 County PULASKI Truck Pct 4 Past Current 6 Str Number 0770026 UNION 2017-2021 NHS N 10 2017-2021 Truck Pct 41 Str Number 0910001 NHS Y 41 0910002 Y UNION 8 2017-2021 Truck Pct 54 Str Number 0910005 NHS Y 54 0910006 Y UNION 9 2017-2021 Truck Pct 43 Str Number 0910011 NHS Y 43 0910012 Y UNION JOHNSON 1 2017-2021 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street I 57 Location Improvements WESTMINISTER DR 0.3 MI S OF OLD ILL 13 IN MARION Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG I 57 1.2 MI N OF JOHNSTON CITY Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE NEW DECK Structure Status STRUCTURAL ACCRUING I 57 INA INTCHG SAFETY PRESERVE SYSTEM BRIDGE NEW DECK Bridge Maintenance Structure Status STRUCTURAL ACCRUING I I 57 57 I 57 I 64 ATCHINSON CREEK 2 MI N OF INA INTCHG Bridge Maintenance 2.2 MILES N OF BONNIE AT DODDS CREEK Bridge Maintenance ILL 15 TO NORTH TRI LEVEL AT MT VERNON System Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT 9-3 AADT 75 $1,500,000 AADT 900 $1,300,000 AADT 4,000 $6,000,000 WILLIAMSON Truck Pct 13 7 Str Number 1000055 WILLIAMSON Truck Pct 3 Str Number 1000053 2017-2021 NHS N 3 Str Number 0410055 JEFFERSON 2017-2021 NHS N 2 JEFFERSON Truck Pct 24 Past Current 2017-2021 NHS N 2 2017-2021 AADT 15,350 Truck Pct 33 Str Number 0410001 NHS Y STRUCTURAL ACCRUING 15,350 33 0410002 Y $800,000 JEFFERSON 1 2017-2021 Structure Status FUNCTIONAL LONG TERM AADT 15,350 Truck Pct 33 Str Number 0410003 NHS Y FUNCTIONAL LONG TERM 15,350 33 0410004 Y SAFETY PRESERVE SYSTEM LIGHTING $4,000,000 County Structure Status STRUCTURAL ACCRUING SAFETY PRESERVE SYSTEM BRIDGE DECK OVERLAY Est. Cost $750,000 JEFFERSON 1 2017-2021 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street I 64 Needs Category ACCRUING I 64 Location Improvements I-57 TO ILL 142 E OF MT VERNON Miles = 4.37 System Maintenance Miles 4.37 Roughness(IRI) GOOD Rutting 0.21 SAFETY PRESERVE SYSTEM RESURFACING AADT 11,418 WABASH RIVER BRIDGES Bridge Maintenance Objectives Truck Pct 38.0 Est. Cost County Past Current $6,860,000 JEFFERSON 1 2017-2021 $5,000,000 WHITE 9 2017-2021 $6,000,000 WHITE 3 2017-2021 $5,000,000 WHITE 1 2017-2021 $500,000 WHITE 1 2016 $60,000,000 WHITE 3 2017-2021 NHS Y P.E. (PHASE II) ILLINOIS LEAD AGENCY; INDIANA AND ILLINOIS WILL SHARE COST EQUALLY. ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 64 WABASH RIVER BRIDGES Bridge Maintenance CONSTRUCTION ENGINEERING ILLINOIS LEAD AGENCY; INDIANA AND ILLINOIS WILL SHARE COST EQUALLY. ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 64 WABASH RIVER BRIDGES System Maintenance MISCELLANEOUS ILLINOIS LEAD AGENCY; INDIANA AND ILLINOIS WILL SHARE COST EQUALLY. ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 64 WABASH RIVER BRIDGES Bridge Maintenance P.E. (PHASE II) ILLINOIS LEAD AGENCY; INDIANA AND ILLINOIS WILL SHARE COST EQUALLY. ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. I 64 WABASH RIVER BRIDGES Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT ILLINOIS LEAD AGENCY; INDIANA AND ILLINOIS WILL SHARE COST EQUALLY. ILLINOIS MAJOR BRIDGE PROGRAM PROJECT. Structure Status STRUCTURAL ACCRUING STRUCTURAL ACCRUING 9-4 AADT 6,350 6,350 Truck Pct 43 Str Number 0970003 NHS Y 43 0970004 Y FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current US 45 FEAZEL ST IN HARRISBURG Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $150,000 SALINE 1 2017-2021 US 45 S FORK SALINE RIVER 1.5 MI NE OF STONEFORT Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,400,000 SALINE 10 2016 Structure Status STRUCTURAL BACKLOG US 45 Needs Category ACCRUING US 45 1 MI S OF I-24 TO ILL 146 IN VIENNA Miles = 1.25 System Maintenance Miles 1.25 Roughness(IRI) ACCEPTABLE Rutting 0.49 AADT 4,063 RESURFACING Truck Pct 8.7 Needs Category BACKLOG US 51 Miles 4.72 Roughness(IRI) ACCEPTABLE Rutting 0.14 AADT 4,213 SCL OF DOWELL RESURFACING Truck Pct 9.4 Str Number 0830011 NHS N $300,000 JOHNSON 1 2016 SAFETY PRESERVE SYSTEM $1,200,000 JOHNSON 11 2017-2021 NHS N LITTLE CACHE CREEK 0.2 MI S OF ILL 146 BRIDGE REPLACEMENT Bridge Maintenance 1.7 MI N OF ILL 154 TO NCL OF DUQUOIN Miles = 4.72 System Maintenance Truck Pct 13 SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG US 51 AADT 1,900 AADT 2,150 SAFETY PRESERVE SYSTEM $1,600,000 SAFETY PRESERVE SYSTEM $600,000 Truck Pct 6 Str Number 0440004 NHS N PERRY 1 2016 JACKSON 8 2017-2021 NHS N CULVERT REPLACEMENT Bridge Maintenance Structure Status STRUCTURAL BACKLOG 9-5 AADT 7,000 Truck Pct 6 Str Number 0392027 NHS N FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street US 51 Location Improvements STREAM 0.2 MI N OF SCL OF ELKVILLE Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG Est. Cost $900,000 AADT 6,750 County JACKSON Truck Pct 10 Past Current 7 Str Number 0390002 2017-2021 NHS N US 51 CREEK 0.9 MI S OF HALLIDAYBORO RD Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $150,000 JACKSON 1 2017-2021 US 51 MAKANDA RD TO ILL 146 IN ANNA Miles = 10.91 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $2,800,000 JACKSON UNION 2 2016 Needs Category BACKLOG Miles 1.26 Roughness(IRI) GOOD BACKLOG 9.65 GOOD ILL 1 ILL 14 ILL 1 Rutting 0.10 AADT 5,136 Truck Pct 8.8 NHS Y 0.12 5,114 8.5 Y 0.1 MI N OF ILL 14 IN CROSSVILLE Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $600,000 WHITE 5 2017-2021 4 MI NE OF US 45 NEAR NORRIS CITY Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $600,000 WHITE 4 2017-2021 Structure Status STRUCTURAL BACKLOG AADT 3,400 Truck Pct 15 Str Number 0970012 NHS Y ILL 1 0.5 MI S OF WHITE CO LINE Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $250,000 GALLATIN 5 2017-2021 ILL 1 S OF GRATER RD TO HARDIN CO LINE Miles = 8.49 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $2,460,000 GALLATIN 1 2017-2021 Needs Category ADEQUATE Miles 8.49 Roughness(IRI) ACCEPTABLE Rutting 0.19 AADT 1,846 Truck Pct 31.7 NHS N 9-6 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street ILL 4 Needs Category ACCRUING ILL 13 Needs Category BACKLOG Location Improvements ILL 151 IN AVA TO ILL 127 Miles = 10.81 System Maintenance Miles 10.81 Roughness(IRI) ACCEPTABLE Rutting 0.19 AADT 1,551 3.2 MI E OF RANDOLPH CO LINE TO ILL 154 IN PINCKNEYVILLE Miles = 9.75 System Maintenance Miles 9.75 Roughness(IRI) GOOD Rutting 0.16 AADT 2,080 Objectives RESURFACING Truck Pct 21.5 ABANDONED ICG RR 3 MI W OF CARBONDALE Bridge Maintenance BRIDGE REMOVAL/DEMOLITION ILL 13 ILL 148 TO SKYLINE DR IN MARION Miles = 2.05 System Maintenance RESURFACING ILL 13 Needs Category BACKLOG ILL 13 Needs Category BACKLOG Miles 2.05 Roughness(IRI) GOOD Rutting 0.15 AADT 22,703 HARRISBURG ECL TO LINDALE CEMETERY RD Miles = 3.14 System Maintenance Miles 3.14 Roughness(IRI) GOOD Rutting 0.21 AADT 4,050 SALINE CO LINE TO ILL 1 IN EQUALITY Miles = 4.90 System Maintenance Miles 4.90 Roughness(IRI) GOOD Rutting 0.16 AADT 4,988 Truck Pct 6.9 $2,700,000 JACKSON 1 2016 SAFETY PRESERVE SYSTEM $2,600,000 PERRY 2 2017-2021 $1,000,000 JACKSON 10 2017-2021 SAFETY PRESERVE SYSTEM $1,300,000 WILLIAMSON 1 2017-2021 SAFETY PRESERVE SYSTEM $850,000 SALINE 1 2017-2021 SAFETY PRESERVE SYSTEM $1,500,000 GALLATIN 1 2016 NHS Y RESURFACING Truck Pct 30.4 SAFETY PRESERVE SYSTEM NHS Y RESURFACING Truck Pct 15.4 Past Current NHS N ILL 13 Needs Category ADEQUATE County NHS N RESURFACING Truck Pct 6.7 Est. Cost NHS Y 9-7 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street ILL 13 Needs Category BACKLOG ILL 14 Needs Category ACCRUING ILL 14 ILL 37 ILL 14 Location Improvements ILL 1 TO KENTUCKY STATE LINE IN OLD SHAWNEETOWN Miles = 8.96 System Maintenance Miles 8.96 Roughness(IRI) GOOD Rutting 0.16 AADT 4,790 N COURT ST TO GLEN ST IN BENTON Miles = 1.13 System Maintenance Miles 1.13 Roughness(IRI) ACCEPTABLE Rutting 0.13 AADT 10,470 Objectives RESURFACING Truck Pct 35.8 $2,500,000 GALLATIN 1 2017-2021 SAFETY PRESERVE SYSTEM $500,000 FRANKLIN 1 2017-2021 NHS Y ILL 14/37 IN BENTON Congestion Mitigation INTERSECTION RECONSTN SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FREIGHT MOVEMENT $850,000 FRANKLIN 1 2017-2021 0.2 MI E OF ILL 142 IN MCLEANSBORO Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $550,000 HAMILTON 6 2017-2021 1.8 MI E OF ILL 142 IN MCLEANSBORO Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 14 Past Current SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG ILL 14 County NHS Y RESURFACING Truck Pct 8.4 Est. Cost 4.1 MI E OF MCLEANSBORO Bridge Maintenance SAFETY PRESERVE SYSTEM CULVERT REPLACEMENT 9-8 AADT 5,250 $600,000 AADT 2,600 $120,000 Truck Pct 9 Str Number 0330005 HAMILTON Truck Pct 16 HAMILTON NHS N 6 Str Number 0330007 2016 NHS N 5 2017-2021 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current ILL 14 5.6 MI E OF MCLEANSBORO Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $120,000 HAMILTON 5 2017-2021 ILL 15 ELK HORN CREEK 4.4 MI E OF WASHINGTON CO LINE Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $500,000 JEFFERSON 3 2017-2021 Structure Status STRUCTURAL BACKLOG AADT 2,600 Truck Pct 7 Str Number 0410020 NHS N ILL 15 4.7 MI E OF WASHINGTON CO LINE Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $120,000 JEFFERSON 5 2017-2021 ILL 15 POLE CAT CREEK 5 MI E OF WASHINGTON CO LINE Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $1,100,000 JEFFERSON 10 2017-2021 Structure Status STRUCTURAL BACKLOG ILL 15 (EASTBOUND) Needs Category BACKLOG ILL 15 C (WESTBOUND) Needs Category ACCRUING ILL 34 15TH ST TO OLD FAIRFIELD RD IN MT VERNON Miles = 1.13 System Maintenance Miles 1.13 Roughness(IRI) NOT ACCEPTABLE Rutting 0.20 AADT 7,951 16TH ST TO OLD FAIRFIELD RD IN MT VERNON Miles = 1.24 System Maintenance Miles 1.24 Roughness(IRI) NOT ACCEPTABLE Rutting 0.20 AADT 7,981 DRAINAGE DITCH 5.5 MI E OF ILL 37 Bridge Maintenance RESURFACING Truck Pct 4.6 Truck Pct 7 Str Number 0410021 NHS N SAFETY PRESERVE SYSTEM $700,000 JEFFERSON 1 2017-2021 SAFETY PRESERVE SYSTEM $750,000 JEFFERSON 1 2016 SAFETY PRESERVE SYSTEM $250,000 FRANKLIN 8 2017-2021 NHS Y RESURFACING Truck Pct 5.3 AADT 2,600 NHS Y CULVERT REPLACEMENT 9-9 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street ILL 34 Location Improvements Objectives SAFETY PRESERVE SYSTEM GASAWAY BRANCH AT WCL OF GALATIA BRIDGE REPLACEMENT Bridge Maintenance Structure Status STRUCTURAL BACKLOG ILL 34 STREAM 0.8 MI SE OF GALATIA Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 34 Needs Category ACCRUING RALEIGH RD TO 0.6 MI S OF ELLIS RD Miles = 2.86 System Maintenance Miles 2.86 Roughness(IRI) ACCEPTABLE Rutting 0.28 AADT 4,900 RECONSTRUCTION WIDENING & RESURFACING Truck Pct 26.8 Est. Cost $800,000 AADT 2,800 $850,000 AADT 5,700 County SALINE Truck Pct 13 11 Str Number 0830026 SALINE Truck Pct 31 Past Current 2017-2021 NHS N 11 Str Number 0830027 2017-2021 NHS N SAFETY PRESERVE SYSTEM $3,200,000 SALINE 1 2016 NHS N ILL 34 0.4 MI S OF RALEIGH RD Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $450,000 SALINE 7 2016 ILL 34 US 45 TO ILL 34/145 Miles = 5.95 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $1,500,000 SALINE 1 2017-2021 SAFETY PRESERVE SYSTEM $2,500,000 SALINE POPE 1 2016 ILL 145 Needs Category ACCRUING ILL 34 Miles 5.95 Roughness(IRI) ACCEPTABLE Rutting 0.29 AADT 6,042 ILL 145 TO HARDIN CO LINE Miles = 9.08 System Maintenance Truck Pct 24.8 NHS N RESURFACING Needs Category BACKLOG Miles 3.46 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 3,072 Truck Pct 48.2 NHS N BACKLOG 5.62 ACCEPTABLE 0.22 3,452 42.0 N 9 - 10 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street ILL 34 Location Improvements SPRING VALLEY CREEK 0.2 MI W OF RUDEMENT WCL Bridge Maintenance Objectives SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 37 STREAM 5.2 MI S OF ILL 148 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 37 ATCHISON CREEK 8 MI S OF ILL 148 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 37 STREAM AT NCL OF INA Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 37 STREAM 1 MI S OF MARION Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG ILL 37 Needs Category BACKLOG PULASKI CO LINE TO US 51 N OF CAIRO Miles = 2.74 System Maintenance Miles 2.74 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 2,266 SAFETY PRESERVE SYSTEM RESURFACING Truck Pct 17.3 NHS N 9 - 11 Est. Cost $850,000 AADT 3,500 $650,000 AADT 4,300 $1,200,000 AADT 4,000 $350,000 AADT 4,000 $800,000 AADT 4,950 $650,000 County SALINE Truck Pct 42 9 Str Number 0830022 JEFFERSON Truck Pct 6 Str Number 0410035 Truck Pct 7 Str Number 0410036 Truck Pct 9 ALEXANDER 2017-2021 NHS N 9 Str Number 0410093 WILLIAMSON 2017-2021 NHS N 10 JEFFERSON 2016 NHS N 5 JEFFERSON Truck Pct 7 Past Current 2017-2021 NHS N 11 Str Number 1002002 2017-2021 NHS N 1 2016 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street ILL 127 BRIDGE ST Location BIG MUDDY RIVER AT ECL OF MURPHYSBORO Bridge Maintenance Improvements Objectives SAFETY PRESERVE SYSTEM TRANSPORTATION OPS BRIDGE SUPERSTRUCTURE Structure Status STRUCTURAL BACKLOG ILL 127 UNDER CHESTNUT ST AT ALTO PASS Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING ILL 141 CANE CREEK TRIB 0.3 MI E OF ILL 1 Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 141 3 MI W OF NEW HAVEN Bridge Maintenance SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG ILL 141 2 MI W OF NEW HAVEN Bridge Maintenance BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG ILL 141 NEW HAVEN TO 2 MI E System Maintenance TRANSPORTATION OPS MODAL CONNECTIVITY SAFETY PRESERVE SYSTEM SUSTAINABILITY GRADING CULVERT EXTENSION SLOPE STABILIZATION 9 - 12 Est. Cost $3,000,000 AADT 6,050 $1,200,000 AADT 500 $1,000,000 AADT 2,400 $600,000 AADT 2,050 $700,000 AADT 2,050 $3,400,000 County JACKSON Truck Pct 3 10 Str Number 0390036 UNION Truck Pct 12 Str Number 0910047 Truck Pct 20 Str Number 0970036 Truck Pct 20 WHITE 2017-2021 NHS N 6 Str Number 0970064 WHITE GALLATIN 2017-2021 NHS N 10 WHITE GALLATIN 2016 NHS N 1 WHITE GALLATIN Truck Pct 18 Past Current 2017-2021 NHS N 6 Str Number 0970029 2017-2021 NHS N 14 2016 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street ILL 142 Needs Category ACCRUING ILL 142 Location Improvements ILL 14 IN MCLEANSBORO TO SALINE CO LINE Miles = 13.57 System Maintenance Miles 13.57 Roughness(IRI) ACCEPTABLE Rutting 0.30 AADT 2,005 INDIAN CREEK 3 MI N OF ELDORADO Bridge Maintenance Objectives RESURFACING Truck Pct 15.7 SAFETY PRESERVE SYSTEM $3,350,000 SAFETY PRESERVE SYSTEM $600,000 County Past Current HAMILTON 1 2017-2021 SALINE 10 2017-2021 NHS N BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING ILL 146 Est. Cost MISSISSIPPI RIVER AT CAPE GIRARDEAU BRIDGE REPAIR Bridge Maintenance AADT 1,800 SAFETY PRESERVE SYSTEM $750,000 SAFETY PRESERVE SYSTEM Truck Pct 13 Str Number 0830032 NHS N ALEXANDER 1 2016 $1,200,000 UNION 1 2016 SAFETY PRESERVE SYSTEM $1,460,000 JOHNSON 1 2016 SAFETY MODAL CONNECTIVITY PRESERVE SYSTEM $2,000,000 JOHNSON 1 2017-2021 MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST. ILL 146 Needs Category ACCRUING ILL 146 Needs Category ADEQUATE ILL 146 Needs Category ACCRUING 0.4 MI E OF US 51 IN ANNA TO 0.9 MI W OF I-57 Miles = 5.31 System Maintenance Miles 5.31 Roughness(IRI) GOOD Rutting 0.17 AADT 5,016 UNION CO LINE TO E OF ILL 37 Miles = 4.29 System Maintenance Miles 4.29 Roughness(IRI) ACCEPTABLE Rutting 0.21 AADT 2,486 W OF INDUSTRIAL DR TO I-24 RAMPS IN VIENNA Miles = 0.55 System Maintenance Miles 0.55 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 7,445 RESURFACING Truck Pct 18.4 NHS Y RESURFACING Truck Pct 16.6 NHS Y BI-DIRECT LEFT TURN LANE WIDENING & RESURFACING Truck Pct 15.5 NHS Y 9 - 13 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current ILL 148 DITCH 1.6 MI S OF ILL 14 IN CHRISTOPHER Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $150,000 FRANKLIN 1 2017-2021 ILL 148 N 17TH ST TO HERRIN ST IN HERRIN Miles = 1.72 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $750,000 WILLIAMSON 1 2016 SAFETY PRESERVE SYSTEM $800,000 WILLIAMSON 1 2017-2021 SAFETY PRESERVE SYSTEM $1,855,000 WILLIAMSON 1 2017-2021 SAFETY PRESERVE SYSTEM $2,000,000 WILLIAMSON 1 2017-2021 Needs Category BACKLOG ILL 148 Needs Category ADEQUATE ILL 148 Needs Category BACKLOG ILL 148 Miles 1.72 Roughness(IRI) ACCEPTABLE Rutting 0.30 AADT 7,783 HERRIN ST TO HEMLOCK ST IN HERRIN Miles = 1.28 System Maintenance Miles 1.28 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 16,084 0.5 MI S OF OLD ILL 13 TO E OF I-57 Miles = 7.84 System Maintenance Miles 7.84 Roughness(IRI) GOOD Rutting 0.19 AADT 5,465 WOLF CREEK 1 MI N OF I-57 Bridge Maintenance Truck Pct 5.6 NHS Y RESURFACING Truck Pct 4.6 NHS Y RESURFACING Truck Pct 9.9 NHS N BRIDGE REPLACEMENT Structure Status STRUCTURAL ACCRUING ILL 149 Needs Category ACCRUING 22ND ST TO ILL 13/127 IN MURPHYSBORO Miles = 1.32 System Maintenance Miles 1.32 Roughness(IRI) ACCEPTABLE Rutting 0.16 AADT 10,655 RESURFACING Truck Pct 6.4 SAFETY PRESERVE SYSTEM NHS Y 9 - 14 AADT 4,950 $450,000 Truck Pct 9 JACKSON Str Number 1000038 NHS N 1 2017-2021 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street ILL 149 Needs Category ACCRUING ILL 154 Needs Category ACCRUING ILL 154 Location Improvements ILL 148 IN ZEIGLER TO ORIENT RD W OF WEST FRANKFORT Miles = 5.08 System Maintenance Miles 5.08 Roughness(IRI) ACCEPTABLE Rutting 0.16 AADT 3,595 PANTHER DR IN PINCKNEYVILLE TO US 51 Miles = 7.29 System Maintenance Miles 7.29 Roughness(IRI) ACCEPTABLE Rutting 0.22 AADT 4,982 REESE CREEK 1.2 MI E OF US 51 Bridge Maintenance Objectives RESURFACING Truck Pct 7.0 Needs Category BACKLOG ILL 166 CREAL SPRINGS RD MOELLERS RD TO 0.4 MI N OF CANAVILLE RD W OF MARION Miles = 4.65 System Maintenance Miles 4.65 Roughness(IRI) ACCEPTABLE Rutting 0.17 AADT 2,418 $1,400,000 FRANKLIN 1 2017-2021 SAFETY PRESERVE SYSTEM $1,850,000 PERRY 1 2017-2021 $600,000 PERRY 9 2017-2021 NHS Y SAFETY PRESERVE SYSTEM TRANSPORTATION OPS BRIDGE SUPERSTRUCTURE STREAM 2.7 MI S OF ILL 13 Bridge Maintenance RESURFACING Truck Pct 9.1 Past Current SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG ILL 166 County NHS N RESURFACING Truck Pct 11.9 Est. Cost AADT 2,700 Truck Pct 16 Str Number 0730027 NHS Y SAFETY PRESERVE SYSTEM $1,090,000 WILLIAMSON 1 2017-2021 SAFETY PRESERVE SYSTEM $600,000 WILLIAMSON 9 2017-2021 NHS N CULVERT REPLACEMENT Structure Status STRUCTURAL BACKLOG 9 - 15 AADT 2,500 Truck Pct 8 Str Number 1002008 NHS N FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street ILL 242 Needs Category BACKLOG ILL 242 Location Improvements WAYNE CO LINE TO MCLEANSBORO Miles = 11.11 System Maintenance Miles 11.11 Roughness(IRI) ACCEPTABLE Rutting 0.31 AADT 1,541 STREAM 3.5 MI N OF MCLEANSBORO Bridge Maintenance Objectives RESURFACING Truck Pct 14.2 STREAM 7 MI S OF WAYNE CO LINE Bridge Maintenance Past Current $2,300,000 HAMILTON 5 2016 SAFETY PRESERVE SYSTEM $250,000 HAMILTON 11 2017-2021 NHS N CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM BRIDGE REPLACEMENT Structure Status STRUCTURAL BACKLOG BLUEGRASS LN County SAFETY PRESERVE SYSTEM Structure Status STRUCTURAL BACKLOG BLAIRSVILLE RD Est. Cost SPRING CREEK 6.7 MI N OF ILL 3 (OFF ILL BRIDGE REPLACEMENT 151) BRIDGE APPROACH ROADWAY Bridge Maintenance SAFETY PRESERVE SYSTEM AADT 1,700 $800,000 AADT 550 $370,000 Truck Pct 11 Str Number 0332000 HAMILTON Truck Pct 6 NHS N 11 Str Number 0330024 JACKSON 2017-2021 NHS N 11 2017-2021 SCHEDULING CONTINGENT UPON FUTURE NEGOTIATIONS WITH LOCAL AGENCY FOR TRANSFER OF JURISDICTION. Structure Status STRUCTURAL BACKLOG CR 2275E Needs Category BACKLOG HERRIN RD Needs Category ACCRUING ILL 15 TO E SUNSWEPT RD NEAR BLUEFORD Miles = 1.95 System Maintenance Miles 1.95 Roughness(IRI) ACCEPTABLE Rutting 0.14 AADT 776 RESURFACING Truck Pct 0.0 AADT 25 Truck Pct N/A Str Number 0390046 NHS N SAFETY PRESERVE SYSTEM $500,000 JEFFERSON 1 2016 SAFETY PRESERVE SYSTEM $355,000 WILLIAMSON 1 2017-2021 NHS N 0.5 MI W OF PUMPKIN PATCH RD TO 0.1 RESURFACING MI W OF PROSPERITY AVE IN JOHNSTON CITY Miles = 1.64 System Maintenance Miles Roughness(IRI) Rutting AADT Truck Pct NHS 1.64 ACCEPTABLE 0.18 7,215 3.1 N 9 - 16 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street MAIN ST GORHAM RD Needs Category ACCRUING N 14TH ST Needs Category BACKLOG OLD ILL 13 Needs Category BACKLOG OLD ILL 13 WEST Needs Category ACCRUING Location Improvements LAKE ST TO ILL 3 IN GORHAM Miles = 1.55 System Maintenance Miles 1.55 Roughness(IRI) ACCEPTABLE Rutting 0.29 AADT 375 POPLAR ST TO AVA RD IN MURPHYSBORO Miles = 2.77 System Maintenance Miles 2.77 Roughness(IRI) ACCEPTABLE Rutting 0.25 AADT 3,435 ILL 148 TO WCL OF MARION Miles = 1.81 System Maintenance Miles 1.81 Roughness(IRI) ACCEPTABLE Rutting 0.30 AADT 6,925 WILLIAMSON CO LINE TO DANNIE RD Miles = 1.58 System Maintenance Miles 1.58 Roughness(IRI) ACCEPTABLE Rutting 0.23 AADT 275 Objectives RESURFACING Truck Pct 5.3 SAFETY PRESERVE SYSTEM $400,000 JACKSON 1 2017-2021 SAFETY PRESERVE SYSTEM $800,000 JACKSON 1 2017-2021 SAFETY PRESERVE SYSTEM $500,000 WILLIAMSON 1 2017-2021 SAFETY PRESERVE SYSTEM $300,000 SALINE 1 2016 NHS N RESURFACING Truck Pct 7.3 Past Current NHS N RESURFACING Truck Pct 2.4 County NHS N RESURFACING Truck Pct 1.6 Est. Cost NHS N OLD US 51 CREEK 1.6 MI S OF US 51 IN MAKANDA Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $150,000 JACKSON 4 2017-2021 OLD US 51 STORM DRAINAGE 0.6 MI N OF 4-WAY IN ANNA Bridge Maintenance CULVERT REPLACEMENT SAFETY PRESERVE SYSTEM $150,000 UNION 4 2017-2021 RALEIGH RD ILL 34 TO ILL 142 Miles = 4.84 System Maintenance RESURFACING SAFETY PRESERVE SYSTEM $1,200,000 SALINE 1 2016 CHURCH ST Needs Category BACKLOG Miles 4.84 Roughness(IRI) ACCEPTABLE Rutting 0.20 AADT 3,630 Truck Pct 11.2 NHS N 9 - 17 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS ADA IMPROVEMENTS System Maintenance PEDESTRIAN RAMPS/ADA SAFETY TRANSPORTATION OPS $200,000 DISTRICT-WIDE 2 2016 VARIOUS ADA IMPROVEMENTS System Maintenance PEDESTRIAN RAMPS/ADA SAFETY TRANSPORTATION OPS $250,000 DISTRICT-WIDE 2 2017-2021 VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS System Maintenance SAFETY IMPROVEMENTS SAFETY $3,385,000 DISTRICT-WIDE 6 2016 VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS SAFETY $16,925,000 DISTRICT-WIDE 5 2017-2021 VARIOUS DISTRICTWIDE GUARDRAIL SAFETY $75,000 DISTRICT-WIDE 1 2016 SAFETY $265,000 DISTRICT-WIDE 1 2017-2021 System Maintenance VARIOUS DISTRICTWIDE GUARDRAIL VARIOUS DISTRICT MISCELLANEOUS System Maintenance MISCELLANEOUS PROJECTS $500,000 DISTRICT-WIDE 5 2016 VARIOUS DISTRICT MISCELLANEOUS MISCELLANEOUS PROJECTS $2,000,000 DISTRICT-WIDE 2 2017-2021 VARIOUS RIGHT-OF-WAY SURVEYS System Maintenance P.E. SURVEYS (ROW) $200,000 DISTRICT-WIDE 5 2016 VARIOUS RIGHT-OF-WAY SURVEYS P.E. SURVEYS (ROW) $600,000 DISTRICT-WIDE 2 2017-2021 9 - 18 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS MISCELLANEOUS UTILITY ADJUSTMENTS System Maintenance UTILITY ADJUSTMENT $50,000 DISTRICT-WIDE 5 2016 VARIOUS MISCELLANEOUS UTILITY ADJUSTMENTS UTILITY ADJUSTMENT $200,000 DISTRICT-WIDE 2 2017-2021 VARIOUS MISCELLANEOUS LAND ACQUISITION System Maintenance LAND ACQUISITION $100,000 DISTRICT-WIDE 5 2016 VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION $200,000 DISTRICT-WIDE 2 2017-2021 VARIOUS ON-CALL ENGINEERING System Maintenance PRELIMINARY ENGINEERING $200,000 DISTRICT-WIDE 1 2016 VARIOUS ON-CALL ENGINEERING PRELIMINARY ENGINEERING $600,000 DISTRICT-WIDE 1 2017-2021 VARIOUS CHANGE ORDER RESERVE System Maintenance CHANGE ORDERS $565,000 DISTRICT-WIDE 1 2016 VARIOUS PRE-LAND ACQUISITION ACTIVITY System Maintenance PRE-ACQUISITION ACTIVITY $75,000 DISTRICT-WIDE 5 2016 VARIOUS PRE-LAND ACQUISITION ACTIVITY PRE-ACQUISITION ACTIVITY $300,000 DISTRICT-WIDE 2 2017-2021 VARIOUS BRIDGE DECK SEALING Bridge Maintenance BRIDGE DECK SEALING $300,000 DISTRICT-WIDE 3 2016 PRESERVE SYSTEM 9 - 19 FY 2016-2021 Highway Improvement Program District 9 State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS POST-LAND ACQUISITION ACTIVITY System Maintenance POST-ACQUISITION ACTIVITY $100,000 DISTRICT-WIDE 5 2016 VARIOUS POST-LAND ACQUISITION ACTIVITY POST-ACQUISITION ACTIVITY $400,000 DISTRICT-WIDE 2 2017-2021 9 - 20 DISTRICT FY 2016-2019 Highway Improvement Program District 9 Local Highways MYP Years Route/Street Location Improvements Objectives 12TH ST CATHERINE ST TO PULLEN RD IN METROPOLIS P.E. (PHASE II) 12TH ST CATHERINE ST TO PULLEN RD IN METROPOLIS Miles = 0.55 RECONSTRUCTION 12TH ST CATHERINE ST TO PULLEN RD IN METROPOLIS CONSTRUCTION ENGINEERING 1000 N RD DRAINAGE DITCH 3.5 MI N OF EMMA BRIDGE REPLACEMENT DRAINAGE DITCH 3.5 MI N OF EMMA CONSTRUCTION ENGINEERING 1800 N RD TO 3RD ST Miles = 3.25 RESURFACING 1150 E RD 1125 E RD 1800 N RD TO 3RD ST CONSTRUCTION ENGINEERING 1150 E RD FERGUSON CREEK 0.8 MI NW OF BLAIRSVILLE BRIDGE REPLACEMENT 1150 E RD FERGUSON CREEK 0.8 MI NW OF BLAIRSVILLE CONSTRUCTION ENGINEERING 1425 E RD UNNAMED CREEK 3 MI SW OF CROSSVILLE BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM TR 267 1000 N RD Est. Cost County Past Current $180,000 MASSAC 1 2016 $1,000,000 MASSAC 6 2017-2021 $60,000 MASSAC 3 2017-2021 $150,000 WHITE 1 2017-2021 $8,000 WHITE 1 2017-2021 $600,000 WHITE 3 2016 $8,000 WHITE 3 2016 $200,000 HAMILTON 5 2017-2021 $4,000 HAMILTON 4 2017-2021 WHITE 3 2017-2021 TR 267 1125 E RD SAFETY PRESERVE SYSTEM 1150 E RD TR 302 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 9 - 21 $150,000 FY 2016-2019 Highway Improvement Program District 9 Local Highways MYP Years Route/Street 1425 E RD Location Improvements Objectives UNNAMED CREEK 3 MI SW OF CROSSVILLE CONSTRUCTION ENGINEERING SOUTHERN OUTLET 3 MI NW OF SPRINGERTON BRIDGE REPLACEMENT SOUTHERN OUTLET 3 MI NW OF SPRINGERTON CONSTRUCTION ENGINEERING 1700 N RD ILL 242 TO TR 346 Miles = 3.88 RESURFACING 1750 E RD CROOKED CREEK 0.5 MI N OF GARNERVILLE BRIDGE REPLACEMENT CROOKED CREEK 0.5 MI N OF GARNERVILLE CONSTRUCTION ENGINEERING TR 380 2000 E RD FRENCH CREEK 1 MI N OF CALVIN BRIDGE REPLACEMENT 2000 E RD FRENCH CREEK 1 MI N OF CALVIN CONSTRUCTION ENGINEERING 300 N RD UNNAMED CREEK 4 MI SE OF NORRIS CITY BRIDGE REPLACEMENT UNNAMED CREEK 4 MI SE OF NORRIS CITY CONSTRUCTION ENGINEERING TR 302 1700 E RD TR 486 1700 E RD TR 486 TR 380 1750 E RD TR 403 300 N RD TR 403 $6,000 County Past Current WHITE 3 2017-2021 $175,000 HAMILTON 2 2017-2021 $4,000 HAMILTON 2 2017-2021 SAFETY PRESERVE SYSTEM $450,000 HAMILTON 4 2017-2021 SAFETY PRESERVE SYSTEM $150,000 WHITE 2 2017-2021 $8,000 WHITE 2 2017-2021 $200,000 WHITE 3 2017-2021 $8,000 WHITE 3 2017-2021 $150,000 WHITE 5 2017-2021 $6,000 WHITE 5 2017-2021 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 9 - 22 Est. Cost FY 2016-2019 Highway Improvement Program District 9 Local Highways MYP Years Route/Street 400 E RD Location Improvements Objectives SAFETY PRESERVE SYSTEM BIG CREEK TRIB 1.8 MI SW OF DELAFIELD BRIDGE REPLACEMENT BIG CREEK TRIB 1.8 MI SW OF DELAFIELD CONSTRUCTION ENGINEERING INDIAN CREEK 1.5 MI SE OF NORRIS CITY BRIDGE REPLACEMENT INDIAN CREEK 1.5 MI SE OF NORRIS CITY CONSTRUCTION ENGINEERING PRAIRIE CREEK 4.3 MI NE OF SPRINGERTON BRIDGE REPLACEMENT PRAIRIE CREEK 4.3 MI NE OF SPRINGERTON CONSTRUCTION ENGINEERING TR 124 575 E RD UNNAMED CREEK 4 MI NE OF ENFIELD BRIDGE REPLACEMENT 575 E RD UNNAMED CREEK 4 MI NE OF ENFIELD CONSTRUCTION ENGINEERING 600 N RD UNNAMED CREEK 1 MI W OF HERALD BRIDGE REPLACEMENT UNNAMED CREEK 1 MI W OF HERALD CONSTRUCTION ENGINEERING TR 106 400 E RD TR 106 440 E RD TR 335 440 E RD TR 335 475 E RD TR 124 475 E RD SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM TR 349 600 N RD TR 349 9 - 23 Est. Cost County Past Current $100,000 HAMILTON 2 2016 $4,000 HAMILTON 2 2016 $150,000 WHITE 6 2017-2021 $8,000 WHITE 6 2017-2021 $250,000 WHITE 5 2016 $8,000 WHITE 5 2016 $150,000 WHITE 7 2017-2021 $6,000 WHITE 7 2017-2021 $150,000 WHITE 3 2017-2021 $6,000 WHITE 3 2017-2021 FY 2016-2019 Highway Improvement Program District 9 Local Highways MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM ALTO WATER WKS RD CEDAR CREEK 0.5 MI W OF ALTO PASS BRIDGE REPLACEMENT ALTO WATER WKS RD CEDAR CREEK 0.5 MI W OF ALTO PASS CONSTRUCTION ENGINEERING AVA RD MCLAUGHLIN RD TO ILL 127 Miles = 1.67 RESURFACING AVA RD MCLAUGHLIN RD TO ILL 127 CONSTRUCTION ENGINEERING BARTON TRAIL RD DRAINAGE DITCH 2 MI SW OF ELDORADO BRIDGE REPLACEMENT BARTON TRAIL RD DRAINAGE DITCH 2 MI SW OF ELDORADO CONSTRUCTION ENGINEERING BURRELL ST STEWART ST TO ILL 14 Miles = 0.50 RESURFACING BURRELL ST STEWART ST TO ILL 14 CONSTRUCTION ENGINEERING CH 3 N 100E RD: ILL 142 TO TR 117; CH 3: CH 10 TO TR 646 Miles = 6.04 BIT SURFACE TREATMENT-A1 N 100E RD: ILL 142 TO TR 117; CH 3: CH 10 TO TR 646 CONSTRUCTION ENGINEERING N 100E RD CH 3 N 100E RD SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 9 - 24 SAFETY PRESERVE SYSTEM Est. Cost County Past Current $150,000 UNION 3 2017-2021 $8,000 UNION 3 2017-2021 $400,000 JACKSON 3 2016 $8,000 JACKSON 3 2016 $100,000 SALINE 4 2017-2021 $4,000 SALINE 4 2017-2021 $950,000 WHITE 1 2016 $35,000 WHITE 1 2016 $231,000 HAMILTON 1 2017-2021 $8,000 HAMILTON 1 2017-2021 FY 2016-2019 Highway Improvement Program District 9 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost US 51 TO MARLOW RD Miles = 3.23 RESURFACING SAFETY PRESERVE SYSTEM $300,000 CORINTH RD CH 3 TO SALINE CO LINE Miles = 8.43 RESURFACING SAFETY PRESERVE SYSTEM CORINTH RD CH 3 TO SALINE CO LINE CONSTRUCTION ENGINEERING COUNTRY CLUB RD US 45 TO ILL 145 Miles = 5.30 RESURFACING COUNTRY CLUB RD US 45 TO ILL 145 CONSTRUCTION ENGINEERING COUNTY LINE RD ILL 13 TO HOLLYHOCK RD Miles = 3.43 RESURFACING SAFETY PRESERVE SYSTEM CROCKER RD PERRY CO LINE TO ILL 148 Miles = 4.09 RESURFACING SAFETY PRESERVE SYSTEM DENEAL RD UNNAMED CREEK 3 MI E OF MITCHELLSVILLE P.E. (PHASE II) UNNAMED CREEK 3 MI E OF MITCHELLSVILLE BRIDGE REPLACEMENT DIVISION ST: JERSEY ST TO VINE ST; GRAND AVE: OAK ST TO WALNUT ST Miles = 0.33 RECONSTRUCTION CH 3 KIMMEL RD CH 5 DENEAL RD CH 5 DIVISION ST GRAND AVE Past Current PERRY 1 2016 $1,000,000 WILLIAMSON 6 2017-2021 $12,000 WILLIAMSON 2 2017-2021 $800,000 MASSAC 2 2017-2021 $15,000 MASSAC 2 2017-2021 $325,000 PERRY RANDOLPH 1 2017-2021 $850,000 FRANKLIN 1 2017-2021 $12,000 SALINE 2 2017-2021 SAFETY PRESERVE SYSTEM $180,000 SALINE 1 2017-2021 SAFETY PRESERVE SYSTEM $659,000 WILLIAMSON 1 2017-2021 SAFETY PRESERVE SYSTEM 9 - 25 County FY 2016-2019 Highway Improvement Program District 9 Local Highways MYP Years Route/Street DIVISION ST Location Improvements Objectives Est. Cost DIVISION ST: JERSEY ST TO VINE ST; GRAND AVE: OAK ST TO WALNUT ST CONSTRUCTION ENGINEERING GRAND AVE E 13TH ST ICG RR IN BELLE RIVE BRIDGE REPLACEMENT E ACADEMY RD LITTLE MUDDY RIVER 1 MI W OF SCHELLER BRIDGE REPLACEMENT CONSTRUCTION ENGINEERING CH 26 LITTLE MUDDY RIVER 1 MI W OF SCHELLER E GRAND AVE AT LEWIS LN IN CARBONDALE INTERSECTION IMPROVEMENT E GRAND AVE AT LEWIS LN IN CARBONDALE CONSTRUCTION ENGINEERING E RICHVIEW RD PIERCE CREEK 3 MI SE OF BOYD BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $300,000 E ST LOUIS ST BRYAN ST TO HORRELL ST Miles = 0.84 RECONSTRUCTION SAFETY PRESERVE SYSTEM E ST LOUIS ST BRYAN ST TO HORREL ST CONSTRUCTION ENGINEERING CH 26 E ACADEMY RD 9 - 26 County Past Current $48,000 WILLIAMSON 1 2017-2021 SAFETY PRESERVE SYSTEM $219,000 JEFFERSON 4 2017-2021 SAFETY PRESERVE SYSTEM $230,000 JEFFERSON 1 2017-2021 $10,000 JEFFERSON 1 2017-2021 $350,000 JACKSON 2 2016 $20,000 JACKSON 2 2016 JEFFERSON 3 2017-2021 $1,000,000 FRANKLIN 1 2017-2021 $60,000 FRANKLIN 1 2017-2021 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY TRANSPORTATION OPS FY 2016-2019 Highway Improvement Program District 9 Local Highways MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM ELDORADO BLACKTOP N FORK SALINE RIVER 1.8 MI W OF ILL 1 BRIDGE REPLACEMENT ELDORADO BLACKTOP N FORK SALINE RIVER 1.8 MI W OF ILL 1 CONSTRUCTION ENGINEERING FAIRFIELD RD ILL 15 TO STINSON DR Miles = 1.61 RESURFACING FAIRFIELD RD ILL 15 TO STINSON DR CONSTRUCTION ENGINEERING GARNER RD BRUSH CREEK 3.5 MI NE OF ELDORADO BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM GIANT CITY RD VERCLIFF RD TO BOSKYDELL RD Miles = 2.49 RESURFACING SAFETY PRESERVE SYSTEM GIANT CITY RD VERCLIFF RD TO BOSKYDELL RD CONSTRUCTION ENGINEERING GIANT CITY RD DRURY CREEK 1 MI SE OF CARBONDALE BRIDGE REPLACEMENT GIANT CITY RD DRURY CREEK 1 MI SE OF CARBONDALE CONSTRUCTION ENGINEERING HIRONS ST ILL 15 TO E PARTISAN RD Miles = 2.50 SAFETY PRESERVE SYSTEM TR 330 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM RECONSTRUCTION 9 - 27 Est. Cost County Past Current $500,000 GALLATIN 1 2017-2021 $30,000 GALLATIN 1 2017-2021 $1,000,000 JEFFERSON 1 2016 $20,000 JEFFERSON 1 2016 $125,000 SALINE 2 2017-2021 $500,000 JACKSON 3 2017-2021 $8,000 JACKSON 3 2017-2021 $1,500,000 JACKSON 8 2017-2021 $100,000 JACKSON 8 2017-2021 JEFFERSON 2 2017-2021 $1,425,000 FY 2016-2019 Highway Improvement Program District 9 Local Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current HORSESHOE RD UNNAMED STREAM 7.5 MI E OF HARRISBURG BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $400,000 SALINE 3 2016 HUGHEY LN CACHE RIVER TRIB 3 MI SE OF COBDEN BRIDGE REPLACEMENT SAFETY PRESERVE SYSTEM $150,000 UNION 3 2017-2021 HUGHEY LN CACHE RIVER TRIB 3 MI SE OF COBDEN CONSTRUCTION ENGINEERING $8,000 UNION 3 2017-2021 KARBERS RIDGE RD ILL 34 TO 3.9 MI E Miles = 3.90 RESURFACING $800,000 HARDIN 4 2016 KARBERS RIDGE RD ILL 34 TO 3.9 MI E CONSTRUCTION ENGINEERING $12,000 HARDIN 4 2016 KERR CANYON RD BRADSHAW CREEK 5 MI NE OF COBDEN BRIDGE REPLACEMENT $150,000 UNION 3 2016 KERR CANYON RD BRADSHAW CREEK 5 MI NE OF COBDEN CONSTRUCTION ENGINEERING $8,000 UNION 3 2016 LIMB BRANCH LN BNSF RR 1.5 MI S OF MARION BRIDGE REPLACEMENT $755,000 WILLIAMSON 10 2017-2021 LIMB BRANCH LN BNSF RR 1.5 MI S OF MARION CONSTRUCTION ENGINEERING $12,000 WILLIAMSON 8 2017-2021 LOG CABIN RD E ADAMS RD TO E INA RD Miles = 2.08 RESURFACING $500,000 JEFFERSON 4 2017-2021 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 9 - 28 FY 2016-2019 Highway Improvement Program District 9 Local Highways MYP Years Route/Street Location Improvements Objectives LOG CABIN RD E ADAMS RD TO E INA RD CONSTRUCTION ENGINEERING LOGAN RD ILL 34 TO ILL 149 Miles = 4.64 RESURFACING LOGAN RD ILL 34 TO ILL 149 CONSTRUCTION ENGINEERING MILLER RD MILL CREEK TRIB 2.5 MI NE OF MILL CREEK BRIDGE REPLACEMENT MILL CREEK TRIB 2.5 MI NE OF MILL CREEK CONSTRUCTION ENGINEERING TR 112 N 1350 E RD UNNAMED CREEK 1 MI W OF EPWORTH BRIDGE REPLACEMENT N 1350 E RD UNNAMED CREEK 1 MI W OF EPWORTH CONSTRUCTION ENGINEERING N LOG CABIN RD N OF E SADDLE CLUB RD TO E ADAMS RD Miles = 2.14 RESURFACING N LOG CABIN RD N OF E SADDLE CLUB RD TO E ADAMS RD CONSTRUCTION ENGINEERING N OLD CENTRALIA RD WEST CREEK 2.5 MI SW OF DIX BRIDGE REPLACEMENT TR 112 MILLER RD $4,000 SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM TR 1A 9 - 29 Est. Cost County Past Current JEFFERSON 2 2017-2021 $1,000,000 FRANKLIN 4 2017-2021 $8,000 FRANKLIN 2 2017-2021 $150,000 UNION 1 2017-2021 $8,000 UNION 1 2017-2021 $150,000 WHITE 5 2017-2021 $6,000 WHITE 5 2017-2021 $550,000 JEFFERSON 6 2016 $4,000 JEFFERSON 2 2016 $241,000 JEFFERSON 1 2016 FY 2016-2019 Highway Improvement Program District 9 Local Highways MYP Years Route/Street N OLD CENTRALIA RD Location Improvements Objectives WEST CREEK 2.5 MI SW OF DIX CONSTRUCTION ENGINEERING N WOODLAWN LN S OF YALE RD TO S OF N MAIN ST Miles = 1.95 RESURFACING NASH RD BIG CREEK 3 MI SE OF ANNA BRIDGE REPLACEMENT NASH RD BIG CREEK 3 MI SE OF ANNA CONSTRUCTION ENGINEERING PERKS RD CASA HELM LN TO JOHNSON CO LINE Miles = 4.40 RESURFACING PERKS RD CASA HELM LN TO JOHNSON CO LINE CONSTRUCTION ENGINEERING PITTSBURG RD ILL 13 TO TR 333 Miles = 2.50 RESURFACING PITTSBURG RD ILL 13 TO TR 333 CONSTRUCTION ENGINEERING REND CITY RD REND LAKE DAM RD TO ILL 14 Miles = 2.95 RESURFACING REND CITY RD REND LAKE DAM RD TO ILL 14 CONSTRUCTION ENGINEERING Est. Cost Past Current $8,000 JEFFERSON MARION 1 2016 SAFETY PRESERVE SYSTEM $500,000 JEFFERSON 4 2017-2021 SAFETY PRESERVE SYSTEM $150,000 UNION 3 2016 $8,000 UNION 3 2016 $900,000 PULASKI 1 2017-2021 $8,000 PULASKI 1 2017-2021 $230,000 WILLIAMSON 10 2016 $8,000 WILLIAMSON 10 2016 $400,000 FRANKLIN 6 2017-2021 $8,000 FRANKLIN 2 2017-2021 TR 1A SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 9 - 30 County FY 2016-2019 Highway Improvement Program District 9 Local Highways MYP Years Route/Street Location Improvements Objectives RUSSELL ST MORGAN AVE TO SCOTTSBORO RD LAND ACQUISITION RUSSELL ST MORGAN AVE TO SCOTTSBORO RD Miles = 0.16 RECONSTRUCTION RUSSELL ST MORGAN AVE TO SCOTTSBORO RD CONSTRUCTION ENGINEERING S DUQUOIN ST CNRR UNDERPASS TO WEBSTER ST IN BENTON CURB AND GUTTER S DUQUOIN ST CNRR UNDERPASS TO WEBSTER ST IN BENTON CONSTRUCTION ENGINEERING S OAKLAND AVE Est. Cost County Past Current $30,000 WILLIAMSON 1 2017-2021 $500,000 WILLIAMSON 1 2017-2021 $32,000 WILLIAMSON 1 2017-2021 $1,000,000 FRANKLIN 5 2017-2021 $100,000 FRANKLIN 5 2017-2021 ILL 13 (WALNUT ST) TO CHAUTAUQUA ST P.E. (PHASE II) $60,000 JACKSON 1 2017-2021 S OAKLAND AVE ILL 13 (WALNUT ST) TO CHAUTAUQUA ST LAND ACQUISITION $75,000 JACKSON 1 2017-2021 SARAVILLE RD CRAB ORCHARD RD TO WASHINGTON ST IN STONEFORT Miles = 11.41 RESURFACING $675,000 WILLIAMSON 6 2017-2021 SARAVILLE RD CRAB ORCHARD RD TO WASHINGTON ST IN STONEFORT CONSTRUCTION ENGINEERING $12,000 WILLIAMSON 6 2017-2021 SHAMROCK RD WEST CORGAN RD TO US 51 Miles = 3.57 RESURFACING PERRY 1 2017-2021 SAFETY PRESERVE SYSTEM PRESERVE SYSTEM SAFETY SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 9 - 31 $350,000 FY 2016-2019 Highway Improvement Program District 9 Local Highways MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM SKYLINE DRIVE ILL 127 TO JAMESTOWN RD Miles = 2.02 RESURFACING SKYLINE DRIVE ILL 127 TO JAMESTOWN RD CONSTRUCTION ENGINEERING SOUTH ACCESS RD GRAND AVE TO 0.5 MI S IN HERRIN Miles = 0.25 NEW CONSTRUCTION Est. Cost County Past Current $1,000,000 UNION 2 2016 $12,000 UNION 2 2016 TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT $390,000 WILLIAMSON 5 2016 TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT $904,000 WILLIAMSON 2 2016 $48,000 WILLIAMSON 2 2016 $700,000 WILLIAMSON 4 2017-2021 $12,000 WILLIAMSON 4 2017-2021 $1,600,000 JACKSON 3 2017-2021 $128,000 JACKSON 3 2017-2021 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. THIS EARMARK WILL BE FUNDED SEPARATELY. SOUTH ACCESS RD GRAND AVE TO 0.5 MI S IN HERRIN Miles = 0.25 NEW CONSTRUCTION SOUTH ACCESS RD GRAND AVE TO 0.5 MI S IN HERRIN CONSTRUCTION ENGINEERING STONEFORT RD PALZO RD TO US 45 Miles = 4.48 RESURFACING STONEFORT RD PALZO RD TO US 45 CONSTRUCTION ENGINEERING SYCAMORE ST EXT MAIN ST TO RAMADA LN Miles = 0.23 RECONSTRUCTION SYCAMORE ST EXT MAIN ST TO RAMADA LN CONSTRUCTION ENGINEERING SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 9 - 32 FY 2016-2019 Highway Improvement Program District 9 Local Highways MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM TOWN CREEK RD GRIMSBY RD TO POND RIDGE RD Miles = 3.13 RESURFACING TOWN CREEK RD GRIMSBY RD TO POND RIDGE RD CONSTRUCTION ENGINEERING TR 353 UNNAMED CREEK 1 MI SE OF HERALD BRIDGE REPLACEMENT UNNAMED CREEK 1 MI SE OF HERALD CONSTRUCTION ENGINEERING TUNNEL HILL RD LARKINS CREEK RD TO US 45 Miles = 3.56 RESURFACING SAFETY PRESERVE SYSTEM TUNNEL HILL RD PARRISH RIDGE RD TO LARKINS CREEK RD Miles = 2.83 RESURFACING VARIOUS COUNTYWIDE BIT SURFACE TREATMENT-A1 VARIOUS COUNTYWIDE CONSTRUCTION ENGINEERING WALNUT GROVE RD US 45 TO ILL 145 Miles = 5.21 RESURFACING WALNUT GROVE RD US 45 TO ILL 145 CONSTRUCTION ENGINEERING TR 353 County Past Current $600,000 JACKSON 3 2017-2021 $8,000 JACKSON 3 2017-2021 $150,000 WHITE 11 2016 $6,000 WHITE 6 2016 $600,000 JOHNSON 2 2016 SAFETY PRESERVE SYSTEM $650,000 JOHNSON 1 2017-2021 SAFETY PRESERVE SYSTEM $260,000 HAMILTON 1 2017-2021 $8,000 HAMILTON 1 2017-2021 $1,000,000 SALINE 3 2017-2021 $32,000 SALINE 3 2017-2021 SAFETY PRESERVE SYSTEM 550 N RD Est. Cost 550 N RD SAFETY PRESERVE SYSTEM 9 - 33 FY 2016-2019 Highway Improvement Program District 9 Local Highways MYP Years Route/Street Location Improvements Objectives SAFETY PRESERVE SYSTEM WASSON RD RALEIGH RD TO THOMAS RD Miles = 2.13 RESURFACING WASSON RD RALEIGH RD TO THOMAS RD CONSTRUCTION ENGINEERING WEST GRAND AVE LION DR TO GREENBRIAR RD IN CARTERVILLE Miles = 0.52 RECONSTRUCTION WEST GRAND AVE LION DR TO GREENBRIAR RD IN CARTERVILLE CONSTRUCTION ENGINEERING WILDERNESS RETREAT UNNAMED CREEK 2.5 MI W OF MILL CREEK BRIDGE REPLACEMENT UNNAMED CREEK 2.5 MI W OF MILL CREEK CONSTRUCTION ENGINEERING WISELY RD BEAUCOUP CREEK 2 MI SW OF VERGENNES BRIDGE REPLACEMENT WISELY RD BEAUCOUP CREEK 2 MI SW OF VERGENNES CONSTRUCTION ENGINEERING WOODLAWN RD S MAIN ST TO ILL 15 Miles = 1.53 RESURFACING WOODLAWN RD S MAIN ST TO ILL 15 CONSTRUCTION ENGINEERING RD WILDERNESS RETREAT RD SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM SAFETY PRESERVE SYSTEM 9 - 34 Est. Cost County Past Current $1,000,000 SALINE 5 2016 $60,000 SALINE 5 2016 $700,000 WILLIAMSON 2 2017-2021 $45,000 WILLIAMSON 2 2017-2021 $150,000 UNION 11 2017-2021 $8,000 UNION 11 2017-2021 $500,000 JACKSON 3 2017-2021 $12,000 JACKSON 2 2017-2021 $375,000 JEFFERSON 1 2017-2021 $4,000 JEFFERSON 1 2017-2021 JO DAVIESS STEPHENSON WINNEBAGO MCHENRY BOONE LAKE CARROLL D1 OGLE KANE DEKALB D2 COOK Schaumburg DUPAGE WHITESIDE LEE Dixon KENDALL HENRY BUREAU R2 ROCK ISLAND MERCER WILL R1 LASALLE GRUNDY Ottawa KANKAKEE PUTNAM KNOX MARSHALL HENDERSON WARREN LIVINGSTON STARK PEORIA D4 Peoria MCLEAN FULTON HANCOCK IROQUOIS D3 WOODFORD MCDONOUGH MASON R3 TAZEWELL VERMILION CHAMPAIGN LOGAN 063 SCHUYLER FORD DEWITT ADAMS D5 MENARD CASS MACON BROWN SANGAMON MORGAN D6 R4 SCOTT MACOUPIN GREENE PIATT Springfield DOUGLAS MOULTRIE PIKE SHELBY EDGAR Paris COLES CLARK CALHOUN CHRISTIAN CUMBERLAND MONTGOMERY D7 FAYETTE JERSEY JASPER EFFINGHAM Effingham BOND MADISON CRAWFORD CLAY RICHLAND MARION Collinsville LAWRENCE D8 WAYNE EDWARDS ST. CLAIR JEFFERSON R5 PERRY FRANKLIN JACKSON UNION ALEXANDER Statewide SALINE Carbondale WILLIAMSON D9 JOHNSON PULASKI MASSAC POPE WHITE GALLATIN WASHINGTON RANDOLPH HAMILTON MONROE HARDIN WABASH CLINTON TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION STATEWIDE LINE ITEMS FOR HIGHWAY PROJECTS The FY 2016-2021 Proposed Highway Improvement Program includes $526 million for statewide projects. The statewide projects are used to reserve funds for types of work for which the need is anticipated but exact locations or other details are not known in program development. In some cases, actual projects are identified for these line items during the course of the current fiscal year. In other cases, the funds are reserved in the later years of the program for projects to be identified in subsequent programs. A complete list is included, but as examples, the statewide projects provide funding for:              Work zone and highway safety Traffic control improvements Contract maintenance which includes intermittent resurfacing, crack and joint sealing, bridge repairs and other roadway-related improvements that are performed by non-state forces Emergency road and bridge repairs Federally authorized Equal Employment Opportunity training programs and support services Economic Development Program providing highway improvements to provide access to new or expanding industrial and manufacturing developments National Recreational Trails Program Environmental studies Engineering for miscellaneous work statewide Railroad crossing safety projects Local Truck Access Route Program (TARP) Illinois Transportation Enhancement Program Safe Routes to School Program 0-i FY 2016-2021 Highway Improvement Program Statewide State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS BRIDGE PAINTING Bridge Maintenance BRIDGE PAINTING PRESERVE SYSTEM $10,000,000 STATE-WIDE 6 2016 VARIOUS BRIDGE PAINTING BRIDGE PAINTING PRESERVE SYSTEM $10,000,000 STATE-WIDE 4 2017-2021 VARIOUS MAJOR BRIDGE PREVENTIVE MAINTENANCE PROGRAM Bridge Maintenance BRIDGE REPAIR SAFETY PRESERVE SYSTEM $5,000,000 STATE-WIDE 6 2016 VARIOUS MAJOR BRIDGE PREVENTIVE MAINTENANCE PROGRAM BRIDGE REPAIR SAFETY PRESERVE SYSTEM $5,000,000 STATE-WIDE 4 2017-2021 VARIOUS SCOUR MITIGATION Bridge Maintenance BRIDGE REPAIR SAFETY PRESERVE SYSTEM $1,000,000 STATE-WIDE 2 2016 VARIOUS SCOUR MITIGATION BRIDGE REPAIR SAFETY PRESERVE SYSTEM $1,000,000 STATE-WIDE 2 2017-2021 VARIOUS WEIGH STATIONS WEIGH STATION REPAIRS PRESERVE SYSTEM $1,500,000 STATE-WIDE 6 2016 System Maintenance VARIOUS WEIGH STATIONS WEIGH STATION REPAIRS PRESERVE SYSTEM $1,500,000 STATE-WIDE 4 2017-2021 VARIOUS REST AREA IMPROVEMENTS & RENOVATIONS System Maintenance REST AREA IMPROVEMENT PRESERVE SYSTEM ECONOMIC DEVELOP $5,000,000 STATE-WIDE 6 2016 VARIOUS REST AREA IMPROVEMENTS & RENOVATIONS REST AREA IMPROVEMENT PRESERVE SYSTEM ECONOMIC DEVELOP $3,500,000 STATE-WIDE 4 2017-2021 0-1 FY 2016-2021 Highway Improvement Program Statewide State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS System Maintenance SAFETY IMPROVEMENTS SAFETY $16,000,000 STATE-WIDE 6 2016 VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS SAFETY $16,000,000 STATE-WIDE 4 2017-2021 VARIOUS HIGHWAY SAFETY ENGINEERING System Maintenance P.E. (PHASE I) $2,000,000 STATE-WIDE 6 2016 VARIOUS HIGHWAY SAFETY ENGINEERING P.E. (PHASE I) $2,000,000 STATE-WIDE 4 2017-2021 VARIOUS HIGHWAY-RAILROAD CROSSINGS (STATE) System Maintenance RR CROSSING IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY $4,138,000 STATE-WIDE 6 2016 VARIOUS HIGHWAY-RAILROAD CROSSINGS (STATE) RR CROSSING IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY $4,138,000 STATE-WIDE 4 2017-2021 VARIOUS HIGHWAY-RAILROAD CROSSING SURFACE IMPROVEMENTS (STATE) System Maintenance RR CROSSING IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY $1,500,000 STATE-WIDE 6 2016 VARIOUS HIGHWAY-RAILROAD CROSSING SURFACE IMPROVEMENTS (STATE) RR CROSSING IMPROVEMENT SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY $1,500,000 STATE-WIDE 4 2017-2021 VARIOUS NATIONAL RECREATIONAL TRAILS System Maintenance MISCELLANEOUS $1,296,000 STATE-WIDE 6 2016 0-2 FY 2016-2021 Highway Improvement Program Statewide State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS NATIONAL RECREATIONAL TRAILS MISCELLANEOUS $1,296,000 STATE-WIDE 4 2017-2021 VARIOUS ILLINOIS BROADBAND CONNECTIONS PROGRAM System Maintenance MISCELLANEOUS $3,000,000 STATE-WIDE 6 2016 VARIOUS ILLINOIS BROADBAND CONNECTIONS PROGRAM MISCELLANEOUS $3,000,000 STATE-WIDE 3 2017-2021 VARIOUS FREEWAY SIGN MAINTENANCE System Maintenance SIGN MAINTENANCE SAFETY PRESERVE SYSTEM $2,900,000 STATE-WIDE 6 2016 VARIOUS FREEWAY SIGN MAINTENANCE SIGN MAINTENANCE SAFETY PRESERVE SYSTEM $2,900,000 STATE-WIDE 4 2017-2021 VARIOUS PAVEMENT MARKING System Maintenance PAVEMENT MARKING SAFETY PRESERVE SYSTEM $9,800,000 STATE-WIDE 6 2016 VARIOUS PAVEMENT MARKING PAVEMENT MARKING SAFETY PRESERVE SYSTEM $9,800,000 STATE-WIDE 4 2017-2021 VARIOUS RAISED PAVEMENT MARKERS System Maintenance RAISED PAVEMENT MARKERS SAFETY $3,500,000 STATE-WIDE 6 2016 VARIOUS RAISED PAVEMENT MARKERS RAISED PAVEMENT MARKERS SAFETY $3,500,000 STATE-WIDE 4 2017-2021 VARIOUS DOWNSTATE SIGNAL COORDINATION & TIMING System Maintenance PRELIMINARY ENGINEERING $600,000 STATE-WIDE 6 2016 0-3 FY 2016-2021 Highway Improvement Program Statewide State Highways MYP Years Route/Street Location Improvements Objectives VARIOUS DOWNSTATE SIGNAL COORDINATION & TIMING PRELIMINARY ENGINEERING VARIOUS GUARDRAIL DELINEATION MAINTENANCE System Maintenance GUARDRAIL VARIOUS GUARDRAIL DELINEATION MAINTENANCE VARIOUS Est. Cost County Past Current $600,000 STATE-WIDE 4 2017-2021 SAFETY $200,000 STATE-WIDE 6 2016 GUARDRAIL SAFETY $200,000 STATE-WIDE 4 2017-2021 MISCELLANEOUS TRAFFIC CONTROL System Maintenance MISC TRAFFIC CONTROL SAFETY $1,000,000 STATE-WIDE 6 2016 VARIOUS MISCELLANEOUS TRAFFIC CONTROL MISC TRAFFIC CONTROL SAFETY $1,000,000 STATE-WIDE 4 2017-2021 VARIOUS WORK ZONE SAFETY (STATE POLICE HIREBACK) System Maintenance MISC TRAFFIC CONTROL SAFETY $3,650,000 STATE-WIDE 6 2016 VARIOUS WORK ZONE SAFETY (STATE POLICE HIREBACK) MISC TRAFFIC CONTROL SAFETY $3,650,000 STATE-WIDE 4 2017-2021 VARIOUS SIGN TRUSS INSPECTION System Maintenance PRELIMINARY ENGINEERING $650,000 STATE-WIDE 6 2016 VARIOUS SIGN TRUSS INSPECTION PRELIMINARY ENGINEERING $650,000 STATE-WIDE 4 2017-2021 VARIOUS SIGN TRUSS REPLACEMENT & REPAIR System Maintenance MISCELLANEOUS $4,550,000 STATE-WIDE 6 2016 0-4 FY 2016-2021 Highway Improvement Program Statewide State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS SIGN TRUSS REPLACEMENT & REPAIR MISCELLANEOUS $4,550,000 STATE-WIDE 4 2017-2021 VARIOUS EMERALD ASH BORER CONTROL System Maintenance MISCELLANEOUS $1,000,000 STATE-WIDE 2 2016 VARIOUS SPECIFIC GRAVITY TESTING OF AGGREGATE MATERIALS Bridge Maintenance CE QA/MATERIALS TESTING $300,000 STATE-WIDE 1 2016 VARIOUS SPECIFIC GRAVITY TESTING OF AGGREGATE MATERIALS CE QA/MATERIALS TESTING $300,000 STATE-WIDE 1 2017-2021 VARIOUS WEED SPRAYING MISCELLANEOUS $1,500,000 STATE-WIDE 2 2016 $500,000 STATE-WIDE 6 2016 System Maintenance SAFETY VARIOUS PHOTO ENFORCEMENT ACTIVITIES System Maintenance MISC TRAFFIC CONTROL VARIOUS DYNAMIC MESSAGE/ITS SIGN MAINTENANCE System Maintenance MISCELLANEOUS $600,000 STATE-WIDE 6 2016 VARIOUS DYNAMIC MESSAGE/ITS SIGN MAINTENANCE MISCELLANEOUS $600,000 STATE-WIDE 4 2017-2021 VARIOUS FIBER OPTIC SYSTEM MANAGEMENT System Maintenance MISCELLANEOUS $350,000 STATE-WIDE 3 2016 VARIOUS FIBER OPTIC SYSTEM MANAGEMENT MISCELLANEOUS $350,000 STATE-WIDE 2 2017-2021 0-5 FY 2016-2021 Highway Improvement Program Statewide State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS MAINTENANCE OF HIGH TENSION MEDIAN CABLE BARRIER System Maintenance MEDIAN CABLE SAFETY $1,000,000 STATE-WIDE 6 2016 VARIOUS MAINTENANCE OF HIGH TENSION MEDIAN CABLE BARRIER MEDIAN CABLE SAFETY $1,000,000 STATE-WIDE 4 2017-2021 VARIOUS TRAFFIC SIGNAL LAMPS REPLACEMENT WITH LED MODULES & UPS System Maintenance TRAF SIGNAL MODERNIZATION SAFETY PRESERVE SYSTEM $3,000,000 STATE-WIDE 1 2016 VARIOUS BIOLOGICAL & AGRICULTURAL SURVEYS BIOLOGICAL SURVEYS System Maintenance AGRICULTURAL SURVEY $1,700,000 STATE-WIDE 6 2016 VARIOUS BIOLOGICAL & AGRICULTURAL SURVEYS BIOLOGICAL SURVEYS AGRICULTURAL SURVEY $1,700,000 STATE-WIDE 4 2017-2021 VARIOUS ARCHAEOLOGICAL & HISTORICAL SURVEYS System Maintenance ARCHAEOLOGICAL SURVEY HISTORICAL SURVEY $2,300,000 STATE-WIDE 6 2016 VARIOUS ARCHAEOLOGICAL & HISTORICAL SURVEYS ARCHAEOLOGICAL SURVEY HISTORICAL SURVEY $2,300,000 STATE-WIDE 4 2017-2021 VARIOUS HAZARDOUS MATERIAL STUDIES (PHASE I) System Maintenance HAZARDOUS MATERIAL PE $2,710,000 STATE-WIDE 6 2016 VARIOUS HAZARDOUS MATERIAL STUDIES (PHASE I) HAZARDOUS MATERIAL PE $2,610,000 STATE-WIDE 4 2017-2021 VARIOUS HAZARDOUS MATERIAL SURVEYS (PHASE II) System Maintenance HAZARDOUS MATERIAL PE $12,950,000 STATE-WIDE 6 2016 0-6 FY 2016-2021 Highway Improvement Program Statewide State Highways MYP Years Route/Street Location Improvements Objectives VARIOUS HAZARDOUS MATERIAL SURVEYS (PHASE II) HAZARDOUS MATERIAL PE VARIOUS GEOLOGICAL SURVEY MAP System Maintenance GEOLOGICAL SURVEY MAP VARIOUS GEOLOGICAL SURVEY MAP GEOLOGICAL SURVEY MAP VARIOUS AERIAL SURVEYS Est. Cost County Past Current $11,200,000 STATE-WIDE 4 2017-2021 SUSTAINABILITY $300,000 STATE-WIDE 6 2016 SUSTAINABILITY $300,000 STATE-WIDE 4 2017-2021 PRELIMINARY ENGINEERING $650,000 STATE-WIDE 6 2016 $650,000 STATE-WIDE 4 2017-2021 System Maintenance VARIOUS AERIAL SURVEYS PRELIMINARY ENGINEERING VARIOUS WETLAND SURVEYS System Maintenance P.E. SURVEYS (PHASE I) $1,700,000 STATE-WIDE 6 2016 VARIOUS WETLAND SURVEYS P.E. SURVEYS (PHASE I) $1,700,000 STATE-WIDE 4 2017-2021 VARIOUS WETLAND MONITORING System Maintenance PRELIMINARY ENGINEERING $250,000 STATE-WIDE 6 2016 VARIOUS WETLAND MONITORING PRELIMINARY ENGINEERING $250,000 STATE-WIDE 4 2017-2021 VARIOUS NOISE ANALYSIS CONSULTANT System Maintenance PRELIMINARY ENGINEERING $100,000 STATE-WIDE 6 2016 0-7 FY 2016-2021 Highway Improvement Program Statewide State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS NOISE ANALYSIS CONSULTANT PRELIMINARY ENGINEERING $100,000 STATE-WIDE 4 2017-2021 VARIOUS VARIOUS ENGINEERING TASKS IN CENTRAL OFFICE System Maintenance PRELIMINARY ENGINEERING $1,450,000 STATE-WIDE 6 2016 VARIOUS VARIOUS ENGINEERING TASKS IN CENTRAL OFFICE PRELIMINARY ENGINEERING $1,450,000 STATE-WIDE 4 2017-2021 VARIOUS EQUAL EMPLOYMENT OPPORTUNITY System Maintenance TRAINING HUMAN CAPITAL $8,500,000 STATE-WIDE 6 2016 VARIOUS STATEWIDE HIGHWAY CONSTRUCTION APPRENTICESHIP PROGRAM System Maintenance TRAINING HUMAN CAPITAL $6,336,000 STATE-WIDE 2 2016 VARIOUS SUMMER TRANSPORTATION INSTITUTE System Maintenance TRAINING HUMAN CAPITAL $125,000 STATE-WIDE 2 2016 VARIOUS DIVERSITY IN ENGINEER SCHOLARSHIP PROGRAM System Maintenance TRAINING HUMAN CAPITAL $150,000 STATE-WIDE 6 2016 VARIOUS ASBESTOS INSPECTION Bridge Maintenance HAZARDOUS MATERIAL PE $200,000 STATE-WIDE 6 2016 VARIOUS ASBESTOS INSPECTION HAZARDOUS MATERIAL PE $200,000 STATE-WIDE 4 2017-2021 VARIOUS OUTDOOR ADVERTISING CONTROL CONSULTANT Bridge Maintenance P.E. PROJECT MANAGERS $3,000,000 STATE-WIDE 6 2016 0-8 FY 2016-2021 Highway Improvement Program Statewide State Highways MYP Years Route/Street Location Improvements Objectives Est. Cost County Past Current VARIOUS OUTDOOR ADVERTISING CONTROL CONSULTANT P.E. PROJECT MANAGERS $3,000,000 STATE-WIDE 4 2017-2021 VARIOUS BRIDGE PAINTING ENGINEERING Bridge Maintenance PRELIMINARY ENGINEERING CONSTRUCTION ENGINEERING $1,200,000 STATE-WIDE 6 2016 VARIOUS BRIDGE FABRICATION INSPECTION Bridge Maintenance CONSTRUCTION ENGINEERING $500,000 STATE-WIDE 6 2016 VARIOUS BRIDGE FABRICATION INSPECTION CONSTRUCTION ENGINEERING $1,000,000 STATE-WIDE 4 2017-2021 VARIOUS BRIDGE PROJECTS MISCELLANEOUS (P.E. II) Bridge Maintenance P.E. (PHASE II) $6,000,000 STATE-WIDE 6 2016 VARIOUS BRIDGE PROJECTS MISCELLANEOUS (P.E. II) P.E. (PHASE II) $6,000,000 STATE-WIDE 4 2017-2021 VARIOUS UNDERWATER DIVING Bridge Maintenance P.E. (PHASE I) $600,000 STATE-WIDE 6 2016 VARIOUS BMPR CONSULTANT TECHNICIANS Bridge Maintenance CE QA/MATERIALS TESTING $500,000 STATE-WIDE 3 2016 VARIOUS BMPR CONSULTANT TECHNICIANS CE QA/MATERIALS TESTING $1,000,000 STATE-WIDE 2 2017-2021 VARIOUS ENGINEERING SERVICES FOR PHYSICAL CE QA/MATERIALS TESTING RESEARCH Bridge Maintenance $1,000,000 STATE-WIDE 3 2016 0-9 FY 2016-2021 Highway Improvement Program Statewide State Highways MYP Years Route/Street Location Improvements Objectives VARIOUS ENGINEERING SERVICES FOR PHYSICAL CE QA/MATERIALS TESTING RESEARCH VARIOUS CONCRETE, CEMENT AND MINERAL LABORATORY TESTING Bridge Maintenance VARIOUS Est. Cost County Past Current $1,000,000 STATE-WIDE 2 2017-2021 CE QA/MATERIALS TESTING $200,000 STATE-WIDE 4 2017-2021 PAVEMENT TESTING, ENGINEERING EVALUATIONS AND PERFORMANCE MONITORING Bridge Maintenance CE QA/MATERIALS TESTING $1,200,000 STATE-WIDE 1 2016 VARIOUS PAVEMENT TESTING, ENGINEERING EVALUATIONS AND PERFORMANCE MONITORING CE QA/MATERIALS TESTING $1,200,000 STATE-WIDE 1 2017-2021 VARIOUS RESERVE FOR EMERGENCIES & OTHER HIGHWAY NEEDS System Maintenance EMERGENCY RESERVE $5,000,000 STATE-WIDE 6 2016 VARIOUS RESERVE FOR EMERGENCIES & OTHER HIGHWAY NEEDS System Maintenance EMERGENCY RESERVE $5,000,000 STATE-WIDE 4 2017-2021 VARIOUS CONTRACT MAINTENANCE Miles = 50.00 System Maintenance CONTRACT MAINTENANCE RESURFACING SAFETY PRESERVE SYSTEM $44,500,000 STATE-WIDE 6 2016 VARIOUS CONTRACT MAINTENANCE Miles = 50.00 CONTRACT MAINTENANCE RESURFACING SAFETY PRESERVE SYSTEM $44,500,000 STATE-WIDE 4 2017-2021 VARIOUS PAVEMENT PRESERVATION System Maintenance CONTRACT MAINTENANCE RESURFACING SAFETY PRESERVE SYSTEM $7,500,000 STATE-WIDE 2 2016 0 - 10 FY 2016-2021 Highway Improvement Program Statewide State Highways MYP Years Route/Street Location Improvements Objectives VARIOUS PAVEMENT PRESERVATION CONTRACT MAINTENANCE RESURFACING SAFETY PRESERVE SYSTEM VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS (LOCAL) SAFETY IMPROVEMENTS VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS (LOCAL) SAFETY IMPROVEMENTS VARIOUS ENHANCEMENT PROJECTS (LOCAL) VARIOUS Est. Cost County Past Current $7,500,000 STATE-WIDE 2 2017-2021 SAFETY $14,739,000 STATE-WIDE 6 2016 SAFETY $44,217,000 STATE-WIDE 4 2017-2021 MISCELLANEOUS PROJECTS $29,238,000 STATE-WIDE 6 2016 ENHANCEMENT PROJECTS (LOCAL) MISCELLANEOUS PROJECTS $83,632,000 STATE-WIDE 4 2017-2021 VARIOUS SAFE ROUTES TO SCHOOLS PROGRAM MISCELLANEOUS $3,750,000 STATE-WIDE 6 2016 VARIOUS SAFE ROUTES TO SCHOOLS PROGRAM MISCELLANEOUS $11,250,000 STATE-WIDE 4 2017-2021 VARIOUS STATE PARK PROJECTS PAVING PRESERVE SYSTEM TRANSPORTATION OPS $5,400,000 STATE-WIDE 5 2016 VARIOUS STATE PARK PROJECTS PAVING PRESERVE SYSTEM TRANSPORTATION OPS $16,200,000 STATE-WIDE 3 2017-2021 VARIOUS STATE PARK PROJECTS P.E. (PHASE I) P.E. (PHASE II) $600,000 STATE-WIDE 5 2016 0 - 11 FY 2016-2021 Highway Improvement Program Statewide State Highways MYP Years Route/Street Location Improvements Objectives VARIOUS STATE PARK PROJECTS P.E. (PHASE I) P.E. (PHASE II) VARIOUS HIGHWAY-RAILROAD CROSSINGS (LOCAL) RR CROSSING IMPROVEMENT VARIOUS HIGHWAY-RAILROAD CROSSINGS (LOCAL) RR CROSSING IMPROVEMENT VARIOUS LOCAL TRUCK ACCESS ROUTE PROGRAM (TARP) VARIOUS Est. Cost County Past Current $1,800,000 STATE-WIDE 3 2017-2021 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY $6,207,000 STATE-WIDE 6 2016 SAFETY PRESERVE SYSTEM MODAL CONNECTIVITY $18,621,000 STATE-WIDE 4 2017-2021 MISCELLANEOUS $7,000,000 STATE-WIDE 6 2016 LOCAL TRUCK ACCESS ROUTE PROGRAM (TARP) MISCELLANEOUS $21,000,000 STATE-WIDE 4 2017-2021 VARIOUS BLR&S MANUAL UPDATE & VARIOUS ENGINEERING TASKS PRELIMINARY ENGINEERING $500,000 STATE-WIDE 3 2016 VARIOUS BLR&S MANUAL UPDATE & VARIOUS ENGINEERING TASKS PRELIMINARY ENGINEERING $1,500,000 STATE-WIDE 2 2017-2021 VARIOUS ENVIRONMENTAL SURVEYS FOR LOCAL AGENCIES P.E. SURVEYS (PHASE I) $700,000 STATE-WIDE 6 2016 VARIOUS ENVIRONMENTAL SURVEYS FOR LOCAL AGENCIES P.E. SURVEYS (PHASE I) $1,800,000 STATE-WIDE 4 2017-2021 VARIOUS ARCHAEOLOGICAL SURVEYS FOR LOCAL AGENCIES P.E. SURVEYS (PHASE I) $600,000 STATE-WIDE 4 2016 0 - 12 FY 2016-2021 Highway Improvement Program Statewide State Highways MYP Years Route/Street Location Improvements VARIOUS ARCHAEOLOGICAL SURVEYS FOR LOCAL AGENCIES P.E. SURVEYS (PHASE I) VARIOUS ECONOMIC DEVELOPMENT PROJECTS (LOCAL) NEW CONSTRUCTION RECONSTRUCTION VARIOUS ECONOMIC DEVELOPMENT PROJECTS (LOCAL) NEW CONSTRUCTION RECONSTRUCTION Objectives 0 - 13 Est. Cost County Past Current $2,700,000 STATE-WIDE 3 2017-2021 TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT SAFETY PRESERVE SYSTEM $15,000,000 STATE-WIDE 6 2016 TRANSPORTATION OPS MODAL CONNECTIVITY FREIGHT MOVEMENT SAFETY PRESERVE SYSTEM $40,000,000 STATE-WIDE 4 2017-2021